Page 1: PPMT CE408T

PPMTCE408T

Engr. Faisal ur Rehman

Page 2: PPMT CE408T

Presentation Outline

• Project Porcurement Managment• Project Closure

Page 3: PPMT CE408T

Project Porcurement• Plan Purchases and Acquisitions – determining what to purchase

or acquire and determining when and how.

• Plan Contracting – documenting products, services, and results requirements and identifying potential sellers.

• Request Seller Responses – obtaining information, quotations, bids, offers, or proposals, as appropriate.

• Select Sellers – reviewing offers, choosing among potential sellers, and negotiating a written contract with each seller.

• Contract Administration – managing the contract and relationship between the buyer and seller, reviewing and documenting seller performance

• Contract Closure – completing and settling each contract, including the resolution of any open items, and closing each contract applicable to the project or a project phase.

Page 4: PPMT CE408T

Project Porcurement

• A complex project can involve managing multiple contracts or subcontracts simultaneously or in sequence.

Page 5: PPMT CE408T

Plan Purchases and Acquisitions• The Plan Purchases and Acquisitions process identifies

which project needs can best be met by purchasing or acquiring products, services

• It also includes consideration of potential sellers, particularly if the buyer wishes to exercise some degree of influence or control over contracting decisions.

• It includes reviewing the risks involved in each make-or-buy decision

• The project schedule can significantly influence the Plan Purchases and Acquisitions process.

Page 6: PPMT CE408T

Plan Purchases and Acquisitions Inputs

• Enterprise Environmental Factors• Organizational Process Assets• Project Scope Statement• WBS• Project Management Plan

Page 7: PPMT CE408T

Plan Purchases and Acquisitions Tools

• Make-or-Buy Analysis• Expert Judgement• Contract Types• Time & Material Contracts

Page 8: PPMT CE408T

Plan Contracting• Plan Contracting: Inputs– Procurement Management Plan– Contract Statement of Work– Make-or-Buy Decision

• Plan Contracting: Tools and Techniques– Standard Forms– Expert Judgement

• Plan Contracting: Outputs– Procurement Documents– Evaluation Criteria

Page 9: PPMT CE408T

Request Seller Responses

• Tools and Techniques– Bidder Conferences– Advertising– Develop Qualified Sellers List

Page 10: PPMT CE408T

Request Seller Responses• Outputs– Qualified Sellers List

• The qualified sellers list are those sellers who are asked to submit a proposal or quotation.

– Procurement Document Package• The procurement document package is a buyer-prepared

formal request sent to each seller and is the basis upon which a seller prepares a bid

– Proposals• Proposals are seller-prepared documents that describe the

seller’s ability and willingness to provide the requested products, services, or results described in the procurement documentation.

Page 11: PPMT CE408T

Select Sellers

• Price or cost can be the primary determinant for an off-the-shelf item

• but the lowest proposed price may not be the lowest cost if the seller proves unable to deliver the products, services, or results in a timely manner.

Page 12: PPMT CE408T

Select Sellers: Tools and Techniques

• Weighting System– A weighting system is a method for quantifying qualitative

data to minimize the effect of personal prejudice on seller selection.

• Independent Estimates

• Screening System– A screening system involves establishing minimum

requirements of performance for one or more of the evaluation criteria

• Contract Negotiation

Page 13: PPMT CE408T

Select Sellers: Output

• Selected Selers• Contract• Resource Availibility• Project Procurement Plan

Page 14: PPMT CE408T

Contract Administration: Tools and Techniques

– Inspections and Audits– Performance Reporting– Payment System– Records Management System

• Contract Administration: Outputs– Requested Changes– Recommended Corrective Actions

Page 15: PPMT CE408T

Contract Closure• The Contract Closure process supports the Close

Project process, since it involves verification that all work and deliverables were acceptable.

• Tools and Techniques– Procurement Audits– Records Management System

• Outputs– Closed Contracts– Organizational Process Assets

• Contract file• Deliverable acceptance• Lessons learned documentation

Page 16: PPMT CE408T

Ending a Project• Ending a project: more than project closure• Project life-cycle• Project termination is difficult • Failure or success? • Timing of termination • How should a project be terminated? • Projects take place in business networks • Planning the ending strategy • Project-ending competences • The ending means managing changes in different relations• Success in ending • The Ending Project: a case study from the aircraft industry • Key points for managers

– Managing Project Ending by Virpi Havila and Asta Salmi

Page 17: PPMT CE408T

Thanks

Topics to be covered further:• Project Risk Management • Study of PC forms and Cashflow • Study of Bids

Page 18: PPMT CE408T

Appendix• Project Management in Context of Pakistan– Project Identification & Preparation– Project Appraisal & Approval– Project Authorization

• Project Activation• Pay Package• Project Allowance• Delegation of Powers• Allocation of Funds• Opening of Accounts• Release of Funds

– Project Implementation– Project Completion/Closure

Page 19: PPMT CE408T

Project Management in Context of Pakistan

• Financial Management• Project Monitoring & Evaluation System– Result Based Monitoring (RBM)

• Project Evaluation• Do’s and don’ts

Page 20: PPMT CE408T

Project Management in Context of Pakistan