MISSION TO SUPPLY PETROLEUM PRODUCTS TO THE DOMESTIC MARKET
AT A MINIMUM OPERATING COSTS.
TO PROVIDE EXCELLENT CUSTOMER SERVICE BY EFFICIENTLY TRANSPORTING CRUDE OIL TO THE REFINERIES AND MOVING PETROLEUM PRODUCTS TO THE MARKET.
TO MARKET SPECIAL PRODUCTS COMPETITIVELY IN THE DOMESTIC AND INTERNATIONAL MARKETS.
VISION
PPMC WILL BE THE DOMINANT SUPPLIER OF REFINED PETROLEUM
PRODUCTS TO THE EXISTING DOMESTIC AND GROWING EXPORT
MARKETS WITHIN THE WEST AFRICAN SUB-REGION.
PPMC’s RESPONSIBILITIES
TRANSPORTATION OF CRUDE OIL TO THE REFINERIES
EVACUATION OF PRODUCTS FROM THE REFINERIES
DISTRIBUTION OF PETROLEUM PRODUCTS NATIONWIDE
PRODUCT QUALITY ASSURANCE
SAFE OPERATIONS AND MAINTENANCE OF THE 5,120KM PIPELINE NETWORK
MARKETING OF SPECIAL PRODUCTS
OPERATION OF PRODUCTS IMPORT TERMINAL AT ATLAS COVE
OPERATION OF CRUDE OIL TERMINAL AT ESCRAVOS
PPMC INFRASTRUCTURE
5,120 km PIPELINE NETWORK
22 STORAGE DEPOTS
14 PUMP STATIONS
9 LPG DEPOTS
4 JETTIES - APAPA, WARRI, OKIRIKA AND CALABAR
IMPORT TERMINAL AT ATLAS COVE
CRUDE OIL TERMINAL AT ESCRAVOS
OPERATION OF AN IMPORT BERTH PLATFORM FOR IMPORTED CRUDE OIL (OFFSHORE ESCRAVOS)
8”
170 km
8”
765 km
8”
180 km
8”
72 km
Kano Gusau
Kaduna Gomb
e
Ilorin
Ibadan Mosimi
Auchi
12”
299 km
12”
169 km
12”
107 km
Makurdi
Enugu
Suleja
Benin City
Aba Warri
Maiduguri
Biu
Zaria
Minna
[6”]
6” 10”
12”
168 km
12”
[12”]
156km
[6”]
New Tankage Location
Refinery and Depot Distribution Depot Booster Pipeline
Port Harcourt
Calabar Bight of
Benin
N
Yola
LEGEND
Lake
Chad
Ore
Atlas
Cove
Apapa/satelite
Source depots- bridging
Jos
Destination depots-bridging
Pipelines prone to vandalism
PETROLEUM PRODUCTS SUPPLY & DISTRIBUTION
NETWORK
PPMC BOARD
MANAGING
DIRECTOR
EXEC. DIRECTOR
OPERATIONS
EXEC. DIRECTOR
SERVICES
EXEC. DIRECTOR
FIN. & ACCOUNTS
EXEC. DIRECTOR
COMMERCIAL
PPMC ORGANOGRAM
PPMC AREA OFFICES
PPMC COMPRISES OF FIVE (5) AREA OFFICES VIZ.
MOSIMI
KADUNA
WARRI
PORT HARCOURT
GOMBE
MANPOWER
STAFF STRENGTH OF PPMC IS 1,785
106 MANAGEMENT STAFF
1,231 MIDDLE LEVEL MANAGEMENT
448 JUNIOR STAFF
CURRENT STATUS OF OPERATION
CRUDE OIL
IMPROVEMENT IN CRUDE OIL SUPPLY FROM CNL TO ESCRAVOS PPMC TERMINAL.
ESCRAVOS-WARRI REFINERY CRUDE PIPELINE RUNS AT 80%
CAPACITY UTILISATION.
SECTIONAL REPLACEMENT CONCLUDED AT ZAGAZAGA, KAZAI & KUNAI ON THE WARRI – KADUNA CRUDE OIL PIPELINE.
SECTIONAL REPLACEMENT IN PROGRESS AT OVIRI-OKPE IN DELTA STATE ON THE WARRI – KADUNA CRUDE OIL PIPELINE.
CURRENT STATUS OF OPERATION
PRODUCTS
PRODUCT LOADING IN MOSIMI, SATELLITE, IBADAN, ILORIN, ORE, PORT HARCOURT, CALABAR, WARRI, KADUNA AND KANO DEPOTS IS ON-GOING.
GOMBE AREA IS FULLY SUPPORTED BY BRIDGING FROM OTHER PPMC OPERATIONAL LOCATIONS.
RECENT ACHIEVEMENTS
PPMC RECENT ACHIEVEMENTS CAN BE SUMMARIZED AS FOLLOWS:
CRUDE SUSTAINED DELIVERY OF CRUDE OIL ON SYSTEM 2C
(ESCRAVOS-WARRI AND WARRI-KADUNA).
SUSTAINED DELIVERY OF IMPORTED CRUDE TO KADUNA FOR THE LUBES PLANT.
SUSTAINED CRUDE DELIVERY TO PHRC FROM BONNY TERMINAL
RECENT ACHIEVEMENTS
PRODUCT
ROBUST SUPPLY OF PETROLEUM PRODUCTS NATIONWIDE.
PUMPING OF PRODUCTS THROUGH SYSTEM 2E TO ABA AFTER 18MTHS OF PIPELINE INACTIVITY.
PUMPING OF PETROLEUM PRODUCTS TO KANO DEPOT AFTER TWO AND HALF YEARS.
RECENT ACHIEVEMENTS
PRODUCT
PUMPING OF PRODUCTS TO BENIN DEPOT.
REDUCTION IN DEMURRAGE COST ON VESSELS AWAITING TO DISCHARGE.
REPAIR AND SUSTENANCE OF ATLAS COVE – MOSIMI PIPELINE AND OTHER PIPELINES WITHIN MOSIMI AREA.
RECENT ACHIEVEMENTS
OTHERS
HARMONIOUS WORKING RELATIONSHIP WITH THE IN-HOUSE UNIONS (NUPENG & PENGASSAN).
ISSUES AND CHALLENGES
PIPELINES
WILLFUL DAMAGE TO PIPELINE
PRODUCT THEFT THROUGH PIPELINE VANDALISM
LACK OF OPERATIONAL/PIPELINE FLEXIBILITY
INCREASING COST OF PIPELINE REPAIRS
MANAGEMENT OF PIPELINE NETWORK WITH DOUBTFUL INTEGRITY
CRUDE OIL THEFT THROUGH BUNKERING
500
5,500
10,500
15,500
20,500
25,500
30,500
35,500
2-D
ec
3-D
ec
4-D
ec
5-D
ec
6-D
ec
7-D
ec
8-D
ec
9-D
ec
10-D
ec
11-D
ec
12-D
ec
13-D
ec
14-D
ec
15-D
ec
16-D
ec
17-D
ec
18-D
ec
19-D
ec
20-D
ec
21-D
ec
22-D
ec
23-D
ec
24-D
ec
25-D
ec
26-D
ec
27-D
ec
28-D
ec
29-D
ec
30-D
ec
31-D
ec
1-Ja
n
DATES
QU
AN
TITY
(m3 )
PUMPED (m3)
RECEIVED (m3)
.
MEETING BETWEEN MGT & COMMANDER JTF TO REGISTER PPMC CONCERN IN
RESPECT OF MASSIVE CRUDE LOSSES --- DEC 12TH 2008
ESCRAVOS – WARRI PIPELINE PERFORMANCE DECEMBER 2008
ISSUES AND CHALLENGES
FACILITIES
AGED EQUIPMENT/FACILITIES, (MOST ARE OVER 28 YEARS)
INADEQUATE STORAGE AT ATLAS COVE LEADING TO HIGH DEMURRAGE COST.
INADEQUATE STORAGE AT ESCRAVOS CRUDE TERMINAL
LACK OF FISCALISATION EQUIPMENT
LONG LEAD TIME IN EQUIPMENT AND SPARE PARTS PROCUREMENT
ISSUES AND CHALLENGES
OTHERS
INADEQUATE FUNDING AND FUND RELEASE FOR ASSET REPLACEMENT AND MAINTENANCE
LONG AND CUMBERSOME APPROVAL CYCLE
SUGGESTED WAYS FORWARD
IMPROVED AND SUSTAINED FUNDING FOR PIPELINE SECURITY/COMMUNITY POLICING.
STRENGTHENING VANDALS PROSECUTION PROCESS WITH THE DIRECTOR OF PUBLIC PROSECUTION AND THE POLICE HQ.
PHASED REPLACEMENT OF FAILED AND OR VANDAL-PRONE PIPELINE SEGMENTS NATIONWIDE USING HORIZONTAL DIRECTIONAL DRILLING (HDD) METHOD
SUGGESTED WAYS FORWARD
COMPLETION OF 3NOs “ABANDONED STORAGE TANKS AT ATLAS COVE TERMINAL (IPCO PROJECT).
REVAMPING OF ATLAS COVE TERMINAL FACILITIES.
REVAMPING OF ESCRAVOS CRUDE TERMINAL FACILITIES INCLUDING IMPORT BERTH PLATFORM.
PHASED ASSET REPLACEMENT (PUMPS, POWER PLANTS ETC)
SUGGESTED WAYS FORWARD
REHABILITATION OF FAILED TANKER LOADING AREAS
REHABILITATION OF FAILED/COLLAPSED TANKS AT VARIOUS LOCATIONS
PROVISION OF FIRE FIGHTING FACILITIES IN THE DEPOTS.
PROVISION OF PHCN POWER SUPPLY TO ATLAS COVE.
PROVISION OF 3.3KV POWER PLANT AT IBADAN TO ENHANCE PRODUCT SUPPLY TO ILORIN
EXPANSION OF CALABAR LOADING GANTRY TO IMPROVE LOAD-OUT RATE TO THE NORTH EAST
REHABILITATION OF PHC & WARRI DEPOT ACCESS ROAD TO IMPROVE LOADING TURN-AROUND TIME
STORAGE TANKS
LOCATION
INSTALLED CAPACITY
(M3)
AVAILABLE CAPACITY
(M3) REMARKS
ATLAS COVE 70,292 41,747
MOSIMI 163,653 23,710
Currently using the ethanol dedicated tanks
(57,000m3)
SATELLITE 12,009 12,009 Grossly inadequate