PPC Industry Forum, 1st March 2007
Managed Bandwidth Services
BTW Products and Strategy
Disclaimer•BT has taken reasonable care to check that the information contained in the following slides was accurate at time of publication.
•Any price indications or timescales contained within this presentation are estimates for information purposes only and do not constitute any contractual or other obligation.
•In relation to any products/services referred to in this presentation which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available
•BT reserves the right to make changes to the information in this presentation at any time without further notice
•Exclusive reliance on the information in this slide pack is at your own risk
Partial Private Circuits
Managed Bandwidth Services
BTW Products and Strategy
Agenda•Review of previous actions – Pauline Cowie/All•Presentations – EAB Update – Bob Day•Pricing Tool Update – James Dewing•Product Development Update – Pauline Cowie/All•Product In Life Update – Pauline Cowie/All
• QoS• Billing• Communications• Third Party Equipment Re-Use
•Regulatory Update – Kath Embleton• COLT’s SOR – Gordon Robinson•AOB - All•Date of next meeting - All
Partial Private Circuits
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Action Point Review
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 12/1 (01/12/05) – “BT to investigate the inclusion of eCo Repair in the data quality monitoring on the One Truth Data Base”
Due to continued EOI work, which is given priority over other developments, no date for the alignment of eCo to the PPC OTDB is available.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 3/5 (02/03/06) – “BT to review the breakdown of charges of the different shift charges on the CPL, and look into the possibility of retrospection if appropriate”
•Closure date for Retrospection claims 31 Jan 07
•Those Retrospection claims received from industry are being validated.
•Payment is expected 1st Qtr 07/08 financial year.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 6/8 (08/06/06) – “CPs believe CDDs are being pushed out and asked for this to be clarified in the Handbook. BT were also asked to look into the possibility of a process which allows quicker delivery when possible”
•Handbook under review and clarity will be given to when CDDs can be extended.
•CPs to provide BT with examples where CDDs are being pushed out without their agreement. BT to investigate on receipt of examples.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 6/9 (08/06/06) – “Product Handbook – When will the changes be made”
•Interim revision made based on Industry’s feedback.
•Product Line revising Handbook based on feedback received.
•Revision due for distribution to Industry mid-March for agreement.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private CircuitsResponse to Action Point 9/1 (08/09/06) – “How many times is ‘Stop the Clock’ initiated because of a 3rd Party customer issues e.g. refusing access? Data to be fed back via the Service Reviews”
Reason Percentage
CP Customer/ Site contact not available or no contact 0.22%
CP Site Not Ready (Building or Cabinet etc) 1.74%
CP Site Access not available 1.60%
3rd Party Customer/ Site contact not available or no contact 20.20%
3rd Party Site Not Ready (Building or Cabinet etc) 9.47%
3rd Party Site Access not available 18.66%
All reasons including access (CP and 3rd Party) 100.00%
Managed Bandwidth Services
BTW Products and Strategy
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
Percentage
STC Reasons due to no access
Percentage
Percentage 0.22% 1.74% 1.60% 20.20% 9.47% 18.66%
CP Customer/ Site contact not
availab le or no
CP Site Not Ready (Building or Cabinet etc)
CP Site Access not availab le
3rd Party Customer/ Site
contact not
3rd Party Site Not Ready (Building or
Cabinet etc)
3rd Party Site Access not availab le
Partial Private Circuits
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 12/1 (07/12/06) – “Wolverhampton CMC have asked CPs to provide circuit IDs of A Ends to begin provision process, but SNEiD is already provided to the CMC and should suffice. BT to check why this is requested”
This request is due to a change in the ISH provision process to overcome issues whereby BT occasionally bill ccts from the CP’s POH rather than the BT Exchange. To ensure the right information is gathered up front and both parties agree the address of the SNEID, which should follow through to correct bills being generated.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 12/2 (07/12/06) – “Do BTW provide wholesale variants of Defence Private Services, and if not, can these be developed as a service for CPs to take?”
BT Wholesale do not provide Defence Private Service variant. To evaluate whether a BT Wholesale product is possible BT requests CPs submit their requirement as an SoR.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 12/3 (07/12/06) – “CPs requested that BT initiate a process to communicate closure of exchanges to CPs as and when this happens, as this only happens from an LLU perspective”
Current:
•CPs notice of Exchange Closure minimum of 6 months
•Notification posted on LLU & TSR websites.
•Future:
•CPs to provide PPC Product Team with details of persons in organisation to whom the closure notification to be distributed.
•BT to ensure Closure Notification Team receives CPs list of notification recipients.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 12/4 (07/12/06) – “BT to provide CPs with a process of what happens when exchanges close with regards to moving circuits, downtime, possible cost increase etc. Ideally BT to provide this ahead of the next PPC forum”
•Once notified the Planned Engineering Works process as detailed in CPs Customer Service Plans is initiated.
•CPs to liaise with Service Managers regarding circuit downtime.
•There may be no increase in cost to existing service as a result of the closure, currently being clarified.
•New circuits will attract the charge from the re-allocated exchange.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Action: 12/5 (07/12/05) - BT to define exactly what the 0207/CLZ geographic zone is, as there are potential NGN implications? BT to also define what the difference is between Metro/CLZ charging structures.
A snap-shot of the PPC Exchange Data is provided to clarify CLZ listings – See next Slide
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
SE 1141 MDF SITE IDEXCHANGE NAME EASTING
NORTHING
Radial Distance Exch to T1 T1 SDH Node EASTING NORTHING
Serving SDH Node 1141 for CSH and ISH EXTN POH
CLZ Exchange
L/VAN LSWAN WANDSWORTH 525820 174960 7.65LONDON COVENT GARDEN 530490 181020 L/VAN N
L/VIC WRPIM PIMLICO 529340 178870 2.44LONDON COVENT GARDEN 530490 181020 L/VIC Y
L/VIG LSSUT SUTTON CHEAM 525930 163860 6.38LONDON CROYDON SSC 532120 165420 L/VIG N
L/WAN LNWSD WANSTEAD 540040 188260 3.85LONDON ILFORD SSC 543350 186300 L/WAN N
L/WAT WRSTHBK SOUTHBANK 531560 180120 0LONDON SOUTHBANK 531560 180120 L/WAT Y
L/WAX LWGRE GREENFORD 514410 182140 2.75LONDON EALING SSC 516850 180870 L/WAX N
L/WDN LWWDRA WEST DRAYTON 506050 179860 7.78 SLOUGH ATE 498270 179740 L/WDN NL/WEL WEWMAR MARYLEBONE 528200 181860 1 LONDON MUSEUM 529200 181930 L/WEL Y
L/WEM LWWEM WEMBLEY 518350 185090 3.77LONDON HARLESDEN 521620 183220 L/WEM N
L/WES WRKGDN KENSINGTON GARDENS525810 179320 4.06LONDON MAIDA VALE 525720 183380 Not SDH EnabledY
L/WF LWWAT WATFORD 510840 196450 0LONDON WATFORD HERTS 510840 196450 L/WF N
L/WG LNWGN WELWYN GARDEN523730 213070 11.52LONDON POTTERS BAR 526150 201810 L/WG N
L/WHI WRWHI WHITEHALL 530120 180320 0.79LONDON COVENT GARDEN 530490 181020 L/WHI Y
L/WIL LWWIL WILLESDEN 522720 184480 1.67LONDON HARLESDEN 521620 183220 L/WIL N
L/WIM LSWIM WIMBLEDON 523980 170720 5.26LONDON KINGSTON SSC 518850 169560 L/WIM N
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Response to Action Point 12/6 (07/12/06) – “BT to check legal implications of previous application of Ancillary Charges which were charged but not noted in the CPL”BT agree to change the cancellation charges to reflect the following:•Cancellation on same day as FOCA will only incur actual charges incurred.•Cancellation from day after FOCA onwards will incur published cancellation charges.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
BT Wholesale PPC
Equivalence Measures
Bob Day
March 2007
Managed Bandwidth Services
BTW Products and Strategy
BT Reporting Structure
BT BT Retail
Main BT PLC Board
BT GlobalServices
Openreach
OpenreachBoard
OperatingCommittee
BT WholesaleBoard
BT RetailBoard
BT GSBoard
EAB
BT CEOManagement reporting
Compliance oversight
Wholesale
Managed Bandwidth Services
BTW Products and Strategy
Wholesale Product KPIs reported to the EAB
BT IPstreamFulfilment % orders completed by CCD Assurance % Broadband faults cleared by BT Wholesale within 40 hrs of receipt
Migrations External CPs to BT; BT to external CPs; IPstream to Datastream and Datastream to IPstream. (wef Apr 07)
BT Datastream Fulfilment % orders completed by CCD Assurance % Broadband faults cleared by
BT Wholesale within 40 hrs of receipt
PPCFulfilment The percentage of Service orders successfully completed on or before the committed delivery date
Assurance The number and percentage of product faults that are cleared within 5 hours
Managed Bandwidth Services
BTW Products and Strategy
Analysis
Analysis is carried out in line with agreed EAB reporting principles i.e. initiated after 2 months’ and reported after 3 months’ when performance is outside of the control limits (pooled z-test)
Commentary supporting current results and any resulting analysis is included in the monthly report compiled for the EAB.
A quarterly commentary now being added to the added to the published charts on the Industry Web site.
The same approach will apply to all new measures.
Managed Bandwidth Services
BTW Products and Strategy
Industry requirements captured and analysed.
Availability of measures and feasibility of reporting on them being investigated.
Measures are being developed where possible.
Data will be collected and produced in publication format (absolute measures and pooled z-test where appropriate).
Additional PPC Measures
Managed Bandwidth Services
BTW Products and Strategy
Progress on Measures.
Industry Suggestions Measures under Consideration / Development
% Success Assurance The percentage of Private Circuit / Partial Private Circuit fault reports cleared in objective time.
This measure can be split between bandwidth groups.
% Success Fulfilment (CDD, std lead-times)
The mean time it takes to Provide a Private Circuit / Partial Private Circuit measured from Order Validation Date (OVD) to Service Completion Date (SCD).
This measure can be split between bandwidth groups.
Fault Rates Average number of Private Circuit / Partial Private Circuits faults per circuit per year.
Average time to restore The average time taken to clear a Private Circuit / Partial Private Circuit fault
Service Availability The average OST (out of service time) per circuit per annum.
Managed Bandwidth Services
BTW Products and Strategy
Format of new measures
Absolute Measures: Performance will be measure monthly for BT and external CPs, and will include a twelve month rolling average.
Statistical comparison test: performance for BT and External CPs will be measured monthly against a standard 5% two tailed pooled z-test.
The pooled z-test will only be applied to volumes greater than 200. If the denominator for either BT or external CPs is less than 200 per month, only absolute measures will be provided.
Managed Bandwidth Services
BTW Products and Strategy
Example of New measures for PPCs
PPC Assurance
50
55
60
65
70
75
80
85
90
95
Feb-06 Mar-06 Apr-06 May-06 J un-06 J ul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 J an-07
% F
aults
cle
ared
on
time
Extl CP s BT Extl CP s 12 mth Avg BT 12 mth Avg
Managed Bandwidth Services
BTW Products and Strategy
Example of New measures for PPCs
PPC Assurance
-15
-10
-5
0
5
10
15
20
25
30
Feb 06 Mar 06 Apr 06 May 06 J un 06 J ul 06 Aug 06 Sep 06 Oct 06 Nov 06 Dec 06 J an 07
Po
ole
d z
-tes
t sc
ore
Assurance
h External CPs better
h BT better
Managed Bandwidth Services
BTW Products and Strategy
Next Steps
Validation of Measures
Signoff within BT Group
Formal Response to Industry (March/April 07)
Information made available to the EAO/EAB
Measures published on Industry Web site
Managed Bandwidth Services
BTW Products and Strategy
Questions…
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
BT Wholesale PPC Pricing Tool
James Dewing
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Issues Log Update
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Product Development Update
Managed Bandwidth Services
BTW Products and Strategy
Data Connectivity Development Timeline
TDM on 21CN (Strategy
statement)
Ethernet
Portfolio Harmonisation
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Q4
IPClear UDS Special Offer
E-Line revised pricing
E-Line Migration
MPLS Interconnect
trial
622Mbit/s PPC (re) launch
High band PPC pricing
review (155Mbit/s)
Bundled Cct Pricing
(PPC)
Data Connectivity Pricing tool –
Phase 1 (PPC)
PPC Enhanced (phase 2) – Vol & term
discounts
Harmonised Ethernet – Release 1
Managed BNS
PPC Metro Pricing
(Phase 2)
Metro E-ring
MPLS Interconnect
Campaign (type A)
Managed PPC
(Enhanced Phase 3)
Harmonised Ethernet – Release 2
Harmonised Ethernet – Release 3
Traditional
iVPN – Harmonised MPLS (Int)
Data Connectivity Pricing tool –
Phase 2
iVPN – Harmonised MPLS (Phase
2)
PPC Metro Pricing
(Phase 1)
On-net pricing (PPC)
RPC to PPC Novation Process
Wires only PPC
MPLS
NB - All dates quoted are target launch dates only
See next slide
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Product In-Life Update•QoS
•Billing
•Communications
•Third Party Sited Equipment Re-use
•Customer Satisfaction
Managed Bandwidth Services
BTW Products and Strategy
QoS
QoS Performance - Reporting Update
•Q3 Aggregated Report published on website•Q3 CP reports distributed •Retail Comparison available on CDD, CRD and Repair
PPC/Retail Comparison Q3CDD Retail 95.03% PPC 93.67%Repair Retail 83.00% PPC 86.07%
Managed Bandwidth Services
BTW Products and Strategy
QoS
QoS Performance – Q3 Highlights•Circuit CDD performance improved to 93.67% from 92.05% last quarter
•FOCR targets decreased for the 5th quarter in a row. FOCR success is 78.81% against 77.89% in the last quarter
•The repair performance improved from 83.88% (7679 faults) to 86.07% 9197 faults) despite increased fault volume
Managed Bandwidth Services
BTW Products and Strategy
QoS
QoS Performance – Q3 Lowlights•The Highband FOCR remain stable.
•CP’s customers STC increased to 92% from 88% in the last quarter against slight increase in the number of Stop the Clocks.
•The number of new installation faults down to Communication Providers increased from 65.71% in the last quarter to 71.19%.
Managed Bandwidth Services
BTW Products and Strategy
BillingMigration to Geneva – Proposed Delivery & Migration•Development to go live mid May 07
•Parallel feeds between PCNBS & Geneva from mid-May to end-Sept. Parallel bills to show correlation between bills produced by PCNBS and those produced by Geneva.
•Migration commences July 07
•30/09/07 PCNBS switch off
•01/10/07 – Geneva commencing PPC bill production
•Throughout October reconciliation of PCNBS & Geneva Bills.
Trial Period
Trial will be between mid-May and 30/9/07.
Managed Bandwidth Services
BTW Products and Strategy
CommunicationsJanuary:•002/07 – PPC Data File update – 16/01/07•ACCN764 – Withdrawal of New Circuit on Spare Capacity Charges – 18/01/07
March•External Briefing – Withdrawal of New Circuit on Spare Capacity Charges – Mid-March
Partial Private Circuits
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Third Party Sited Equipment Re-use
•WEEE and RoHS directives
•Recovery of Third Party Equipment on cessation of last PPC.
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
Managed Bandwidth Services
BTW Products and Strategy
Partial Private Circuits
SORGordon Robinson
Managed Bandwidth Services
BTW Products and Strategy
A.O.B
Next Meeting Scheduled
7th June 2007
BTC, Business Showcase
Partial Private Circuits