Upload
nesarkiran-bagade
View
230
Download
0
Embed Size (px)
Citation preview
7/28/2019 PowerTest Concept en V2.10
1/30
PowerTestBasic Concept
1
PONOVO POWER CO., LTD
2F, 4Cell, Tower C, In.Do Mansion
No.48A Zhichun Road, Haidian District
Beijing, China (Post Code 100098)
OfficeTEL. +86 (10) 82755151 ext. 8887FAX +86 (10) 82755257
E-Mail [email protected]
Website www.ponovo.com.cn
PowerTest
Basic Concept
VERSION: PowerTest Concept-AE-2.10DATE: 23/09/2011
This manual is the publisher of PONOVO POWER CO., LTD. To make any kind of copy of thimanual please contact PONOVO POWER CO., LTD in advance.
This manual represents the technical status for the moment of publishing. The product informatio
description and specifications mentioned in the manual do not have any contact binding force andPONOVO POWER CO., LTD remains the right to make modifications to the technicaspecifications and configurations without prior notice. PONOVO POWER does not takresponsibility to the possible error/mistakes in this manual.
7/28/2019 PowerTest Concept en V2.10
2/30
PowerTest Basic Concept
2
1. Start page. 32. Typical test page 73. Test module. 84. Test template.. 85. Test module composit ion 96. How to generate test
template 107. Open test template. 11
a) Open template fromstart page 11
b) Open template fromtest page. 11
c) Open template fromreport 11
8. System sett ings.. 12a) Voltage (LN).. 12b) Current 12c) Frequency.. 12d) Debounce time.. 12e) Instrument.. 12f) Set Comm.. 13
9. Aux.DC 13
10. Binary input type 1411. Output moni tor ing 1512. Test process display 1513. Test process recording 1614. Recording window... 17
a) Instantaneous andRMS value 18
b) Adjust display scale 18c) Time between cursors 18d) Export COMTRADE file. 18
15. Vector diagram................... 18
16. Manage test items 19a) Add and remove test
item/point.. 19b) Select test item/point.. 19c) Status of test item/point... 19
d) Add wiring and testinformation. 19
e) Set test item parameters. 21f) Wiring diagram. 22g) Set group settings 22h) Set group parameters.. 22i) Set group binary inputs 22
17. View windows 2318. Name for settings and
variables. 2319. Bookmark 2420. Recover task.. 2421. Test report.. 25
a) Report in rpt format. 25b) Report in word format. 25c) Report generation 25d) User defined logo in
the report.. 25e) Report head setting 26
22. Binary input configuration 26a) OR logic 27
b) AND logic. 2723. Test equipment information.. 2724. Control test process 28
a) Start the test. 28b) Stop the test. 28c) State control button. 28d) Pause the test. 28
25. License 2926. IP set 2927. GPS Instruct ion 30
Contents
7/28/2019 PowerTest Concept en V2.10
3/30
PowerTest Basic Concept
3
Start page
The start page ofPowerTest is the place where we can see all test modules and set system
setting.
Basic:Here we have access to many basic test modules. Customer can select one or more modules atthe same time and click OK button to enter into the test page.
7/28/2019 PowerTest Concept en V2.10
4/30
PowerTest Basic Concept
4
Protection:Here users can open the Protection modules after authorized by PONOVO.
Advanced:Here we can open the Advanced modules after authorized by PONOVO.
7/28/2019 PowerTest Concept en V2.10
5/30
PowerTest Basic Concept
5
Special:Here user can open the Special modules after authorized by PONOVO.
New Modules:Here we can open the New modules saved by customer in the place of customers selection. Itrequires authorization from PONOVO.
TemplatesHere we can open the test templates saved by customer in the place of customers selection.
ReportUsers can open the saved reports here.
Test PlanHere users can made test plans or check the previous test plans.
System SetHere we can set system settings which will be used by all test modules. See System Settings in
Basic ConceptAux. DCHere we can set the Auxiliary DC for driving the relay which requires DC power supply.
BinaryHere we can set binary input forms (dry contact or threshold and power level)
IEC61850Here we can set parameters of IEC61850 including:
7/28/2019 PowerTest Concept en V2.10
6/30
PowerTest Basic Concept
6
Refer to detailed in IEC61850 User Manual.
LicenseIt is used to check the authorization information of all test templates.
IP SetWhen the relay testing system cant be operated online and there is something wrong with IPsettings, users can reset IP information. Please refer to the detailed setting methods in hardwareuser manual of each model.
7/28/2019 PowerTest Concept en V2.10
7/30
PowerTest Basic Concept
7
Typical test page
The typical test page is shown bellow.
The test page provides the facilities for customer to manage the test process, such as Managing test modules managing test items and test points editing relay settings setting test parameters displaying relay characteristic displaying output vector diagram displaying test process control test process display hardware operation status managing test reports
managing test templates managing the output monitoring function managing the test process recording
function
7/28/2019 PowerTest Concept en V2.10
8/30
PowerTest Basic Concept
8
Test moduleTest module is the basic test unit inPowerTest.
We can have access to test modules just fromthe start page.
For example in basic we can have thefollowing test modules available.
We can select one or more test modules at thesame time according to our test requirement.
Test templateTest template is composed by one ore testmodules.
Test template is used to test a completeprotective relay system where different relaytests are required.
7/28/2019 PowerTest Concept en V2.10
9/30
PowerTest Basic Concept
9
Test modulecomposition
The typical composition for distance module isshown bellow.
The association of the above diagramcomponents to the software is shown bellow.
7/28/2019 PowerTest Concept en V2.10
10/30
PowerTest Basic Concept
10
How to generate testtemplate
Step 1Select test modules to be included in the testtemplate from the start page and enter into thetest page. In our example here we are going togenerate a test template which containsRamp and Distance(R,X) modules.
Step 2In the Task List area of test page right clickthe mouse button and we see the pop-upselection page
Step 3Click the Disable multi -select option tomake it active. After this operation we will beable to select more test modules at the sametime.
Step 4Select the two modules
Step 5We can also change the module name. To doit we can right click the mouse button andselect Rename. Then we see the pop-updialog box.
Step 6Enter the new name for the module.
Step 7Make relay settings for these two modulesaccordingly.
Step 8In the Task Lis t area right click the mousebutton and select Save as Template File anwe will be asked to select the folder where wewant to save the template.
Step 9
7/28/2019 PowerTest Concept en V2.10
11/30
PowerTest Basic Concept
11
Select the folder we want to save the templateand give the name for the template.
Open test template
There are three ways to open the testtemplates.
Open template from start page
Click the Templates button in the start pageand select the template file from the folderwhere the template file is saved. Then we willenter into the test page automatically with testmodules containing in this template. The testparameters and relay settings in the savedtemplate will also be uploaded here.
Open template from test page
We can also open the template from the testpage.
In the test page drop-down menu selectTemplate and select open. Then we need toselect template file from the place where itssaved.
Open template from report
If we have save the test report in PowerTestformat with the extension ofrpt we can alsoopen the template through opening this reportin any module.
rpt format test report can be opened in the tesmodule. At the same time the templateinformation contained in the report will also be
opened.
7/28/2019 PowerTest Concept en V2.10
12/30
PowerTest Basic Concept
12
System settings
In the start page we can set some basicsystem settings which will be applicable for alltest modules.
Click System Set to enter into the settingpage.
Voltage (LL)
Here we need to give the nominal secondary
voltage of PT which is connected to the relayvoltage input.
If we know the L-N voltage we can get the L-Lvoltage with the following calculation.
( ) ( ) / 3V LN V LL=
Current
Here we need to give the nominal secondarycurrent of CT which is connected to the relaycurrent input.
Frequency
Here we need to define the system frequency
Debounce time
This time will be used to filter the bouncing ofoutput contact of the relay under test.
Example:
In above example the relay contact isexperiencing bouncing process. The durationof T1-T4 are all less than 3ms. So these T1-T4bouncing will not be sensed by our testsoftware. The T5 sensed by the test softwarebecause its duration is longer than 3ms.
By default we set 3ms here. Customer needsto make necessary modification if this settingcan not meet the test requirement.
The setting range is 0-25msWhen test is over we will consider thisdebounce time in our tripping time calculationSo that no extra error will be added to trippingtime result.
Instrument
The PowerTest software can be used bydifferent model of our relay test sets. Beforewe enter into the test page customer needs to
select the model he is going to use
7/28/2019 PowerTest Concept en V2.10
13/30
PowerTest Basic Concept
13
Set Comm.
Here we need to define the communicationport of the relay test set. By default Ethernetwill be set here.
Aux DC
Here we can set theAuxi liary DC for drivingthe relay which requires DC power supply.
The auxiliary DC voltage will be generatedat the moment we start the test and willremain active when we change from testmodule to test module.
We can also set the auxiliary DC in the testpage by selectingAuxDC in Settings ofdrop-down menu
Then we can see the setting page as shownbellow.
Drag the cursor to the setting position and clic
OK to confirm the setting.
To stop the auxiliary DC output we need toenter into the above setting page and set dragthe cursor to OFF position.
Click OK button to confirm this operation.
7/28/2019 PowerTest Concept en V2.10
14/30
PowerTest Basic Concept
14
Binary input type
For relay test set with adjustable threshold weneed to configure the binary inputcharacteristic and/or threshold here.
Click Binary to enter into the setting page.
Potential FreeFor potential free contact customer needs toselect the potential free box for the binary inputto be used. In that case the setting forthreshold will be prohibited.
ThresholdFor potential contact customer needs to set
the threshold here.
The threshold is the point where potentialcontact changes from high status to low statusor from low status to high status.
Close statusFor potential free or potential contact customercan associate its actual status with that to bedisplayed in the software. For example, wecan define the high status of potential contactas the closed status in the software, or vise
versa.
Example: setting potential contact
Suppose the potential contact has a thresholdof 90V. Bellow 90V the potential contact is to
be regarded as closed status in the softwareWhen the contact status changes the voltagapplied to the binary input will jump to 220VWe can set any one of the 8 binary inputs. Inthis example we are going to set binary inpu1.
----------------------------------------------Note: We can increase the thresholsetting to avoid possible electromagnetic noisat the site. For example we can set 110V ithis example
----------------------------------------------
In the example above the low status voltage is90V, lower than the threshold setting of 110V.When potential status changes the voltage wi
jump to 220V and this status will be regardedas open status in the software.
7/28/2019 PowerTest Concept en V2.10
15/30
PowerTest Basic Concept
15
Output monitoring
This function is used to monitor the outputwaveform and value during the test process
This function is used to monitor the output
Customer can activate this monitoring functionby clicking the quick control button
During the test process we can see the outputwaveform and output value from thismonitoring window.
Test processdisplay
For some test modules, such as RAMP,QuickTest, we can view the test process ontest page during test process.
Click the control button to switch amongdifferent display windows
Here we can also view the binary input/outputstatus during the test process. We can also
see the output or tripping values by movingcursor to the position we need.
7/28/2019 PowerTest Concept en V2.10
16/30
PowerTest Basic Concept
16
Test processrecording
This function is used to record the test processafter test is over. The binary input/outputstatus during the test process is also recorded.
When test is over we can click the recordingbutton to activate the recording operation.
Example: recording of ramping process forpick-up and drop-off test
In this example we show a ramping process.The current will increase with set step valueand step duration. When relay trips the currentwill decrease until relay drops.
----------------------------------------------Note: The recording button will beactivated only after test is over
----------------------------------------------
We can enlarge it by using two cursors along
time axis.
7/28/2019 PowerTest Concept en V2.10
17/30
PowerTest Basic Concept
17
Recording window
The recording window provides some simpletools to better view the recording display.
Instantaneous and RMS value
The instantaneous, RMS and harmonic valuesfor voltages and currents at the cursor placecan be displayed at the same time.
----------------------------------------------Note: To view the value display at a cursorposition drag the cursor to the position.
----------------------------------------------
Adjust display scale
The instantaneous, RMS and harmonic valuesfor voltages and current
Through these settings we can set themaximum range for displaying the voltagesand currents for better view.
Time between cursorsThe time difference between two cursors andalso the absolute time for each cursor positionare also be displayed.
T1: the absolute time counted from the startpoint to the position of cursor 1
T2: the absolute time counted from the startpoint to the position of cursor 2
dT: the time difference between T1 and T2
7/28/2019 PowerTest Concept en V2.10
18/30
PowerTest Basic Concept
18
Example: one typical recording display
Export COMTRADE file
The recorded waveform and binaryinput/output status can be exported toCOMTRADE format file.
Move mouse pointer to the waveform displayarea and right click the mouse button. Then wesee the following menu will appear.
SelectSave As Comtrade to export thecurrent waveform and binary input/outputstatus display as COMTRDE file.
Vector diagram For a test process we can view the outputvector diagram (calculation value).
By click the quick control button we can openthis display window.
The vector diagram window is show bellow
7/28/2019 PowerTest Concept en V2.10
19/30
PowerTest Basic Concept
19
Manage test items Before starting a test customer needs tomanage the test items/points according to testrequirement
The green cursor indicates that the currentitem/point is active.
Add and remove test item/point
Click Add and Remove buttons in theparameter setting area to add or delete thetest point in a test item.
Each test item/point has its own parametersetting screen.
If the newly added test item/point may havedifferent parameters, wiring, report setting, orassessment customer can make setting just inthe parameter setting area.
All test items/points share the same group ofrelay setting values, general parameters,binary input configuration and relaycharacteristic.
Select test item/point
For all test items/points listed in the tablecustomer can decide which items/points will betested. Simply click the items/points in thecolumn ofSel to enable or disable it.
Status of test item/point
When test is over the status for each testeditem/point will be displayed
Add wir ing and test information
Right click on the item table a pop-up screewill appear and we can see Message optiothere.
7/28/2019 PowerTest Concept en V2.10
20/30
PowerTest Basic Concept
20
Click Message the following screen willappear
Here we can edit the wiring information for theselected test items/points. In the message boxwe can also edit necessary notice/instructions.
The following is one example
When this is selected the software wicompare the message of this test item/poinwith that of the last test item/point. If there iany difference the current popping box wiappear before test starts. And test will star
after click the OK button.
With this selection and after the current test icompleted a pop-up dialog box will appearCustomer needs to click the OK button to starthe next test.
----------------------------------------------
Note: This facility can be used to manuallobserve each test item/point----------------------------------------------
7/28/2019 PowerTest Concept en V2.10
21/30
PowerTest Basic Concept
21
With this selection and when we start test thesetting page will pop-up first. And after we clickOK button the test will then start.
Set test item parameters
For each test item/point we can set testparameters in the item parameter setting area.
Example: Parameter setting area for
Under-frequency module
For each test item/point it has its own test
Parameter, Assessment, and Wiring
----------------------------------------------Note: The layout and content of parameter
setting area may differ from module to module----------------------------------------------
Set parameter with direct setting value
For test parameters which require settingvalues we can put in the direct setting valuesaccording to our test requirement.
Example: direct setting in distance module
Set test parameters with variablesWhen one module is opened parameterrelated to settings will be expressed witvariables.
Example: setting with variables in distancemodule
In the above example the variable RE1 andXE1 represents the relay setting RE1 andXE1.
If RE1 setting is 3 ohm then the expression o0.95*RE1 is equal 0.95*3=2.85 ohm
----------------------------------------------Note: For more details about variableplease refer to Name for settings and variableon page 17
----------------------------------------------
7/28/2019 PowerTest Concept en V2.10
22/30
PowerTest Basic Concept
22
Wiring diagram
Click Wiring button we can view the wiringdiagram. The wiring diagram is made basedon the information we put in Message.
Example: wiring diagram based on theinformation we put in Message (see page 15)
Set group settings
Click to enter into the group settingpage
For different test modules the group settingpage may be different.
Example: group setting page forUnder-frequency module
----------------------------------------------Note: The settings here will be applicableto all test items/points
----------------------------------------------
Set group parameters
Click to enter into the groupparameter page
For different test modules the group parametepage may be different.
Example: group parameter page foUnder-frequency module
----------------------------------------------Note: The parameters here will bapplicable to all test items/points
----------------------------------------------
Set group binary input
For some modules group binary setting iapplicable.
In these modules the group binary settingbutton will be activated
----------------------------------------------Note 1: for more information about binar
input configuration please refer to page 21----------------------------------------------
----------------------------------------------Note 2: The set binary input configuratiowill be applicable to all test items/points
----------------------------------------------
7/28/2019 PowerTest Concept en V2.10
23/30
PowerTest Basic Concept
23
View windows
4 control buttons are provided to switch overamong different view windows.
Depending on the module these 4 controlbuttons may bring different view windows,such as relay characteristic, vector diagram,wiring, relay settings, test process, etc.
Example: a view window which shows thevector diagram and output settings.
Example: click we can view the relaysettings/parameters
Name for settingsand variables
The settings/parameters in all modules havbeen assigned to a dedicated name. And foeach setting/parameter a dedicated variablename has also been assigned for settingpurpose purpose.
By select button we can view thsetting names and their variables.
Example: setting names and variables fodifferential module
By select button we can view thparameter names and their variables.
Example: parameter names and variables fo
differential module
7/28/2019 PowerTest Concept en V2.10
24/30
PowerTest Basic Concept
24
By click button we can view thesetting/parameter names and their variables atthe same time.
Example: setting/parameter names andvariables for differential module
Bookmark
PowerTest software provides the facility foadvanced report template editing (optional).
To edit the report template we need to use thbookmarks associated to settings/tesparameters in the software.
Click we can see the bookmarks for thmodule customer is using.
Example: bookmarks for differential module
----------------------------------------------Note: To know more about the optionareport editing tool please contact themanufacture
----------------------------------------------
Recover Task
Use the context menu Resume last test taskon the Test template menu to resume lasunfinished test plan, so that accidentapower-off wont affect the whole test plan
7/28/2019 PowerTest Concept en V2.10
25/30
PowerTest Basic Concept
25
Test report There are two type of report formats inPowerTest software.
Report in rpt formatThis type of report does not allow any editingoperation. And it contains also the templateinformation of the module used. When weopen this report in any module both content ofthe report and all settings/test parametersweve set for that test will be uploaded.
Report in Word formatWork format report is allowed for any editingoperation.
Report generation
To generate rpt format report click
To generate word format report click
Example: distance test report in rpt format
Example: distance test report in word format
User defined logo in the reportTo use his own company logo in the repocustomer can simply replace the bmp formalogo file in the installation directory oPowerTest with his own logo file with same filformat and name.
7/28/2019 PowerTest Concept en V2.10
26/30
PowerTest Basic Concept
26
Report head setting
In the drop-down menu we can select Settingto configure what is to be included in the reporthead.
The follow setting screen will the appear
Select the items we want to include in thereport and click OK to confirm the operation.
Binary inputconfiguration
The binary inputs will be used to sense therelay operation during the test.
Properly configure the binary input is importanfor successful relay test.
The selection of binary input type, potentiafree or potential as while as the setting othreshold for potential contact, can be founonpage 10.
In the test module what we do is to configurethe logic combination of binary input and
decide which one will be used to sense therelay operation.
We can assign binary input with followingnames.
Not used:This binary input is not usedStartTripTrip LATrip LBTrip LCSig.1 Sig.8
These names will be associated with threport.
We can also modify these names according toour own wish in the column ofDisplay Name
7/28/2019 PowerTest Concept en V2.10
27/30
PowerTest Basic Concept
27
For the selected binary inputs we canconfigure them as OR logic orAND logic.
OR logic
IndicatingOR logic. When any of the selectedbinary input meets with the trigger conditionthe current test process will be terminated.
In above example binary 1 and 2 are definedas OR logic. Any trigger operation of binary 1or 2 will terminate the current test process.
AND logicIndicatingAND logic. When all of the selectedbinary input meets with the trigger conditionthe current test process will be terminated.
In above example binary 1 and 2 are definedasAND logic. Only when both of them meetthe trigger condition then the current testprocess will be terminated.
Test equipmentinformation
When the communication between testequipment and external PC is setup we canselect from drop-down menu Help the optionof About Test Set to get some basic hardwareinformation of test equipment in use.
Then we can see the following messagescreen.
7/28/2019 PowerTest Concept en V2.10
28/30
PowerTest Basic Concept
28
Control test process
We can use the follow 4 quick control buttonsto control the test process
Start the test
Stop the test
Used in some modules to switchfrom one state to the next onePause the test and click again the
resume the test
Start the testAfter test is started one message will pop-up toindicate the current test status
Stop the testAfter test is started the stop button will beactivated for stop action.
button is activated
If we press this button we will stop the test andthe button will become inactivated.
button becomes inactivated
State control but tonThis button is used in some modules where weuse this button to manually switch from onestate to the next one
----------------------------------------------Note: More detailed information will bprovided on the use of this button in module
where this button is used.----------------------------------------------Pause the testWe can temporally stop the test by pressingthis pause button. Then the button will havethe following look
At the same time a message will pop-up
If we press this button again the test will beresumed
Note:More detailed description onis available in the module where this controlbutton will be used
----------------------------------------------
7/28/2019 PowerTest Concept en V2.10
29/30
PowerTest Basic Concept
29
License
This is used to check information of modulesauthorization.
Example:
Step1: Press in the maininterface and select the modules.
Step2: Check modules authorization.
IP Set
This is used to set IP address of relay testingsystem. The fault IP is 192.168.1.133.
Step1: Press in the main interfaceStep2: Change address.
----------------------------------------------Notes:Please dont change the IP addressin normal situation. Otherwise, other PC cantconnect with the kit.If it cant connect with other PC, please refer tIP reset in hardware user manual
----------------------------------------------
7/28/2019 PowerTest Concept en V2.10
30/30
PowerTest Basic Concept
GPS Instruction
GPSTest state will be switched to the nextone if GPS pulse signal is received. GPSsignal trigger condition means the end of thecurrent state (after output 50ms) and begin ofnext state.
GPS is usually used in the ends of linedifferential protection to make online test. Itrequires the current as 0 beforesynchronization output. If the GPS is set as thefirst state (before fault), there should not becurrent output. If the first state has currentoutput, it will make the first state protection tripsince the outputs of both sides is not
synchronized.
Example:The line differential protection is made bysimulating phase A fault in State Sequence.
The following is the parameter setting.
It is waveform output.
From the waveform, there is a 50mS statewaveform output after receiving GPS signals.
The waveform is synchronized at both ends athis time.