Technology
Center
Construction
LOI with EDA PPA
Negotiations
Technical
Pre-
Evaluation
Technology
Center
Inauguration
Proof of
Concept
Signing of
PPA & PIR*
2006 2007 2008 2009 2010 2011 2012 2013 2014
Graciosa
Chosen as
Pilot Project
Ground
Breaking
Ceremony
* Project of Regional interest
Battery
Power
Plant
Photovoltaic
Plant
Transmission
Line
Wind
Park
Diesel
Generators
3.2
1.0
4.6
-
4.5
Commissioning
Ready for
production
Commissioning of
the interconnection
Completed
Completed
MWh-s
installed Current Status
Provides the energy
control system
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•