Circuit Reliability Review

Simi Valley

2021

Page 2: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

2

• Southern California Edison (SCE) is an Edison International company

• One of the nation’s largest electric utilities

• More than 130 years of history

• Headquartered in Rosemead, California

• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)

• 50,000 square miles of SCE service area across Central, Coastal, and Southern California

• 15 million residents through 5 million customer accounts

• 445 communities and 13 Native American tribes

Who We Are

Page 3: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

Our Grid

To deliver safe, reliable, and affordable power,

we monitor and maintain a vast electricity system

730,000 Transformers

119,000 Miles of Transmission and Distribution Lines

4,600 Circuits

1.4 Million Poles

50,000 Square Miles

3

Page 4: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

Strengthening and Modernizing the Grid

• Infrastructure reliability – updating

underground cables, poles, switches, and

transformers

• Wildfire mitigation – hardening infrastructure,

bolstering situational awareness capabilities,

and enhancing operational practices

• Transmission – connecting renewables,

installing new substations, and updating lines

• Grid readiness – updating the grid for impacts

from new technologies

• Long-term energy policy – supporting energy

storage, electric vehicles, and renewables

SCE plans to spend more than $5B each

year to maintain, improve, and harden

its infrastructure

SCE’s investments support safe, reliable, affordable, and clean energy for our customers

2020 Capital Investments

235 miles of

underground cable replaced

97 miles of overhead conductor

replaced for public safety

11.1k distribution poles replaced

3.6k transmission poles replaced

79 underground structure

replacements

4

Page 5: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

Protecting Public Safety: Wildfire Mitigation Activities

2020 Year-End Progress Report – Data as of 12/31/20 5

Page 6: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

Protecting Public Safety: Public Safety Power Shutoffs

6

• To reduce the threat of wildfires, SCE

implements Public Safety Power Shutoffs

(PSPS) to temporarily shut off power to some

customers in areas with a high risk for wildfires

to prevent the electric system from

becoming the source of ignition

• PSPS is used as a measure of last resort to

protect public safety under dangerous fire

weather conditions, including high winds,

low humidity, and dry vegetation

• Multiple methods are used to notify people in

affected areas before, during and after a PSPS

event

• SCE provides resources to support customers

during PSPS and offers several programs and

rebates to help customers be prepared and

more resilient during emergencies

• SCE is working to reduce the impact of PSPS

and is continuing to strengthen the electric

grid to become more resilient in the face of

extreme weather events

Page 7: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

Pathway 2045: Key steps California must take to reach carbon neutrality

Creating a Clean Energy Future

7

100% of grid sales with

carbon-free electricity

80 GW of utility-scale

clean generation

30 GW of utility-scale

energy storage

70% of all buildings will

use efficient electric

space and water heating

90% fewer GHG

emissions from all-

electric homes

26 million electric

vehicles

Over 1 million

electrified medium

and heavy duty

vehicles

50% reduction in natural

gas consumption

40% of the remaining

natural gas is

biomethane and

hydrogen

Page 8: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

Reliability Overview

8

Page 9: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

What is Reliability?

• In simplest terms:

Having dependable electricity when you need it.

• Outages:

• Maintenance outages (aka planned outages)

• Repair outages (aka unplanned outages)

• Sustained Outage = An outage lasting > 5 minutes

• Momentary Outage = An outage lasting ≤ 5 minutes

• Public Safety Power Shutoff (PSPS)

9

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

Page 10: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

How Do We Measure Reliability?

10

Page 11: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

11Overview of Simi ValleyThere are 26 circuits that serve Simi Valley 1

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

APPLETON(16KV) 1,670 - - -

BIG ROCK(16KV) 2,484 - - -

BRAND(16KV) 1,157 - - -

BRENNAN(16KV) 2,210 - - -

BUCKNER(16KV) 2,003 - - -

BURLESON(16KV) 1,811 - - -

CASSIDY(16KV) 1,338 - - -

ENCHANTED(16KV) 348 - - -

ENERGY(16KV) 1,712 - - -

ERRINGER(16KV) 2,831 - - -

GILLIBRAND(16KV) 2,075 - - -

GLASSCOCK(16KV) 2,379 - - -

HOSS(16KV) 2,074 - - -

KUEHNER(16KV) 2,768 - - -

MONARCH(16KV) 1,565 - - -

MONTGOMERY(16KV) 2,350 - - -

MORELAND(16KV) 1,801 - - -

MORGANSTEIN(16KV) 1,918 - - -

REJADA(16KV) 475 - - -

SINALOA(16KV) 2,093 - - -

STEARNS(16KV) 2,200 - - -

TAPO(16KV) 1,276 - - -

TOWNSHIP(16KV) 2,207 - - -

TWIN LAKES(16KV) 1,940 - - -

YOSEMITE(16KV) 1,232 - - -

ABRAHAM(16KV) 1,860 - - -

- - - -

- - - -

- - - -

- - - -

Grand Total 47,777

Note: The number of customers listed represents the total number of customers on each circuit (not the local jurisdiction).

11

Page 12: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

BarChart

SCE SYSTEMWIDE

**Data is as of 03/16/2021, data

can be slightly different due to

outage data validation process

Simi Valley

Reliability History of Circuits Serving Simi Valley (No Exclusions)

**“Exclusions” are days which

utilities are allowed to remove

from their metrics because

the outages on those days

were caused by acts of

nature.

135.1129.1

1,003.1

1,409.5

139.7 136.8178.0 201.3

0.0

200.0

400.0

600.0

800.0

1,000.0

1,200.0

1,400.0

1,600.0

2017 2018 2019 2020

SAIDI

(average

minutes of

sustained

interruptions)

1.3

1.0

2.3

3.1

1.20.9 1.0

1.1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

SAIFI

(average

frequency of

sustained

interruptions)

6.2

1.3 1.4 1.21.8

1.4 1.4 1.4

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

MAIFI

(average

frequency of

momentary

interruptions)

12

Page 13: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

SAIDIChart

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

Causes of Repair Outages in Simi Valley

2020

PSPS

86.6%

Equipment Failure

5.4%

Operation

1.7%3rd Party

1.1%

Vegetation /Animal

0.3%

Weather /Fire

/Earthquake

0.7%

Other

4.3%

Contributions to

SAIDI by Outage Cause▪ Equipment Failure e.g., in-service failure of transformer, switch, or conductors▪Vegetation/Animale.g., tree branch, rodent, or bird causing a short circuit betweenconductors▪ Other e.g., patrolled but no cause found▪ Operations e.g., urgent maintenance w/o 3-daynotice▪ 3rd Party e.g., balloon, car hit pole, dig-in

▪ PSPS e.g., Public

Safety Power Shutoff

13

Page 14: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

SAIFIChart

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

Causes of Repair Outages in Simi Valley

2020

3rd Party

4.7%

Equipment Failure

26.6%

Operation

12.5%

Other

20.7%

Vegetation /Animal

2.7%

Weather /Fire

/Earthquake

3.4%

PSPS

29.2%

Contributions to SAIFI by Outage Cause

▪ Equipment Failure e.g., in-service failure of

transformer, switch, or conductors▪Vegetation/Animal

e.g., tree branch, rodent, or birdcausing a short circuit between conductors

▪ Othere.g., patrolled but no cause found

▪ Operationse.g., urgent maintenance w/o 3-daynotice▪ 3rd Party e.g., balloon, car hit pole, dig-in

▪ PSPS

e.g., Public Safety Power Shutoff

14

Page 15: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

15

Page 16: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

16

Page 17: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

Back-up Slides

Reliability Histories of Circuits Serving Simi Valley

Updated through Dec 2020

17

Page 18: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

135.1 1.3 6.2 129.1 1.0 1.3 1,003.1 2.3 1.4 19.7 0.3 0.4 26.6 0.5 0.2 75.9 0.8 0.3 1,287.4 1.5 0.3 1,409.5 3.1 1.2

3rd Party 8% 7% 2% 17% 11% 9% 1% 0% 7% 13% 15% 4% 6% 6% 20% 1% 5% 8% 1% 3% - 1% 5% 7%

Equipment Failure 65% 58% 13% 39% 34% 18% 8% 32% 39% 53% 33% 16% 30% 28% 21% 57% 51% 37% 1% 12% 39% 5% 27% 27%

Operation 5% 6% 1% 8% 7% 14% 3% 19% 1% 28% 18% 0% 21% 37% 12% 9% 18% 16% 0% 1% 53% 2% 13% 18%

Other 7% 8% 15% 17% 22% 23% 7% 9% 30% 4% 15% 61% 40% 16% 46% 33% 27% 39% 2% 20% 0% 4% 21% 40%

Vegetation/Animal 7% 11% 68% 4% 11% 33% 1% 13% 21% 2% 19% 3% 2% 1% - 0% 0% - 0% 2% 0% 0% 3% 1%

Weather/Fire/Earthquake 9% 10% 1% 15% 15% 3% 1% 4% 2% - - 16% 2% 11% - - - - 1% 4% 0% 1% 3% 6%

PSPS - - - 1% 0% - 78% 23% - - - - - - - - - - 95% 59% 7% 87% 29% 2%

SCE SYSTEMWIDE 139.7 1.2 1.8 136.8 0.9 1.4 178.0 1.0 1.4 17.1 0.2 0.3 17.2 0.2 0.4 71.4 0.3 0.4 95.5 0.4 0.4 201.3 1.1 1.4

Average Reliability of 26 Circuits Serving Simi Valley

4th Qtr 2020 20202017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020

26 Circuits Serving Simi Valley -- Total

Customers: 47,777

Notes:

No outages are excluded from the metrics.

Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff

SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

18

Page 19: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ABRAHAM(16KV) - Customers: 1,860 - - - - - - 8.0 1.0 - 0.4 0.0 - - - - - - - - - - 0.4 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - 100% 100% - - - - - - - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

APPLETON(16KV) - Customers: 1,670 40.9 0.1 1.0 59.5 0.8 0.2 181.0 1.7 2.1 64.1 1.0 - 39.0 0.6 2.3 0.7 0.0 - 62.4 1.0 - 166.3 2.6 2.3

3rd Party - - - - - - - - - 97% 97% - 100% 100% 58% - - - - - - 61% 61% 58%

Equipment Failure 38% 60% - 9% 5% - 75% 71% 1% - - - - - - 100% 100% - 100% 100% - 38% 38% -

Operation 11% 22% - - - 8% 17% 26% - - - - - - - - - - - - - - - -

Other - - - - - - 4% 1% 51% 3% 3% - - - 42% - - - - - - 1% 1% 42%

Vegetation/Animal - - - 91% 95% 92% - - 48% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 51% 17% 100% - - - 4% 1% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BIG ROCK(16KV) - Customers: 2,484 421.8 5.7 4.7 328.3 2.3 - 3,042.4 5.6 4.9 - - 1.3 285.7 3.4 0.9 145.4 1.2 1.2 7,297.0 4.6 - 7,728.2 9.2 3.4

3rd Party 7% 5% 18% - - - 0% 0% - - - - - - - - - - - - - - - -

Equipment Failure 34% 40% - 1% 2% - 6% 64% 80% - - 100% 32% 61% 100% 0% 4% - - - - 1% 23% 65%

Operation 0% 1% - 1% 1% - 0% 0% 0% - - - 3% 2% - - - - - - - 0% 1% -

Other 17% 15% 55% 86% 87% - 0% 0% 20% - - - 66% 37% - 100% 96% 100% - - - 4% 26% 35%

Vegetation/Animal - - 26% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 42% 40% - 12% 9% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 94% 36% - - - - - - - - - - 100% 100% - 94% 50% -

BRAND(16KV) - Customers: 1,157 45.2 0.3 13.0 378.3 2.2 1.5 44.3 0.6 - 38.2 0.3 - - - - 5.7 0.1 - - - - 43.8 0.4 -

3rd Party - - - 15% 47% 22% - - - - - - - - - - - - - - - - - -

Equipment Failure 81% 50% 8% 83% 51% 78% 50% 33% - 97% 72% - - - - - - - - - - 85% 61% -

Operation 6% 36% - - - - 50% 67% - 3% 28% - - - - 100% 100% - - - - 15% 39% -

Other 13% 14% 15% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 77% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 2% 2% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Simi Valley - 1 of 7

2017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020 4th Qtr 2020 2020

19

Page 20: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CircuitHistory2

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

BRENNAN(16KV) - Customers: 2,210 189.6 0.9 1.9 29.8 0.9 0.8 51.6 0.2 1.7 11.9 1.2 - 55.9 1.4 - 1.3 0.0 - - - - 69.1 2.7 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 96% 93% 45% 56% 6% - 94% 93% 50% 44% 8% - - - - 53% 67% - - - - 9% 4% -

Operation 4% 7% 1% - - - 6% 7% - - - - 100% 100% - 47% 33% - - - - 82% 53% -

Other - - - 44% 94% 100% - - 50% - - - - - - - - - - - - - - -

Vegetation/Animal - - 54% - - - - - - 56% 92% - - - - - - - - - - 10% 43% -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BUCKNER(16KV) - Customers: 2,003 69.0 1.1 3.3 7.4 0.0 - 38.9 0.3 1.0 - - - 6.5 0.1 - 182.3 2.2 1.0 0.1 0.0 - 188.9 2.3 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 83% 96% 11% 100% 100% - 81% 66% - - - - 100% 100% - 99% 99% 100% - - - 99% 99% 100%

Operation 1% 0% - - - - 1% 7% - - - - - - - 1% 1% - 100% 100% - 1% 1% -

Other 9% 2% 89% - - - 2% 2% - - - - - - - - - - - - - - - -

Vegetation/Animal 8% 1% - - - - 16% 26% 100% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BURLESON(16KV) - Customers: 1,811 188.6 1.4 0.1 33.9 0.2 1.0 43.0 1.2 1.1 - - - - - - 20.4 1.0 0.5 271.2 1.1 - 291.6 2.1 0.5

3rd Party - - - - - - - - - - - - - - - 98% 100% 100% 100% 100% - 100% 100% 100%

Equipment Failure 87% 81% 100% 75% 58% - 33% 10% 3% - - - - - - 2% 0% - - - - 0% 0% -

Operation 11% 17% - 25% 42% 1% 65% 90% - - - - - - - - - - - - - - - -

Other 1% 2% - - - - 2% 0% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 99% - - 97% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CASSIDY(16KV) - Customers: 1,338 366.8 1.8 9.5 120.2 1.1 1.0 2,104.7 1.3 2.9 - - 1.0 - - - 40.1 0.2 - 1,110.0 1.1 - 1,150.0 1.2 1.0

3rd Party 58% 43% 3% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 34% 50% 3% 93% 98% - 4% 20% 30% - - - - - - 99% 63% - - - - 3% 9% -

Operation - - - 7% 2% 100% 0% 1% - - - - - - - 1% 37% - 2% 9% - 2% 13% -

Other - - 11% - - - - - 70% - - 100% - - - - - - - - - - - 100%

Vegetation/Animal - - 84% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 8% 7% - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 96% 79% - - - - - - - - - - 98% 91% - 94% 78% -

Reliability Histories for Individual Circuits Serving Simi Valley - 2 of 7

2017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020 4th Qtr 2020 2020

20

Page 21: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CircuitHistory3

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ENCHANTED(16KV) - Customers: 348 20.6 1.0 - 139.6 1.7 0.7 1,660.6 1.8 4.8 0.5 0.0 - 63.4 0.8 - 0.5 0.0 - 3,648.7 2.1 - 3,713.2 2.9 -

3rd Party - - - - - - 97% 39% - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 16% 60% - 1% 57% 38% - - - - - - - - - 0% 1% - 0% 1% -

Operation - - - - - - 1% 4% 41% 100% 100% - - - - - - - - - - 0% 0% -

Other - - - 84% 40% - - - - - - - - - - 100% 100% - - - - 0% 0% -

Vegetation/Animal - - - - - 100% - - 21% - - - 100% 100% - - - - - - - 2% 26% -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - 100% 99% - 98% 72% -

ENERGY(16KV) - Customers: 1,712 389.5 2.6 4.3 642.5 1.7 0.6 6,465.5 6.4 0.2 9.8 1.0 1.0 17.7 0.1 - 136.8 1.1 1.2 5,754.7 4.9 0.0 5,919.1 7.0 2.2

3rd Party 2% 38% 23% 57% 30% 96% - - - - - 50% - - - - - - - - - - - 22%

Equipment Failure 64% 41% 3% 5% 4% 4% 1% 15% 9% 34% 3% - 3% 5% - 2% 0% - 0% 0% - 0% 1% -

Operation 2% 1% 23% 0% 3% - 1% 16% 2% 11% 2% - 33% 34% - - - 9% 1% 2% - 1% 2% 5%

Other 26% 19% 28% - - - 8% 16% 65% 54% 95% 50% 28% 32% - 98% 100% 91% - - 50% 2% 29% 72%

Vegetation/Animal - - 23% 4% 9% - 0% 0% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 7% 1% - 30% 53% - 0% 0% 24% - - - 36% 29% - - - - - - 50% 0% 0% 1%

PSPS - - - 4% 1% - 90% 52% - - - - - - - - - - 99% 98% - 96% 68% -

ERRINGER(16KV) - Customers: 2,831 40.4 0.6 4.6 32.0 0.4 4.2 844.6 3.7 3.0 189.6 1.2 1.1 2.0 0.0 - 353.9 3.5 - 0.8 0.0 - 546.4 4.7 1.1

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 29% 24% 58% 77% 69% - 1% 1% - 53% 30% - 57% 81% - 57% 68% - 100% 100% - 56% 59% -

Operation - - - 1% 7% - 2% 36% - 44% 64% - - - - 0% 0% - - - - 15% 16% -

Other - - 21% - - 24% 88% 27% 67% 3% 6% - - - - 43% 32% - - - - 29% 25% -

Vegetation/Animal 71% 76% 21% 23% 23% 76% 9% 36% 33% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - 100% 43% 19% - - - - - - - 0% 0% 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

GILLIBRAND(16KV) - Customers: 2,075 33.2 0.4 12.3 10.2 0.1 - 2,289.8 2.6 0.0 1.1 0.0 - 0.7 0.0 - 1.0 0.0 - 2,533.6 2.1 - 2,536.5 2.1 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% 19% 84% 80% - 18% 59% 100% - - - 100% 100% - 100% 100% - 0% 0% - 0% 1% -

Operation - - - 16% 20% - 0% 2% - 100% 100% - - - - - - - - - - 0% 1% -

Other - - 8% - - - 0% 1% - - - - - - - - - - - - - - - -

Vegetation/Animal - - 73% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 82% 38% - - - - - - - - - - 100% 100% - 100% 98% -

Reliability Histories for Individual Circuits Serving Simi Valley - 3 of 7

2017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020 4th Qtr 2020 2020

21

Page 22: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CircuitHistory4

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

GLASSCOCK(16KV) - Customers: 2,379 53.6 0.3 10.0 32.4 0.6 0.5 1,479.6 1.2 1.0 9.1 0.0 1.1 1.0 0.0 - 78.6 1.1 - 2,187.2 3.3 - 2,275.8 4.4 1.1

3rd Party 43% 14% 10% - - - - - 100% - - - - - - - - - - - - - - -

Equipment Failure 23% 51% - 83% 96% 100% 1% 5% - - - - 100% 100% - 10% 1% - 0% 0% - 0% 1% -

Operation 34% 35% - 17% 4% - 1% 4% - 100% 100% - - - - - - - 0% 1% - 1% 1% -

Other - - 10% - - - 2% 5% - - - 100% - - - 90% 99% - 5% 33% - 8% 49% 100%

Vegetation/Animal - - 80% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 0% 1% - - - - - - - - - - 9% 33% - 8% 25% -

PSPS - - - - - - 96% 84% - - - - - - - - - - 86% 33% - 82% 25% -

HOSS(16KV) - Customers: 2,074 107.5 0.7 0.4 39.9 0.3 2.0 224.4 5.9 2.0 61.7 1.2 - 20.9 1.3 - 98.6 1.2 - - - - 181.2 3.6 -

3rd Party - - - - - - - - 50% - - - - - - - - - - - - - - -

Equipment Failure 88% 79% 100% 35% 43% 2% 18% 12% - 100% 100% - - - - 100% 100% - - - - 88% 65% -

Operation 8% 15% - 65% 57% - 25% 27% - - - - 68% 10% - - - - - - - 8% 3% -

Other - - - - - 49% 5% 17% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 49% 52% 44% 50% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 4% 6% - - - - - - - - - - 32% 90% - - - - - - - 4% 32% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

KUEHNER(16KV) - Customers: 2,768 125.5 2.0 10.2 181.1 1.8 - 1,090.5 3.5 2.3 5.2 0.1 1.1 21.7 0.1 - 305.6 3.4 0.4 1,389.5 5.4 1.1 1,722.1 9.0 2.7

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 8% 5% - 2% 1% - 22% 71% 100% 100% 100% - 100% 100% - 67% 33% 100% 6% 25% 100% 18% 30% 58%

Operation 4% 2% - 5% 4% - 0% 0% - - - - - - - 33% 67% - 0% 0% - 6% 25% -

Other - - 10% - - - - - - - - 100% - - - - - - 15% 63% - 12% 38% 42%

Vegetation/Animal 87% 93% 90% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 94% 95% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 78% 29% - - - - - - - - - - 79% 12% - 64% 7% -

MONARCH(16KV) - Customers: 1,565 23.6 0.3 1.8 42.3 0.5 1.7 816.6 3.5 1.0 - - - 19.3 0.3 0.8 20.6 0.3 1.2 106.8 1.1 1.0 146.7 1.7 3.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 83% 91% 43% 93% 78% 42% 0% 2% - - - - 8% 10% - - - - - - 98% 1% 2% 33%

Operation 17% 9% - 7% 22% - 65% 35% - - - - 0% 1% - 100% 100% 100% - - - 14% 16% 38%

Other - - 57% - - - 14% 29% - - - - 91% 89% 100% - - - 100% 100% - 85% 82% 28%

Vegetation/Animal - - - - - 58% 0% 1% 100% - - - - - - - - - - - 2% - - 1%

Weather/Fire/Earthquake - - - - - - 20% 33% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Simi Valley - 4 of 7

2017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020 4th Qtr 2020 2020

22

Page 23: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CircuitHistory5

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

MONTGOMERY(16KV) - Customers: 2,350 9.1 0.1 1.0 35.0 0.5 2.8 204.0 3.1 0.5 1.8 0.0 - 0.3 0.0 - 0.4 0.0 - - - - 2.5 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 33% 4% - 2% 1% - 100% 100% - - - - 100% 100% - - - - 87% 97% -

Operation 100% 100% - 65% 94% 64% 6% 32% - - - - 100% 100% - - - - - - - 13% 3% -

Other - - 100% - - - 2% 1% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - 2% 2% 36% 15% 32% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 74% 34% 100% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MORELAND(16KV) - Customers: 1,801 56.4 1.1 8.2 98.0 0.3 0.8 250.7 1.0 0.4 - - 1.1 14.8 0.1 - 4.7 0.0 - 0.0 0.0 1.1 19.6 0.1 2.2

3rd Party - - - 5% 15% - - - - - - - - - - - - - - - - - - -

Equipment Failure 85% 95% 1% 82% 66% 100% 88% 86% 100% - - - 100% 100% - 100% 100% - 100% 100% - 100% 100% -

Operation 15% 5% - 13% 20% - 9% 6% - - - - - - - - - - - - 100% - - 50%

Other - - 12% - - - - - - - - 100% - - - - - - - - - - - 50%

Vegetation/Animal - - 87% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 3% 8% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MORGANSTEIN(16KV) - Customers: 1,918 116.1 1.2 3.8 229.9 1.2 2.6 1,097.8 1.6 - 6.6 0.0 0.4 1.5 0.0 - 1.5 0.0 - 118.9 0.6 - 128.6 0.7 0.4

3rd Party - - - 2% 4% 1% - - - - - - - - - - - - - - - - - -

Equipment Failure 89% 92% 59% 36% 52% 22% 0% 1% - 85% 61% - 96% 96% - 44% 50% - 39% 8% - 42% 13% -

Operation 7% 5% - 59% 26% 22% 3% 37% - 4% 11% 7% 4% 4% - 56% 50% - 0% 0% - 1% 1% 7%

Other 2% 0% - 0% 0% 43% 0% 0% - - - - - - - - - - - - - - - -

Vegetation/Animal 3% 3% 41% 2% 19% 12% - - - 12% 28% 93% - - - - - - 61% 92% - 57% 86% 93%

Weather/Fire/Earthquake - - - 1% 1% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 96% 62% - - - - - - - - - - - - - - - -

REJADA(16KV) - Customers: 475 166.6 2.9 0.7 75.8 1.6 2.4 89.0 1.3 2.2 0.7 0.0 - - - - 87.4 1.7 - 317.4 2.0 - 405.5 3.7 -

3rd Party - - - 74% 81% 71% - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% 100% 23% 19% 29% 5% 1% - 100% 100% - - - - 100% 100% - 26% 48% - 42% 72% -

Operation 0% 0% - 3% 0% - 15% 84% - - - - - - - - - - 6% 5% - 5% 3% -

Other - - - - - - 1% 1% 50% - - - - - - - - - 59% 46% - 46% 25% -

Vegetation/Animal - - - 0% 0% - 1% 0% 50% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 78% 14% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - 10% 1% - 8% 1% -

Reliability Histories for Individual Circuits Serving Simi Valley - 5 of 7

2017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020 4th Qtr 2020 2020

23

Page 24: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CircuitHistory6

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

SINALOA(16KV) - Customers: 2,093 370.5 3.4 4.0 310.1 1.4 3.4 56.4 1.5 1.0 - - - 8.0 1.2 1.1 0.2 0.0 - - - - 8.2 1.2 1.1

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 92% 75% 92% 99% 98% 41% 9% 12% - - - - - - - 100% 100% - - - - 2% 0% -

Operation 1% 4% - 0% 0% - 2% 0% - - - - 100% 100% - - - - - - - 98% 100% -

Other 2% 1% - 0% 1% - 0% 0% 100% - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - 29% 90% 87% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 5% 20% 8% 0% 0% 29% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

STEARNS(16KV) - Customers: 2,200 280.6 0.9 11.9 21.2 0.2 2.0 93.4 0.9 1.7 - - - 10.5 0.0 - 10.3 0.1 - 1,315.1 1.3 - 1,335.9 1.4 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 90% 72% 8% 45% 28% - 97% 93% 100% - - - 100% 100% - 69% 66% - 0% 0% - 1% 8% -

Operation 6% 21% - 27% 35% 1% 3% 7% - - - - - - - - - - 3% 16% - 3% 14% -

Other 4% 7% 8% 21% 18% 99% - - - - - - - - - 31% 34% - - - - 0% 3% -

Vegetation/Animal - - 83% 6% 18% - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - 97% 84% - 95% 75% -

TAPO(16KV) - Customers: 1,276 155.0 1.9 13.2 250.7 2.1 1.0 2,089.1 1.1 - 1.9 0.0 - 0.6 0.0 - 12.9 0.1 - 2,219.5 1.6 0.7 2,234.9 1.7 0.7

3rd Party - - - - - - 0% 1% - - - - - - - - - - - - - - - -

Equipment Failure 34% 43% 17% 95% 96% - 0% 5% - 22% 71% - - - - 0% 1% - - - - 0% 0% -

Operation 0% 0% - - - - 0% 0% - - - - - - - 91% 72% - 0% 0% - 1% 3% -

Other 46% 53% 8% 5% 4% 100% 0% 1% - 78% 29% - 100% 100% - - - - 2% 3% - 2% 3% -

Vegetation/Animal 20% 4% 75% - - - - - - - - - - - - 9% 26% - - - - 0% 1% -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 100% 93% - - - - - - - - - - 98% 96% 100% 97% 93% 100%

TOWNSHIP(16KV) - Customers: 2,207 13.5 0.5 12.2 215.8 2.2 2.7 843.4 3.0 1.0 9.3 0.2 - 31.3 0.9 0.6 37.6 0.2 - 1,408.5 2.2 - 1,486.7 3.5 0.6

3rd Party - - - 78% 34% 42% - - - 78% 79% - 5% 4% - - - - - - - 1% 5% -

Equipment Failure 76% 14% 8% 9% 18% 21% 17% 34% - - - - 2% 0% - 100% 100% - 7% 52% - 9% 39% -

Operation 24% 86% 2% 5% 2% 37% 0% 0% 0% - - - 92% 96% 100% - - - - - - 2% 25% 100%

Other - - 8% - - - 18% 33% 100% 22% 21% - - - - - - - - - - 0% 1% -

Vegetation/Animal - - 82% 7% 46% - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 65% 33% - - - - - - - - - - 93% 48% - 88% 31% -

Reliability Histories for Individual Circuits Serving Simi Valley - 6 of 7

2017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020 4th Qtr 2020 2020

24

Page 25: PowerPoint Presentation · 2021. 2. 14. · To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system. 730,000 Transformers 119,000 Miles

CircuitHistory7

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

TWIN LAKES(16KV) - Customers: 1,940 76.7 1.6 9.2 102.6 1.0 - 1,715.1 1.1 - 1.7 0.0 1.2 10.9 0.1 - 0.2 0.0 - 3,340.4 3.0 2.3 3,353.1 3.1 3.5

3rd Party - - - - - - - - - - - - 33% 45% - - - - 0% 0% - 0% 2% -

Equipment Failure 91% 83% - 17% 10% - 1% 7% - - - - 67% 55% - 100% 100% - 0% 0% - 0% 3% -

Operation 1% 1% - - - - - - - 100% 100% - - - - - - - - - 100% 0% 1% 67%

Other 8% 16% 20% 83% 90% - 0% 2% - - - 100% - - - - - - - - - - - 33%

Vegetation/Animal - - 80% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - 99% 91% - - - - - - - - - - 100% 100% - 100% 95% -

YOSEMITE(16KV) - Customers: 1,232 136.4 1.3 12.0 31.7 0.1 - 259.7 2.5 0.9 - - - 0.7 0.0 - 91.3 1.2 1.1 8.4 0.0 - 100.4 1.2 1.1

3rd Party 71% 77% - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 25% 18% 8% 90% 33% - 99% 99% 100% - - - 45% 38% - 99% 96% 100% 100% 100% - 99% 95% 100%

Operation 4% 5% - 10% 67% - 0% 0% - - - - 55% 63% - 1% 4% - - - - 1% 5% -

Other - - 8% - - - 1% 0% - - - - - - - - - - - - - - - -

Vegetation/Animal - - 83% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Simi Valley - 7 of 7

2017 2018 2019 1st Qtr 2020 2nd Qtr 2020 3rd Qtr 2020 4th Qtr 2020 2020

25