RIA Target Station Design and Infrastructure Presented by: Reg Ronningen (MSU) Prepared by Tony Gabriel and Dave Conner (Oak Ridge National Laboratory) RIA R&D Participants: Argonne National Lab: J. Nolen Lawrence Berkley Nation Lab: L. Heilbronn Lawrence Livermore National Lab: L. Ahle, J. Boles, S. Reyes, W. Stein Los Alamos National Laboratory: Dave Viera Michigan State University: I. Baek, G. Bollen, M. Hausmann, D. Lawton, P. Mantica, D. Morrissey, R. Ronningen, B. Sherrill, A. Zeller Oak Ridge National Lab: J. Beene, T. Burgess, D. Conner, T. Gabriel, I. Remec, M. Wendel 2 nd High-Power Targetry Workshop October 10–14, 2005 Oak Ridge, TN

PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

  • Upload
    doduong

  • View
    216

  • Download
    2

Embed Size (px)

Citation preview

Page 1: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

RIA Target Station Design and InfrastructurePresented by: Reg Ronningen (MSU)

Prepared by Tony Gabriel and Dave Conner (Oak Ridge National Laboratory)RIA R&D Participants:

Argonne National Lab: J. Nolen

Lawrence Berkley Nation Lab: L. Heilbronn

Lawrence Livermore National Lab: L. Ahle, J. Boles, S. Reyes, W. Stein

Los Alamos National Laboratory: Dave Viera

Michigan State University: I. Baek, G. Bollen, M. Hausmann, D. Lawton, P. Mantica, D. Morrissey, R. Ronningen, B. Sherrill, A. Zeller

Oak Ridge National Lab: J. Beene, T. Burgess, D. Conner, T. Gabriel, I. Remec, M. Wendel

2nd High-Power Targetry Workshop October 10–14, 2005

Oak Ridge, TN

Page 2: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

2

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

RIA Overview

R&D Activities Overall Layout and Parameters Remote Maintenance Requirements ISOL Target Design and Analysis Fragmentation Beam Dump Design Project Status

Page 3: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

3

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Rare Isotope Accelerator (RIA)DOE Sponsored R&D Areas Beam Simulation Front End Driver Linac (2nd

Stripper Region RH Considerations) Isotope-Separator-on-Line (ISOL) Fragment Separation- for Fragment Separators Fragment Separation- for Gas Cell Post Acceleration Multi User Considerations

Page 4: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

4

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

ISOL Target

Analysis and evaluation of target concepts (Mercury, Tungsten/Water Cooled)

Identification of required utilities and corresponding remote maintenance capabilities

Activation and Heating Calculations Target Gallery layout and optimization for

maximum availability

Page 5: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

5

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Fragmentation Target

Development of simulation codes for heavy ion transport

Evaluation of Beam Dump for full range of production scenarios [Cu (water or gas cooled), Lithium Stream]

Development of high-power target concepts Simulation of radiation doses to magnets and other

components Development of concepts for remote maintenance for

damaged components Materials Research

Page 6: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

6

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Multi-User Considerations

Incorporate capability for simultaneous independent experiments

Multiple target vs. Cost Optimization Maximize availability

Page 7: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

7

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

The RIA facility schematic layout and areas of R&D

Page 8: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

8

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

A Possible RIA Site Layout

Page 9: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

9

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

RIA Parameters List

WBS Parameter BaseValue Unit Comments

1.0 GLOBAL PARAMETERS1. 0. Maximum beam power on target 400 kw1. 0. Primary beam kinetic energy on target 1.0 GeV protons

400 MeV/u uranium1. 0. Beam Frequency Steady State1. 0. Protons/sec 2.5x10151. 0. Ion Types H thru Uranium1. 0. Front end length TBD1. 0. Linac Length TBD1. 0. HEBT Length TBD1. 0. RTBT Length TBD1. 0. Maximum uncontrolled beam loss 1 W/m1. 0. ISOL Target material Hg,W,Ta,Ucx …..1. 0. Fragmentation target material Li, Graphite, ??1. 0. Number of ISOL targets 2 (3rd optional)1. 0. Number of Fragmentation targets 21. 0. Number of stripper stations 21. 0. Initial number of instruments ??

Page 10: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

10

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

85m x 60m

75m x 16.5m

RIA Target Gallery Layout

Page 11: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

11

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

RIA Beam production area

ISOL type beams

Fast fragment beams

• High-power target design (ANL, ORNL, MSU)• Development of overall concepts for the beam production areas

(MSU, ORNL, LLNL, LBNL, LANL, ANL)

Challenges: High power + high power densityFrequent target changes

Page 12: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

12

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Page 13: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

13

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

HIGH BAY AREA

DUAL SERVOMANIPULATORS

(SHOWN IN STORAGE POSITION)

TRANSFER CELL

(HANDS ON MAINT.) BASEMENT/

WASTE DISPOSAL

INCELL SHIELD DOORS

ISOL TARGET STATIONS

FRAGMENTATION TARGET STATIONS

FRAG SHIELDED STORAGE AREA

FRAG MAINTENANCE/DECON CELL

50 TON GALLERY CRANE

100 TON HIGHBAY CRANE

ISSUES CELL ACCESS (CONTAMINATION)

SHIELD DOORS

Page 14: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

14

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

SHIELDED HOTCELL

ISSUES MODULE SIZE

DOSE LIMITS?

Page 15: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

15

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

BRIDGE MOUNTED SERVO MANIPULATOR

Page 16: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

16

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

ISOL BEAMS

FRAGMENTATION BEAMS

Page 17: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

17

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

FLIGHT TUBE

BEAM DIANOSTICS

LI TARGETQUADRAPOLE SET

DIPOLE

BEAM DUMP

SHIELDING

ISSUES COMPONENT SIZE

LIFETIME

COUPLINGS

Page 18: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

18

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

HIGHBAY CRANE

TARGET GALLERY CRANE

AUXILLARY CRANE (WEDGE REGION 30T)

19m

12m

Page 19: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

19

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

INSTALL ALL ACTIVE TARGET SYSTEMS

TARGET SERVICE TRAYS

Page 20: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

20

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

STEEL SHIELDING

Page 21: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

21

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

COVER SHIELDING

Page 22: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

22

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

BEAM DUMP

ISOL TARGET BEAM DIAGNOSTICS

ELASTOMER VACUUM SEALS

ISSUES MODULE SIZE

HEATING

SEALS

Page 23: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

23

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

ION OPTICS

DIPOLE / SWITCHYARD

Page 24: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

24

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

ISOL TARGET UTILITIES

HEAVY WATER DELAY TANK

LIGHT WATER DELAY TANK

VACUUM SYSTEM

POWER / INSTRUMENTATION

PRESSURIZED GASES

NOTE: HEAVY WATER MAY NOT BE REQUIRED

Page 25: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

25

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

SECONDARY VACUUM (BLUE)PRIMARY VACUUM (RED)

Page 26: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

26

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

LIGHT WATER JUMPERS

HEAVY WATER JUMPERS

POWER / INSTR JUMPERS

GAS FLEXIBLE HOSES

THERMOCOUPLE CONNECTORS

LIFTING FEATURES

SPRING LOADED CAPTURED BOLTS

Page 27: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

27

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Page 28: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

28

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Requirements for RIA Target Building Remote Maintenance Large Hot Cell Remote Handling Equipment

Large Hot Cell Configuration and Function

Component Design for Remote Handling

Remote Tooling

Page 29: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

29

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Remote Handling Manipulators

There are three basic types of manipulators: Wall Mounted Master-Slave Manipulator Power-arm mounted on bridge Servomanipulator mounted on bridge

Page 30: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

30

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Master-Slave Manipulator (MSM)

Advantages Highly dexterous Force reflecting Inexpensive Reliable (HD models) Work well with a shielding window

Disadvantages: Limited reach Small effective working volume Require a shielding window

workstation Can be overloaded by operator

Page 31: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

31

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Bridge Mounted Servomanipulator Advantages:

Highly dexterous handling Force reflecting 5 to 8 X hands-on task times Reduces need and cost of special

remote handling features on components

Moderately powerful Can be equipped with an auxiliary

hoist to assist with material handling

Disadvantages: Expensive Complex and potentially unreliable Mechanically compliant arm limits

positioning accuracy in robotic mode

Page 32: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

32

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Hot Cell Video Cameras - Rad TolerantRadiation hard IST/REES R981 Cameras (industry standard ) Advantages

Wall and bridge mountable Can include lights and cameras Rad resistance to >105 rads Reliable

Disadvantages High cost Hands-on maintenance

required Black and White only Relatively poor visual quality Limits hot cell background

Page 33: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

33

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Hot Cell Functions

Hot cells have two primary functions1. Radiation Control; passive elements such as

concrete, shielding windows and vault doors.2. Contamination Control; active systems

high efficiency ventilation low level liquid waste water treatment Solid waste treatment, handling and shipping

Each of the three active systems is expensive and large

Page 34: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

34

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Hot Cell Material Handling

Gravity is our only friend; therefore….. Virtually all material handling is accomplished by

bridge cranes; as a result: Cells tend to be high to provide head room, hook height and

clearance over servomanipulator bridges. Cells tend to be long and narrow to reduce the bridge width

and allow for easier monitoring of bridge motions. Working areas of cell determined by bridge coverage; thus

crowning of the cell is advantageous. Cell modules should be designed for the minimum possible

load since larger cranes have less coverage.

Page 35: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

35

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Crane and Servomanipulator Combinations

Overhead bridge crane is mounted above the servo bridge

Servomanipulator and transporter with Aux hoist must be able to pass bridge crane to operate on both sides of the hook

Retrieving tools and lift fixtures is difficult and time consuming

RIA will probably require multiple cranes and servo systems to provide backup and reduce turn-around times.

Page 36: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

36

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Personnel Access vs. Fully Remote

A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell in Cell Design, Component Design, Layout, Tooling, and Operation.

A Cell Designed To Operate Partially Hands-on Cannot Be Easily Converted To Full RH.

Cooling water vaults can be entered after 1-3 days of radiation cool-down if filters and IX columns have local shielding.

Page 37: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

37

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Remote Maintenance Design

Process components modularized based on expected maintenance frequency

Remote handling interfaces incorporated to facilitate remote disassembly and assembly of modules with standardized remote tooling and lift fixtures

Maintenance accomplished by replacement of failed component

Motor module

Pump module

Sump tank

SNS Hg Pump

Page 38: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

38

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Identification of Tasks

Summary Top Level Maintenance Design Parameters

Expe

cted

Ope

r. Li

fe

Res

tora

tion

Tim

e G

oals

Spar

e

Rep

air

1. 0. Target Process Components1. Target Module >4 Mo < 5 D Yes No2. Primary Mercury Pump ~20 Yr <30 D No No3. Primary Mercury Pump Motor ~5 Yr < 5 D Yes No3. Process Control Sensors 1 Yr <2 D Yes No4. Vacuum Pump Module ~5 Yr <5 D No No6. Mercury Process Gas Valves ~5 Yr <5 D Yes No7. Mercury Transfer Valve ~20 Yr <5 D No No

Mercury Transfer Valve Operator ~5 Yr <2 D Yes No8. Hg/Water Heat Exch. >15 Yr <60 D No No9. Pipe Spools (Frequent Coupling) >10 Yr <60 D No No

10. Collection Basin No NoLOF

Remote handling tasks must be identified early; the list is the basis of design for the RH system and the components

Page 39: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

39

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Remote lift fixture examples

Page 40: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

40

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

L2

D 1

water coolingand/or radiative cooling

watercooling

heating/ heat shield

line to ion source

Actinide target

2000 deg C

Mercury or D2O-cooled W

Two-step fission targets for 100 kW beam power

Choice of converter type has impact on design of target area • Investigation of neutron/fission yields, beam and decay heating, radiation damage for

400 kW 2-step target• Conceptual design studies of cooling schemes

Are there alternatives to Li +W ? (MSU, ORNL, LLNL)1) Mercury as target and coolant2) Water-cooled W

Original proposal (J. Nolen, ANL): Li-cooled W converter

?

Principle of 2-step fission targets: • Neutron converter for neutron production and

dissipation of beam power• Surrounding blanket of fissionable material

for rare isotope production

Page 41: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

41

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Page 42: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

42

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Axial flow DesignWater velocity of 18.2 m/s

Grid 1 Grid 2

W Volume 80% 80%Velocity 18.2 m/s 18.2 m/s

Inlet Temperature 40ºC 40ºC

Outlet Temperature 62ºC 62ºC

Pressure Drop 97 psi 100 psi

Max W Temperature 224ºC 214ºC

Max D2O Temperature

143ºC75/210ºC

134ºC76/191ºC

Page 43: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

43

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

two wheels and one stationary beam dump

Page 44: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

44

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Example of a RIA Pre-Separator

Beam

Target

Dipole Quad-Triplet

IsotopeSlits

Wedge

BeamDump Power Densities

Radiation Fields

Optics design

Page 45: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

45

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

AIR INLET/OUTLET JUMPERS

TARGET MODULE

VACUUM ENCLOSURE

Page 46: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

46

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

HEAT EXCHANGER

AIRFLOW PIPES

SHIELDING

6” REMOTE PIPE COUPLINGS

UTILITY CONNECTIONS

VACUUM SEAL

Page 47: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

47

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

floor between dump motor and vacuum space

Page 48: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

48

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

Beam dump section; magnet vacuum space extended to top of above floor.

Page 49: PowerPoint Presentation€¦ · PPT file · Web view · 2005-10-10Personnel Access vs. Fully Remote A Fully Remote Hot Cell Is Completely Different from a Personnel Accessible Cell

49

OAK RIDGE NATIONAL LABORATORYU. S. DEPARTMENT OF ENERGY

RIA Project Status

CD0 granted Unfunded Mandate—Construction start

Sept 2008