    proposed Kennedy Plaza schematic

  • 5

    1-N, 32, 34, 40, 78 51, 54, 58, 72

    56, 9

    2E

    9, 55, 57 8, 21, 30

    35, 49, 50

    10X

    , 12X

    , 61X

    59X, 68X, 95X

    1-S, 31

    17, 1

    8, 1

    9

    27, 28

    3, 92W 6, 20, 22

    14 33 66

    60

  • 01.1

    5.1

    4

    How can materials be used to help transform this space?

    Distinctive, hardwearing pavement

    Flexible, resilient furniture

    Contemporary, well-performing shelters

    Smart branding, signage and wayfinding

    Trees to frame space

  • 01.1

    5.1

    4

    infill materials – concrete

  • 01.1

    5.1

    4

    structured tree planting; use of stone dust

    Lincoln Center Lincoln Center – after construction

  • 01.1

    5.1

    4

    signage, branding, wayfinding

    Portland, OR

  • 01.1

    5.1

    4

    a flexible shelter family

  • 01.1

    5.1

    4

    re-purposing of existing shelters

    proposed – option 1

  • 01.1

    5.1

    4

    proposed Kennedy Plaza schematic

  • 01.1

    5.1

    4

    proposed Kennedy Plaza schematic

  • 01.1

    5.1

    4

    proposed Kennedy Plaza schematic

  • Operational (COA) Considerations

    • COA scheduling efficiencies will allow us to drop from 18 to 15 berths at KP

    • But ridership is growing!

    • # of buses serving KP will remain similar to today and potentially grow

    • Like many other mid-sized US cities, Providence may be growing too big to effectively terminate all downtown bus service at one location

    15

  • Study to Consider Additional Downtown Hubs

    GOALS & OBJECTIVES OF STUDY

    1. IMPROVE SERVICE FOR EXISTING RIDERS AND ATTRACT NEW RIDERS

    Improve access throughout downtown

    Provide comfortable facilities

    Reduce travel times

    Minimize transfers

    Improve connections

    2. ADDRESS OPERATIONAL CONCERNS AT KENNEDY PLAZA

    Provide a safe and secure environment

    Reduce passenger volumes at KP

    Reduce passenger waiting space requirements at KP

    Reduce berth requirements at KP and around Burnside Park

    Reduce bus volumes at KP

    3. DEVELOP A FUNDABLE PROJECT

    Minimize operating cost increases

    Ensure reasonable capital costs

    Provide opportunity for funding partnerships

    4. SUPPORT LOCAL DEVELOPMENT GOALS

    16

  • Alternatives & Actions being considered

    Multiple transit centers:

    Alt 1: KP and Providence Station

    Alt 2: KP and Jewelry District

    Alt 3: KP, Providence Station and Jewelry District

    Supplement with:

    • Easy access to transit at other locations

    • Attractive downtown superstops

    • Transit emphasis corridors

    • Frequent service

    • Fast service (TSP and limited stops)

    • Convenient transfers

    17

  • Downtown Service with 2 or 3 Transit Centers

    18

    • Buses pass through KP and extend to:

    – Providence Station; or

    – Garrahy Courthouse

    • If one new terminal introduced, some buses would continue to terminate/layover at KP

    • With two new terminals, all routes would serve KP, but none would terminate there

  • Benefits/Costs of Additional Downtown Hubs

    • Passenger benefits include:

    – Riders have more direct service to more downtown locations

    – Improved intermodal connections

    – Increased transit service in the Jewelry District

    • Operational benefits include:

    – Reduced passenger volumes at KP

    – Reduced berth requirements at KP

    – Reduced bus presence (total time) at KP

    • How/why?

    – Many who now walk from KP (or transfer buses) to reach different downtown destinations would shift to the new hubs

    – Buses operating beyond KP would spend much less time at KP

    RIPTA operating costs would increase with extended service to new hubs.