Upload
phungkiet
View
216
Download
4
Embed Size (px)
Citation preview
CONERGY.COM
SaCaSol Project Philippines - Alexander Lenz, MD Asia & Middle East
Solar Energy South East Asia
CONERGY.COM
Powering solar
in a world full of energy.
Agenda
Company Overview
SaCaSol IA+B: 22 MWp Project Philippines
2
The Conergy track record
> 15 YEARS
of solar experience.>700 MW
installed solar parks.> 300
projects globally.
2.5 GW
solar capacity sold.16
countries.
WHO WE ARE
> 350
employees.
3
Successfully active in Asia since 2002
Market leader in Thailand and Philippines.
Conergy Core Business OverviewM
ark
et
Seg
men
ts
Sale
s C
han
nels
ROOFTOP (B2C & B2B) PROJECTS (SPV & EPC)
COMMERCIAL (roof-top)RESIDENTIAL
Directsale
Direct Sale to solar installers
Directsale
INDUSTRIAL (free-field)
O & M BUSINESS
| Indirect distribution of PV System components via installer network – incl. modules, mounting systems, inverters, storage & monitoring as well as accessories
| One-stop shop for all PV system components & comprehensive services incl. O&M residential service offering
| Distribution to large investors, project developers, EPCs and/or project financiers
| Turnkey solar park projects, incl. project development, financing support, engineering, procurement and construction
| Operation & maintenance services (technical & commercial operations management)
CONERGY CORE BUSINESS
4
Project Development &
Financing
EngineeringProcurementConstruction
+
Conergy has a global footprint and has been active in Asia since 2002
WHO WE ARE
GERMANY|Hamburg|Leipzig (Service)|Zweibrücken (Central Warehouse)
CANADA|Edmonton|Toronto
U.S.A|Denver
|Sacramento|Malvern|Miami (Kawa)
UK|Milton Keynes|Pulborough (Wirsol UK)
ITALY|Vicenza
AUSTRALIA|Brendale
THAILAND|Bangkok
JAPAN|Tokyo
SINGAPORE|Singapore
UNITED ARAB EMIRATES|Dubai
COOPERATION AGREEMENTS:|Mexico|Brazil|Turkey|Jordan|Saudi Arabia
5
PHILIPPINES|Manila
The business is supported by strong service units regionally and globally
Comments
| Conergy is headquartered in Hamburg, Germany, where
central functions reside in the entity Conergy Global
Solutions GmbH (CGS)
| In this central entity Conergy’s core competencies and
services are bundled - including global Engineering, Quality
Management, Purchasing and Supply Chain
| Through the bundling of the services and know-how in one
central organization an efficient setup of the company is
ensured and the competencies are continuously
strengthened
| The strong shared service functions support the sales units
on a global basis and ensure a consistent high-quality
service to our clients
| To cater to regionally specific needs and to avoid time zone
related reaction time issues, all Asia & ME units are
furthermore supported from APAC HQ in Singapore (CAS)
CONERGY CORE BUSINESS
ConergyGlobal
Solutions
6= CGS = CGS/CAS = CAS
Conergy builds turnkey solar power plants and provides O&M services after grid connection
Conergy’s project service offering for commercial and industrial customers
Conergy hands over the turnkey solar park to the customer – the power plant is ready for operation
Conergy provides
operation & maintenance
(O&M) services to
ensure highest possible yields
BEFORE GRID CONNECTION AFTER GRID CONNECTION
CONERGYOperate
(long-term)Build
(short-term)
EXPERIENCE OF OVER 650 MWP EXPERIENCE OF OVER 300 MWP
CONERGY
Project Development
Financing Support
Engineering
Procurement
Construction
Operation &
Maintenance
CONERGY PROJECT BUSINESS
7
Conergy’s value proposition is based on top quality, experience and bankability
Conergy’s Value Proposition
… focused on providing the best development,
financing, EPC and O&M Services Globally
„Global Experience combined with local expertise – 170 MWp in Asia”
„Founded in 1998, the Conergy team provides theunbiased quality solar
projects need”
„Privately owned, well capitalized, debt-free”
„O&M as profit boost to the project”
8
A global leader in turnkey solar power plants with over 700 MWp installed worldwide
Conergy’s project experience per country [MWp]
INSTALLED TURNKEY SOLAR POWER PLANTS
TRACK RECORD
9
� For more than 15 years Conergy has built multi-megawatt PV power plants as a global system provider
�Conergy’s international footprint encompasses the construction of more than 300 PV power plants in Europe, Asia, Middle East and America
�Conergy has completed 700 MWp of installed solar power by H1 2014
+ 41.0 contracted
As a first mover in Asia, Conergy has achieved considerable track record in the region
Presence and market share Asia & ME [%] as of 30/06/2014
TRACK RECORD
JAPAN|Market Entry in 2013|2 MW completed|>100 MW Pipeline to be build
Thailand|>100 MW|≈15% market share of ???? volume|First to have completed a PV power plant
Philippines|>80% market share|First to have completed a PV power plant|22 MW completed|51 MW under construction
Middle East|Among a handful of competitors with relevant references|KAUST 2 MW Rooftop
South Korea|35 MW completed
10
Once you’ll know what to look for,you’ll see us everywhere
11
Siam Solar, ThailandSize 73,5 MWp CO2-Saving / Year 55,400 tons Year Of Construction 2013-14
SaCaSol, The PhilippinesSize 22 MWp CO2-Saving / Year 18,820 tons Year Of Construction 2014
TRACK RECORD
Once you’ll know what to look for,you’ll see us everywhere
CARILLION/NATIONWIDE
BUILDING SOCIETY, UKSize 50 kWp CO2-Saving / Year 20 tons Year Of Construction 2012
PALO ALTO, USA
JEWISH COMMUNITY CENTERSize 397.5 kWpCO2-Saving / Year 150 tonsYear Of Construction 2014
REFERENCES
12
Conergy’s power plants are now globally certified with internationally accredited "TÜV Label”
Quality in Design, Engineering & Execution
FINAL ACCEPTANCE
| Commissioning together with TÜV Rheinland
| Documentation in accordance to TÜV Rheinland criteria
Conergy offers certified TÜV standards on a global basis
Certification of TÜV is now offered as integral part of Conergy‘s EPC services for large-scale turnkey solar parks: Customer benefits from inclusion of external second opinion that ensures reliable and sustainable project execution – customer’s power plant is automatically TÜV certified
| Leading international auditor network for security and quality examination of solar installations
| TÜV certification of solar installations prove internationally accredited standards and quality management
| TÜV certification as external consultation for a second opinion is widely used to validate bankability of project
PARTNERSHIP FOR PLANT CERTIFICATION
PLANNING
| Check of yield prognosis
| Qualification of components
| Release of exe-cution planning
CONSTRUCTION
| Site supervision and on site quality assurance
| Test of modules by TÜV Rheinland laboratory
+ +
CONERGY QUALITY
13
Stringent supplier quality management on a global basis grants high quality product portfolio
Conergy’s Supplier Management
| Conergy’s supplier management ensures high quailty products
| According to high Conergy standards
Worldwide production sites:
GERMANY CHINA CZECH TAIWAN USA
Activities
1. Production process and product quality audits at supplier’s manufacturing sites
2. Quality Assurance Agreement (QAA) required for supplier qualification
3. Conergy Quality Requirements (CQR) implemented in supplier production sites
4. Product quality inspections (according to ISO2859)
5. Claim management
Quality of product portfolio
MODULES STORAGE INVERTER MOUNTING SYSTEMS
SUPPLIER QUALITY MANAGEMENT
14
CONERGY QUALITY
Conergy is among the most bankable solar downstream companies
15
Privately Owned | Majority ownership by Kawa Capital Management, USA
Well capitalized | Debt-free balance sheet, strong equity position
Capital and finance access
| Excellent access to development capital and trade finance / bank guarantees to endure business growth
BANKABILITY
Throughout the lifetime of the PV plant, Conergy offers O&M services with proven experience
Conergy’s Operation & Maintenance service offering
16
| Conergy can offer even more benefits as O&M partner if the project has been planned and built by Conergy
| In such case Conergy has direct and quick access to the project planning and execution documentation to clarify upcoming questions
| Moreover, Conergy knows its components and the system integration best and is experienced with possible fault corrections
BENEFITS
EX
PE
RIE
NC
ES
ER
VIC
E S
CO
PE
| Technical management of over 300 MWp output power
| Commercial management of over 200 operating companies
| With a technical availability in average of 98,7 % Conergy projects are always outperforming
| Leading company with over 12 years experience in O&M services with the required infrastructure in place
TECHNICAL OPERATION MANAGEMENT
COMMERCIAL OPERATION MANAGEMENT+
| Technical plant management
| Fault management
| Data and information mgmt.
| Engineering / Consulting
| Administration
| System maintenance
| Bookkeeping
| Management
| Controlling
| Cash Management
O&M CAPABILITIES
Agenda
Company Overview
SaCaSol IA+B: 22 MWp Project Philippines
17
| 22 MW contract divided into two phases of 13 MW and 9 MW respectively
| Project Timeframe: October 2013 to June 2014
| Phase I inaugurated in May 2014 by President Benigno S. Aquino III
| Phase II Commissioning in June 2014
| 1st large-scale project to break ground in the Philippines aiming for the FIT
| Fully equity financed construction
| RE hub significantly increased local job availability
The site is located near San Carlos in Negros Occidental
Project Details
18
Conergy has delivered the project in a consortium approach
Conergy – Local Partner Consortium
|Overall conceptual design|Overall mechanical and electrical design
|Main DC & AC components supply
|Remote Project Management Support|Commissioning support
|Warranties and Guarantees
|O&M
Consortium Member
General role in project
Tasks
Engineering Engineering Procurement ConstructionProcurement
PROJECT ENGINEERING PROJECT MANAGEMENT
|Local civil design|Local mechanical design|Local electrical design
|Local components supply
|Installation |Commissioning
19
As the first project of that kind in the country, the project was particularly challenging
Challenges in the first PV Project in the Philippines
Challenge Solution
20
Purchasing| Components normally sourced locally such
as cables, switch-gears, transformers not available domestically (or only with many middle-men)
Planning
Execution
| Shift of many components from onshore to offshore supply with resulting challenges in certifications, specifications and logistics
| Local partner: Lack of experience | Through screening of experience, resources and cash positon, strong Conergy involvement
| Local costs calculation | Extensive know how transfer from Conergy to local partner, cost plus
| Tight schedules in remote areas
| Permitting bottlenecks (BOI)
| Logistics bottlenecks
| Bring in experience, support
| Workaround solutions
| Work with experienced local customers brokers / forwarders, plan sufficient buffer
The project has produced above expectations in the first months of operation
21
Highlights:| SaCaSol Plant started 13 MW operation on 15th of May 2014
| The full 22 MW capacity started operation on 16th of August 2014
| The plant has produced 680 MWh more than the planned energy production since it started operation in May 2014 up to 13th of
November 2014
Weekly cumulative Energy Production (MWh)
The first large PV power plant of the Philippines is delivering clean energy to the grid
CONERGY.COMCONERGY.COM
Our World is full of Energy.