  • The Republic of the Union of MyanmarMinistry of Electric PowerPresent & Future Power Sector Development in MyanmarPlace - NaypyitawDate - 27-2-2013

  • Policies *

  • To employ the available energy resources in power generation for the sufficient supply of electricity.To promote the effective and efficient use of electricity for future energy sufficiency, reserves and sustainability in our nation.To conduct the reliable power quality to be supplied safely.To enhance the electricity distribution system to be developed in accordance with the advance technologies.To adopt the environment-friendly ways in electricity generation, transmission and distribution.To encourage the expansion of power transmission and distribution throughout the country and the Public-Private-Participation in each sector.To get millennium achievements, besides of constructing of thermal power plants, have to construct more hydro power plants yearly by the least of EIA and SIA, whereas hydro power is the clean and renewable energy.Policies*

  • Present Condition*

  • *Department of Hydropower ImplementationHydropower Generation EnterpriseDepartment of Hydropower PlanningDepartment of Electric PowerMyanma Electric Power EnterpriseElectricity Supply EnterpriseYangon City Electricity Supply BoardMinistry of Electric Power (MOEP) Distribution TransmissionGenerationGenerationSystemOperator

  • Tigyit120MWHydro Power PlantMone75MWSedawgyi25MWZawgyi-212MWZawgyi-118MWBluchaung-128MWPaunglaung280MWShwetaung55.35MWYenwe25MWZaungtu20MWMyanaung34.7MWHlawga154.2MWThaton50.95MWMawlamyaing12MWAhlone154.2MWYwama70.3MWYeywa790MWKhapaung30MWShweli-1600MWKengTawng54MWShwekyin75MWKun60MWKyeeOhnKyeeWa74MWTapein240MWSteam Power PlantGas Power PlantCurrent Generation FacilitiesOf Power System*Thaphanseik30 MWKyunchaung54.3 MWMan36.9 MWThaketa92 MWKinda56 MWBluchaung-2168MW

    Sr No.Type of Power PlantNumberInstalled Capacity (MW)1.2.Hydro Power Gas & Steam19112660.0834.9Total303494.9

  • *Transmission FacilitiesDistribution Facilities

    Voltage(kV)Lengthmileskm2301,982.653,190.771321,542.242,481.99662,511.64,042.03Total6,036.499,714.79

    Voltage(kV)Nos. ofSubstationCapacity(MVA)230243,990132261,783.5661132,580.6Total1638,282.1

    Voltage(kV)Lengthmileskm334,516.487,268.58118,682.9813,973.876.68,24.511,326.92Total14,023.9722,569.35

    Voltage(kV)Capacity(MVA)334,278.89114,399.386.61,475.23Total10,153.5

  • Demand Forecasting and Situation for Short Term Period during 2013 to 2016*

  • Demand ForecastIncreased rate will be 15% based on peak load (1790) MW of 2012 year.Demand for industrial zones and special economic zones is not included. *

    Sr. No.YearDemand (MW)Increased Rate(%)12013206015 %22014237015 %32015272515 %42016313015 %

  • If there is no additional generation from new power plant, power shortage will be about 500 MW (25% shortage) in Dry Season. Thermal power is the best solution to reduce power shortage because it is not depend on season and establishing time saving as well. Therefore, priority to establish gas engine power plant and gas turbine power plant.*

    Dry Season (May) (MW)Wet Season (Sep:) (MW)Hydro Generation12101897Thermal Generation350242Total Generation15602139Demand Forecast20601957Difference(-) 509(+) 182

  • *(MW)

    Description2013201420152016DryWetDryWetDryWetDryWetHydro Generation13012017125922891341228913462319Thermal Generation540492107611821572178421532089Total Generation18412509233534712913407334994408Demand Forecast20601957237022522725258931302974Difference (-) 219(+) 552(-) 35(+) 1219(+) 188(+) 1484(+) 369(+)1434

  • *To be Completed Power Plant Projects during Year 2013 to 2016 (MW)*

    Sr.No.Project NameTypeInstalled CapacityCompletion Year1Thaukyekhat-2Hydel12020132Hlawga (Zeya Co.)Gas Engine5020133Ywama (MyanShwePyay Co.)Gas Engine5020134Thaketa (CIC Co.) Gas Engine 5020135Ahlone (Toyo Thai Co.) Gas Turbine12020136PhyuHydel4020147NamchoHydel4020148Ywama ( Transferred from Thailand)Gas Turbine24020149Thaketa (BKB Co., Korea)Gas Turbine500201410Hlawga ( Hydrolancang Co., China) Gas Turbine530201411Upper PaunglaungHydel140201512Baluchaung No.(3)Hydel52201513Mawlamyaing (Myanmar Lighting Co.)Gas Turbine150201514KyaukphyuGas Turbine50201515Upper BaluchaungHydel29201616Kyunchaung (Extension)Gas Turbine70201617Shwedaung (Extension)Gas Turbine802016Total 2311

  • Transmission Line & Substation Projects during Year 2012-13 to 2015-2016*

    Sr. NoState/ RegionTransmission LinesSubstations500 kV (mile)230 kV (mile)132 kV (mile)66 kV (mile)33 kV (mile)500 kV230 kV132 kV66 kVNo.MVANo.MVANo.MVANo.MVA1.Kachin State2856016133001605422Kayar State12016145110053303653Kayin State805622003304Chin State1746245Mon State5091110041006Rakhaing State404374330011927Shan State6044722001100121258Sagaing Region8430222622003209Tanintharyi Region132220022010Bago Region16750921000330011Magway Region3806611044603220412012Mandalay Region14680381015003300546036013Ayeyarwaddy Region24520233001016014Yangon Region14091500Total31325691421828103150038448617137066858(4,862) miles(8,214) MVA

  • Distribution Line & Substation Projects during Year 2012-13 to 2015-2016*

    Sr NoState/ RegionDistribution LinesSubstations66kV mile33 kV mile11 kV mile0.4 kV mile66 kV33 kV11 kVNo.MVANo.MVANo.MVA1.Kachin State-15.070.8826.00--38.50265.322Kayar State-12.50135.259.08--28.0092.153Kayin State-80.0073.4047.00--410.256112.424Chin State--30.8831.25----234.525Mon State-83.00176.66228.81--22123.0016635.046Rakhaing State-67.50142.7363.95--26.008817.827Shan State (South)-94.2151.25143.48--737.558419.458Shan State (East)--11.982.27----347.499Shan State (North)-49.2151.25143.48--418.014432.5210Sagaing Region-149.6847.0730.09--1261.508116.2011Tanintharyi Region-132401.12151.85--860.022545.4612Bago Region (East)-63.55115.380.02--315.013127.9313Bago Region (West)-20.096.7856.86--26.09018.1214Magway Region--41.9156.77----6513.4615Mandalay Region-115.7081.9592.30--1494.0022145.0516Ayeyarwaddy Region-19.0038.9038.69--15.009721.3617Naypyitaw -25.1089.8955.62--1195.011924.9518Yangon Region117.9171.25380.00346.02768033320.0608191.52Total117.91997.582430.181583.2227680128867.82272540.76(5,128.89) miles(2,088.56) MVA

  • Demand Forecasting and Project Implementation for the Long Term Period during 2016-17 to 2030-31*

  • Planned Target for Long Term Yr.(2011-12) to Yr.(2030-31)*

    Project TermPopulationForecast(million)Power DemandPer Capita Consumption(kWh)Electrified Household (%)Demand(MW)Generation(GWh)Yr. 2011-1260.441,80610,44417327%From Yr.(2012-13) to Yr.(2015-16)63.143,07817,79728234%From Yr.(2016-17) to Yr.(2020-21)66.695,68632,87449345%From Yr.(2021-22) to Yr.(2025-26)70.4510,40060,13285460%From Yr.(2026-27) to Yr.(2030-31)74.4219,216111,1001,49380%

  • Generation Plan to Fulfill the Demand from year (2016-17) to (2030-31) (MW)*

    Project TermDemandForecastingReserve PowerInstalled CapacityTo be Implemented during (5) year planFrom Yr.(2012-13) to Yr.(2015 - 16)3,2367654,0011,740From Yr. (2016-17) to Yr.(2020 -21)5,6861,7067,3923,391From Yr. (2021-22) to Yr.(2025 -26)10,4003,12013,5206,128From Yr.(2026-27) to Yr.(2030 - 31)19,2165,76524,98111,461

  • Generation Plan for Long Term*

    Sr.DescriptionTypeNo. of ProjectInstalled Capacity(MW)1Implemented by MOEPHydel103,1902Implemented by Local InvestorHydelCoal51497.63003Implementing by Foreign Investment(a) Had been signed JVAHydel411,399(b) Had been signed MOAHydelGas22217,566.5620(c) Had been signed MOUHydelCoalGasWind1736212,6901,3701,3002,8504To be Implemented Gas Fired Power PlantGas152,825Total54,608.1

  • Power Plant Projects in Northern Side

    Sr.NameInstalled Capacity(MW)1Myitsone6,0002Chibwe3,4003Wutsok1,8004Kaunglangphu2,7005Yenam1,2006Pisa2,0007Lasa1,9008Chibwengae999Gawlan10010Wxhonhgze6011Hkankwan14012Tongxinqiao32013Lawngdin43514Natabat(Kachin)200Total20,345

  • Tapain(2)Konlong(Upper Thanlwin)Naung Pha/MantaungNankhaKeng TongWantapengSoluHekuKeng YanShweli(2)MongwaPower Plant Projects in East & North East Side

    Sr.NameInstalled Capacity(MW)1Tapain(2)1682Konlong(UpperThanlwin)1,4003Naung Pha1,0004Mantaung2005Shweli(2)5206Keng Tong967Wantapeng258Solu1659Mongwa5010Keng Yan2811Heku8812Nankha200Total3,940

  • MawlightKalaywa (Coal)ManipuShwesaryaePower Plant Projects in North-West SideHtamanthi

    Sr.NameInstalled Capacity(MW)1Htamanthi1,2002Mawlight5203Kalaywa (Coal)6004Manipu3805Shwesaryae669Total3,360

  • HtukyanHannaThakyaNatabat(Kayar)PalaungBawlakaeYwathitHutgyiMong Tong(Upper Thanlwin)PekonHis-HsonePower Plant Projects in South-East Side

    Sr.NameInstalled Capacity(MW)1Mong Tong(Upper Thanlwin)7,1102Htukyan1053Hanna454Thakya1505Palaung1056Bawlakae1807Natabat(Kayar)1808Ywathit4,0009Hutgyi1,36010His-Hsone (Wind)22011Pekon(Wind)950Total14,405

  • Power Plant Projects in Western SideSinedinLaymyoLaymyo(2)Thahtay

    Sr.NameInstalled Capacity(MW)1Sinedin76.52Laymyo6003Laymyo(2)904Thahtay111Total877.5

  • TanintharyiPharponZinkyaukKawkareikMudoneDaweiPower Plant Projects in Southern SideYangon(Huanenglancang)Yangon(Virtue Land)

    Sr.NameInstalled Capacity(MW)1Tanintharyi6002Pharpon (Wind)2903Zinkyauk(Wind)1604Kawkareik (Wind)5805Mudone(Wind)5106Dawei(Wind)2207Yangon (Coal)(Huaneng Lancang)2708Yangon(Coal)( Virtue Land)300Total2,930

  • Transmission Plan during Year 2016-17 to 2030-2031*

    Sr. NoState/ RegionTransmission LinesSubstations230 kV (mile)66 kV (mile)230 kV132 kV66 kVNo.MVANo.MVANo.MVA1.Kachin State3252Kayar State3Kayin State25251501454Chin State95245Mon State3011004506Rakhaing State7Shan State3063935500211558Sagaing Region701100159Tanintharyi Region34570440031810Bago Region120011011Magway Region6433012Mandalay Region14391380456053513Ayeyarwaddy Region8017110078014Yangon RegionTotal963700222730566051457(1,663) miles(3,847) MVA

  • *Distribution Planduring Year 2016-17 to 2030-2031

    Sr NoState/ RegionDistribution LinesSubstations66 kV mile33 kV mile11 kV mile0.4 kV mile66 kV33 kV11 kVNo.MVANo.MVANo.MVA1.Kachin State123.5024.00120.1179.85626.00550.006613.202Kayar State-53.00287.76278.40--330.0016733.403Kayin State-80.00196.00487.00----646129.204Chin State--15.639.00----5310.605Mon State-26.00456.001138.0--330.001519303.806Rakhaing State--91.45170.50----24549.007Shan State (South)-12.00325.50813.75--440.001085217.008Shan State (East)-135.00171.00427.50--11110.00570114.009Shan State (North)-20265.80664.50--440.00886177.2010Sagaing Region-369.00712.901686--52520.002252450.4011Tanintharyi Region--586.001174----1638327.6012Bago Region (East)-46.00470.001177--32320.001566313.2013Bago Region (West)-17.50372.00928.00--19190.001236247.2014Magway Region-95.00498.001174--770.001564312.8015Mandalay Region-188.003851.909580.4--2012010127732554.616Ayeyarwaddy Region--782.001786--220.002573514.6017Naypyitaw -102.001468.003673--76760.004896979.2018Yangon Region486.0016.00848.00668.001073210----Total609.501103.50115182594511332364194190337356747(39,176) miles (14,173) MVA