POWER REQUIREMENT
Ground floor
Sl. No.
Room-1 lab Head
1
2
3
4
5
6
7
8
9
Attached bath room
9
10
11
12
13
14
Room 3 Office
15
16
17
18
Room 2 PA to Lab
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 2/21
Room 4 and 5 Toilets
19
20
21
22
Room 9 conference room
23
24
25
26
2728
29
30
31
32
3334
Room 11 Air Lab
35
36
37
38
39
40
41
42
43
44
Room 12 Air store
45
46
Room 6 & 7 Electrical
Room 10 Sample
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 3/21
47
48
staircase & corrider
49
Room 13 staff room
50
51
52
53
54
Room 14 server Room
55
56
Room 15 Store
57
58
59
60
61
Lift
staircase
62
Entrance Lobby63
64
65
66
Room 16 Bio Lab
67
68
69
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 4/21
Room 16 Bio Assay Lab
POWER REQUIREMENT
1st floor
Sl. No.
Terrace
Room 17 Instrumentroom
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 5/21
Room 18 and 19 Toilets
Room 20 water utility
Room 21 Hot Zone
Room 22 soil lab
Room no 23 Balanceroom
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 6/21
Room no 24 Chemical Lab
Room no 25 Library
Room no 26 Lab Store
Staircase Fire escape &
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 7/21
Room no 27 UPS room
Room no 28 Insrument
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 8/21
Instrument / Equipment
Computers with all peripherals 0.2
Laserjet Colour printer 0.2
TV 0.5
Fax 0.1
Refrigerator 2
Air Conditionre 3
Lighting 0.5
2 fans 0.2 x 2
Table lamp 0.01
Extra points 1
Exhaust fan 0.2
Lighting 0.01
Computers with all peripherals 0.2
LaserJet printer 0.2
AC 3
Lighting 0.2
Fax 0.1
photo copier 1
Extra points
Fan 1 0.2
Computers with all peripherals 4 nos. 0.2 x 4
LaserJet central printer 1
AC 3
Lighting 0.2
Fan 2 0.2 x 2
photo copier 1
Fax 0.1
Extra points
Unit wise PowerRequirement in
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 9/21
Exhaust fan 2 nos 1 x0.2
Lighting 0.02
Exhaust fan 1 nos 0.2
Lighting 0.02
AC 3 nos 3 x 3
Mike 0.01
LCD projecter 0.5
LED TV 0.5
Computers with all peripherals 0.2Lighting 0.5
Fan 8 Nos. 0.2 x 8
Extra points 0.5
Computers with all peripherals 0.2
LaserJet printer 0.2
Deep freezer 3
Lighting 0.02Fan 2 Nos. 0.2 x 2
Refrigerator 2
Extra points 0.5
Spectro photometer 0.1
Balance 0.05
Oven 3
refrigerator 2
pH meter 0.01
Computers with all peripherals 0.2
LaserJet printer 0.2
Lighting 0.2
Fan 4 Nos. 0.2 x 4
Exhaust fan 2 nos 0.2x2
Extra points 1
Fan 02 Nos 0.2 x 1
Exhaust fan 1 nos 0.2
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 10/21
Lighting 0.1
Instrument Charging points 0.2
Extra points 0.5
Work shop table with power supply 0.5
Lightings 0.1
Computers with all peripherals 5 sets 0.2x5
LaserJet printer 01 central 0.2
AC 2 nos 3 x 2
Lighting 0.1
Fan 4 Nos. 0.2 x 4
Extra points 0.5
lighting 0.1
AC 1 no. 3
Extra points 0.5
Lightning 0.1
Fan 2 Nos 0.2 x 2
Exhaust fan 2 nos 0.2x2
Computers with all peripherals 1 sets 0.2
LaserJet printer 01 central 0.2
Extra points 0.5
Lightings 0.1
Lightning 0.2
Fan wall mounted 3 Nos and stand fan 3 Nos 0.2 x 6
Computers with all peripherals 1 sets 0.2
LaserJet printer 01 central 0.2
Extra points 0.5
laminar flow -1 1
Centrifuge-1 0.25
Computers with all peripherals 1 sets 0.2
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 11/21
auto clave -1 3
balance-1 0.25
oven-1 3
deep freezer -1 2
incubator- 2 2 x 1refrigerator –1 2
Lightning 0.5
Fan 4 Nos 0.2 x 4
Exhaust fan 2 nos 0.2 x 2
Extra points 1
Lightning 0.1
Fan 2 Nos 0.2 x 2
Computers with all peripherals 1 sets 0.5Extra points 0.5
Grand Total in Ground Floor
Instrument / Equipment
Lightning 0.2
Power points 0.5
XRF 3
TFIR 0.5SP Ion meter 0.1
UV Visible 0.5
Nephlometer 0.1
Flame photometer 0.2
Conductivity meter 0.01
Computers with all peripherals 4 sets 0.2
Lighting 0.2
AC 2 nos 3 x 2
Extra points 0.5
Unit wise PowerRequirement in
KW
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 12/21
Exhaust fan 4 nos 0.2 x 4
Lighting 0.1
Distillation set -2 3 x 2
Millipore system-1 1
Lighting 0.1
Extra points 0.5
fume hood-3 2 x 3
water bath-2 2 x 2
hot air oven-2 3 x 2
distillation sets-1 2 x 1
muffle furnace-1 5
hot plate stirrer -4 1 x 4
Exhaust fan 2 nos 0.2 x 2
Lighting 0.1
Extra points 0.5
Shaker-1 1
Computers with all peripherals 1 sets 0.2visible specto, 0.1
karl fischer, 0.1
bomb calorimeter, 2
flame photometer, 0.2
pH meter, 0.01
flash point apparatus 0.5
Refrigerator 2
Micro wave digester 3
hot air oven 3
distillation 3
Lighting 0.2
Fan 3 nos 0.2 x 3
Extra points 0.5
Balance 3 nos 0.1 x 3
Lighting 0.1
AC Dehumidifier 3
Extra points 0.5
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 13/21
Rerigerator-1 2
Ovan-1 3
Deep freezer -1 3
BOD incubator -2 3 x 2Centrifuge -1 0.25
Visible spectrophotometer 0.1
Flame photometer 0.2
COD Digester with Heating Block system -2 Nos. 1 x 2
1 x 2
Filtration assembly with vacuum pump 0.25
Centrifuge 0.25
Water bath (Thermostatic control) 2
Heating mantles-6 Nos. 0.5 x 6Magnetic stirrer with hot plates-6 Nos. 0.5 x 6
pH meter with combined glass electrode 0.01
Conductivity meter 0.01
Nepheloturbidity meter 0.01
Computers with all peripherals 1 sets 0.2
Lighting 0.2
Fan 6 nos 0.2 x 6
Rotary evaporater 0.2
0.2
mecury analyser 0.1 TOC 2
Nirogen generator
Beta counter 0.5
scintilation counter 0.5
Extra points 0.5
Lightings 0.01
Lightning 0.5
Fan 2 Nos 0.2 x 2
Computers with all peripherals 1 sets 0.2
AC 3
Photo copier 1
Lager Jet printer 0.2
Extra points 1
Lightning 0.5
TKN analyser automatic with aluminium blockdigestor-2 Nos.
Zero head space extraction with filtration
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 14/21
Fan 3 Nos 0.2 x 3
Exhaust fan 2 nos 0.2 X 2
Computers with all peripherals 1 sets 0.2
printer 01 0.2
Extra points 0.5
Lightning 0.2
ICP: work station , 4
GC-MS: work station 2
HPLC: work station 2
Refrigerator 2
AOX: work station 1CHNS 3
work station 0.5
Extra points 0.5
Grand Total in 1st Floor
Total power requirement
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 15/21
Total power on UPS
7.91 0.1
0.2
0.2
0.5
0.1
2
3
0.5 0.1
0.4
0.01
1
0.21 0.01
0.2
0.01 0.01
4.9 0.20.2
0.2
3
0.2 0.1
0.1 0.1
1
0.2
6.5 0.2
0.8
1
3
0.2 0.1
0.4
1
0.1 0.1
Total PowerRequirement in
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 16/21
0.42 0.020.4
0.02 0.02
0.22 0.02
0.2
0.02 0.02
12.81 0.59
0.01
0.5
0.5
0.20.5 0.5
1.6
0.5
6.32 0.02
0.2
0.2
3
0.02 0.020.4
2
0.5
7.96 0.35
0.1 0.1
0.05 0.05
3
2
0.01
0.2
0.2
0.2 0.2
0.8
0.4
1
1.7 0.1
0.2
0.2
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 17/21
0.1 0.1
0.2
0.5
0.5
0.1 0.1
0.1 0.1
8.6 0.11
0.2
6
0.1 0.1
0.8
0.5
3.6 0.1
0.1 0.1
3
0.5
1.8 0.1
0.1 0.1
0.4
0.4
0.2
0.2
0.5
0.1 0.1
0.1 0.1
2.3 0.20.2 0.2
1.2
0.2
0.2
0.5
16.4 4.1
1
0.25
0.2
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 18/21
3
0.25
3
2
2 22 2
0.5 0.1
0.8
0.4
1
1.5 0.10.1 0.1
0.4
0.50.5
74.75 6.32
0.7 0.2
0.2 0.2
0.5
11.31 6.95
3 3
0.5 30.1 0.25
0.5 0.5
0.1
0.2
0.01
0.2
0.2 0.2
6
0.5
Total PowerRequirement in
KW
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 19/21
0.9 0.1
0.8
0.1 0.1
7.6 0.16
1
0.1 0.1
0.5
28 0.1
6
4
6
2
5
4
0.4
0.1 0.1
0.5
16.41 0.7
1
0.20.1 0.1
0.1 0.2
2
0.2 0.2
0.01
0.5
2
3
3
3
0.2 0.2
0.6
0.5
3.9 0.4
0.3 0.3
0.1 0.1
3
0.5
8/4/2019 Power Requirement
http://slidepdf.com/reader/full/power-requirement 20/21
32.68 3.5
2
3
3
60.25
0.1 0.1
0.2
2
2
0.25
0.25
2
33
0.01
0.01
0.01
0.2
0.2 0.2
1.2
0.2
0.2
0.1 0.22 3
0.5
0.5
0.5
0.01 0.01
0.01 0.01
6.3 0.2
0.5 0.2
0.4
0.2
3
1
0.2
1
2.4 0.010.5 0.01