    Historical Overview

    Electricity generation in Nigeria began in 1896. The Nigeria Electricity Supply Company

    (NESCO) commenced operation a an electric utility company in Nigeria in 19!9 "iththe contruction o# a hydroelectric po"er tation at $urra near %o.

    The Electricity Corporation o# Nigeria (ECN) "a etablihed in 19&1' "hile the #irt

    1!$ line "a contructed in 196!' lin*ing +,ora -o"er Station to +badan -o"er

    Station.

    The Niger am /uthority (N/) "a etablihed in 196! "ith a mandate to de0elop thehydropo"er potential o# the country. o"e0er' ECN and N/ "ere merged in 192! to

    #orm the National Electric -o"er /uthority (NE-/). +n 1998' NE-/ ceaed to ha0e an

    e3clui0e monopoly o0er electricity generation' tranmiion' ditribution and ale.

    Present Status of the Electricity Supply Infrastructure

    The National electricity grid preently conit o# nine generating tation ( hydro and 6

    thermal ) "ith a total intalled generating capacity o# &946 5. The detail o# the po"er

    generation tation are in appendi3 1.

    Supply and Demand

    The demand #or electricity i etimated to be about 7&445. o"e0er' the preentgeneration le0el i about 1&445. There i about !744 5 o# el# generation in the

    #orm o# mall dieel and petrol generating et. The etimated percentage o# Nigerian

    ha0ing acce to electricity #rom NE-/ i only 6. The etimated demand #or po"er in

    !44& i about 92845. Thi "ill reuire a generating capacity o# about 1!2445.

    Thu it i neceary to #ully rehabilitate the e3iting po"er tation ("hich "ill pro0ide a

    ma3imum o# &7445 generating capacity) rehabilitate ome critical tranmiion and

    ditribution line and their aociated ubtation and add ne" generating' tranmiionand ditribution capacity to the grid' in the immediate and #oreeeable #uture.

    Need for Reform

    The po"er ector i 0ery capital inteni0e and go0ernment can not #und it de0elopment

    a outlined abo0e .+n line "ith their ob,ecti0e the #ollo"ing bodie "ill be et up.

    Nigeria Electricity Regulation Commission

    Thi "ill be an independent regulation agency #or electricity in the #orm o# a

    regulatory commiion. +t hall ha0e many #unction inter alia:

    Electricity regulator #or grid connected er0ice.

    +t "ill iue licene to the companie operating in the Nigeria Electricity Supply

    +ndutry.

  • 8/13/2019 Power Privatisation

    2/5

    Structure of the Electric Power Industry

    The ob,ecti0e "ill be met by the introduction o# competition and the appropriate

    regulatory #rame"or*. The unbundling o# NE-/ "ill be into:

    i. a number o# competing' pri0ati;ed generation companie

  • 8/13/2019 Power Privatisation

    3/5

    There "ill be a need to negotiate hort=term increae in generation capacity under

    Emergency -o"er -ro,ect (E--) agreement.Buideline #or +ndependent -o"er -ro,ect

    (+--):

    1. NE-/ hall only conclude contract' be#ore the etablihment o# corporatied

    tranmiion and ditribution companie' i# e3plicit reaignment claue to the#uture inheritor o# the contract (prior to ma,ority pri0ati;ation o# ditribution

    companie ) and to #uture ditribution companie ( a#ter their ma,oritypri0ati;ation) are pro0ided