12
Description Location POWER AND DESALINATION ASSETS IN OMAN Sohar Power Company S.A.O.G. P.O. Box 147, P.C. 134, Jawharat A’Shatti Muscat, Sultanate of Oman Tel. +968 24 40 06 00 Fax +968 24 69 84 96 Sohar 1 Independent Power & Water Plant Sohar 1 Sohar 1 is a 585 MW electricity generation and 33 million imperial gallons a day (MIGD) seawater desalination plant. The site is located in the Sohar Industrial Port Area in the northern Al Batinah region of the Sultanate of Oman. Since it reached commercial operation on 27 May 2007, Sohar 1 IWPP has been selling power and water to Oman Power and Water Procurement Company S.A.O.C. under a 15-year Power and Water Purchase Agreement (PWPA). The plant is owned by Sohar Power Company S.A.O.G. Since its successful Initial Public Offering (IPO) in August 2008, 35% of the Sohar Power Company shareholding is listed on the Muscat Securities Market. www.soharpower.com

power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Embed Size (px)

Citation preview

Page 1: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Description Location

power and desalination assets in oman

Sohar Power Company S.A.O.G.P.O. Box 147,

P.C. 134, Jawharat A’ShattiMuscat, Sultanate of Oman

Tel. +968 24 40 06 00Fax +968 24 69 84 96Sohar 1

Independent Power & Water Plant

Sohar 1

Sohar 1 is a 585 MW electricity generation and 33 million imperial gallons a day (MIGD) seawater desalination plant. The site is located in the Sohar Industrial Port Area in the northern Al Batinah region of the Sultanate of Oman.

Since it reached commercial operation on 27 May 2007, Sohar 1 IWPP has been selling power and water to Oman Power and Water Procurement Company S.A.O.C. under a 15-year Power and Water Purchase Agreement (PWPA).

The plant is owned by Sohar Power Company S.A.O.G. Since its successful Initial Public Offering (IPO) in August 2008, 35% of the Sohar Power Company shareholding is listed on the Muscat Securities Market.

www.soharpower.com

Page 2: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Technical description Quick facts

www.iprplc-gdfsuez-meta.com

Operations & Maintenance Company

FuelNatural Gas

Electric Capacity585 MW

Water Production Capacity33 MIGD

OwnershipThe plant is owned by Sohar Power Company S.A.O.G., in which International Power plc has 45 Percent Beneficial Ownership. 35% is owned by Institutional and Individual Investors.

PartnersZubair Corp (5%)WJ Towell & Co LLC (5%)Sogex Oman (5%)Ministry of Defence Pension Fund (5%)

CustomerOman Power and Water Procurement Company SAOC

Commercial Operation Date27 May 2007

The plant consists of :

- Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference Site Condition. Hybrid burners for premix and diffusion mode operation with both natural gas and distillate fuel oil are used for NOx control.

- Three supplementary fired HRSGs. The HRSGs are dual pressure natural circulation with a horizontal gas flow. The manufacturer is Doosan Heavy Industries.

- A single casing condensing steam turbine of 220 MW manufactured by Alstom with a high pressure and a low pressure body. The steam is extracted from the steam turbine at 2.8 bara to feed the evaporators.

- Four multistage flash evaporators with a 20 stages evaporation vessel and brine heater manufactured by Doosan Heavy Industries.

Sohar Operation & Maintenance

OwnershipInternational Power plc has 70 Percent Beneficial Ownership. Sogex Oman Company LLC has 30%.

AddressP.O. Box 451Postal Code 322, Falaq al Qabail OmanTel. +968 96 60 27 80Fax +968 26 85 05 01

Sohar 1 Independent Power & Water Plantpower and desalination assets in oman

3 x 123MW

Page 3: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Description Location

Al-Rusail

Al-RusailIndependent Power Plant

SMN Power Holding S.A.O.C.P.O. Box 121,

P.C. 134, Jawharat A’Shatti,Muscat, Sultanate of Oman

Tel. + 968 24 68 30 22Fax + 968 24 68 30 30

Al Rusail is a natural gas-fired 665 MW power plant. It was the first state-owned power plant to be privatized in the Sultanate of Oman. In December of 2006, the shareholders acquired the shares in Al Rusail Power Company from the Government of Oman.

The plant is located inland, approximately 40 km west of Muscat in an industrial area. Al Rusail’s primary fuel is natural gas, but diesel oil is also stored on site to serve as a backup fuel. Power capacity and production are sold to the Oman Power and Water Procurement Company S.A.O.C. under a 17-year PPA ending in March 2022.

www.smnpower.com

power and desalination assets in oman

Page 4: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Technical description Quick facts

www.iprplc-gdfsuez-meta.com

Operational Company

Power is produced through 8 (dual fuel) GE gas turbines in single cycle.

The electrical output is connected to the 132 kV grid system.

Al Rusail Independent Power Plant

SUEZ-Tractebel Operation and Maintenance Oman (STOMO)

OwnershipInternational Power plc has 70 Percent Beneficial Ownership. Sogex Oman Company LLC has 30%.

AddressPO Box 692, PC 320Barka, OmanTel. +968  26 89 39 36Fax +968  26 89 39 37www.stomo.com

power and desalination assets in oman

FuelNatural gas with fuel oil as back-up

Electric Capacity665 MW

Percent OwnershipThe plant is owned by SMN Power Holding SAOG, in which International Power plc has 30.875 Percent Beneficial Ownership. 35% of SMN Power is owned by Institutional and Individual Investors

PartnersMubadala Power Holding (20,00%) National Trading Company (3,25%) MDC Industrial Holding (10,88%)

CustomerOman Power and Water Procurement Company SAOC

Commercial Operation DateBetween 1984 and 2000, in four phases

Page 5: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Description Location

Barka 2

Barka 2 Independent Power & Water Plant

SMN Power Holding S.A.O.G.P.O. Box 121,

P.C. 134, Jawharat A’Shatti,Muscat, Sultanate of Oman

Tel. + 968 24 68 30 22Fax + 968 24 68 30 30

Barka Phase 2 is an Independent Power & Water project situated at Barka, about 50 km northwest of Oman’s capital, Muscat. The design net power output of the plant in a combined cycle mode is 678 MW. The plant operates on natural gas with fuel oil as back-up. The water production capacity is 26 million imperial gallons a day (MIGD) or 120,000 cubic meters per day.

The facility entered into full commercial operation on 15 November 2009 and commenced the 15-year P(W)PA, guaranteeing the sale of its electricity and potable water capacity and production to the Oman Power and Water Procurement Company.

Desalination for water production involves a Degrémont sea water reverse osmosis desalination plant along with an associated ancillary plant. Reverse osmosis needs less energy than multi-stage flash or multi-effect distillation, the other two major technologies used for desalination. It also provides Barka 2 the flexibility, in certain cases, to buy power from the grid for the purpose of running the desalination plant, instead of depending only on its own generated power.

www.smnpower.com

power and desalination assets in oman

Page 6: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Technical description Quick facts

www.iprplc-gdfsuez-meta.com

Operational Company

Power is produced through 3 (dual fuel) Ansaldo gas turbines and 2 Siemens steam turbines. Each GT is connected to a heat recovery steam generator with a bypass stack to be able to generate electrical power in single cycle mode. The turnkey EPC Contractor is Doosan Heavy Industries and Construction Co., Ltd.

Each turbine is connected to the 220 kV grid system.

Water is produced through a 2 stages Degrémont reverse osmosis process.

Suez Tractebel Operation & Maintenance Oman (STOMO)

OwnershipInternational Power plc has 70% Percent Beneficial Ownership. Sogex Oman Company LLC has 30%.

AddressPO Box 692, PC 320Barka, OmanTel. + 968  26 89 39 36Fax + 968  26 89 39 37www.stomo.com.om

Barka 2 Independent Power & Water Plantpower and desalination assets in oman

FuelNatural gas with fuel oil as back-up

Electric Capacity678 MW

Water Production Capacity26 MIGD

Percent OwnershipThe plant is owned by SMN Power Holding SAOG, in which International Power plc has 30.875 Percent Beneficial Ownership. 35% of SMN Power is owned by Institutional and Individual Investors

PartnersMubadala Power Holding (20,00%) National Trading Company (3,25%) MDC Industrial Holding (10,88%)

CustomerOman Power and Water Procurement Company SAOC

Commercial Operation Date15 November 2009

Page 7: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Description Location

Al Kamil

Al Kamil Independent Power Plant

Al Kamil Power S.A.O.G.P.O. Box 1360P.C. 112, Ruwi

Sultanate of OmanTel. +968 24 60 74 66Fax +968 24 60 74 41

Al Kamil Power Company is an independent power generation company that was incorporated on 15 July 2000. It was established to build, own and operate the 277 MW power plant, which is located approximately 25km north-west of Al Kamil in the central Sharqiya region of Oman. The site is strategically located near the main gas transmission system and electricity grid network.

The facility entered into full commercial operation on 19 July 2003. Power capacity and production are sold to the Oman Power and Water Procurement Company under a 15-year PPA ending in 2017.

Since its successful Initial Public Offering in August 2004, 35% of Al Kamil Power Company shareholding is listed on the Muscat Securities Market.

www.alkamilpower.com

power and desalination assets in oman

Page 8: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Technical description Quick facts

www.iprplc-gdfsuez-meta.com

Operational Company

The generating plant at Al Kamil power station comprises three Frame 9171E gas turbines provided by General Electric in open cycle configuration together with associated ancillary equipment required to facilitate fully independent operation. The gas turbines are designed to run on both gas and distillate fuel oil.

Al Kamil Construction & Services LLC

OwnershipInternational Power plc has 65 Percent Beneficial Ownership. OHI Petroleum & Energy Services has 35%.

AddressPO Box 280, PC 412Al Kamil, OmanTel. + 968  25 56 38 10Fax + 968  25 56 38 21

Al Kamil Independent Power Plantpower and desalination assets in oman

FuelNatural gas

Electric Capacity277 MW

Percent OwnershipThe plant is owned by Al Kamil Power SAOG, in wich International Power plc has 65 Percent Beneficial Ownership. 35% is owned by Institutional and Individual Investors

CustomerOman Power and Water Procurement Company SAOC

Commercial Operation Date2003

Page 9: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Description Location

Barka 3

Barka 3 Independent Power Plant

Al Suwadi Power Company S.A.O.C.P.O. Box 39, Bareeq Al Shatti 103

Al Khuwair, MuscatSultanate of Oman

Tel. +968 24 39 33 00Fax +968 24 39 33 66

229014 229015

229016 229017

229018 229019

power and desalination assets in oman

Barka 3 is a greenfield CCGT plant under construction with capacity of 744 MW running on natural gas, with diesel oil as back-up fuel. The electricity produced will be sold under a 15-year Power Purchase Agreement to the Oman Power and Water Procurement Company.

Barka 3 is located 50 km northwest from Muscat, adjacent to Barka 2 IWPP in which International Power plc has 30.875 Percent Beneficial Ownership via SMN Power Holding.

The EPC contractor is a consortium of Germany’s Siemens AG and GS Engineering & Construction of South Korea.

Early power is expected to be commissioned in the first half of 2012 and full completion of the plant in the first half of 2013.

Page 10: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Technical description Quick facts

www.iprplc-gdfsuez-meta.com

Power will be produced through 2 dual fuel Siemens gas turbines and 1 Siemens steam turbine. Each GT will be connected to a heat recovery steam generator with bypass stack to be able to generate electrical power in single cycle mode.

In the first half of 2012, the plant will go on line as simple-cycle gas turbine installation, with the extension to combined cycle stations to follow in the first half of 2013.

Barka 3 Independent Power Plant

228998 228999

229000 229001

229002 229003

228955228957

228958228959

228960228961

228955 228957

228958 228959

228960 228961

power and desalination assets in oman

FuelNatural gas

Electric Capacity744 MW

Percent OwnershipThe plant is owned by Al Suwadi Power Company SAOC, in which International Power plc has 46 Percent Beneficial Ownership

PartnersMultitech (Bahwan Engineering Company) (22%)Sojitz (11%)Shikoku Electric Power Co. (11%)Public Authority for Social Insurance (PASI) (10%)

CustomerOman Power and Water Procurement Company SAOC

Commercial Operation DatePlant under construction. Full completion is expected in the first half of 2013

Operational Company

Suez Tractebel Operation & Maintenance Oman ( STOMO)

OwnershipInternational Power plc has 70 PercentBeneficial Ownership.Sogex Oman Company LLC has 30%.

AddressPO Box 692, PC 320Barka, OmanTel. + 968 26 89 39 36Fax + 968 26 89 39 37www.stomo.com.om

Page 11: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Description Location

power and desalination assets in oman

Al Batinah Power Company S.A.O.C.P.O. Box 39, Bareeq Al Shatti 103

Al Khuwair, MuscatSultanate of Oman

Tel. +968 24 39 33 00Fax +968 24 39 33 33Sohar 2

Independent Power Plant

Sohar 2

Sohar 2 is a greenfield CCGT plant under construction with capacity of 744 MW running on natural gas, with diesel oil as back-up fuel. The electricity produced will be sold under a 15-year Power Purchase Agreement to the Oman Power and Water Procurement Company.

Sohar 2 is located 250 km northwest from Muscat, adjacent to Sohar 1 IWPP in which International Power plc has 45 Percent Beneficial Ownership via Sohar Power Company SAOG.

The EPC contractor is a consortium of Germany’s Siemens AG and GS Engineering of South Korea.

Early power is expected to be commissioned in the first half of 2012 and full completion of the plant in the first half of 2013.

Page 12: power and desalination assets in oman - gdfsuez … power and desalination assets in oman Sohar Power Company S.A.O.G. ... - Three gas turbine Siemens V94.2 (6) of 123 MW each at Reference

Technical description Quick facts

www.iprplc-gdfsuez-meta.com

FuelNatural Gas

Electric Capacity744 MW

Percent OwnershipThe plant is owned by Al Batinah Power Company SAOC, in which International Power plc has 46 Percent Beneficial Ownership

PartnersMultitech (Bahwan Engineering Company) (22%)Sojitz (11%)Shikoku Electric Power Co. (11%)Public Authority for Social Insurance (PASI) (10%)

CustomerOman Power and Water Procurement Company SAOC

Commercial Operation DatePlant under construction. Full completion is expected in the first half of 2013.

Power will be produced through 2 dual fuel Siemens gas turbines and 1 Siemens steam turbine. Each GT will be connected to a heat recovery steam generator with bypass stack to be able to generate electrical power in single cycle mode.

In the first half of 2012, the plant will go on line as simple-cycle gas turbine installation, with the extension to combined cycle stations to follow in the first half of 2013.

Sohar 2 Independent Power Plantpower and desalination assets in oman

Operations & Maintenance Company

Suez Tractebel Operation & Maintenance Oman (STOMO)

OwnershipInternational Power plc has 70 PercentBeneficial Ownership.Sogex Oman Company LLC has 30%.

AddressPO Box 692, PC 320Barka, Oman+ 968  26 89 39 36+ 968  26 89 39 37www.stomo.com.om