Post Project Report Kake Cannery Abatement 538 Keku Road
Kake, AK 99830
Client/Contractor
Dept. of Environmental Conservation PO Box 111800 Juneau, AK 99811
Prepared by Satori Group, Inc.
1310 East 66th Avenue, Suite 2 Anchorage, AK 99518
May 2019
TABLE OF CONTENTS
I. Notification II. Daily Reports III. Visual Inspection IV. Worker Certificates V. Daily Air Monitoring VI. Clearance Air Monitoring VII. Photographs VIII. Disposal
I. Notification
NOTIFICATION OF ASBESTOS ABATEMENT The intent of this letter is notification of the job and participating workers per AAC 61.620b
To: Alaska Occupational Safety & Health Date: 3/29/2019 Satori Project Number: 40375
ACM Abatement Location 538 Keku Road Kake, AK 99830 Projected Time Frame Start Date: 4/28/2019 End Date: 5/06/2019
Workers to be involved
Last Name First Name Cert # Expires Caldwell Alan 20020632 01/31/2020 Taei Bahaa 20150014 10/08/2019 Guzman Payano 20160593 06/20/2019 Mercedes Yunior 20160492 01/31/2020 Caldwell Blake 20180305 05/25/2019 Rodriquez Gustavo 20050848 06/20/2019 Resto Miranda Jose 20160592 01/31/2020 Munoz Nunez Agripino 20180791 11/30/2019 Chadwell Adam 20190136 02/15/2020
Please contact me if you have any questions or require additional information. [email protected]
Thank you,
Alan Caldwell Operations Manager
3/29/2019
II. Daily Reports
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 1 of 3
Asbestos Lead Other
Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted
4. Applicable SDSs on site and available
1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:9:00 AM Crew arrived onsite and held the daily site safety meeting.
10:00 AM
12:00 PM Crew continued removing the piping from the cannery.
2:00 PM CP inspected worker safety and removal progress.
7:00 PM
WORK AREA PREPARATION PROCEDURES
2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site
11. Tape and seal windows, vents, and all critical openings12. Seal stationary items
7. Post demarcation signage
40375Project Location: Kake, AK
9. Secure the electrical system
5. Secure the area 6. Notify other building occupants
14. Establish decontamination unit(s)
8. Shut down the HVAC
13. Cover the floor and walls with polyethylene
DAILY FIELD REPORT
Competent Person: Bahaa Taei Date:
1
Crew finished setting up the containment areas and the decon units. Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers and the decon unit. Once the inspections were finished the crew entered the containment and started removing the pipes from the cannery. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.
Crew finished working for the day. Crew exited the containment and left the job site secure for the night.
16. Establish negative pressure in area (Class I)
04/30/19
10. Clean and remove furniture and fixtures
Project Name: Kake Cannery AbatementDaily Report #:
Project #:
15. Establish waste load out unit
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 2 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
Completed In Process N/A
1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:
2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):
3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):
4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:
5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:
6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:
7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:
70 Bags
Cannery
N/A
10am & 7pm
10am & 7pm
HEPA vacuums, wet methods, and prompt cleanup
40375
2. Negative Air System being monitored and working properly
Kake, AK 1
15. Load out area – secured16. First Aid supplies – available and stocked
14. Storage area – secured
3. Demarcation signs posted 4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew
11. Electrical system used – GFCI’s
13. Beginning/end of shift – water on/off
7. Safety meeting held 8. Decon unit being monitored and working properly
12. Work area clean of trash and debris
DAILY SITE INSPECTION
9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected
ACM piping
04/30/19
1. Barriers and enclosure inspected during shift per regulations
Kake Cannery AbatementBahaa Taei
DAILY FIELD REPORT
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 3 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:
9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:
10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:
11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):
12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:
13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:
14. LIST SITE VISITORS / MEETINGS ATTENDED:
15. CONTRACTOR'S VERIFICATION
Bahaa Taei 04/30/19
Kake, AK 1
None
None
None
10am & 7pm
All crew members signed the regulated area sign in sheet properly
Satori conducted the air monitoring in accordance with our SoW
70 Bags
Kake Cannery Abatement 40375
Project Supervisor04/30/19
Date
The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 1 of 3
Asbestos Lead Other
Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted
4. Applicable SDSs on site and available
1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily site safety meeting.
8:15 AM
12:00 PM Crew stopped work, exited the containment, and took their lunch break.
1:00 PM
7:00 PM Crew finished work for the day. Crew exited the containment and left the job site secure.
ACM removed from the Cannery Building today by sample #: 50000-KEKU-20 50000-KEKU-53 50000-KEKU-0250000-KEKU-94 50000-KEKU-86 50000-KEKU-8750000-KEKU-72 50000-KEKU-01 50000-KEKU-10050000-KEKU-52 50000-KEKU-05 50000-KEKU-5950000-KEKU-51 50000-KEKU-38
Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers and the decon unit. Once the inspections were finished the crew entered the containment and began removing the ACM listed in the Limited Hazmat Survey Report. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.
Crew returned from their lunch break. Crew and CP inspected their PPE once more for proper fit and function. CP then inspected the containment barriers and the decon unit. Once the inspections were finished the crew entered the containment and continued removing the ACM.
15. Establish waste load out unit14. Establish decontamination unit(s)
WORK AREA PREPARATION PROCEDURES
2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site
11. Tape and seal windows, vents, and all critical openings12. Seal stationary items
7. Post demarcation signage
16. Establish negative pressure in area (Class I)
DAILY FIELD REPORT
Competent Person: Bahaa Taei Date:
240375
Project Location: Kake, AK
9. Secure the electrical system
13. Cover the floor and walls with polyethylene
05/01/19
10. Clean and remove furniture and fixtures
Project Name: Kake Cannery AbatementDaily Report #:
Project #:
8. Shut down the HVAC
5. Secure the area 6. Notify other building occupants
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 2 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
Completed In Process N/A
1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:
2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):
3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):
4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:
5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:
6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:
7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:
HEPA vacuums, wet methods, and prompt cleanup
30 Bags
Cannery
N/A
40375
2. Negative Air System being monitored and working properly
Kake, AK 2
8am and 1pm
8am and 1pm
Various ACM materials listed in the Limited Hazmat Survey
4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew
11. Electrical system used – GFCI’s
13. Beginning/end of shift – water on/off
7. Safety meeting held 8. Decon unit being monitored and working properly
Kake Cannery AbatementBahaa Taei
3. Demarcation signs posted
12. Work area clean of trash and debris
DAILY SITE INSPECTION
9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected
15. Load out area – secured16. First Aid supplies – available and stocked
14. Storage area – secured
05/01/19
1. Barriers and enclosure inspected during shift per regulations
DAILY FIELD REPORT
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 3 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:
9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:
10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:
11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):
12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:
13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:
14. LIST SITE VISITORS / MEETINGS ATTENDED:
15. CONTRACTOR'S VERIFICATION
40375
All crew members signed the regulated area sign in sheet properly
Satori conducted the air monitoring in accordance with our SoW
30 Bags
Bahaa Taei 05/01/19
Kake, AK 2Kake Cannery Abatement
The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
None
None
None
8am and 1pm
Project Supervisor05/01/19
Date
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 1 of 3
Asbestos Lead Other
Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted
4. Applicable SDSs on site and available
1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily safety meeting.
8:15 AM
12:00 PM Crew stopped work, exited the containment, and took their lunch break.
1:00 PM
7:00 PM Crew finished work for the day. Crew exited the containment and left the job site secure.
ACM removed from the Cannery, Blacksmith Buildings and the Generator Room today by sample #:50000-KEKU-3 50000-KEKU-5850000-KEKU-82 50000-KEKU-13450000-KEKU-137 50000-KEKU-14750000-KEKU-149 50000-KEKU-16250000-KEKU-163 50000-KEKU-16550000-KEKU-166
WORK AREA PREPARATION PROCEDURES
2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site
11. Tape and seal windows, vents, and all critical openings12. Seal stationary items
7. Post demarcation signage
5. Secure the area 6. Notify other building occupants
14. Establish decontamination unit(s)15. Establish waste load out unit
8. Shut down the HVAC
DAILY FIELD REPORT
Competent Person: Bahaa Taei Date:
340375
Project Location: Kake, AK
9. Secure the electrical system
Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers and the decon unit. After the inspections were concluded the crew entered the containment and continued removing the ACM noted in the Limited Hazmat Survey. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.
Crew returned from their lunch break. Crew and CP inspected their PPE for proper fit and function once more before properly donning them. CP then inspected the containment barriers and the decon unit before the crew entered the containment and continued removing the listed ACM.
16. Establish negative pressure in area (Class I)
05/02/19
10. Clean and remove furniture and fixtures
Project Name: Kake Cannery AbatementDaily Report #:
Project #:
13. Cover the floor and walls with polyethylene
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 2 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
Completed In Process N/A
1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:
2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):
3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):
4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:
5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:
6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:
7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:
20 Bags
Cannery, Blacksmith Buildings and the Generator Room
N/A
8am and 1pm
8am and 1pm
HEPA vacuums, wet methods, and prompt cleanup
40375
2. Negative Air System being monitored and working properly
Kake, AK 3
15. Load out area – secured16. First Aid supplies – available and stocked
14. Storage area – secured
3. Demarcation signs posted 4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew
11. Electrical system used – GFCI’s
13. Beginning/end of shift – water on/off
7. Safety meeting held 8. Decon unit being monitored and working properly
12. Work area clean of trash and debris
DAILY SITE INSPECTION
9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected
Various ACM listed on the Limited Hazmat Survey
1. Barriers and enclosure inspected during shift per regulations
Kake Cannery AbatementBahaa Taei 05/02/19
DAILY FIELD REPORT
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 3 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:
9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:
10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:
11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):
12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:
13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:
14. LIST SITE VISITORS / MEETINGS ATTENDED:
15. CONTRACTOR'S VERIFICATION
Bahaa Taei 05/02/19
Kake, AK 3
None
None
None
8am and 1pm
All crew members signed the regulated area sign in sheet properly
Satori conducted the air monitoring in accordance with our SoW
20 bags
Kake Cannery Abatement 40375
Project Supervisor05/02/19
Date
The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 1 of 3
Asbestos Lead Other
Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted
4. Applicable SDSs on site and available
1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily safety meeting.
8:15 AM
12:00 PM Crew stopped work, exited the containment, and took their lunch break.
1:00 PM
7:00 PM Crew stopped work for the day and left the job site secure.
ACM removed from the Warehouse Building by Sample #:50000-KEKU-123
13. Cover the floor and walls with polyethylene
05/03/19
10. Clean and remove furniture and fixtures
Project Name: Kake Cannery AbatementDaily Report #:
Project #:
8. Shut down the HVAC
DAILY FIELD REPORT
Competent Person: Bahaa Taei Date:
440375
Project Location: Kake, AK
9. Secure the electrical system
5. Secure the area 6. Notify other building occupants
14. Establish decontamination unit(s)
WORK AREA PREPARATION PROCEDURES
2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site
11. Tape and seal windows, vents, and all critical openings12. Seal stationary items
7. Post demarcation signage
16. Establish negative pressure in area (Class I)15. Establish waste load out unit
Crew inspected their PPE for proper fit and function before properly donning them. The CP then inspected the containment barriers and the decon unit. Once the inspections were completed the crew entered the containment and continued removing the designated ACM per the Limited Hazmat Survey. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.
Crew returned from lunch. The crew and CP inspected their PPE for proper fit and function before properly donning them. The CP then inspected the containment barriers and the decon unit. Once all of the inspections were finished the crew entered the containment and continued removing the designated ACM.
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 2 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
Completed In Process N/A
1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:
2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):
3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):
4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:
5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:
6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:
7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:
DAILY FIELD REPORT05/03/19
1. Barriers and enclosure inspected during shift per regulations
12. Work area clean of trash and debris
DAILY SITE INSPECTION
9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected11. Electrical system used – GFCI’s
13. Beginning/end of shift – water on/off
7. Safety meeting held 8. Decon unit being monitored and working properly
Kake Cannery AbatementBahaa Taei
15. Load out area – secured16. First Aid supplies – available and stocked
14. Storage area – secured
3. Demarcation signs posted
ACM designated on the Limited Hazmat Survey
4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew
8am and 1pm
HEPA vacuums, wet methods, and prompt cleanup
10 Bags
Warehouse
N/A
8am and 1pm
40375
2. Negative Air System being monitored and working properly
Kake, AK 4
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 3 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:
9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:
10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:
11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):
12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:
13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:
14. LIST SITE VISITORS / MEETINGS ATTENDED:
15. CONTRACTOR'S VERIFICATION
Project Supervisor05/03/19
Date
The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
None
None
None
8am and 1pm
Satori crew members all signed the regulated area sign in sheet properly
Satori conducted the air monitoring in accordance with our SoW
10 Bags
Bahaa Taei 05/03/19
Kake, AK 4Kake Cannery Abatement 40375
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 1 of 3
Asbestos Lead Other
Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted
4. Applicable SDSs on site and available
1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily site safety meeting.
8:15 AM
12:00 PM Crew stopped working and took their lunch break.
1:00 PM
5:00 PM
7:00 PM Crew finished working for the day. Crew left the job site secure.
ACM removed today from the Warehouse Building by sample #:50000-KEKU-11050000-KEKU-12450000-KEKU-126
Crew and CP inspected their PPE for proper fit and function before properly donning them. The CP then inspected the containment barriers and the decon unit. Once all the inspections were finished the crew entered the containment and continued removing the designated ACM items. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt clean up.
Crew returned from their lunch break. Crew and CP inspected the PPE once more for proper fit and function. The CP then inspected the containment barriers and the decon unit. Once all the inspections were finished the crew entered the containment and continued removing the designated ACM items.
Crew finished removing all of the designated ACM items. Crew began loading out the bagged debris to the container for ship out.
15. Establish waste load out unit14. Establish decontamination unit(s)
WORK AREA PREPARATION PROCEDURES
2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site
11. Tape and seal windows, vents, and all critical openings12. Seal stationary items
7. Post demarcation signage
16. Establish negative pressure in area (Class I)
DAILY FIELD REPORT
Competent Person: Bahaa Taei Date:
540375
Project Location: Kake, AK
9. Secure the electrical system
13. Cover the floor and walls with polyethylene
05/04/19
10. Clean and remove furniture and fixtures
Project Name: Kake Cannery AbatementDaily Report #:
Project #:
8. Shut down the HVAC
5. Secure the area 6. Notify other building occupants
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 2 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
Completed In Process N/A
1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:
2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):
3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):
4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:
5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:
6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:
7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:
N/A
40375
2. Negative Air System being monitored and working properly
Kake, AK 5
HEPA vacuums, wet methods, and prompt cleanup
20 Bags
Warehouse Building
8am and 1pm
8am and 1pm
Various items listed in the Limited Hazmat Survey
4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew
11. Electrical system used – GFCI’s
13. Beginning/end of shift – water on/off
7. Safety meeting held 8. Decon unit being monitored and working properly
Kake Cannery AbatementBahaa Taei
3. Demarcation signs posted
12. Work area clean of trash and debris
DAILY SITE INSPECTION
9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected
15. Load out area – secured16. First Aid supplies – available and stocked
14. Storage area – secured
05/04/19
1. Barriers and enclosure inspected during shift per regulations
DAILY FIELD REPORT
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 3 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:
9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:
10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:
11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):
12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:
13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:
14. LIST SITE VISITORS / MEETINGS ATTENDED:
15. CONTRACTOR'S VERIFICATION
Kake, AK 5Kake Cannery Abatement 40375
All crew signed the regulated area sign in sheet properly
Satori conducted the daily air monitoring in accordance with our SoW
20 Bags
Bahaa Taei 05/04/19
The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
None
None
None
8am and 1pm
Project Supervisor05/04/19
Date
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 1 of 3
Asbestos Lead Other
Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted
4. Applicable SDSs on site and available
1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:9:00 AM Crew arrived onsite and held the daily safety meeting.
9:15 AM
11:00 AM
13. Cover the floor and walls with polyethylene
05/05/19
10. Clean and remove furniture and fixtures
Project Name: Kake Cannery AbatementDaily Report #:
Project #:
8. Shut down the HVAC
DAILY FIELD REPORT
Competent Person: Bahaa Taei Date:
640375
Project Location: Kake, AK
9. Secure the electrical system
5. Secure the area 6. Notify other building occupants
14. Establish decontamination unit(s)
WORK AREA PREPARATION PROCEDURES
2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site
11. Tape and seal windows, vents, and all critical openings12. Seal stationary items
7. Post demarcation signage
16. Establish negative pressure in area (Class I)15. Establish waste load out unit
Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers before the crew began scraping the lead paint from the generator. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.
Crew finished scrapping the lead paint from the generator. Crew loaded out their tools, equipment, and the bagged debris. Crew finished the job and left the job site secure.
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 2 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
Completed In Process N/A
1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:
2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):
3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):
4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:
5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:
6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:
7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:
DAILY FIELD REPORT05/05/19
1. Barriers and enclosure inspected during shift per regulations
12. Work area clean of trash and debris
DAILY SITE INSPECTION
9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected11. Electrical system used – GFCI’s
13. Beginning/end of shift – water on/off
7. Safety meeting held 8. Decon unit being monitored and working properly
Kake Cannery AbatementBahaa Taei
15. Load out area – secured16. First Aid supplies – available and stocked
14. Storage area – secured
3. Demarcation signs posted
Lead paint
4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew
9am
HEPA vacuums, wet methods, and prompt cleanup
3 Bags
Generator Room
N/A
9am
40375
2. Negative Air System being monitored and working properly
Kake, AK 6
1310 E 66th Ave, Suite 2Anchorage, AK [email protected]
Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com
Page 3 of 3
Competent Person: Date:Project Name: Project #:
Project Location: Daily Report #:
8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:
9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:
10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:
11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):
12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:
13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:
14. LIST SITE VISITORS / MEETINGS ATTENDED:
15. CONTRACTOR'S VERIFICATION
Project Supervisor05/05/19
Date
The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
None
None
None
9am
All crew members signed the regulated area sign in sheet properly
Air monitoring was conducted by Satori in accordance with our SoW
3 Bags
Bahaa Taei 05/05/19
Kake, AK 6Kake Cannery Abatement 40375
III. Visual Inspection
IV. Worker Certificates
V. Daily Air Monitoring
VI. Clearance Air Monitoring
VII. Photographs
TSI piping cleaned Example Samples KEKU-01-06
KEKU-72 ACM Gasket removed
ACM stack cleaned
ACM debris removed
ACM gasket cleaned
ACM debris packaged for disposal
ACM Electrical panel components
ACM Window caulking removed
ACM electrical panel removed
ACM debris cleaned up
ACM mastic on roof removal
VIII. Disposal
May 10, 2019 Kake Cannery Abatement To Whom It May Concern: This letter is in regards to the asbestos abatement project Kake Cannery Abatement Satori Group was contracted for. All abatement has been completed per the Scope of Work and agreed upon contract. All debris has been shipped to Seattle Washington via Alaska Marine Lines and Lynden Transport. All final documentation will be forward to the appropriate personnel once received. Enclosed is the current shipping documentation, along with the Canadian approval for all materials. These are provided to demonstrate the materials have left the project site and are in route to the final destination. We anticipate receiving the final disposal documents in the next month. Please feel free to contact me or Satori’s main office if there are any questions. Regards,
Alan Caldwell ASP IH Operations Manager Satori Group, Inc.