Post Project Report Kake Cannery Abatement 538 Keku Road Kake, AK 99830 Client/Contractor Dept. of Environmental Conservation PO Box 111800 Juneau, AK 99811 Prepared by Satori Group, Inc. 1310 East 66th Avenue, Suite 2 Anchorage, AK 99518 May 2019

Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

Post Project Report Kake Cannery Abatement 538 Keku Road

Kake, AK 99830

Client/Contractor

Dept. of Environmental Conservation PO Box 111800 Juneau, AK 99811

Prepared by Satori Group, Inc.

1310 East 66th Avenue, Suite 2 Anchorage, AK 99518

May 2019

Page 2: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

TABLE OF CONTENTS

I. Notification II. Daily Reports III. Visual Inspection IV. Worker Certificates V. Daily Air Monitoring VI. Clearance Air Monitoring VII. Photographs VIII. Disposal

Page 3: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

I. Notification

Page 4: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

NOTIFICATION OF ASBESTOS ABATEMENT The intent of this letter is notification of the job and participating workers per AAC 61.620b

To: Alaska Occupational Safety & Health Date: 3/29/2019 Satori Project Number: 40375

ACM Abatement Location 538 Keku Road Kake, AK 99830 Projected Time Frame Start Date: 4/28/2019 End Date: 5/06/2019

Workers to be involved

Last Name First Name Cert # Expires Caldwell Alan 20020632 01/31/2020 Taei Bahaa 20150014 10/08/2019 Guzman Payano 20160593 06/20/2019 Mercedes Yunior 20160492 01/31/2020 Caldwell Blake 20180305 05/25/2019 Rodriquez Gustavo 20050848 06/20/2019 Resto Miranda Jose 20160592 01/31/2020 Munoz Nunez Agripino 20180791 11/30/2019 Chadwell Adam 20190136 02/15/2020

Please contact me if you have any questions or require additional information. [email protected]

Thank you,

Alan Caldwell Operations Manager

3/29/2019

Page 5: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

II. Daily Reports

Page 6: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 1 of 3

Asbestos Lead Other

Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted

4. Applicable SDSs on site and available

1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:9:00 AM Crew arrived onsite and held the daily site safety meeting.

10:00 AM

12:00 PM Crew continued removing the piping from the cannery.

2:00 PM CP inspected worker safety and removal progress.

7:00 PM

WORK AREA PREPARATION PROCEDURES

2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site

11. Tape and seal windows, vents, and all critical openings12. Seal stationary items

7. Post demarcation signage

40375Project Location: Kake, AK

9. Secure the electrical system

5. Secure the area 6. Notify other building occupants

14. Establish decontamination unit(s)

8. Shut down the HVAC

13. Cover the floor and walls with polyethylene

DAILY FIELD REPORT

Competent Person: Bahaa Taei Date:

1

Crew finished setting up the containment areas and the decon units. Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers and the decon unit. Once the inspections were finished the crew entered the containment and started removing the pipes from the cannery. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.

Crew finished working for the day. Crew exited the containment and left the job site secure for the night.

16. Establish negative pressure in area (Class I)

04/30/19

10. Clean and remove furniture and fixtures

Project Name: Kake Cannery AbatementDaily Report #:

Project #:

15. Establish waste load out unit

Page 7: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 2 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

Completed In Process N/A

1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:

2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):

3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):

4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:

5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:

6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:

7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:

70 Bags

Cannery

N/A

10am & 7pm

10am & 7pm

HEPA vacuums, wet methods, and prompt cleanup

40375

2. Negative Air System being monitored and working properly

Kake, AK 1

15. Load out area – secured16. First Aid supplies – available and stocked

14. Storage area – secured

3. Demarcation signs posted 4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew

11. Electrical system used – GFCI’s

13. Beginning/end of shift – water on/off

7. Safety meeting held 8. Decon unit being monitored and working properly

12. Work area clean of trash and debris

DAILY SITE INSPECTION

9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected

ACM piping

04/30/19

1. Barriers and enclosure inspected during shift per regulations

Kake Cannery AbatementBahaa Taei

DAILY FIELD REPORT

Page 8: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 3 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:

9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:

10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:

11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):

12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:

13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:

14. LIST SITE VISITORS / MEETINGS ATTENDED:

15. CONTRACTOR'S VERIFICATION

Bahaa Taei 04/30/19

Kake, AK 1

None

None

None

10am & 7pm

All crew members signed the regulated area sign in sheet properly

Satori conducted the air monitoring in accordance with our SoW

70 Bags

Kake Cannery Abatement 40375

Project Supervisor04/30/19

Date

The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

Page 9: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 10: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 11: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 1 of 3

Asbestos Lead Other

Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted

4. Applicable SDSs on site and available

1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily site safety meeting.

8:15 AM

12:00 PM Crew stopped work, exited the containment, and took their lunch break.

1:00 PM

7:00 PM Crew finished work for the day. Crew exited the containment and left the job site secure.

ACM removed from the Cannery Building today by sample #: 50000-KEKU-20 50000-KEKU-53 50000-KEKU-0250000-KEKU-94 50000-KEKU-86 50000-KEKU-8750000-KEKU-72 50000-KEKU-01 50000-KEKU-10050000-KEKU-52 50000-KEKU-05 50000-KEKU-5950000-KEKU-51 50000-KEKU-38

Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers and the decon unit. Once the inspections were finished the crew entered the containment and began removing the ACM listed in the Limited Hazmat Survey Report. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.

Crew returned from their lunch break. Crew and CP inspected their PPE once more for proper fit and function. CP then inspected the containment barriers and the decon unit. Once the inspections were finished the crew entered the containment and continued removing the ACM.

15. Establish waste load out unit14. Establish decontamination unit(s)

WORK AREA PREPARATION PROCEDURES

2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site

11. Tape and seal windows, vents, and all critical openings12. Seal stationary items

7. Post demarcation signage

16. Establish negative pressure in area (Class I)

DAILY FIELD REPORT

Competent Person: Bahaa Taei Date:

240375

Project Location: Kake, AK

9. Secure the electrical system

13. Cover the floor and walls with polyethylene

05/01/19

10. Clean and remove furniture and fixtures

Project Name: Kake Cannery AbatementDaily Report #:

Project #:

8. Shut down the HVAC

5. Secure the area 6. Notify other building occupants

Page 12: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 2 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

Completed In Process N/A

1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:

2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):

3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):

4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:

5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:

6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:

7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:

HEPA vacuums, wet methods, and prompt cleanup

30 Bags

Cannery

N/A

40375

2. Negative Air System being monitored and working properly

Kake, AK 2

8am and 1pm

8am and 1pm

Various ACM materials listed in the Limited Hazmat Survey

4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew

11. Electrical system used – GFCI’s

13. Beginning/end of shift – water on/off

7. Safety meeting held 8. Decon unit being monitored and working properly

Kake Cannery AbatementBahaa Taei

3. Demarcation signs posted

12. Work area clean of trash and debris

DAILY SITE INSPECTION

9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected

15. Load out area – secured16. First Aid supplies – available and stocked

14. Storage area – secured

05/01/19

1. Barriers and enclosure inspected during shift per regulations

DAILY FIELD REPORT

Page 13: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 3 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:

9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:

10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:

11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):

12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:

13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:

14. LIST SITE VISITORS / MEETINGS ATTENDED:

15. CONTRACTOR'S VERIFICATION

40375

All crew members signed the regulated area sign in sheet properly

Satori conducted the air monitoring in accordance with our SoW

30 Bags

Bahaa Taei 05/01/19

Kake, AK 2Kake Cannery Abatement

The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

None

None

None

8am and 1pm

Project Supervisor05/01/19

Date

Page 14: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 15: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 16: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 1 of 3

Asbestos Lead Other

Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted

4. Applicable SDSs on site and available

1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily safety meeting.

8:15 AM

12:00 PM Crew stopped work, exited the containment, and took their lunch break.

1:00 PM

7:00 PM Crew finished work for the day. Crew exited the containment and left the job site secure.

ACM removed from the Cannery, Blacksmith Buildings and the Generator Room today by sample #:50000-KEKU-3 50000-KEKU-5850000-KEKU-82 50000-KEKU-13450000-KEKU-137 50000-KEKU-14750000-KEKU-149 50000-KEKU-16250000-KEKU-163 50000-KEKU-16550000-KEKU-166

WORK AREA PREPARATION PROCEDURES

2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site

11. Tape and seal windows, vents, and all critical openings12. Seal stationary items

7. Post demarcation signage

5. Secure the area 6. Notify other building occupants

14. Establish decontamination unit(s)15. Establish waste load out unit

8. Shut down the HVAC

DAILY FIELD REPORT

Competent Person: Bahaa Taei Date:

340375

Project Location: Kake, AK

9. Secure the electrical system

Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers and the decon unit. After the inspections were concluded the crew entered the containment and continued removing the ACM noted in the Limited Hazmat Survey. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.

Crew returned from their lunch break. Crew and CP inspected their PPE for proper fit and function once more before properly donning them. CP then inspected the containment barriers and the decon unit before the crew entered the containment and continued removing the listed ACM.

16. Establish negative pressure in area (Class I)

05/02/19

10. Clean and remove furniture and fixtures

Project Name: Kake Cannery AbatementDaily Report #:

Project #:

13. Cover the floor and walls with polyethylene

Page 17: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 2 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

Completed In Process N/A

1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:

2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):

3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):

4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:

5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:

6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:

7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:

20 Bags

Cannery, Blacksmith Buildings and the Generator Room

N/A

8am and 1pm

8am and 1pm

HEPA vacuums, wet methods, and prompt cleanup

40375

2. Negative Air System being monitored and working properly

Kake, AK 3

15. Load out area – secured16. First Aid supplies – available and stocked

14. Storage area – secured

3. Demarcation signs posted 4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew

11. Electrical system used – GFCI’s

13. Beginning/end of shift – water on/off

7. Safety meeting held 8. Decon unit being monitored and working properly

12. Work area clean of trash and debris

DAILY SITE INSPECTION

9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected

Various ACM listed on the Limited Hazmat Survey

1. Barriers and enclosure inspected during shift per regulations

Kake Cannery AbatementBahaa Taei 05/02/19

DAILY FIELD REPORT

Page 18: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 3 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:

9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:

10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:

11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):

12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:

13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:

14. LIST SITE VISITORS / MEETINGS ATTENDED:

15. CONTRACTOR'S VERIFICATION

Bahaa Taei 05/02/19

Kake, AK 3

None

None

None

8am and 1pm

All crew members signed the regulated area sign in sheet properly

Satori conducted the air monitoring in accordance with our SoW

20 bags

Kake Cannery Abatement 40375

Project Supervisor05/02/19

Date

The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

Page 19: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 20: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 21: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 1 of 3

Asbestos Lead Other

Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted

4. Applicable SDSs on site and available

1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily safety meeting.

8:15 AM

12:00 PM Crew stopped work, exited the containment, and took their lunch break.

1:00 PM

7:00 PM Crew stopped work for the day and left the job site secure.

ACM removed from the Warehouse Building by Sample #:50000-KEKU-123

13. Cover the floor and walls with polyethylene

05/03/19

10. Clean and remove furniture and fixtures

Project Name: Kake Cannery AbatementDaily Report #:

Project #:

8. Shut down the HVAC

DAILY FIELD REPORT

Competent Person: Bahaa Taei Date:

440375

Project Location: Kake, AK

9. Secure the electrical system

5. Secure the area 6. Notify other building occupants

14. Establish decontamination unit(s)

WORK AREA PREPARATION PROCEDURES

2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site

11. Tape and seal windows, vents, and all critical openings12. Seal stationary items

7. Post demarcation signage

16. Establish negative pressure in area (Class I)15. Establish waste load out unit

Crew inspected their PPE for proper fit and function before properly donning them. The CP then inspected the containment barriers and the decon unit. Once the inspections were completed the crew entered the containment and continued removing the designated ACM per the Limited Hazmat Survey. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.

Crew returned from lunch. The crew and CP inspected their PPE for proper fit and function before properly donning them. The CP then inspected the containment barriers and the decon unit. Once all of the inspections were finished the crew entered the containment and continued removing the designated ACM.

Page 22: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 2 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

Completed In Process N/A

1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:

2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):

3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):

4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:

5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:

6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:

7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:

DAILY FIELD REPORT05/03/19

1. Barriers and enclosure inspected during shift per regulations

12. Work area clean of trash and debris

DAILY SITE INSPECTION

9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected11. Electrical system used – GFCI’s

13. Beginning/end of shift – water on/off

7. Safety meeting held 8. Decon unit being monitored and working properly

Kake Cannery AbatementBahaa Taei

15. Load out area – secured16. First Aid supplies – available and stocked

14. Storage area – secured

3. Demarcation signs posted

ACM designated on the Limited Hazmat Survey

4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew

8am and 1pm

HEPA vacuums, wet methods, and prompt cleanup

10 Bags

Warehouse

N/A

8am and 1pm

40375

2. Negative Air System being monitored and working properly

Kake, AK 4

Page 23: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 3 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:

9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:

10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:

11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):

12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:

13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:

14. LIST SITE VISITORS / MEETINGS ATTENDED:

15. CONTRACTOR'S VERIFICATION

Project Supervisor05/03/19

Date

The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

None

None

None

8am and 1pm

Satori crew members all signed the regulated area sign in sheet properly

Satori conducted the air monitoring in accordance with our SoW

10 Bags

Bahaa Taei 05/03/19

Kake, AK 4Kake Cannery Abatement 40375

Page 24: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 25: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 26: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 1 of 3

Asbestos Lead Other

Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted

4. Applicable SDSs on site and available

1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:8:00 AM Crew arrived onsite and held the daily site safety meeting.

8:15 AM

12:00 PM Crew stopped working and took their lunch break.

1:00 PM

5:00 PM

7:00 PM Crew finished working for the day. Crew left the job site secure.

ACM removed today from the Warehouse Building by sample #:50000-KEKU-11050000-KEKU-12450000-KEKU-126

Crew and CP inspected their PPE for proper fit and function before properly donning them. The CP then inspected the containment barriers and the decon unit. Once all the inspections were finished the crew entered the containment and continued removing the designated ACM items. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt clean up.

Crew returned from their lunch break. Crew and CP inspected the PPE once more for proper fit and function. The CP then inspected the containment barriers and the decon unit. Once all the inspections were finished the crew entered the containment and continued removing the designated ACM items.

Crew finished removing all of the designated ACM items. Crew began loading out the bagged debris to the container for ship out.

15. Establish waste load out unit14. Establish decontamination unit(s)

WORK AREA PREPARATION PROCEDURES

2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site

11. Tape and seal windows, vents, and all critical openings12. Seal stationary items

7. Post demarcation signage

16. Establish negative pressure in area (Class I)

DAILY FIELD REPORT

Competent Person: Bahaa Taei Date:

540375

Project Location: Kake, AK

9. Secure the electrical system

13. Cover the floor and walls with polyethylene

05/04/19

10. Clean and remove furniture and fixtures

Project Name: Kake Cannery AbatementDaily Report #:

Project #:

8. Shut down the HVAC

5. Secure the area 6. Notify other building occupants

Page 27: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 2 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

Completed In Process N/A

1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:

2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):

3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):

4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:

5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:

6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:

7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:

N/A

40375

2. Negative Air System being monitored and working properly

Kake, AK 5

HEPA vacuums, wet methods, and prompt cleanup

20 Bags

Warehouse Building

8am and 1pm

8am and 1pm

Various items listed in the Limited Hazmat Survey

4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew

11. Electrical system used – GFCI’s

13. Beginning/end of shift – water on/off

7. Safety meeting held 8. Decon unit being monitored and working properly

Kake Cannery AbatementBahaa Taei

3. Demarcation signs posted

12. Work area clean of trash and debris

DAILY SITE INSPECTION

9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected

15. Load out area – secured16. First Aid supplies – available and stocked

14. Storage area – secured

05/04/19

1. Barriers and enclosure inspected during shift per regulations

DAILY FIELD REPORT

Page 28: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 3 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:

9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:

10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:

11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):

12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:

13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:

14. LIST SITE VISITORS / MEETINGS ATTENDED:

15. CONTRACTOR'S VERIFICATION

Kake, AK 5Kake Cannery Abatement 40375

All crew signed the regulated area sign in sheet properly

Satori conducted the daily air monitoring in accordance with our SoW

20 Bags

Bahaa Taei 05/04/19

The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

None

None

None

8am and 1pm

Project Supervisor05/04/19

Date

Page 29: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 30: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 31: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 1 of 3

Asbestos Lead Other

Completed In Process N/A 1. Applicable EPA/DOL notifications current & posted

4. Applicable SDSs on site and available

1. TIMELINE OF WORK ACTIVITIES PERFORMED TODAY:9:00 AM Crew arrived onsite and held the daily safety meeting.

9:15 AM

11:00 AM

13. Cover the floor and walls with polyethylene

05/05/19

10. Clean and remove furniture and fixtures

Project Name: Kake Cannery AbatementDaily Report #:

Project #:

8. Shut down the HVAC

DAILY FIELD REPORT

Competent Person: Bahaa Taei Date:

640375

Project Location: Kake, AK

9. Secure the electrical system

5. Secure the area 6. Notify other building occupants

14. Establish decontamination unit(s)

WORK AREA PREPARATION PROCEDURES

2. OSHA Job Board complete and displayed 3. SSHP and job field binder on site

11. Tape and seal windows, vents, and all critical openings12. Seal stationary items

7. Post demarcation signage

16. Establish negative pressure in area (Class I)15. Establish waste load out unit

Crew and CP inspected their PPE for proper fit and function before properly donning them. CP then inspected the containment barriers before the crew began scraping the lead paint from the generator. Engineering controls used during today's work were: HEPA vacuums, wet methods, and prompt cleanup.

Crew finished scrapping the lead paint from the generator. Crew loaded out their tools, equipment, and the bagged debris. Crew finished the job and left the job site secure.

Page 32: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 2 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

Completed In Process N/A

1. TYPE OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT:

2. QUANTITY OF ACM AND/OR LEAD REMOVED PER ORIGINAL CONTRACT (SQ FT, ETC.):

3. LOCATION IN BUILDING OF REMOVAL (ROOM #, FLOOR #, HALLWAY, BATHROOM, ETC.):

4. LIST ENGINEERING CONTROLS IN PLACE FOR PROJECT:

5. NEGATIVE AIR PRESSURE READINGS FOR DAY - LIST LOW TO HIGH, INCLUDE READOUT:

6. LIST TIMES WHEN CONTAINMENT INSPECTIONS PERFORMED:

7. LIST TIMES WORKER PPE INSPECTIONS PERFORMED UPON ENTERING REGULATED AREA:

DAILY FIELD REPORT05/05/19

1. Barriers and enclosure inspected during shift per regulations

12. Work area clean of trash and debris

DAILY SITE INSPECTION

9. Have all workers sign regulated area sign in/out sheet10. Protective equipment donned and inspected11. Electrical system used – GFCI’s

13. Beginning/end of shift – water on/off

7. Safety meeting held 8. Decon unit being monitored and working properly

Kake Cannery AbatementBahaa Taei

15. Load out area – secured16. First Aid supplies – available and stocked

14. Storage area – secured

3. Demarcation signs posted

Lead paint

4. Applicable EPA/DOL notices displayed properly 5. Daily air monitoring report from previous day posted 6. Work practices reviewed and discussed with crew

9am

HEPA vacuums, wet methods, and prompt cleanup

3 Bags

Generator Room

N/A

9am

40375

2. Negative Air System being monitored and working properly

Kake, AK 6

Page 33: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

1310 E 66th Ave, Suite 2Anchorage, AK [email protected]

Phone: 907-332-0456Fax: 907-332-0457www.gosatori.com

Page 3 of 3

Competent Person: Date:Project Name: Project #:

Project Location: Daily Report #:

8. LIST TIMES WHEN DECONTAMINATION AREA INSPECTIONS PERFORMED:

9. CP CONFIRMED REGULATED AREA SIGN IN SHEET FILLED OUT CORRECTLY AND ACCURATELY:

10. CP CONFIRMED AIR MONITORING CONDUCTED IN ACCORDANCE WITH WORK PLAN:

11. LIST TOTAL QUANTITY OF DEBRIS GENERATED (# OF BAGS / CY):

12. ANY CHANGE OF CONDITION FROM SCOPE OF WORK IN ORIGINAL CONTRACT:

13. CHANGES, DIRECTIVES, AND/OR INSTRUCTIONS RECEIVED OR GIVEN:

14. LIST SITE VISITORS / MEETINGS ATTENDED:

15. CONTRACTOR'S VERIFICATION

Project Supervisor05/05/19

Date

The above report is complete and correct, and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

None

None

None

9am

All crew members signed the regulated area sign in sheet properly

Air monitoring was conducted by Satori in accordance with our SoW

3 Bags

Bahaa Taei 05/05/19

Kake, AK 6Kake Cannery Abatement 40375

Page 34: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 35: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 36: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

III. Visual Inspection

Page 37: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 38: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

IV. Worker Certificates

Page 39: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 40: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 41: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 42: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 43: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 44: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

V. Daily Air Monitoring

Page 45: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 46: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 47: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 48: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 49: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 50: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 51: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 52: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 53: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 54: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 55: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 56: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 57: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 58: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 59: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 60: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

VI. Clearance Air Monitoring

Page 61: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 62: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 63: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 64: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 65: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 66: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 67: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

VII. Photographs

Page 68: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

TSI piping cleaned Example Samples KEKU-01-06

KEKU-72 ACM Gasket removed

Page 69: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

ACM stack cleaned

ACM debris removed

ACM gasket cleaned

Page 70: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

ACM debris packaged for disposal

ACM Electrical panel components

ACM Window caulking removed

Page 71: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

ACM electrical panel removed

ACM debris cleaned up

ACM mastic on roof removal

Page 72: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

VIII. Disposal

Page 73: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure

May 10, 2019 Kake Cannery Abatement To Whom It May Concern: This letter is in regards to the asbestos abatement project Kake Cannery Abatement Satori Group was contracted for. All abatement has been completed per the Scope of Work and agreed upon contract. All debris has been shipped to Seattle Washington via Alaska Marine Lines and Lynden Transport. All final documentation will be forward to the appropriate personnel once received. Enclosed is the current shipping documentation, along with the Canadian approval for all materials. These are provided to demonstrate the materials have left the project site and are in route to the final destination. We anticipate receiving the final disposal documents in the next month. Please feel free to contact me or Satori’s main office if there are any questions. Regards,

Alan Caldwell ASP IH Operations Manager Satori Group, Inc.

Page 74: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 75: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 76: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 77: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 78: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 79: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure
Page 80: Post Project Report - Alaska DEC...16. Establish negative pressure in area (Class I) DAILY FIELD REPORT Competent Person:Bahaa Taei Date: 2 40375 Project Location:Kake, AK 9. Secure