5/23/2012 1 Post-Earthquake Repairs, Part 2 ACI Spring 2012 Convention March 18 – 21, Dallas, TX Kenneth Elwood received his Ph.D. in Civil Engineering from the University of California, Berkeley in 2002, M.S. from the University of Illinois at Urbana-Champaign in 1995, and B.A.Sc. from the University of British Columbia in 1993. From 1995 to 1998, Dr. Elwood worked for Buckland and Taylor, Ltd. of North Vancouver. Dr. Elwood is actively involved in research related to the seismic response of existing structures. In 2006, he chaired a committee for the American Society for Civil Engineers to update the concrete provisions in the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation. ACI Convention Dallas March 2012 Emergency Repairs for Concrete Buildings Immediately after the 22 February 2011 Christchurch Earthquake: Hotel Grand Chancellor Alastair Cattanach: Dunning Thorton Consultants Ken Elwood: University of British Columbia Noel Evans: OPUS Engineers Bruce Galloway: USAR Engineer (Holmes Consulting) David Hopkins: Critical Building Project Leader (Structural Consultant) Weng Yuen Kam: University of Canterbury Graduate Student Andrew McGregor: Lunds Contractor Mike Stannard: Department of Building and Housing Chris Van den Bosch: City of Christchurch Grant Wilkinson: Ruamoko Solutions Christchurch Central Business District (CBD) Christchurch: Pop. = 390,000 2 nd largest in NZ CBD: Approx. 6,000 companies or institutions with over 50,000 employees. 25% of the total employment in the city. Cathedral My location @ 12:51pm Grand Chancellor My hotel CTV (collapsed) Pyne Gould (collapsed) Christchurch Central Business District (CBD) NZSEE Seminar

Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

5/23/2012

1

Post-Earthquake Repairs, Part 2

ACI Spring 2012 ConventionMarch 18 – 21, Dallas, TX

Kenneth Elwood received his Ph.D. in Civil Engineering from the University of California, Berkeley in 2002, M.S. from the University of Illinois at Urbana-Champaign in 1995, and B.A.Sc. from the University of British Columbia in 1993. From 1995 to 1998, Dr. Elwood worked for Buckland and Taylor, Ltd. of North Vancouver.

Dr. Elwood is actively involved in research related to the seismic response of existing structures. In 2006, he chaired a committee for the American Society for Civil Engineers to update the concrete provisions in the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation.

ACI Convention Dallas March 2012

Emergency Repairs for Concrete Buildings Immediately after the 

22 February 2011 Christchurch Earthquake:

Hotel Grand Chancellor

Alastair Cattanach: Dunning Thorton ConsultantsKen Elwood: University of British Columbia

Noel Evans: OPUS EngineersBruce Galloway: USAR Engineer (Holmes Consulting)

David Hopkins: Critical Building Project Leader (Structural Consultant)Weng Yuen Kam: University of Canterbury Graduate Student

Andrew McGregor: Lunds Contractor Mike Stannard: Department of Building and Housing

Chris Van den Bosch: City of ChristchurchGrant Wilkinson: Ruamoko Solutions

Christchurch Central Business District (CBD)

Christchurch:

• Pop. = 390,000

• 2nd largest in NZ

CBD:

• Approx.  6,000 companies or institutions with over 50,000 employees. 

• 25% of the total employment in the city. 

Cathedral

My location @ 12:51pm

Grand ChancellorMy hotel

CTV (collapsed)

Pyne Gould (collapsed)

Christchurch Central Business District (CBD)NZSEE Seminar

Page 2: Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

5/23/2012

2

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

0 0.5 1 1.5 2 2.5 3 3.5 4

Sa (g)

Period (s)

22 Feb 2011

4 Sep 2010

Image courtesy of  GNS

Short Duration,about 8 sec of strong motion

Short intense shaking ‐ CBDEast‐West

North‐South

Vertical

CBD Response Spectra

0

0.5

1

1.5

2

0 0.5 1 1.5 2 2.5 3 3.5 4

Sa (g)

Period (s)

E‐W components

N‐S components

CBD Response Spectra

0

0.5

1

1.5

2

0 0.5 1 1.5 2 2.5 3 3.5 4

Sa (g)

Period (s)

0

0.5

1

1.5

2

0 0.5 1 1.5 2 2.5 3 3.5 4

Sa (g)

Period (s)

Comparison with DBE

Berkeley DBE

Christchurch 500 yrs(Design)

Sacramento DBE

CBD – Cordon: 23 Feb 2011  The engineering response

Page 3: Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

5/23/2012

3

Critical Building Project• Identify buildings that pose a threat of 

collapse or a hazard to adjacent buildings and roads.

• ~40 “Critical buildings” 

• Advise City on action to reduce hazard during State of Emergency.

– Stabilize, Demolish, or Leave it for the owner?

Hotel Grand Chancellor

Initial Information: 23 Feb 2011

Photo of wall failure in foyer:

South FaceEast Face

The Challenge: 24 Feb 2011

Survey: No movement in aftershocks(Feb 23 – Feb 24) 

Drawings: 24 Feb

‐Constructed mid‐1980s‐22 full stories‐East bay cantilevered

Perimeter frame (above Level 14)

Core wall (up to Level 14)

G

2

4

6

8

10

12

x Lobby wall failure

Tension hanger

Transfer girder14

15

16

17

26

27

28

...

... ... ... ...

Perimeter moment fram

eShear walls

Cantileverbeams

Central shear wall on center grid line

Drawings: 24 FebW‐E Elevation

Page 4: Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

5/23/2012

4

Drawings: 24 FebLevel 14

Dunning Thorton

FAILED

Aside: Structure changed during construction

Original Design

Final Design

G

2

4

6

8

10

12

x

??

Lobby wall failure

Tension hanger

Transfer girder14

15

16

17

26

27

28

...

... ... ... ...

Perimeter moment fram

eShear walls

Cantileverbeams

Central shear wall on center grid line

Drawings: 24 FebW‐E Elevation

A

BC

Grid line 1

Inspection – lobby wall: 24 Feb

A

BC

Grid line 1

Inspection ‐ Level 10 Columns: 24 Feb Briefing notes 24 and 25 Feb 2011

Page 5: Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

5/23/2012

5

Solution?

• Demolition?• Reduce mass?• Stabilize?

– “Fix” ground floor wall?– Support under tension columns?

– “Fix” Level 10 columns?

Must all be done with limited exposure in and around building!!

x

XX

USAR Proposal: 25 Feb

Proposal made by Urban Search and Rescue (USAR) Engineer, Bruce Galloway, 25 February 2011.

This proposal provided  vital information on the damage to the building based on USAR engineer observations.  It provided the stimulus for and formed the basis  of  the final proposals which were developed  and implemented.

Brainstorming: 25 Feb

• Stage 1:

– Mass concrete to brace wall from east.

– Pumped from outside potential fall zone.

• Stage 2:– Mass concrete to confine base of 

wall.

• Stage 3:– Reinforce and shotcrete wall and 

slab above.

• Plan B – Prop cantilever in lane

Stabilisation Repair Drawings: 26 Feb

Clearing the work area: Feb 27 Preparing the formwork: Feb 27

Page 6: Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

5/23/2012

6

Pump concrete – east support: Feb 28 Complete wall support: March 1

Room‐by‐room building inspection March 1‐2 (7 days after earthquake)

Shotcrete lobby wall: March 2‐5 Stabilization ‐ Level 10 Columns: March 5+

Plan B: Cantilever propping proposal Deconstruction...

Page 7: Post-Earthquake Repairs, Part 2 - American Concrete Institute · the Seismic Rehabilitation Standard (ASCE 41). Dr. Elwood is Chair of ACI Committee 369, Seismic Repair and Rehabilitation

5/23/2012

7

Hotel Grand Chancellor Acknowledgement

• The constructive approach of all involved was outstanding and is gratefully acknowledged

• People contacted included the original designer in Sydney and the person responsible for the drawings

• Special thanks are due to Steve McCarthy of Christchurch City Council who liaised with and directed the Critical Buildings Group

Concluding remarks

• Unprecedented context

• Urgent need to stabilise major buildings

– USAR access

– Road clearance

• Immense challenge

– Building data and drawings

– Surveys  to check movement

– Stabilisation solutions

– Innovative implementation

• Sustained co‐operative effort of all involved

• Many subsequently demolished but initial stabilisation critical