Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day Dec 20 (AM)-21(PM), blizzard 09 shut us down Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late) Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared s=200 GeV/n Au-Au Jan 2 (midnight) STAR in Physics Mode Jan 8 (0600) PHENIX in Physics Mode Jan 12, Rebucketing not yet routine, stochastic cooling still to come. Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on Mar. 11, End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup Mar. 13, Begin 4 week s = 62.4 GeV/n run Apr. 10, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup Apr. 12, Begin 1.5 week s = 39 GeV/n run Apr 18-22, Satogata is away Apr. 23, End 1.5 week s = 39 GeV/n Run, begin s = 7.7 GeV/n setup Apr. 25, Begin 4 week s = 7.7 GeV/n run May 20, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup May 23, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup May 23 – 28 IPAC (Kyoto) May 25, begin 0.5 week beam studies at s = 5 GeV/n and ~ 0.67 - – 25 CRYO WEEKS This is it unless we have $’s to run longer – revisit in March May 29, end 0.5 week studies May 31, begin s = 11.5 GeV/n for STAR Jun 8, 27 CRYO WEEKS Jun 15, end 2 week s = 11.5 GeV/n run Jun 15 , Begin Cryo Warm-up Jun 16, Warm-up complete, Run 10 ends – 28.2 CRYO WEEKS

Possible Run 10 plan based on 25 Nov Revised Plan

  • Upload
    aldon

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

Possible Run 10 plan based on 25 Nov Revised Plan. Run10, 25 cryo-weeks (my guesses after Jan 12) Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day - PowerPoint PPT Presentation

Citation preview

Page 1: Possible Run 10 plan based on 25 Nov Revised Plan

Possible Run 10 plan based on 25 Nov Revised Plan

• Run10, 25 cryo-weeks (my guesses after Jan 12)

– Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to 4.5K complete in both rings!– Dec. 5, beam setup in RHIC begins.– Dec 16, 20 hr unplanned Maintenance day– Dec 20 (AM)-21(PM), blizzard 09 shut us down– Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)– Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared s=200 GeV/n Au-Au– Jan 2 (midnight) STAR in Physics Mode– Jan 8 (0600) PHENIX in Physics Mode– Jan 12, Rebucketing not yet routine, stochastic cooling still to come.– Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on– Mar. 11, End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup– Mar. 13, Begin 4 week s = 62.4 GeV/n run– Apr. 10, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup– Apr. 12, Begin 1.5 week s = 39 GeV/n run– Apr 18-22, Satogata is away– Apr. 23, End 1.5 week s = 39 GeV/n Run, begin s = 7.7 GeV/n setup– Apr. 25, Begin 4 week s = 7.7 GeV/n run– May 20, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup– May 23, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup – May 23 – 28 IPAC (Kyoto)– May 25, begin 0.5 week beam studies at s = 5 GeV/n and ~ 0.67 - – 25 CRYO WEEKS– This is it unless we have $’s to run longer – revisit in March– May 29, end 0.5 week studies– May 31, begin s = 11.5 GeV/n for STAR– Jun 8, – 27 CRYO WEEKS– Jun 15, end 2 week s = 11.5 GeV/n run– Jun 15 , Begin Cryo Warm-up– Jun 16, Warm-up complete, Run 10 ends – 28.2 CRYO WEEKS

Page 2: Possible Run 10 plan based on 25 Nov Revised Plan

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX Lattice Sextupole Polarity Swap

RHIC Research with s = 200 GeV /n AuAu IBS NO

RHIC Research with s = 62.4 GeV /n AuAu IBS NO

RHIC Research with s = 39 GeV /n AuAu IBS NO

Complete n ~ 0.67 for pp studies

RHIC Research with s = 7.7 GeV /n AuAu NO YES

Beam Studies at s = 5 GeV /n AuAu NO YES

STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)

IPAC

NSRL (NASA Radiobiology)

Shutdown (RHIC)

C-A Operations-FY10

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2010

2 Mar 10

setup with beams in both rings

Sep

concurrent with RHIC

ramp up luminosity

21 Sep

28.2 weeks

1 Dec

20 Nov

setup as required

10 weeks physics

6/16 End Date (TBD)

10 weeks

NSRL Schedule TBD

25 cryo weeks

4weeks

1.5wks

4weeks

2wks

For Discussion Only

~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities

4-6 hour overhead to reverse sextupole polarities (if necessary)

Complete before polarity switches

Page 3: Possible Run 10 plan based on 25 Nov Revised Plan

Possible Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week

• Dec. 1, Begin cool down to 4.5K • Dec. 4, Cooldown to 4.5K complete in both rings!• Dec. 5, beam setup in RHIC begins.• Dec 16, 20 hr unplanned Maintenance day• Dec 20 (AM)-21(PM), blizzard 09 shut us down• Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)• Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared s=200 GeV/n Au-Au• Jan 2 (midnight) STAR in Physics Mode• Jan 8 (0600) PHENIX in Physics Mode• Jan 12, Rebucketing not yet routine, stochastic cooling still to come.• Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on• Mar. 18, End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup• Mar. 20, Begin 4 week s = 62.4 GeV/n run• Apr. 17, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19, Begin 1.5 week s = 39 GeV/n run• Apr 18-22, Satogata is away• Apr. 30, End 1.5 week s = 39 GeV/n Run, begin = 0.67 studies before polarity switches begin (i.e. this is a placeholder)• May 1, complete = 0.67 studies for pp and s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 25 – 25 cryo weeks• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup (6 hr polarity switch)• Jun 2, begin 3 day beam studies at s = 5 GeV/n • Jun 5, end 3 day studies begin s = 11.5 GeV/n setup• Jun 7, begin s = 11.5 GeV/n for STAR• Jun 8 – 27 cryo weeks• Jun 21, end 2 week s = 11.5 GeV/n run• Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS

Page 4: Possible Run 10 plan based on 25 Nov Revised Plan

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX Lattice Sextupole Polarity Swap

RHIC Research with s = 200 GeV /n AuAu IBS NO

RHIC Research with s = 62.4 GeV /n AuAu IBS NO

RHIC Research with s = 39 GeV /n AuAu IBS NO

Complete n ~ 0.67 for pp studies

RHIC Research with s = 7.7 GeV /n AuAu NO YES

Beam Studies at s = 5 GeV /n AuAu NO YES

STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)

IPAC

NSRL (NASA Radiobiology)

Shutdown (RHIC)

C-A Operations-FY10

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2010

2 Mar 10

setup with beams in both rings

Sep

concurrent with RHIC

ramp up luminosity

21 Sep

29.2 weeks

1 Dec

20 Nov

setup as required

10 weeks physics

6/23 End Date (TBD)

11 weeks

NSRL Schedule TBD

25 cryo weeks

4weeks

1.5wks

4weeks

2wks

with s=200 extended 1 week (For Discussion Only)

~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities

4-6 hour overhead to reverse sextupole polarities (if necessary)

Complete before polarity switches

Page 5: Possible Run 10 plan based on 25 Nov Revised Plan

Run 10 100 x 100 GeV/n Au Delivered Luminosity

0

1000

2000

3000

4000

5000

6000

7000

0 1 2 3 4 5 6 7 8 9 10 11

Weeks of Physics collisions

mb-1

Min

Max

STAR-Physics

PHENIX-Physics

Machine (PHENIXZDC)Linear (PHENIX-Physics)

as of 1 Mar, through store 11827

PHENIX Goal*

* With 20 cm sigma IR diamond

PHENIX Minimum Goal*

STAR Goal~12%/week

Page 6: Possible Run 10 plan based on 25 Nov Revised Plan

Run 10 100 x 100 GeV/n Au Delivered Luminosity per day

0

20

40

60

80

100

120

140

160

0 1 2 3 4 5 6 7 8 9 10

Weeks of Physics collisions

b-1

/day

Min

Max

STAR

PHENIX

Yellow Transverse Stochastic Cooling onRebucketing ~on (22 Jan)

as of 1 Mar, through store 11827

Page 7: Possible Run 10 plan based on 25 Nov Revised Plan

Run 10 100 x 100 GeV/n Au Delivered Luminosity per day

0

20

40

60

80

100

120

140

0 1 2 3 4 5 6 7 8 9 10

Weeks of Physics collisions

b-1

/day

Min

Max

STAR 1 week average

PHENIX 1 week average

Yellow Transverse Stochastic Cooling onRebucketing ~on (22 Jan)

as of 1 Mar, through store 11827

Page 8: Possible Run 10 plan based on 25 Nov Revised Plan

71.3

178.9

588.6

359.5

526.8 541.2

302.9

483.2

72.4

179.4

599.7

358.8

547.5 569.2

335.4

525.4

80.3 43.0 107.2 76.2 96.0 95.2 83.8 99.10

24

48

72

96

120

0

100

200

300

400

500

600

700

800

12

/31

to 1

/07

1/0

8 to

1/1

4

1/1

5 to

1/2

1

1/2

2 to

1/2

8

1/2

9 to

2/0

4

2/0

5 to

2/1

1

2/1

2 to

2/1

8

2/1

9 to

2/2

5

ho

urs

pe

r w

ee

k a

t s

tore

Run 10 (AuAu) -- Integrated Luminosity by week in

teg

rate

d l

um

nio

sit

y [m

b^

-1]

period

Phenix STAR (lumi) hours at store

thru fill 11800ending 18:33 25 February Goal

Min

Max

Page 9: Possible Run 10 plan based on 25 Nov Revised Plan

13 Feb – 2 Mar 10

PHENIX ~ Saturated

Look at this one in detail

Page 10: Possible Run 10 plan based on 25 Nov Revised Plan

Fills 11824 28 Feb 10

Lpeak from Table 2 (Maximum Luminosities)

Lstore average from Table 2

Page 11: Possible Run 10 plan based on 25 Nov Revised Plan

Fills 11824 28 Feb 10

Max ions/bunch goal from Table 2, 1.1 x 109

Page 12: Possible Run 10 plan based on 25 Nov Revised Plan

Fills 11824 28 Feb 10, Longitudal Stochastic Cooling

(yellow not operating)

30 % reduction

Page 13: Possible Run 10 plan based on 25 Nov Revised Plan

Fills 11824 28 Feb 10, Transverse Stochastic Cooling

Page 14: Possible Run 10 plan based on 25 Nov Revised Plan

Fill 11489, no cooling, no rebucketing (0.6 m beta*)Monday, 18 Jan.

Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC

XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 111/28 1196 0.911 1.024 0.961 0.999 0.927

Yellow 111/29 1168 0.879 1.023 0.961 0.989 0.905

Page 15: Possible Run 10 plan based on 25 Nov Revised Plan

Ring Bunches/Cycles

Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 56/56 909 0.836 1.056 0.963 0.992 0.828

Yellow 56/56 990 0.971 1.085 0.962 0.959 0.970

Injected Beam Statistics for Fill number 11340Started filling RHIC: Thu Dec 31 22:51:52 2009, Fill complete: Thu Dec 31 22:59:50 2009, Minutes to fill: 7

31 Dec 1st Physics Store

28 Feb Physics Store 11824, 0.7 m b* with some cooling and with rebucketing

Ring Bunches/Cycles Avg Bunch in RHIC

(10^6 ions)

Avg Efficiency

XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf

Wxf to Arc

Arc to RHIC

Blue 111/28 1262 0.917 0.975 0.961 1.001 0.977

Yellow

111/28 1246 0.910 0.961 0.964 0.988 0.994

0.9050.9890.9611.0230.8791168111/29Yellow

0.9270.9990.9611.0240.9111196111/28Blue

Arc to RHIC Wxf to Arc Uxf1 to Wxf XCBM to Uxf1 Avg Efficiency XCBM to RHIC

Avg Bunch in RHIC (10^6 ions)

Bunches/Cycles Ring

18 Jan Physics Store 11489, 0.6 m * No cooling or rebucketing

Page 16: Possible Run 10 plan based on 25 Nov Revised Plan

Future Topics

• 3rd integar studies update – M. Bai• Toward Smaller beta* - new quad triplets – D. Trbojevic

Page 17: Possible Run 10 plan based on 25 Nov Revised Plan

Archive

Page 18: Possible Run 10 plan based on 25 Nov Revised Plan

Through Dec 2009

BNL Energy Cost

$(20)

$-

$20

$40

$60

$80

$100

$120O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

$/M

Wh

rBilled Cost/MWhr

Without Balanced Billing

Balanced Billing Projection

RHIC ON

AGS SEB/FEB

NSRL

Page 19: Possible Run 10 plan based on 25 Nov Revised Plan

Through 2/15/10

RHIC Cryo Operations FY06-10

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

RHIC Cryo 06

RHIC Cryo 07

RHIC Cryo 08

RHIC Cryo 09

RHIC Cryo 10

Page 20: Possible Run 10 plan based on 25 Nov Revised Plan

Through 2/15/10

RHIC Operations FY06-10

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

CAD P ower 06

CAD P ower 07

CAD P ower 08

CAD P ower 09

CAD P ower 10

Page 21: Possible Run 10 plan based on 25 Nov Revised Plan

Through 2/15/10

BNL Energy Use FY 2009-10

0

5

10

15

20

25

30

35

40

45

501-

Jul-

08

1-A

ug-0

8

1-S

ep-0

8

1-O

ct-0

8

1-N

ov-0

8

1-D

ec-0

8

1-Ja

n-09

1-F

eb-0

9

1-M

ar-0

9

1-A

pr-0

9

1-M

ay-0

9

1-Ju

n-09

1-Ju

l-09

1-A

ug-0

9

1-S

ep-0

9

1-O

ct-0

9

1-N

ov-0

9

1-D

ec-0

9

1-Ja

n-10

1-F

eb-1

0

1-M

ar-1

0

Date

Dai

ly A

vera

ge

Po

wer

(M

W)

RHIC Cryo RHIC other

AGS-Exp Booster

AGS-Mach Tandem

CAD Bldg less SMD NSRL

Site Base BNL Peak-Av

Site total not recorded after 30 Nov

Page 22: Possible Run 10 plan based on 25 Nov Revised Plan

5 June 07 22

(w/o stochactic cooling)1.02 x 109 /bunch

0.97 x 109 /bunch

Run 7 Fill 8878 Injected Beam Statistics from ELOGBlue = 103 bunches 1.04x109/bunchYellow= 103 bunches 1.13x109/bunch

Page 23: Possible Run 10 plan based on 25 Nov Revised Plan

5 June 07 23

Store 8849 (w/stochactic cooling)1.02 x 109 /bunch

0.97 x 109 /bunch

Run 7 Fill 8849 Injected Beam Statistics from ELOGBlue = 103 bunches 1.23x109/bunchYellow= 103 bunches 1.15x109/bunch

Page 24: Possible Run 10 plan based on 25 Nov Revised Plan

5 June 07 24

Run7 AuAu ZDC rates with and without stochastic cooling, with equal initial Au ions/bunch in each ring

0

5,000

10,000

15,000

20,000

25,000

30,000

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00

Time (hours)

ZD

C (

Hz)

ZDC 25 May Store 8849 w/ stochastic cooling

ZDC 30 May Store 8878 w/o stochastic cooling

Poly. (ZDC 30 May Store 8878 w/o stochasticcooling)Poly. (ZDC 25 May Store 8849 w/ stochasticcooling)

Physics ON

Loss in 3 hrs= 3.1= 3.7

Page 25: Possible Run 10 plan based on 25 Nov Revised Plan

Physics production or beam studies weekssNN (GeV) 25-cryoweek run 27-cryoweek run

200 10 1062.4 4 439 1.5 1.527 0 018 0 0

11.5 @ STAR 0 27.7 4 4

Beam studies @ 5 GeV and @ 0.67

0.5 0.5

Revised Run 10 Plan, Nov 25, 2009

Page 26: Possible Run 10 plan based on 25 Nov Revised Plan

Run 10 Au-Au Goals11/19/09

• STAR– s = 200 GeV/n

• Luminosity Sampled/Delivered = 2/4 nb-1

• 250M Central Events• 300M Min-bias events

• PHENIX– s = 200 GeV/n

• Luminosity Recorded/Delivered = 1.4/>6 nb-1

• Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb-1

Page 27: Possible Run 10 plan based on 25 Nov Revised Plan
Page 28: Possible Run 10 plan based on 25 Nov Revised Plan

Run 7

Fill 8544

Page 29: Possible Run 10 plan based on 25 Nov Revised Plan

BNL Energy Cost

$(20)

$-

$20

$40

$60

$80

$100

$120O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

$/M

Wh

rBilled Cost/MWhr

Without Balanced Billing

Balanced Billing Projection

RHIC ON

AGS SEB/FEB

NSRL

Through 30 Nov 09

Page 30: Possible Run 10 plan based on 25 Nov Revised Plan

– Oct. 5, N2 scrubbing– Oct. 30, Temp. Control devices in and ready

(required for 45 K wave cooldown).– Nov. 2, 45 K wave begins.– Nov. 12, AGS Testing.– Nov. 12-13, APEX Workshop – Nov. 16, beam setup in Booster and AGS– Nov. 16-20, RHIC Dry Run – Nov 22, Beam extracted from AGS to W dump

Run 10 Setup

Page 31: Possible Run 10 plan based on 25 Nov Revised Plan

Wednesday midnight

Thursday midnight

Page 32: Possible Run 10 plan based on 25 Nov Revised Plan

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX

RHIC Research with s = 200 GeV /n AuAu

RHIC Research with s = 8-62 GeV /n AuAu

Beam Studies at s = 5 GeV /n AuAu

NSRL (NASA Radiobiology)

Shutdown (RHIC)

C-A Operations-FY10

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2010

6 Jan 10

setup with beams in both rings As Run/Planned

Sep

concurrent with RHIC

ramp up luminosity

21 Sep

≥ 25 weeks

1 Dec

20 Nov

setup as required

10 weeks physics

End Date TBD

10 weeks

NSRL Schedule TBD

25 cryo weeks

25 Cryo Weeks

Page 33: Possible Run 10 plan based on 25 Nov Revised Plan