24
Positioning assets

Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

Po

sit

ion

ing

as

se

ts

Page 2: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

fle

xib

ilit

y

pr

ecis

ion

Page 3: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

1

About us

OHT is a specialised heavy transport and installationcontractor, building on Norway’s long and proud herit-age in maritime pioneering.

Since the company was founded in 2006, we have suc-cessfully executed complex projects on behalf of our customers. We serve clients from a wide range of indus-tries including oil & gas, offshore wind and marineinfrastructure.

Handling oversized and challenging cargoes is our trade-mark, and we are proud of having transported well over a hundred jack-up drilling rigs for the majority of rig-owners in the world.

In Q1 2021, OHT will increase the capabilities andbecome a full transport & installation (T&I) contractor with addition of a new heavy lift crane installationvessel to our fleet.

The innovative Alfa Lift project is a response tothe increasing demand for efficient transportation andinstallation solutions within the offshore wind market.

The OHT Management

OFFSHORE HEAVY TRANSPORT AS

Page 4: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

2

OFFSHORE HEAVY TRANSPORT ASpe

op

le

Page 5: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

3

Our customerstell us we have a uniquebusiness cultureWe take that as a great compliment

Page 6: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

4

OFFSHORE HEAVY TRANSPORT AS

Thanks for a successful load operation in Poland.OHT was cooperative and solution oriented duringpre-operational phase of the project. Load out opera-tion was conducted in a safe and professional manner

by the OHT Hawk team.

Christopher Bjønness,Marine Engineer, Aqualis Offshore AS

Page 7: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

5

It is always a pleasure working with professionals! Thanks to the entire OHT Team for your efforts onanother successful Shelf Drilling jackup loadout.

Wayne Allen,Senior Marine Manager, Shelf Drilling

Page 8: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

6

OFFSHORE HEAVY TRANSPORT AS

en

gin

ee

rin

g

From theoryto practical solutionsThe OHT engineering team has decades of experience within the industry. Prior to project execution, careful planning is carried out to ensure safe execution ofthe operations.

Each project requires a thorough study of technical details to bridge the gap between theoretical calcula-tions and practical solutions. Our engineers are involved throughout the project and operational proceduresare developed in close cooperation with the clientand our operation teams.

Page 9: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

7

Page 10: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

8

OFFSHORE HEAVY TRANSPORT ASinn

ovat

ion

Entering new marketsThe unique Alfa Lift project is a 48,000 dwt semi-submersi-ble vessel targeting the offshore windfarm foundationinstallation market. The vessel is designed to efficientlyinstall all types of bottom fixed offshore wind foundations.

Besides Alfa Lift’s superior installation capabilities,the vessel also holds the ability to transport and install topsides and subsea modules as well as transporting other floating and non-floating heavy cargoes.

Valuable feedback from our customers inspires us to con-stantly seek new opportunities to improve our servicesand maintain our position as a leading contractor.

Entering the T&I market leverages on OHT’s experiencein delivering reliable transport services and on ourskilled staff with offshore wind and subsea construction background.

Page 11: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

9

Page 12: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

10

OFFSHORE HEAVY TRANSPORT AS

Rolling

Lifting

Installation

Skidding

Floating

op

er

at

ion

Page 13: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

11

Safe operations

OHT’s experience, solution-oriented attitude and longtrack record within the industry make us the preferredsupplier for our customers. Supervision by highly skilled loadmasters and experienced crew, enable us to provide safe and efficient operations.

Project execution is carried out in close cooperationwith the organization ashore and stakeholders such asour clients, marine warranty surveyors and local authorities.

Page 14: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

12

OFFSHORE HEAVY TRANSPORT AS

Page 15: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

13

Page 16: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

14

OFFSHORE HEAVY TRANSPORT AS

3

21

4

Thanks to your support, we have successfully per-formed the transportation of Woongjin's marine equipment. We were very impressed with the profes-sional operation by all members, master and crewof OHT. Thanks again!

S.H. KimDirector, Mundus partners Inc.

Many thanks to the OHT team for your expertise andprofessional operations which firmly helped us to success-fully fulfil the massive transport of our cargoes from China to Africa. We believe we will definitively have more great opportunities to cooperate in near future and looking for-

ward to that.

Mr. Frank Gong, Offshore Engineering DivisionDirector, CJ Smart Cargo

Float-onFloating cargoes are gently moved across the vessel's submerged deck into position against the guidepostby the vessel's own winches, while standby tugs are connected tothe cargo for an instant pull-out asa contingency measure.

Page 17: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

15

Seajacks Scylla

ADES 2x jack-ups

PEMEX Kukulkan Ensco 8505

Bouygues Zourite

Page 18: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

16

OFFSHORE HEAVY TRANSPORT AS

ljn Chevron South Nemba

Skid-onThese operations are performed withthe greatest diligence and attention todetail. Large offshore modules are loadedwith no visible ship motions during load transfer and tide variations.

It is always a pleasure workingwith OHT professionals!Thanks to the entire OHT Team for your efforts and we look forwardto making a good business withyou in the near future!

Michael KimGeneral Manager, Meister Logistic

We had several transport coopera-tions with OHT in the past yearsand all went very well. Thanks for the professional service, and looking forward to the further coop-eration.

Mr. Andy YueManager of Business Development Dept, CCCC

4

321

Page 19: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

17ljn

Modules

Page 20: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

18

OFFSHORE HEAVY TRANSPORT AS

1 2

3

Wind substructures

Roll-onTo roll on modules, the ships pro-vide a reliable platform with large pumps as well as redundancy in all system components.

Page 21: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

19

4

Lift-onThe large deck space of the vessels provides all the room required for modules, flares, bridges, or jackets.

1

3

Module and bouyance tower

Thanks a lot to you and the OHT team for professional and safe work beeingextended towards our agreed contract for dry tow transportation of rig Halul.

Mohsen AbdelalimTechnical Manager Gulf Drilling International Ltd (Q.S.C.)

2

Page 22: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

20

OFFSHORE HEAVY TRANSPORT AS

Eagle

Falcon

Albatross

Hawk

Osprey

Fle

et

Page 23: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

Design: M

oving Minds • Print: R

K G

rafisk, • Photo: O

HT / Tom

my N

ormann / Lilian Julsvik / O

HT • Illustrations: M

ike Lee, OH

T • Novem

ber 20

18

Page 24: Positioning - OHT€¦ · ADES 2x jack-ups PEMEX Kukulkan Ensco 8505 Bouygues Zourite . 16 OFF V S ljn Chevron South Nemba Skid-on These operations are performed with the greatest

oh

t.n

o

OHT Managment ASHaakon VIIs gt. 10161 Oslo, Norway

P.O. Box 1468, VikaN-0116 Oslo, Norway

www.oht.no