Upload
katie-potts
View
214
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Â
Citation preview
K A T I E P O T T S
K A T I E P O T T S
P U R P O S E : the reason for which something is done or created
Human Figure Gesture 4
Shapes in Architecture 6
Sponge Tube House 8
Seattle Hydrology Institute 10
C A U S E : someone or something that gives rise to an action or condition
Middle School 12
Ice Arena Renovation 18
Personal Photography 20
Boat Sculpture 22
B E L I E F : faith in someone or something
Donor Plaques 24
Core Value Banners 25
Legacy Wall 26
Cherry River Bird Watching Facility 28
T a b l e o f C o n t e n t s
W H Y I D O W H A T I D O
PURPOSE: to gain further understanding of the human scale and relationship to built environments
4 K. P O T T S
I N T E R M E D I A T E D R A W I N G Spring 2011
Course focus:Students are involved with visual problems and solutions through
the study of the human figure and exploration of space.
Medium: conté crayon, ink, chalk, graphite, colored pencil
K. P O T T S 5
P U
R P
O S
E
PURPOSE: to explore the many shapes of architecture
I chose to display architecture in a way that uses fluid lines rather than conventional rigid lines. Shown here are the German Historical Museum, Guggenheim Museum Bilbao and the Louvre.
Medium: permanent marker, watercolor pencils
6 K. P O T T S
I N T E R M E D I A T E D R A W I N G Spring 2011
Course focus:Independent projects allow each student to develop pieces in an area
most interesting to them.
K. P O T T S 7
P U
R P
O S
E
Assignment: Design a house on the given
site based on a motif taken from nature.
8 K. P O T T S
PURPOSE: exploration of designing with curves
A R C H I T E C T U R A L D E S I G NFall 2009
Course focus:Students communicate ideas through graphical means including
orthographic projection, freehand sketching, and sections.
Medium: ink, marker, colored pencil
K. P O T T S 9
P U
R P
O S
E
PURPOSE: to teach the public about water resource concerns and how to effectively conserve water for future generations
10 K. P O T T S
M O N T A N A S T A T E U N I V E R S I T YS E A T T L E H Y D R O L O G Y I N S T I T U T E
Fall 2014
Assignment: Design a Seattle Hydrology Institute on a designated site along the harbor. The
facility must include an exhibition hall, classrooms, tiered lecture hall and exterior deomonstration areas.
Focus: A ripple of rainfall catchment to serve as
an example of how to recycle water
K. P O T T S 11
P U
R P
O S
E
Grand RapidsChristian Schools 1
aerial
N
neighbor meeting 09.30.2013n o t t o s c a l e
breton rd se
Plymouth A
ve SE
Chesaning Dr SE
Proposed middle schoolLocation #2
Existing high schoolcampus
Existing year-round program/Proposed middle school
Location #1Burton St SECAUSE: existing infrastructure paired with the vision to create a collaborative,
21st century learning environment prompts the study of multiple locations Location #1
12 K. P O T T S
shawnee - proposed site plan
N
0’ 60’ 120’
Grand RapidsChristian Schools neighbor meeting 09.30.2013
s c a l e
4
proposed bus drop-off
existing building
before and after school parent drop-off/pick-up
parking(8)
proposed new gymnasium
construction
(15,000 sf footprint)
preservedplayground
proposed parking lot connector
proposed new construction
courtyard infill
potential future expansion
future detention
(tbd)
proposed parking
(44)parking
(18)
chesaning dr
shiawassee dr
student entry
student entry
visitor entry
play entry
evententry
play entry
easement
existingfence
existing
preservedplayground
preservedplay
creek
existingbackstop
student
preservedplayground
preservedgreen space
playground access
playground access
playground access
playground access
playground access
Grand RapidsChristian Schools 1
aerial
N
neighbor meeting 09.30.2013n o t t o s c a l e
breton rd se
Plymouth A
ve SE
Chesaning Dr SE
Proposed middle schoolLocation #2
Existing high schoolcampus
Existing year-round program/Proposed middle school
Location #1Burton St SE
S I T E C O N T E X T
Burton St SE
P R O P O S E D M I D D L E S C H O O L F E A S A B I L I T Y S T U D Y
Location #2
Professional experience: My role included creating graphic packages for zoning approval and
design meetings as well as providing Revit drawing support.
Programs used: Revit, SketchUp, Photoshop, InDesign
K. P O T T S 13
C A
U S
E
Proposed middle schoolLocation #1
Above: SketchUp model completed by teammate
14 K. P O T T S
classroom classroom classroom classroom world language
courtyardcommons
ess
classroom
classroom classroom classroom classroom classroom
ess
world languages
sensory
incl o
m/idf
girls
jc
boys
classroom classroom
practice/st orchestra
choir
practicepractice
band
band st
classroom
classroom
classroom
classroom
ess
mtgincl
girls
boys
science
meeting
media commons
facilities ststsciencekit
incl
mech
mdf
staff
stesssens
flex
wkrm
recp
st
sick
mech
flex
kit
jc
open to gymnasium below
sensory
art
art
art st
outdoor st
incl
incl
meeting
couns
Commons
break/fix
green
media o.
chair st
mechlobby
mtg
kiln
up
up
up
hall
ess
ess o.
preserved playground
playentry
playentry
parent drop-off/pick-up
shiawassee dr
ches
anin
g dr
proposedbus drop-off
preserved green space(240' x 120')
visitor entry
student entry
studententry
studententry
evententry
teachers lounge
wkrm
new courtyard infill
Proposed middle school Location #2
new gymnasium
F E A S A B I L I T Y S T U D Y(continued)
Above: SketchUp model completed by teammate
K. P O T T S 15
C A
U S
E
CAUSE: feasibility study leads to the purchase of a building which requires
renovations and additions
LEVEL 1.1100' - 0"
FIN. GYM FLOOR87' - 4"
CB D E3
A6.1_______
DECORATIVE TINTEDSPLIT FACE CMU VENEER
INSULATED STOREFRONT
FIBER CEMENT BOARD& BATTEN SIDING ONSHEATHING ON MTL.STUDS. 4' WIDEPANELS U.N.O.
3A2.3
_______ 1A2.2
_______1A6.3
_______
A-1A1207B
A
8A6.3
_______ 11A6.3
_______5A6.3
_______
T T T
PAINTED EXPOSEDSTRUCTURAL STEELPIPE COLUMNS, SEESTRUCTURAL
ALUMINUMHANDRAIL BEYOND
6A6.3
_______
S S S
CJ
1/4" / 1'-0"PREFINISHED METAL COPING BYPRE-ENGINEERED METAL BUILDINGMANUFACTURER
PREFINISHED METALCOPING ABOVEPREFINISHED METALPANEL
ALIGN TOP OFCANOPY WITHBOTT. OF COPING
HP 1
HP 2
LIGHTING- SEE ELEC.
LOUVERS- SEE MECH. (TYP.)
5' - 4" 10' - 8" 10' - 0" 6' - 0"
11A3.2
_______
CEMENTITIOUS COATING ATEXPOSED POUREDCONCRETE WALLS, TYP.
CAST STONECOLUMN ENCLOSUREWITH SLOPED TOP(SEE 9/A6.3)
1' -
4"
2' -
0"
1' -
8"
SIM.
8"4"3'
- 4" CMU-1
CMU-2
CMU-2
CMU-1
EQ. EQ.1' - 8" +/-
EQ. EQ. EQ.
6' -
4"
EQ. EQ.
CEN
TER
9' -
0" T
O
ALIG
N
ALIG
N
ALIG
N
ALIG
N ALIG
N
ALIG
N
2
LEVEL 1.1100' - 0"
FIN. GYM FLOOR87' - 4"
C BDE
3A6.1
_______4A6.2
_______
10' -
0"
12' -
8"
DECORATIVETINTED SPLIT FACECMU VENEER
TRANSLUCENTPANEL SYSTEM
NEWSTOREFRONT
FIBER CEMENT BOARD& BATTEN SIDING ONSHEATHING ON MTL.STUDS. 4' WIDEPANELS U.N.O.
TRANSLUCENT PANEL SYSTEM
3A2.3
_______ 1A6.3
_______
0113
ALTERNATE 4BEYOND, TYP.
3A6.3
_______
A
4A6.3
_______
11A6.3
_______
T T TT
PAINTED EXPOSEDSTRUCTURAL STEELPIPE COLUMNS, SEESTRUCTURAL
4' - 0"
S S S S
2' -
0"
1/4" / 1'-0"
CJCJ CJ CJ
HP 1
HP 2
LIGHTING- SEE ELEC.
6A6.1
_______
11A3.2
_______
CEMENTITIOUS COATING ATEXPOSED POUREDCONCRETE WALLS, TYP.
CAST STONECOLUMN ENCLOSUREWITH SLOPED TOP(SEE 9/A6.3)
CONCRETE STAIR ANDSIDE WALLS W/ALUMINUM HANDRAILS- SEE CIVIL ANDSTRUCTURAL
RAISED ROOFABOVEELEVATORBEYOND
4' - 0"
CEMENTITIOUS COATINGAT EXPOSED CONCRETEWALLS - TYP.
8' - 0"
ALIGN WITH MASONRYWALL BEYOND
FDC
STROBEBELL
2' -
3"
2' -
10"
3' -
4"
4"
3' -
4"
4"
3' -
4"
CMU-2
CMU-1
CMU-1
CMU-1
CMU-2
CMU-2
EQ. EQ.
EQ. EQ.
9' -
0"
LIGHT FIXTURE- SEEELEC. INSTALL ONSMOOTH FACE BLOCK.
ALIG
N
ALIG
N
EQ EQ
CJCJ
2 2
16' - 0" 17' - 0" 8' - 4" 22' - 8" 20' - 0" 22222
LEVEL 1.1100' - 0"
FIN. GYM FLOOR87' - 4"
4 3 2 1562
A6.1_______
1A6.1
_______
2A2.1
_______
1A6.4
_______
TRANSLUCENTPANEL SYSTEM
FIBER CEMENT BOARD& BATTEN SIDING ONSHEATHING ON MTL.STUDS. 4' WIDEPANELS, U.N.O.
INSULATEDSTOREFRONT
INSULATED STOREFRONT DECORATIVETINTED SPLITFACE CMU VENEER
1A2.3
_______
10A6.3
_______
3A6.3
_______
4A6.3
_______
2A6.5
_______10A6.5
_______
T TTT T T
T T
T T T
EXISTINGNEW
ALUMINUM HANDRAIL
PAINTED EXPOSEDSTRUCTURAL STEELPIPE COLUMN, SEESTRUCTURAL
10' -
0"
12' -
8"
14' - 8" 22' - 8" 6' - 8" 4' - 0" 4' - 0"
2' -
0"
2' -
0"
1' -
8"
SS S S S S S
ALTERNATE 4, TYP.
PREFINISHED METALCOPING
CJ
PREFINISHED METALCOPING BY PRE-ENGINEERED METALBUILDING MANUFACTURER
HP 1
HP 2
CAST STONECOLUMN ENCLOSUREWITH SLOPED TOP(SEE 9/A6.3)
CEMENTITIOUS COATING ATEXPOSED POUREDCONCRETE WALLS, TYP.
CEMENTITIOUS COATINGAT EXPOSED CONCRETEWALLS - TYP.
2' -
4"
1' -
4"
2' -
0"
TT
CMU-1 CMU-2
CMU-2
CMU-2
3' -
4"
4"
3' -
4"
4"
3' -
4"
CMU-1
EQ. EQ.EQ. EQ.
CJ
KNOX BOX VERIFYTYPE AND HEIGHTW/ GR FIRE DEPT
ALIG
N
EQ EQ
ALIG
N
PROJ. NO.
DATE
DRAWN BY
REVIEWED BY
Addi
tion
and
Reno
vatio
ns fo
r:
REVISION DATE
25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN 49503(616) 454-1600 PHONE(616) 454-1610 FAX
2
A5.2
EXTERIOR ELEVATIONS
130718
Scho
ol -
Shaw
nee
Cam
pus
Gra
nd R
apid
s Chr
istia
n M
iddl
e
06.19.2014
ANP
DC
2036
Che
sani
ng D
r. SE
Gra
nd R
apid
s, M
ichi
gan
4950
6
100% DESIGN DEVELOPMENT
ISSUE FOR PERMIT
BIDS & CONSTRUCTION
ADDENDUM 2
UPDATED SET
12.23.2013
04.16.2014
05.01.2014
05.21.2014
06.19.2014
1/8" = 1'-0"A1.1C2 NORTH ELEVATION OF THE GYMNASIUM
1/8" = 1'-0"A 1-01 SOUTH ELEVATION OF THE GYMNASIUM
1/8" = 1'-0"A1.1C3 WEST ELEVATION OF THE GYMNASIUM
REF. REF.
SENSORY1164
CLASSROOM1188
CLASSROOM1206
ORCHESTRA1204
STOR.1205
GIRLS1185
BOYS1183
J.C.1184
ESS1186
ART1203
ART1201
ART STOR.1202
CHOIR1178STAFF
1177
M/IDF1176
CORRIDOR1179
ANTEROOM1193
PRACTICE1194
PRACTICE1199
BAND1198
BAND STOR.1197
KILN1196
OUTDOOR ST.1195
CORRIDOR1207
ST.1186B
CORRIDOR1175
CORRIDOR1174
CORRIDOR1173
CORRIDOR1192
CORRIDOR1191
CORRIDOR1189
CORRIDOR1187
TEACHERSLOUNGE
1181
WKRM1182
A8.1
A8.19
A8.2
1
2
A8.2
3
A8.2
1 Opp.
A8.22
Opp
.
A8.24
A8.24
A8.2
7
A8.26 5
STAIRB
C5
A9
A9
C1
A1
C1
C1
A1
A1
C2
C2
C1C1
A2
C1
C1
A2
C1
A1
A1
A8
A8
C1
C1
1175
1173A
1188A
11991194
11821181
1202A
1202B
1193
1196
1178
1201A
1203A
1177
12
A8.1
13
10' -
3"
7' - 8"
ALIGN
ALIG
N
6' -
8"3'
- 4"
10' - 6 3/8"
10' -
10
1/8"
10' -
6"
ALIG
N
DN
MEZZANINE ABOVE - SEEENLARGED MEZZANINE PLAN
EXTGEXTG
EXTGEXTG
EXTG
WOM
EXTG
WOM
CPTEXTG
VCTEXTG
CPTCPT
CPT
EXTG
EXTG
PC
CPTCPT
CPTCPT
CPTCPT
CPTCPT
EXTG CPT
CPTCPT
CPTEXTG
CPTEXTG
CPT
VCT
CPT
CPT
CPT
CPT
VCT
CPT
CPT
VCT
CPTCPT
CPT
CPT
CPT
CPT
CPT
SC
UP
NEW 2-HOUR FIREBARRIER (SEAL ALLPENETRATIONS OFEXISTING WALL)
NEW 1-HOURFIRE BARRIER
EXISTING 1-HOUR FIREBARRIER
EXISTING 1-HOUR FIREBARRIER
NEW 1-HOURFIRE BARRIER NEW 1-HOUR
FIRE BARRIER
EXISTING 1-HOURFIRE BARRIER
NEW 1-HOUR FIREBARRIER ATCORRIDOR
1173B
1173C
1188B
1186A
EXISTING 1-HOURFIRE BARRIER
CPTVCT
C4
A9
A9
1197
FIRE CAULK ALLPENETRATIONSIN RM 1176
FIRE CAULK ALLPENETRATIONS
FIRE CAULKALLPENETRATIONSAT RM. 1195
NEW NON-RATEDSMOKE BARRIER- SEAL ALLPENETRATIONSSMOKE TIGHT
5' -
0"
NEW CONC. STOOPWITH TURNEDDOWN EDGES - SEESTRUCTURAL
A4
A4
A4
A4
NEW CLEARGLAZING INEXT'G. FRAMETO REMAINBELOWCEILING ONLY(3) PANES
F
3' -
6"4' - 0"
A7.2 9
A7.214.
EXTG. F.E.AND CAB.
C PT
VCT
35
35
35
EXTG SC
W.O.M. INEXIST.RECESS
W.O.M. INEXIST.RECESS
100' - 0" T.O. SLAB
1
1
1
2
22
2 14
UPPERCABINETS(ALT. 2)
UPPER CABINETS (ALT. 2)
ADJ. SHELVING(ALT. 2)
2
2
2
2
2
2 14
2 14
2
SWING ANCHOREDTO EXISTINGSTRUCTURE ABOVE- SEE STRUCTURAL
8
8
CL
20
A2.011
LINE OFBULKHEADABOVE
LINE OFBULKHEADABOVE
LINE OFBULKHEAD ABOVE
LINE OFEXISTINGBULKHEADABOVE
LINE OF EXISTINGBULKHEAD ABOVE
LINE OF BULKHEADABOVE
A4
A4
NEW OPERABLEWINDOW SYSTEM
NEW OPERABLEALUMINUMWINDOW SYSTEM
17' -
7"
33
33
33
NEW OPERABLEWINDOWS. INSTALLTIGHT TO WALL
33
39
39
CPTEXTG
A7.222
A1.1C2
A1.1C5
EXTG. D.F.
EGRESS WINDOW INEXISTING OPENING
C6
C5
4' - 11"
A8.312
A1.1D3
F7'x7' @ 12 A.F.F.
F7'x7' @ 12" A.F.F.
22
22
3' -
5"
23
A1.1C6
CENTER DOOR INEXISTING CORRIDOR
4"
EXISTINGELEC. PANEL
1157
5
LINE OF FLOATINGCEILING ABOVE
LINE OF FLOATINGCEILING ABOVE
LINE OFBULKHEADABOVE
A4
1172
1198
1201B
1203B
1204B
1205
1204A
1206
1186B
7a
12A6.6
_______
7a
7a
5A6.4
_______
13' - 0"
ALIG
N
ALIG
N
16
ALIG
N
42
7a
7d
7d
42
42
7
ALIGN
ALIGN
14
4" 4"
8"
7c
7a
7a
7a
7a
42
42
23
23 23
23
23
33
23
42
42
7d
7d
6"C L
4"
A1.1D4
1' - 7 1/2"
2' - 5"
SALVAGED MILLWORKFROM SYLVAN CAMPUS
SALVAGED MILLWORKFROM SYLVAN CAMPUS
7b
SALVAGEDMILLWORKM6 & M7
SALVAGEDMILLWORK M1
SALVAGEDMILLWORK M8 & M11
SALVAGED MILLWORKM8, M9 & M11
8.08.18.28.3
9.19.08.4
SALVAGEDMILLWORK M10
.0
.1
.2
.3
.4
.5
.6
.7 .8
.9
.10
.11 .12
7b
7b
4242
42
REPLACEDRAWERSIN KIND
23
23
35
4' - 0"
6' - 3"
15
48
46
15
15
15
23
EXT'G.PLAMBENCH
C1C1
43
43
EXT'G. 1-HOURFIRE BARRIER
4646
6' -
0"
23
23 23
15
15
15
15
EXISTINGEGRESSWINDOW
EXISTINGEGRESSWINDOW
23
12
46
12
48
INSTALL GYP. BD. ONFURRING OVER CMUINFILL TO MATCH EXT'G.WALL THICKNESS
NEW BULKHEAD ABOVE
NEWBULKHEADABOVE
12
10' -
11
3/8"46
4323
26
26
26
INFILLOPENINGW/ GLAZEDCMU
23
ELEC. PANEL
STOP WALL@ CEILING
46
48
15
48
12
FILL EXTGTRENCH W/FLOOR LEVELINGCOMPOUNDCHANGE OFCEILINGHEIGHT ABOVE
F.E. FROMROOM 1199
EXT'G. F.E.
18
RE-FASTENENAMELEDPANEL ABOVEDOOR ANDINSTALL NEWSEALANT ATJOINTS
EXISTINGELEC. PANEL
2' -
6"
2A3.2
_______
CENTER NEWWALL ON EXTGMASONRY
31
TOCLG.
51
CPT EXTG
EXTG SKYLIGHTSABOVE - CLEAN,TYP.
46
9
1' - 0 1/2"1' - 0 1/2"
4"
46
26
INSTALL DOOR FRAMETIGHT TO WALL
4"
6' -
4"
17' - 4"
41
C4
C4
7' -
4 1/
2"
A8.210
A8.210
13' - 4" 14' - 8 3/8"
23
ALIGN
2
A1
1' -
3"
3' -
4"
SEESTRUCTURALFOR NEWLANDINGEXTENSIONDETAILS.
NEWGUARDRAILTO MATCHEXISTING.
A7.2
16
53
SIM.
7a
42
7a
7c
LEVEL 1.1
11.1
11.0
.13
F.E. FROMRM. 1090 9
BF
31
1
1
1
SYSTEMS FURNITURE BY OWNER1
PLAN NOTES
2 CASEWORK PROVIDED AND INSTALLED BY CONTRACTOR
3 POWER DOOR CLOSER ACTUATOR BUTTON TO OPERATE SOUTHMOST LEAF
4 LIBRARY FURNITURE - FURNISHED BY OWNER, INSTALLED BYCONTRACTOR, EXCEPT AS NOTED. CONFIRM FINAL PLACEMENT WITHOWNER PRIOR TO INSTALLATION.
5 ELECTRIC WATER COOLER
6
7 NEW WHITEBOARD PROVIDED BY OWNER INSTALLED BYCONTRACTOR.
8 NEW LOCKERS - REFER TO SPECIFICATIONS (LK-1)
9 NEW CONC. PAD W/ TURNED DOWN EDGES AT NEW EGRESSDOOR - SEE DETAIL 11/A6.4.
1011 EXISTING FOOD SERVICE EQUIPMENT TO REMAIN
12 TOOTH IN NEW BLOCK
13 NEW MASONRY PIER W/ BULLNOSE @ ALL (4) CORNERS UP TOBEARING
14 NEW PLUMBING FIXTURE. REFER TO PLUMBING DRAWINGS
15
NEW LOCKERS - REFER TO SPECIFICATIONS (LK-2)
16 INFILL W/ CMU & 4" BRICK TO MATCH WALL THICKNESS
17
18 RELOCATE EXSTG. C.O. COVER PLATE
19
EXISTING (SALVAGED) LOCKERS RELOCATED. QUANTITY AS SHOWN - SEENOTE 10 ON DEMOLITION DRAWINGS. PROVIDE NEW SLOPED TOP AND FILLERPANELS
3/4" THICK MAPLE BENCH @ 17" HIGH
2021
SEE DRAWING A0.0 FOR GENERAL PLAN NOTES AND WALL TYPES
NEW SLAB TO ALIGN AND MATCH EXTG. SEE STRUCTURAL
INSTALL CEMENTITIOUS COATING ON EXPOSED CONCRETE25PATCH MASONRY WALL WHERE EXISTING MASONRY WALLWAS REMOVED26
EXISTING MILLWORK OR CASEWORK TO REMAIN
NEW CONC. SLAB INFILL TO FLUSH OUT W/ EXISTING ADJACENT ATLOCATIONS WHERE EXISTING MASONRY BRG. WALL & INTEGRALCONC. LOCKER BASES WERE REMOVED. SEE DEMOLITION PLANS
27
4" CONC. HOUSEKEEPING PAD. COORDINATE w/ MECH.FOR SIZE AND LOCATION28
4" CONC. EQUIPMENT PAD. COORDINATE w/ OWNER FOR SIZE ANDLOCATION OF OWNER SUPPLIED EQUIPMENT
29
EQUIPMENT / FURNITURE FURNISHED BY OWNERINSTALLED BY CONTRACTOR.
LOUVER - REFER TO SPECS FOR COLOR AND MECH. DWGS FOR SIZE30
22
3233
NEW ROLLER SHADES RS-2, MOTORIZED BLACK-OUT FABRIC34NEW ROLLER SHADES RS-1, MANUAL SHEER WEAVE FABRIC35CUSTOM BUILT-IN36POWERED DOOR37LEARN WALL PROVIDED BY OWNER, INSTALLED BY CONTRACTOR38
NEW ALUMINUM WINDOW OR DOOR SYSTEM
NEW ALUMINUM DOOR AND FRAME IN EXISTING OPENING
OWNER TO PROVIDE VENDOR-SUPPLIED TOILET ACCESSORIES ATEXISTING TOILET ROOMS TO REMAIN. CONTRACTOR TO INSTALL.
39
APPLY WINDOW FILM TO WINDOWS, SEE SPECIFICATION. COORDINATEDESIGN WITH ARCHITECT PRIOR TO APPLICATION.
31 REPLACE PLAM ON EXISTING MILLWORK TOP.
REPLACE EXISTING PLASTIC OR WD. PANELS GLAZINGWITH CLEAR 1/4" GLASS PANE (INSULATED @ EXTERIOR)
23 TOOTH IN NEW MASONRY AT OPENING WITH INTERIOR BULLNOSE
3/4" THICK ACCESSIBLE BENCH W/ 1-1/2" BULLNOSE24
NOTE: SEE STRUCTURAL ANDELEVATIONS FOR ADDITIONAL CONTROLJOINT LOCATIONS
40 RELOCATED EXISTING PLUMBING FIXTURE. EXTG BUBBLERS TOBE REMOVED AND SINK TOP OPENING CAPPED
4142
PATCH OR FILL CONCRETE FLOOR TO ALIGN W/ EXISTINGPROVIDE WHITE BOARD OR TACK STRIP TACKBOARD FROMSALVAGED MATERIAL, COORDINATE WITH OWNER
43 PATCH MISSING FLOORING W/ VCT OR LEVELINGCOMPOUND FOR FLUSH FLOOR CONDITION
44 PATCH WALL TILE TO MATCH AND ALIGN WITH EXISTING
45 PATCH WALL WITH WOOD TRIM TO MATCH EXISTING
46 PATCH WALL TO MATCH ADJACENT WALL WHERE EXISTINGWALL AND OR MILLWORK WAS REMOVED.
47 NOT USED
48INFILL OPENING W/ METAL STUDS AND GYP. BD. TO MATCHEXISTING WALL THICKNESS. FILL STUD CAVITY W/ SOUNDATTENUATION BATTS.
49 PATCH HOLES IN GLAZED BLOCK
50 NEW SINK BASE CABINET BOTTOM, 1/4" PLYWOOD
51 INSTALL NEW CLEAN OUT PLATE FOR ACCESS TO EXISTINGCLEANOUTPROVIDE NEW BRACKETS TO FIT EXISTING STANDARDS.PROVIDE (2) 12" DEEP GLASS SHELVES, LENGTH TO SPANTHREE STANDARDS.
52
55 NEW PLAM ON 3/4" PARTICLE BOARD FOR FULL LENGTH ANDWIDTH OF MILLWORK
7a 5' x 12'
7b 5' x 4' - LINED FOR MUSIC
7c 4' x 4'
7b 5' x 8'
REPLACE EXTG WOOD PANEL WITH GLASS53REPLACE EXTG WOOD PANEL WITH TEMPERED GLASS54
NEW P.LAM. COUNTERTOP ON EXTG MILLWORK56
NEW ROLLER SHADE RS-3, MANUAL BLACK-OUT FABRIC57
1
1
1
1
NEW ALUMINUM WINDOW BETWEEN TOP OF WALL ANDEXISTING CEILING.
582
MECH.MEZZANINE
2100
DN
REMOVE EXISTINGLOUVER AND REINSTALLPER MECH. DRAWINGS
28
29
SEE MECH.FOR NEW PADSIZES
REMOVE EXISTINGLOUVER AND REINSTALLPER MECH. DRAWINGS
SEE MECH.FOR NEW PADSIZES
12' - 6 5/8" ±93
' - 0
3/4
" ±
1"
3' -
2"
EQ. 7' - 0" EQ.
1193
A10 A10
A4 A4
A4 A4
4" 4"1-HOUR FIREBARRIERACROSSCORRIDOR
1 3/
8"EXISTING WALLTO REMAIN
NEW BULLNOSEEND OF WALL
1 3/
8"
CAULK EA. SIDE
PROJ. NO.
DATE
DRAWN BY
REVIEWED BYAd
ditio
n an
d Re
nova
tions
for:
REVISION DATE
25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN 49503(616) 454-1600 PHONE(616) 454-1610 FAX
1
2
A1.1D
MAIN LEVEL PLAN - AREA D
130718
Scho
ol -
Shaw
nee
Cam
pus
Gra
nd R
apid
s Chr
istia
n M
iddl
e06.19.2014
KP/ANP
DC
2036
Che
sani
ng D
r. SE
Gra
nd R
apid
s, M
ichi
gan
4950
6
100% DESIGN DEVELOPMENT
ISSUE FOR PERMIT
BIDS & CONSTRUCTION
ADDENDUM 1
ADDENDUM 2
UPDATED SET
12.23.2013
04.16.2014
05.01.2014
05.14.2014
05.21.2014
06.19.2014
A
B C
E
D
KEY PLANN.T.S. 1/8" = 1'-0"
MAIN LEVEL PLAN - AREA DNORT
H
1/8" = 1'-0"MECHANICAL MEZZANINE PLANNO
RTH
1/4" = 1'-0"A1.1A3 ENLARGED PLAN @ 1193
3/4" = 1'-0"A1.1A4 WALL DETAIL AT ART 1201
DN
UP
UP
UP
UP
24'-6" 24'-6" 24'-6"
2s 8s 1s 3s 12s 3s 2s 7s 2s
10s 23s 9s
49s
CLASSROOM1147 CLASSROOM
1148
CLASSROOM1149 CLASSROOM
1151
WORLD LANGUAGE1152
ESS1154
CLASSROOM1158
CLASSROOM1167 CLASSROOM
1168
CLASSROOM1169 CLASSROOM
1171
CLASSROOM1172
ESS1186
WORLD LANGUAGE1156
SENSORY1164
M/IDF1176
GIRLS1185
BOYS1183
CLASSROOM1188
CLASSROOM1206
STOR.1205
ORCHESTRA1204
CHOIR1178
PRACTICE1194
PRACTICE1199 BAND
1198
BAND STOR.1197
CLASSROOM1100
COMMONS1101
CLASSROOM1102
CLASSROOM1119
CLASSROOM1121
INCL.1105
GIRLS1122
BOYS1124
SCIENCE CLASSROOM1127
MEETING1103
MEDIA COMMONS1131
FACILITIES STOR.1139
STOR.1138
SCIENCE CLASSROOM1137
KITCHEN1136C
INCL.1136D
MECH.1143
MDF1133
ESS1114B
OFFICE1114C
FLEX1113
WKRM1112
RECEPTION1109
PRINCIPAL1108
SICK1111
MECH.1104
KITCHEN1132
OPEN TOGYMNASIUM
BELOW
SENSORY1105B
MEETING1209
GYM COMMONS1212
BREAK/FIX1134
WKRM1129
MEDIA O.1130
MEETING1157
ART1203
ART1201
ART STOR.1202
ESS1114
FLEX1126
TEACHERS LOUNGE1181
WKRM1182
INCL.1162INCL.1163
FITNESS1214
CHAIR STOR.1213
EL. EQ.1210
ESS1125
KILN1196
ESS1186
M/IDF1176
GIRLS1185
BOYS1183
PRACTICE1194
PRACTICE1199
BAND STOR.1197
INCL.1105
GIRLS1122
BOYS1124
SCIENCE CLASSROOM1127
MEETING1103
MEDIA COMMONS1131
FACILITIES STOR.1139
STOR.1138
SCIENCE CLASSROOM1137
KITCHEN1136C
INCL.1136D
MECH.1143
MDF1133
ESS1114B
OFFICE1114C
FLEX1113
WKRM1112
RECEPTION1109
PRINCIPAL1108
SICK1111
MECH.1104
KITCHEN1132
SENSORY1105B
MECH.1215
MEETING1209
GYM COMMONS1212
BREAK/FIX1134
WKRM1129
ESS1114
STAIRA-1
STAFF1177
TEACHERS LOUNGE1181
WKRM1182
FITNESS1214
CHAIR STOR.1213
EL. EQ.1210
ESS1125
KILN1196
OUTDOOR ST.1195
IF ALT 1 NOT SELECTED, THENCPT 1 FOR ENTIRE ROOM
LOBBY1106
COMMONS1117
CORRIDOR1128
ANTEROOM1193
CORRIDOR1191
CORRIDOR1187
CORRIDOR1192
CORRIDOR1179
WKRM1112B
STAFF1136B
CARPET BASE INPRACTICE 1194
CPT-7 ON NEW STAIRS
6" RB-1 BASE ATCORRIDOR 1116 ATNEW DOOR 1130AOPENING ONLY, ASREQUIRED TO HIDEDEMOLITION OFEXISTING TERRAZZO
GYMNASIUM0113
PE O.0103
PE STOR.0102
VENDING0105
LOBBY0104
BOY'S LKR ROOM0106
BOYS0107
GIRLS0108
GIRL'S LKR ROOM0109
PE STOR.0111
ELEV.1211
GYMNASIUM0113
PE O.0103
PE STOR.0102
VENDING0105
LOBBY0104
BOY'S LKR ROOM0106
BOYS0107
GIRLS0108
GIRL'S LKR ROOM0109
PE STOR.0111
ELEV.1211
STAIRA-0
EXISTING TO REMAIN
FLOORING LEGEND
CPT-3
CPT-1
CPT-2
CONC-1
CPT-5
CPT-4
RUB-1
SEALED CONCRETE
CPT-8
WOOD
VCT-1, 2, 3 (SEE DIAGRAM)
VCT-1
CPT-6
VCT-4
CPT-7
FLOORING GENERAL NOTES
1. LOCKER BASES REQUIRING PLAM TO BE PL-2. SEE DETAILS.
2. ROOMS W/ NEW FLOOR FINISH TO GET NEW RB-1 BASE EXCEPTWHERE GLAZED BLOCK BASE, BRICK OR METAL EXISTS. EXISTINGGLAZED BRICK BASE TO REMAIN TYP. NEW RB-1 BASE TO REPLACE ALLEXISTING VINYL BASE, TO BE INSTALLED AT NEW CONSTRUCTION(EXCLUDING 0111, 0102, 1215, 1210, 1195, 1176, 1143, 1139, 1132, 1133,1104, AREAS WITH CERAMIC WALL TILE, OR JANITOR CLOSETS), NEW ORRELOCATED MILLWORK, AND AT NEW LOCKERS. 4" HIGH TYPICAL,EXCEPT AS NOTED. SEE LOCKER DETAILS FOR HEIGHT AT NEWLOCKER LOCATIONS.
PROJ. NO:
DATE:
DRAWN BYSCALE:
Addi
tion
and
Reno
vatio
ns fo
r:
25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN 49503(616) 454-1600 PHONE(616) 454-1610 FAX
SKETCH NO:
As indicated
Int1-1
130718
Scho
ol -
Shaw
nee
Cam
pus
Gra
nd R
apid
s Ch
ristia
n M
iddl
e
05.01.2014
KP/MW
2036
Che
sani
ng D
r. S
EG
rand
Rap
ids,
Mic
higa
n 49
506
Floo
ring
Diag
ram
1" = 50'-0"main level flooring diagram
1" = 50'-0"gym level flooring diagram
SEE FLOORING DIAGRAMS ON INT1-1BFOR SCIENCE 1127, 1137, ART1201,1202, 1203, CHOIR 1178
16 K. P O T T S
village square 06.18.2014
giving
c o m m u n i t y
inspirationalC H A L L E N G I N G
legacy
next generationF A I T H
donor recognition
purpose
artwork reflecting our faith commissioned/student artwork
leaving a legacy of giving
For where your treasure is, there your heart will be also. - Matthew 6:21
“Determine what God has given you, and take from it what you need. The remainder is needed by others.” - St. Thomas Aquinas
He is ever lending generously, and his children become a blessing. - Psalm 37:26
middle school - village square
name name name name name name name name name name name name name name name
text text text text text text text text text text text text text text text text text text text text text text text text
purpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purpose
B L E S S I N G
exam
ples
from
grc
hs /
grc
es
M I D D L E S C H OO L F E A S A B I L I T Y S T U D Y R E S U L T S
Summer 2014
Professional experience: Produce, with the team, a construction document set with focus on floor plans, reflected ceiling
plans, exterior elevations and interior finish specifications. Create donor graphics to encourage giving in order to cover the remaining cost of the courtyard infill.
CAUSE: the last of a series of school projects requires additional donations
K. P O T T S 17
C A
U S
E
Professional experience:
create budgeting and design packages
measure existing conditions and draft in AutoCAD
build 3D model in SketchUp
Programs used: AutoCAD, SketchUp, Photoshop
Top: lobby prior to renovation
Middle: proposed lobby, SketchUp
Bottom: completed lobbyPhotograph by Anne Schnitzenbaumer
18 K. P O T T S
NEWCANOPY
200
LOBBY218
CONCESSION219
PROSHOP205
OFFICE206
VESTIBULE207
OFFICE216
RECEPTION217
MECH.RM.210
STAIR208
ELEV.209
WOMEN'S211MEN'S
215
MEN'SLOCK. RM.
214
WOMEN'SLOCK. RM.
212
COMMONS220
CLOSET218A
NORTH
25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN, 49503p. 616.454.1600 f. 616.454.1610
CAUSE: lack of spectator views and a desire for an improved communal area demands renovation
R E N O V A T I O N OF I C E A R E N A
K. P O T T S 19
C A
U S
E
20 K. P O T T S
P H O T O G R A P H Y
Left: JW Marriott in Grand Rapids, MI Below: Illinois Institute of Technology Student Center in Chicago, IL
CAUSE: unique and thought provoking design leads to the action of capturing the view
K. P O T T S 21
C A
U S
E
CAUSE: loss of family member inspires boat memorial
22 K. P O T T S
I N T R O D U C T I O N T O S C U L P T U R EFall 2010
Assignment:Create, out of wood, an object that represents family time.
My family’s time together is spent on my parents’ 15-foot 1968 Century Resorter. The boat is named “Jr.” after my grandpa who passed away in 2005.
K. P O T T S 23
C A
U S
E
0'-1
1/2
"
0'-1"0'-1"
0'-1
1/2
"
GRCHS Donor Plaque04/01/2013
Text constraints
Verse length: 100-185 characters (with spaces)
Professional experience:produce 3D model of plaqueassist in designcoordinate production
Program used:SketchUp
H I G H S C H O O L D O N O R P L A Q U E S
BELIEF: reflecting God’s faithfulness and loving guidance
24 K. P O T T S
D A6.2
/ 1A1.2A2
.72
A6.
24
13
7A
6.10
61' - 4 3/4"9' - 9"
BY
OW
NER
,D
BY
CTO
R.
ON
WAL
L &
BLO
CKI
NG
.
correct!
incorrect-"connected throughrelationships" should beshowing here.
flip this banner "connectedthrough relationships" shouldbe showing here.
"rooted in christ" should beshowing here
correct!
"united with home andchurch" should be showinghere
6 54
32
1612
3
4 5
Town Squarebanner layout09/04/2013
D A6.2
/ 1A1.2
A2.72
A6.
24
13
7A
6.10
61' - 4 3/4"9' - 9"
BY
OW
NER
,D
BY
CTO
R.
ON
WAL
L &
BLO
CKI
NG
.
correct!
incorrect-"connected throughrelationships" should beshowing here.
flip this banner "connectedthrough relationships" shouldbe showing here.
"rooted in christ" should beshowing here
correct!
"united with home andchurch" should be showinghere
6 54
32
1612
3
4 5
Town Squarebanner layout09/04/2013
Photograph by Bill Lindhout
H I G H S C H O O L C O R E V A L U E B A N N E R S
Professional experience:produce graphic, assist in design, coordinate production
Program used:Illustrator
K. P O T T S 25
B E
L I E
F
BELIEF: legacy wall verse: “Do not conform to the pattern of this world, but be transformed by the renewing of your mind. Then you will be able to test and approve what God’s will is—His good, pleasing and perfect will.” Romans 12:2
1966 CHESS CLUB 2012 WINTER SPORTS SENIOR ATHLETES
26 K. P O T T S
H I G H S C H O O L L E G A C Y W A L L
Professional experience:Coordinate image selection, production and
installation of lightbox timeline.
Programs used:Revit, Photoshop
photographs by Anne Schnitzenbaumer
K. P O T T S 27
B E
L I E
F
Finish Floor0' - 0"
1A3
Finish Floor0' - 0"
1A3
Finish Floor0' - 0"
Finish Floor0' - 0"
0' 4' 8' 16'South Elevation
Project number
Date
Drawn by
A2
elevationsProject Number
Proj
ect N
ame
Issue DateAuthor
0' 4' 8' 16'North Elevation
0' 4' 8' 16'East Elevation
0' 4' 8' 16'West Elevation
No. Description Date
BELIEF: spending time observing nature encourages peace and patience
Finish Floor0' - 0"
1A3
Finish Floor0' - 0"
1A3
Finish Floor0' - 0"
Finish Floor0' - 0"
0' 4' 8' 16'South Elevation
Project number
Date
Drawn by
A2
elevationsProject Number
Proj
ect N
ame
Issue DateAuthor
0' 4' 8' 16'North Elevation
0' 4' 8' 16'East Elevation
0' 4' 8' 16'West Elevation
No. Description Date
28 K. P O T T S
M O N T A N A S T A T E U N I V E R S I T Y B I R D W A T C H I N G F A C I L I T Y
Spring 2015
Two-week design focus:Design a 120’ x 24’, single story, ADA accessible
bird watching facility on the Cherry River site in Bozeman, MT.
K. P O T T S 29
B E
L I E
F
K A T I E P O T T S