32
[email protected] 616.307.0007 K A T I E P O T T S

Portfolio_February 2015

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Portfolio_February 2015

[email protected]

K A T I E P O T T S

Page 2: Portfolio_February 2015
Page 3: Portfolio_February 2015

K A T I E P O T T S

P U R P O S E : the reason for which something is done or created

Human Figure Gesture 4

Shapes in Architecture 6

Sponge Tube House 8

Seattle Hydrology Institute 10

C A U S E : someone or something that gives rise to an action or condition

Middle School 12

Ice Arena Renovation 18

Personal Photography 20

Boat Sculpture 22

B E L I E F : faith in someone or something

Donor Plaques 24

Core Value Banners 25

Legacy Wall 26

Cherry River Bird Watching Facility 28

T a b l e o f C o n t e n t s

W H Y I D O W H A T I D O

Page 4: Portfolio_February 2015

PURPOSE: to gain further understanding of the human scale and relationship to built environments

4 K. P O T T S

Page 5: Portfolio_February 2015

I N T E R M E D I A T E D R A W I N G Spring 2011

Course focus:Students are involved with visual problems and solutions through

the study of the human figure and exploration of space.

Medium: conté crayon, ink, chalk, graphite, colored pencil

K. P O T T S 5

P U

R P

O S

E

Page 6: Portfolio_February 2015

PURPOSE: to explore the many shapes of architecture

I chose to display architecture in a way that uses fluid lines rather than conventional rigid lines. Shown here are the German Historical Museum, Guggenheim Museum Bilbao and the Louvre.

Medium: permanent marker, watercolor pencils

6 K. P O T T S

Page 7: Portfolio_February 2015

I N T E R M E D I A T E D R A W I N G Spring 2011

Course focus:Independent projects allow each student to develop pieces in an area

most interesting to them.

K. P O T T S 7

P U

R P

O S

E

Page 8: Portfolio_February 2015

Assignment: Design a house on the given

site based on a motif taken from nature.

8 K. P O T T S

Page 9: Portfolio_February 2015

PURPOSE: exploration of designing with curves

A R C H I T E C T U R A L D E S I G NFall 2009

Course focus:Students communicate ideas through graphical means including

orthographic projection, freehand sketching, and sections.

Medium: ink, marker, colored pencil

K. P O T T S 9

P U

R P

O S

E

Page 10: Portfolio_February 2015

PURPOSE: to teach the public about water resource concerns and how to effectively conserve water for future generations

10 K. P O T T S

Page 11: Portfolio_February 2015

M O N T A N A S T A T E U N I V E R S I T YS E A T T L E H Y D R O L O G Y I N S T I T U T E

Fall 2014

Assignment: Design a Seattle Hydrology Institute on a designated site along the harbor. The

facility must include an exhibition hall, classrooms, tiered lecture hall and exterior deomonstration areas.

Focus: A ripple of rainfall catchment to serve as

an example of how to recycle water

K. P O T T S 11

P U

R P

O S

E

Page 12: Portfolio_February 2015

Grand RapidsChristian Schools 1

aerial

N

neighbor meeting 09.30.2013n o t t o s c a l e

breton rd se

Plymouth A

ve SE

Chesaning Dr SE

Proposed middle schoolLocation #2

Existing high schoolcampus

Existing year-round program/Proposed middle school

Location #1Burton St SECAUSE: existing infrastructure paired with the vision to create a collaborative,

21st century learning environment prompts the study of multiple locations Location #1

12 K. P O T T S

Page 13: Portfolio_February 2015

shawnee - proposed site plan

N

0’ 60’ 120’

Grand RapidsChristian Schools neighbor meeting 09.30.2013

s c a l e

4

proposed bus drop-off

existing building

before and after school parent drop-off/pick-up

parking(8)

proposed new gymnasium

construction

(15,000 sf footprint)

preservedplayground

proposed parking lot connector

proposed new construction

courtyard infill

potential future expansion

future detention

(tbd)

proposed parking

(44)parking

(18)

chesaning dr

shiawassee dr

student entry

student entry

visitor entry

play entry

evententry

play entry

easement

existingfence

existing

preservedplayground

preservedplay

creek

existingbackstop

student

preservedplayground

preservedgreen space

playground access

playground access

playground access

playground access

playground access

Grand RapidsChristian Schools 1

aerial

N

neighbor meeting 09.30.2013n o t t o s c a l e

breton rd se

Plymouth A

ve SE

Chesaning Dr SE

Proposed middle schoolLocation #2

Existing high schoolcampus

Existing year-round program/Proposed middle school

Location #1Burton St SE

S I T E C O N T E X T

Burton St SE

P R O P O S E D M I D D L E S C H O O L F E A S A B I L I T Y S T U D Y

Location #2

Professional experience: My role included creating graphic packages for zoning approval and

design meetings as well as providing Revit drawing support.

Programs used: Revit, SketchUp, Photoshop, InDesign

K. P O T T S 13

C A

U S

E

Page 14: Portfolio_February 2015

Proposed middle schoolLocation #1

Above: SketchUp model completed by teammate

14 K. P O T T S

Page 15: Portfolio_February 2015

classroom classroom classroom classroom world language

courtyardcommons

ess

classroom

classroom classroom classroom classroom classroom

ess

world languages

sensory

incl o

m/idf

girls

jc

boys

classroom classroom

practice/st orchestra

choir

practicepractice

band

band st

classroom

classroom

classroom

classroom

ess

mtgincl

girls

boys

science

meeting

media commons

facilities ststsciencekit

incl

mech

mdf

staff

stesssens

flex

wkrm

recp

st

sick

mech

flex

kit

jc

open to gymnasium below

sensory

art

art

art st

outdoor st

incl

incl

meeting

couns

Commons

break/fix

green

media o.

chair st

mechlobby

mtg

kiln

up

up

up

hall

ess

ess o.

preserved playground

playentry

playentry

parent drop-off/pick-up

shiawassee dr

ches

anin

g dr

proposedbus drop-off

preserved green space(240' x 120')

visitor entry

student entry

studententry

studententry

evententry

teachers lounge

wkrm

new courtyard infill

Proposed middle school Location #2

new gymnasium

F E A S A B I L I T Y S T U D Y(continued)

Above: SketchUp model completed by teammate

K. P O T T S 15

C A

U S

E

Page 16: Portfolio_February 2015

CAUSE: feasibility study leads to the purchase of a building which requires

renovations and additions

LEVEL 1.1100' - 0"

FIN. GYM FLOOR87' - 4"

CB D E3

A6.1_______

DECORATIVE TINTEDSPLIT FACE CMU VENEER

INSULATED STOREFRONT

FIBER CEMENT BOARD& BATTEN SIDING ONSHEATHING ON MTL.STUDS. 4' WIDEPANELS U.N.O.

3A2.3

_______ 1A2.2

_______1A6.3

_______

A-1A1207B

A

8A6.3

_______ 11A6.3

_______5A6.3

_______

T T T

PAINTED EXPOSEDSTRUCTURAL STEELPIPE COLUMNS, SEESTRUCTURAL

ALUMINUMHANDRAIL BEYOND

6A6.3

_______

S S S

CJ

1/4" / 1'-0"PREFINISHED METAL COPING BYPRE-ENGINEERED METAL BUILDINGMANUFACTURER

PREFINISHED METALCOPING ABOVEPREFINISHED METALPANEL

ALIGN TOP OFCANOPY WITHBOTT. OF COPING

HP 1

HP 2

LIGHTING- SEE ELEC.

LOUVERS- SEE MECH. (TYP.)

5' - 4" 10' - 8" 10' - 0" 6' - 0"

11A3.2

_______

CEMENTITIOUS COATING ATEXPOSED POUREDCONCRETE WALLS, TYP.

CAST STONECOLUMN ENCLOSUREWITH SLOPED TOP(SEE 9/A6.3)

1' -

4"

2' -

0"

1' -

8"

SIM.

8"4"3'

- 4" CMU-1

CMU-2

CMU-2

CMU-1

EQ. EQ.1' - 8" +/-

EQ. EQ. EQ.

6' -

4"

EQ. EQ.

CEN

TER

9' -

0" T

O

ALIG

N

ALIG

N

ALIG

N

ALIG

N ALIG

N

ALIG

N

2

LEVEL 1.1100' - 0"

FIN. GYM FLOOR87' - 4"

C BDE

3A6.1

_______4A6.2

_______

10' -

0"

12' -

8"

DECORATIVETINTED SPLIT FACECMU VENEER

TRANSLUCENTPANEL SYSTEM

NEWSTOREFRONT

FIBER CEMENT BOARD& BATTEN SIDING ONSHEATHING ON MTL.STUDS. 4' WIDEPANELS U.N.O.

TRANSLUCENT PANEL SYSTEM

3A2.3

_______ 1A6.3

_______

0113

ALTERNATE 4BEYOND, TYP.

3A6.3

_______

A

4A6.3

_______

11A6.3

_______

T T TT

PAINTED EXPOSEDSTRUCTURAL STEELPIPE COLUMNS, SEESTRUCTURAL

4' - 0"

S S S S

2' -

0"

1/4" / 1'-0"

CJCJ CJ CJ

HP 1

HP 2

LIGHTING- SEE ELEC.

6A6.1

_______

11A3.2

_______

CEMENTITIOUS COATING ATEXPOSED POUREDCONCRETE WALLS, TYP.

CAST STONECOLUMN ENCLOSUREWITH SLOPED TOP(SEE 9/A6.3)

CONCRETE STAIR ANDSIDE WALLS W/ALUMINUM HANDRAILS- SEE CIVIL ANDSTRUCTURAL

RAISED ROOFABOVEELEVATORBEYOND

4' - 0"

CEMENTITIOUS COATINGAT EXPOSED CONCRETEWALLS - TYP.

8' - 0"

ALIGN WITH MASONRYWALL BEYOND

FDC

STROBEBELL

2' -

3"

2' -

10"

3' -

4"

4"

3' -

4"

4"

3' -

4"

CMU-2

CMU-1

CMU-1

CMU-1

CMU-2

CMU-2

EQ. EQ.

EQ. EQ.

9' -

0"

LIGHT FIXTURE- SEEELEC. INSTALL ONSMOOTH FACE BLOCK.

ALIG

N

ALIG

N

EQ EQ

CJCJ

2 2

16' - 0" 17' - 0" 8' - 4" 22' - 8" 20' - 0" 22222

LEVEL 1.1100' - 0"

FIN. GYM FLOOR87' - 4"

4 3 2 1562

A6.1_______

1A6.1

_______

2A2.1

_______

1A6.4

_______

TRANSLUCENTPANEL SYSTEM

FIBER CEMENT BOARD& BATTEN SIDING ONSHEATHING ON MTL.STUDS. 4' WIDEPANELS, U.N.O.

INSULATEDSTOREFRONT

INSULATED STOREFRONT DECORATIVETINTED SPLITFACE CMU VENEER

1A2.3

_______

10A6.3

_______

3A6.3

_______

4A6.3

_______

2A6.5

_______10A6.5

_______

T TTT T T

T T

T T T

EXISTINGNEW

ALUMINUM HANDRAIL

PAINTED EXPOSEDSTRUCTURAL STEELPIPE COLUMN, SEESTRUCTURAL

10' -

0"

12' -

8"

14' - 8" 22' - 8" 6' - 8" 4' - 0" 4' - 0"

2' -

0"

2' -

0"

1' -

8"

SS S S S S S

ALTERNATE 4, TYP.

PREFINISHED METALCOPING

CJ

PREFINISHED METALCOPING BY PRE-ENGINEERED METALBUILDING MANUFACTURER

HP 1

HP 2

CAST STONECOLUMN ENCLOSUREWITH SLOPED TOP(SEE 9/A6.3)

CEMENTITIOUS COATING ATEXPOSED POUREDCONCRETE WALLS, TYP.

CEMENTITIOUS COATINGAT EXPOSED CONCRETEWALLS - TYP.

2' -

4"

1' -

4"

2' -

0"

TT

CMU-1 CMU-2

CMU-2

CMU-2

3' -

4"

4"

3' -

4"

4"

3' -

4"

CMU-1

EQ. EQ.EQ. EQ.

CJ

KNOX BOX VERIFYTYPE AND HEIGHTW/ GR FIRE DEPT

ALIG

N

EQ EQ

ALIG

N

PROJ. NO.

DATE

DRAWN BY

REVIEWED BY

Addi

tion

and

Reno

vatio

ns fo

r:

REVISION DATE

25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN 49503(616) 454-1600 PHONE(616) 454-1610 FAX

2

A5.2

EXTERIOR ELEVATIONS

130718

Scho

ol -

Shaw

nee

Cam

pus

Gra

nd R

apid

s Chr

istia

n M

iddl

e

06.19.2014

ANP

DC

2036

Che

sani

ng D

r. SE

Gra

nd R

apid

s, M

ichi

gan

4950

6

100% DESIGN DEVELOPMENT

ISSUE FOR PERMIT

BIDS & CONSTRUCTION

ADDENDUM 2

UPDATED SET

12.23.2013

04.16.2014

05.01.2014

05.21.2014

06.19.2014

1/8" = 1'-0"A1.1C2 NORTH ELEVATION OF THE GYMNASIUM

1/8" = 1'-0"A 1-01 SOUTH ELEVATION OF THE GYMNASIUM

1/8" = 1'-0"A1.1C3 WEST ELEVATION OF THE GYMNASIUM

REF. REF.

SENSORY1164

CLASSROOM1188

CLASSROOM1206

ORCHESTRA1204

STOR.1205

GIRLS1185

BOYS1183

J.C.1184

ESS1186

ART1203

ART1201

ART STOR.1202

CHOIR1178STAFF

1177

M/IDF1176

CORRIDOR1179

ANTEROOM1193

PRACTICE1194

PRACTICE1199

BAND1198

BAND STOR.1197

KILN1196

OUTDOOR ST.1195

CORRIDOR1207

ST.1186B

CORRIDOR1175

CORRIDOR1174

CORRIDOR1173

CORRIDOR1192

CORRIDOR1191

CORRIDOR1189

CORRIDOR1187

TEACHERSLOUNGE

1181

WKRM1182

A8.1

A8.19

A8.2

1

2

A8.2

3

A8.2

1 Opp.

A8.22

Opp

.

A8.24

A8.24

A8.2

7

A8.26 5

STAIRB

C5

A9

A9

C1

A1

C1

C1

A1

A1

C2

C2

C1C1

A2

C1

C1

A2

C1

A1

A1

A8

A8

C1

C1

1175

1173A

1188A

11991194

11821181

1202A

1202B

1193

1196

1178

1201A

1203A

1177

12

A8.1

13

10' -

3"

7' - 8"

ALIGN

ALIG

N

6' -

8"3'

- 4"

10' - 6 3/8"

10' -

10

1/8"

10' -

6"

ALIG

N

DN

MEZZANINE ABOVE - SEEENLARGED MEZZANINE PLAN

EXTGEXTG

EXTGEXTG

EXTG

WOM

EXTG

WOM

CPTEXTG

VCTEXTG

CPTCPT

CPT

EXTG

EXTG

PC

CPTCPT

CPTCPT

CPTCPT

CPTCPT

EXTG CPT

CPTCPT

CPTEXTG

CPTEXTG

CPT

VCT

CPT

CPT

CPT

CPT

VCT

CPT

CPT

VCT

CPTCPT

CPT

CPT

CPT

CPT

CPT

SC

UP

NEW 2-HOUR FIREBARRIER (SEAL ALLPENETRATIONS OFEXISTING WALL)

NEW 1-HOURFIRE BARRIER

EXISTING 1-HOUR FIREBARRIER

EXISTING 1-HOUR FIREBARRIER

NEW 1-HOURFIRE BARRIER NEW 1-HOUR

FIRE BARRIER

EXISTING 1-HOURFIRE BARRIER

NEW 1-HOUR FIREBARRIER ATCORRIDOR

1173B

1173C

1188B

1186A

EXISTING 1-HOURFIRE BARRIER

CPTVCT

C4

A9

A9

1197

FIRE CAULK ALLPENETRATIONSIN RM 1176

FIRE CAULK ALLPENETRATIONS

FIRE CAULKALLPENETRATIONSAT RM. 1195

NEW NON-RATEDSMOKE BARRIER- SEAL ALLPENETRATIONSSMOKE TIGHT

5' -

0"

NEW CONC. STOOPWITH TURNEDDOWN EDGES - SEESTRUCTURAL

A4

A4

A4

A4

NEW CLEARGLAZING INEXT'G. FRAMETO REMAINBELOWCEILING ONLY(3) PANES

F

3' -

6"4' - 0"

A7.2 9

A7.214.

EXTG. F.E.AND CAB.

C PT

VCT

35

35

35

EXTG SC

W.O.M. INEXIST.RECESS

W.O.M. INEXIST.RECESS

100' - 0" T.O. SLAB

1

1

1

2

22

2 14

UPPERCABINETS(ALT. 2)

UPPER CABINETS (ALT. 2)

ADJ. SHELVING(ALT. 2)

2

2

2

2

2

2 14

2 14

2

SWING ANCHOREDTO EXISTINGSTRUCTURE ABOVE- SEE STRUCTURAL

8

8

CL

20

A2.011

LINE OFBULKHEADABOVE

LINE OFBULKHEADABOVE

LINE OFBULKHEAD ABOVE

LINE OFEXISTINGBULKHEADABOVE

LINE OF EXISTINGBULKHEAD ABOVE

LINE OF BULKHEADABOVE

A4

A4

NEW OPERABLEWINDOW SYSTEM

NEW OPERABLEALUMINUMWINDOW SYSTEM

17' -

7"

33

33

33

NEW OPERABLEWINDOWS. INSTALLTIGHT TO WALL

33

39

39

CPTEXTG

A7.222

A1.1C2

A1.1C5

EXTG. D.F.

EGRESS WINDOW INEXISTING OPENING

C6

C5

4' - 11"

A8.312

A1.1D3

F7'x7' @ 12 A.F.F.

F7'x7' @ 12" A.F.F.

22

22

3' -

5"

23

A1.1C6

CENTER DOOR INEXISTING CORRIDOR

4"

EXISTINGELEC. PANEL

1157

5

LINE OF FLOATINGCEILING ABOVE

LINE OF FLOATINGCEILING ABOVE

LINE OFBULKHEADABOVE

A4

1172

1198

1201B

1203B

1204B

1205

1204A

1206

1186B

7a

12A6.6

_______

7a

7a

5A6.4

_______

13' - 0"

ALIG

N

ALIG

N

16

ALIG

N

42

7a

7d

7d

42

42

7

ALIGN

ALIGN

14

4" 4"

8"

7c

7a

7a

7a

7a

42

42

23

23 23

23

23

33

23

42

42

7d

7d

6"C L

4"

A1.1D4

1' - 7 1/2"

2' - 5"

SALVAGED MILLWORKFROM SYLVAN CAMPUS

SALVAGED MILLWORKFROM SYLVAN CAMPUS

7b

SALVAGEDMILLWORKM6 & M7

SALVAGEDMILLWORK M1

SALVAGEDMILLWORK M8 & M11

SALVAGED MILLWORKM8, M9 & M11

8.08.18.28.3

9.19.08.4

SALVAGEDMILLWORK M10

.0

.1

.2

.3

.4

.5

.6

.7 .8

.9

.10

.11 .12

7b

7b

4242

42

REPLACEDRAWERSIN KIND

23

23

35

4' - 0"

6' - 3"

15

48

46

15

15

15

23

EXT'G.PLAMBENCH

C1C1

43

43

EXT'G. 1-HOURFIRE BARRIER

4646

6' -

0"

23

23 23

15

15

15

15

EXISTINGEGRESSWINDOW

EXISTINGEGRESSWINDOW

23

12

46

12

48

INSTALL GYP. BD. ONFURRING OVER CMUINFILL TO MATCH EXT'G.WALL THICKNESS

NEW BULKHEAD ABOVE

NEWBULKHEADABOVE

12

10' -

11

3/8"46

4323

26

26

26

INFILLOPENINGW/ GLAZEDCMU

23

ELEC. PANEL

STOP WALL@ CEILING

46

48

15

48

12

FILL EXTGTRENCH W/FLOOR LEVELINGCOMPOUNDCHANGE OFCEILINGHEIGHT ABOVE

F.E. FROMROOM 1199

EXT'G. F.E.

18

RE-FASTENENAMELEDPANEL ABOVEDOOR ANDINSTALL NEWSEALANT ATJOINTS

EXISTINGELEC. PANEL

2' -

6"

2A3.2

_______

CENTER NEWWALL ON EXTGMASONRY

31

TOCLG.

51

CPT EXTG

EXTG SKYLIGHTSABOVE - CLEAN,TYP.

46

9

1' - 0 1/2"1' - 0 1/2"

4"

46

26

INSTALL DOOR FRAMETIGHT TO WALL

4"

6' -

4"

17' - 4"

41

C4

C4

7' -

4 1/

2"

A8.210

A8.210

13' - 4" 14' - 8 3/8"

23

ALIGN

2

A1

1' -

3"

3' -

4"

SEESTRUCTURALFOR NEWLANDINGEXTENSIONDETAILS.

NEWGUARDRAILTO MATCHEXISTING.

A7.2

16

53

SIM.

7a

42

7a

7c

LEVEL 1.1

11.1

11.0

.13

F.E. FROMRM. 1090 9

BF

31

1

1

1

SYSTEMS FURNITURE BY OWNER1

PLAN NOTES

2 CASEWORK PROVIDED AND INSTALLED BY CONTRACTOR

3 POWER DOOR CLOSER ACTUATOR BUTTON TO OPERATE SOUTHMOST LEAF

4 LIBRARY FURNITURE - FURNISHED BY OWNER, INSTALLED BYCONTRACTOR, EXCEPT AS NOTED. CONFIRM FINAL PLACEMENT WITHOWNER PRIOR TO INSTALLATION.

5 ELECTRIC WATER COOLER

6

7 NEW WHITEBOARD PROVIDED BY OWNER INSTALLED BYCONTRACTOR.

8 NEW LOCKERS - REFER TO SPECIFICATIONS (LK-1)

9 NEW CONC. PAD W/ TURNED DOWN EDGES AT NEW EGRESSDOOR - SEE DETAIL 11/A6.4.

1011 EXISTING FOOD SERVICE EQUIPMENT TO REMAIN

12 TOOTH IN NEW BLOCK

13 NEW MASONRY PIER W/ BULLNOSE @ ALL (4) CORNERS UP TOBEARING

14 NEW PLUMBING FIXTURE. REFER TO PLUMBING DRAWINGS

15

NEW LOCKERS - REFER TO SPECIFICATIONS (LK-2)

16 INFILL W/ CMU & 4" BRICK TO MATCH WALL THICKNESS

17

18 RELOCATE EXSTG. C.O. COVER PLATE

19

EXISTING (SALVAGED) LOCKERS RELOCATED. QUANTITY AS SHOWN - SEENOTE 10 ON DEMOLITION DRAWINGS. PROVIDE NEW SLOPED TOP AND FILLERPANELS

3/4" THICK MAPLE BENCH @ 17" HIGH

2021

SEE DRAWING A0.0 FOR GENERAL PLAN NOTES AND WALL TYPES

NEW SLAB TO ALIGN AND MATCH EXTG. SEE STRUCTURAL

INSTALL CEMENTITIOUS COATING ON EXPOSED CONCRETE25PATCH MASONRY WALL WHERE EXISTING MASONRY WALLWAS REMOVED26

EXISTING MILLWORK OR CASEWORK TO REMAIN

NEW CONC. SLAB INFILL TO FLUSH OUT W/ EXISTING ADJACENT ATLOCATIONS WHERE EXISTING MASONRY BRG. WALL & INTEGRALCONC. LOCKER BASES WERE REMOVED. SEE DEMOLITION PLANS

27

4" CONC. HOUSEKEEPING PAD. COORDINATE w/ MECH.FOR SIZE AND LOCATION28

4" CONC. EQUIPMENT PAD. COORDINATE w/ OWNER FOR SIZE ANDLOCATION OF OWNER SUPPLIED EQUIPMENT

29

EQUIPMENT / FURNITURE FURNISHED BY OWNERINSTALLED BY CONTRACTOR.

LOUVER - REFER TO SPECS FOR COLOR AND MECH. DWGS FOR SIZE30

22

3233

NEW ROLLER SHADES RS-2, MOTORIZED BLACK-OUT FABRIC34NEW ROLLER SHADES RS-1, MANUAL SHEER WEAVE FABRIC35CUSTOM BUILT-IN36POWERED DOOR37LEARN WALL PROVIDED BY OWNER, INSTALLED BY CONTRACTOR38

NEW ALUMINUM WINDOW OR DOOR SYSTEM

NEW ALUMINUM DOOR AND FRAME IN EXISTING OPENING

OWNER TO PROVIDE VENDOR-SUPPLIED TOILET ACCESSORIES ATEXISTING TOILET ROOMS TO REMAIN. CONTRACTOR TO INSTALL.

39

APPLY WINDOW FILM TO WINDOWS, SEE SPECIFICATION. COORDINATEDESIGN WITH ARCHITECT PRIOR TO APPLICATION.

31 REPLACE PLAM ON EXISTING MILLWORK TOP.

REPLACE EXISTING PLASTIC OR WD. PANELS GLAZINGWITH CLEAR 1/4" GLASS PANE (INSULATED @ EXTERIOR)

23 TOOTH IN NEW MASONRY AT OPENING WITH INTERIOR BULLNOSE

3/4" THICK ACCESSIBLE BENCH W/ 1-1/2" BULLNOSE24

NOTE: SEE STRUCTURAL ANDELEVATIONS FOR ADDITIONAL CONTROLJOINT LOCATIONS

40 RELOCATED EXISTING PLUMBING FIXTURE. EXTG BUBBLERS TOBE REMOVED AND SINK TOP OPENING CAPPED

4142

PATCH OR FILL CONCRETE FLOOR TO ALIGN W/ EXISTINGPROVIDE WHITE BOARD OR TACK STRIP TACKBOARD FROMSALVAGED MATERIAL, COORDINATE WITH OWNER

43 PATCH MISSING FLOORING W/ VCT OR LEVELINGCOMPOUND FOR FLUSH FLOOR CONDITION

44 PATCH WALL TILE TO MATCH AND ALIGN WITH EXISTING

45 PATCH WALL WITH WOOD TRIM TO MATCH EXISTING

46 PATCH WALL TO MATCH ADJACENT WALL WHERE EXISTINGWALL AND OR MILLWORK WAS REMOVED.

47 NOT USED

48INFILL OPENING W/ METAL STUDS AND GYP. BD. TO MATCHEXISTING WALL THICKNESS. FILL STUD CAVITY W/ SOUNDATTENUATION BATTS.

49 PATCH HOLES IN GLAZED BLOCK

50 NEW SINK BASE CABINET BOTTOM, 1/4" PLYWOOD

51 INSTALL NEW CLEAN OUT PLATE FOR ACCESS TO EXISTINGCLEANOUTPROVIDE NEW BRACKETS TO FIT EXISTING STANDARDS.PROVIDE (2) 12" DEEP GLASS SHELVES, LENGTH TO SPANTHREE STANDARDS.

52

55 NEW PLAM ON 3/4" PARTICLE BOARD FOR FULL LENGTH ANDWIDTH OF MILLWORK

7a 5' x 12'

7b 5' x 4' - LINED FOR MUSIC

7c 4' x 4'

7b 5' x 8'

REPLACE EXTG WOOD PANEL WITH GLASS53REPLACE EXTG WOOD PANEL WITH TEMPERED GLASS54

NEW P.LAM. COUNTERTOP ON EXTG MILLWORK56

NEW ROLLER SHADE RS-3, MANUAL BLACK-OUT FABRIC57

1

1

1

1

NEW ALUMINUM WINDOW BETWEEN TOP OF WALL ANDEXISTING CEILING.

582

MECH.MEZZANINE

2100

DN

REMOVE EXISTINGLOUVER AND REINSTALLPER MECH. DRAWINGS

28

29

SEE MECH.FOR NEW PADSIZES

REMOVE EXISTINGLOUVER AND REINSTALLPER MECH. DRAWINGS

SEE MECH.FOR NEW PADSIZES

12' - 6 5/8" ±93

' - 0

3/4

" ±

1"

3' -

2"

EQ. 7' - 0" EQ.

1193

A10 A10

A4 A4

A4 A4

4" 4"1-HOUR FIREBARRIERACROSSCORRIDOR

1 3/

8"EXISTING WALLTO REMAIN

NEW BULLNOSEEND OF WALL

1 3/

8"

CAULK EA. SIDE

PROJ. NO.

DATE

DRAWN BY

REVIEWED BYAd

ditio

n an

d Re

nova

tions

for:

REVISION DATE

25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN 49503(616) 454-1600 PHONE(616) 454-1610 FAX

1

2

A1.1D

MAIN LEVEL PLAN - AREA D

130718

Scho

ol -

Shaw

nee

Cam

pus

Gra

nd R

apid

s Chr

istia

n M

iddl

e06.19.2014

KP/ANP

DC

2036

Che

sani

ng D

r. SE

Gra

nd R

apid

s, M

ichi

gan

4950

6

100% DESIGN DEVELOPMENT

ISSUE FOR PERMIT

BIDS & CONSTRUCTION

ADDENDUM 1

ADDENDUM 2

UPDATED SET

12.23.2013

04.16.2014

05.01.2014

05.14.2014

05.21.2014

06.19.2014

A

B C

E

D

KEY PLANN.T.S. 1/8" = 1'-0"

MAIN LEVEL PLAN - AREA DNORT

H

1/8" = 1'-0"MECHANICAL MEZZANINE PLANNO

RTH

1/4" = 1'-0"A1.1A3 ENLARGED PLAN @ 1193

3/4" = 1'-0"A1.1A4 WALL DETAIL AT ART 1201

DN

UP

UP

UP

UP

24'-6" 24'-6" 24'-6"

2s 8s 1s 3s 12s 3s 2s 7s 2s

10s 23s 9s

49s

CLASSROOM1147 CLASSROOM

1148

CLASSROOM1149 CLASSROOM

1151

WORLD LANGUAGE1152

ESS1154

CLASSROOM1158

CLASSROOM1167 CLASSROOM

1168

CLASSROOM1169 CLASSROOM

1171

CLASSROOM1172

ESS1186

WORLD LANGUAGE1156

SENSORY1164

M/IDF1176

GIRLS1185

BOYS1183

CLASSROOM1188

CLASSROOM1206

STOR.1205

ORCHESTRA1204

CHOIR1178

PRACTICE1194

PRACTICE1199 BAND

1198

BAND STOR.1197

CLASSROOM1100

COMMONS1101

CLASSROOM1102

CLASSROOM1119

CLASSROOM1121

INCL.1105

GIRLS1122

BOYS1124

SCIENCE CLASSROOM1127

MEETING1103

MEDIA COMMONS1131

FACILITIES STOR.1139

STOR.1138

SCIENCE CLASSROOM1137

KITCHEN1136C

INCL.1136D

MECH.1143

MDF1133

ESS1114B

OFFICE1114C

FLEX1113

WKRM1112

RECEPTION1109

PRINCIPAL1108

SICK1111

MECH.1104

KITCHEN1132

OPEN TOGYMNASIUM

BELOW

SENSORY1105B

MEETING1209

GYM COMMONS1212

BREAK/FIX1134

WKRM1129

MEDIA O.1130

MEETING1157

ART1203

ART1201

ART STOR.1202

ESS1114

FLEX1126

TEACHERS LOUNGE1181

WKRM1182

INCL.1162INCL.1163

FITNESS1214

CHAIR STOR.1213

EL. EQ.1210

ESS1125

KILN1196

ESS1186

M/IDF1176

GIRLS1185

BOYS1183

PRACTICE1194

PRACTICE1199

BAND STOR.1197

INCL.1105

GIRLS1122

BOYS1124

SCIENCE CLASSROOM1127

MEETING1103

MEDIA COMMONS1131

FACILITIES STOR.1139

STOR.1138

SCIENCE CLASSROOM1137

KITCHEN1136C

INCL.1136D

MECH.1143

MDF1133

ESS1114B

OFFICE1114C

FLEX1113

WKRM1112

RECEPTION1109

PRINCIPAL1108

SICK1111

MECH.1104

KITCHEN1132

SENSORY1105B

MECH.1215

MEETING1209

GYM COMMONS1212

BREAK/FIX1134

WKRM1129

ESS1114

STAIRA-1

STAFF1177

TEACHERS LOUNGE1181

WKRM1182

FITNESS1214

CHAIR STOR.1213

EL. EQ.1210

ESS1125

KILN1196

OUTDOOR ST.1195

IF ALT 1 NOT SELECTED, THENCPT 1 FOR ENTIRE ROOM

LOBBY1106

COMMONS1117

CORRIDOR1128

ANTEROOM1193

CORRIDOR1191

CORRIDOR1187

CORRIDOR1192

CORRIDOR1179

WKRM1112B

STAFF1136B

CARPET BASE INPRACTICE 1194

CPT-7 ON NEW STAIRS

6" RB-1 BASE ATCORRIDOR 1116 ATNEW DOOR 1130AOPENING ONLY, ASREQUIRED TO HIDEDEMOLITION OFEXISTING TERRAZZO

GYMNASIUM0113

PE O.0103

PE STOR.0102

VENDING0105

LOBBY0104

BOY'S LKR ROOM0106

BOYS0107

GIRLS0108

GIRL'S LKR ROOM0109

PE STOR.0111

ELEV.1211

GYMNASIUM0113

PE O.0103

PE STOR.0102

VENDING0105

LOBBY0104

BOY'S LKR ROOM0106

BOYS0107

GIRLS0108

GIRL'S LKR ROOM0109

PE STOR.0111

ELEV.1211

STAIRA-0

EXISTING TO REMAIN

FLOORING LEGEND

CPT-3

CPT-1

CPT-2

CONC-1

CPT-5

CPT-4

RUB-1

SEALED CONCRETE

CPT-8

WOOD

VCT-1, 2, 3 (SEE DIAGRAM)

VCT-1

CPT-6

VCT-4

CPT-7

FLOORING GENERAL NOTES

1. LOCKER BASES REQUIRING PLAM TO BE PL-2. SEE DETAILS.

2. ROOMS W/ NEW FLOOR FINISH TO GET NEW RB-1 BASE EXCEPTWHERE GLAZED BLOCK BASE, BRICK OR METAL EXISTS. EXISTINGGLAZED BRICK BASE TO REMAIN TYP. NEW RB-1 BASE TO REPLACE ALLEXISTING VINYL BASE, TO BE INSTALLED AT NEW CONSTRUCTION(EXCLUDING 0111, 0102, 1215, 1210, 1195, 1176, 1143, 1139, 1132, 1133,1104, AREAS WITH CERAMIC WALL TILE, OR JANITOR CLOSETS), NEW ORRELOCATED MILLWORK, AND AT NEW LOCKERS. 4" HIGH TYPICAL,EXCEPT AS NOTED. SEE LOCKER DETAILS FOR HEIGHT AT NEWLOCKER LOCATIONS.

PROJ. NO:

DATE:

DRAWN BYSCALE:

Addi

tion

and

Reno

vatio

ns fo

r:

25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN 49503(616) 454-1600 PHONE(616) 454-1610 FAX

SKETCH NO:

As indicated

Int1-1

130718

Scho

ol -

Shaw

nee

Cam

pus

Gra

nd R

apid

s Ch

ristia

n M

iddl

e

05.01.2014

KP/MW

2036

Che

sani

ng D

r. S

EG

rand

Rap

ids,

Mic

higa

n 49

506

Floo

ring

Diag

ram

1" = 50'-0"main level flooring diagram

1" = 50'-0"gym level flooring diagram

SEE FLOORING DIAGRAMS ON INT1-1BFOR SCIENCE 1127, 1137, ART1201,1202, 1203, CHOIR 1178

16 K. P O T T S

Page 17: Portfolio_February 2015

village square 06.18.2014

giving

c o m m u n i t y

inspirationalC H A L L E N G I N G

legacy

next generationF A I T H

donor recognition

purpose

artwork reflecting our faith commissioned/student artwork

leaving a legacy of giving

For where your treasure is, there your heart will be also. - Matthew 6:21

“Determine what God has given you, and take from it what you need. The remainder is needed by others.” - St. Thomas Aquinas

He is ever lending generously, and his children become a blessing. - Psalm 37:26

middle school - village square

name name name name name name name name name name name name name name name

text text text text text text text text text text text text text text text text text text text text text text text text

purpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purposepurpose purpose purpose purpose

B L E S S I N G

exam

ples

from

grc

hs /

grc

es

M I D D L E S C H OO L F E A S A B I L I T Y S T U D Y R E S U L T S

Summer 2014

Professional experience: Produce, with the team, a construction document set with focus on floor plans, reflected ceiling

plans, exterior elevations and interior finish specifications. Create donor graphics to encourage giving in order to cover the remaining cost of the courtyard infill.

CAUSE: the last of a series of school projects requires additional donations

K. P O T T S 17

C A

U S

E

Page 18: Portfolio_February 2015

Professional experience:

create budgeting and design packages

measure existing conditions and draft in AutoCAD

build 3D model in SketchUp

Programs used: AutoCAD, SketchUp, Photoshop

Top: lobby prior to renovation

Middle: proposed lobby, SketchUp

Bottom: completed lobbyPhotograph by Anne Schnitzenbaumer

18 K. P O T T S

Page 19: Portfolio_February 2015

NEWCANOPY

200

LOBBY218

CONCESSION219

PROSHOP205

OFFICE206

VESTIBULE207

OFFICE216

RECEPTION217

MECH.RM.210

STAIR208

ELEV.209

WOMEN'S211MEN'S

215

MEN'SLOCK. RM.

214

WOMEN'SLOCK. RM.

212

COMMONS220

CLOSET218A

NORTH

25 COMMERCE SW SUITE 300GRAND RAPIDS, MICHIGAN, 49503p. 616.454.1600 f. 616.454.1610

CAUSE: lack of spectator views and a desire for an improved communal area demands renovation

R E N O V A T I O N OF I C E A R E N A

K. P O T T S 19

C A

U S

E

Page 20: Portfolio_February 2015

20 K. P O T T S

Page 21: Portfolio_February 2015

P H O T O G R A P H Y

Left: JW Marriott in Grand Rapids, MI Below: Illinois Institute of Technology Student Center in Chicago, IL

CAUSE: unique and thought provoking design leads to the action of capturing the view

K. P O T T S 21

C A

U S

E

Page 22: Portfolio_February 2015

CAUSE: loss of family member inspires boat memorial

22 K. P O T T S

Page 23: Portfolio_February 2015

I N T R O D U C T I O N T O S C U L P T U R EFall 2010

Assignment:Create, out of wood, an object that represents family time.

My family’s time together is spent on my parents’ 15-foot 1968 Century Resorter. The boat is named “Jr.” after my grandpa who passed away in 2005.

K. P O T T S 23

C A

U S

E

Page 24: Portfolio_February 2015

0'-1

1/2

"

0'-1"0'-1"

0'-1

1/2

"

GRCHS Donor Plaque04/01/2013

Text constraints

Verse length: 100-185 characters (with spaces)

Professional experience:produce 3D model of plaqueassist in designcoordinate production

Program used:SketchUp

H I G H S C H O O L D O N O R P L A Q U E S

BELIEF: reflecting God’s faithfulness and loving guidance

24 K. P O T T S

Page 25: Portfolio_February 2015

D A6.2

/ 1A1.2A2

.72

A6.

24

13

7A

6.10

61' - 4 3/4"9' - 9"

BY

OW

NER

,D

BY

CTO

R.

ON

WAL

L &

BLO

CKI

NG

.

correct!

incorrect-"connected throughrelationships" should beshowing here.

flip this banner "connectedthrough relationships" shouldbe showing here.

"rooted in christ" should beshowing here

correct!

"united with home andchurch" should be showinghere

6 54

32

1612

3

4 5

Town Squarebanner layout09/04/2013

D A6.2

/ 1A1.2

A2.72

A6.

24

13

7A

6.10

61' - 4 3/4"9' - 9"

BY

OW

NER

,D

BY

CTO

R.

ON

WAL

L &

BLO

CKI

NG

.

correct!

incorrect-"connected throughrelationships" should beshowing here.

flip this banner "connectedthrough relationships" shouldbe showing here.

"rooted in christ" should beshowing here

correct!

"united with home andchurch" should be showinghere

6 54

32

1612

3

4 5

Town Squarebanner layout09/04/2013

Photograph by Bill Lindhout

H I G H S C H O O L C O R E V A L U E B A N N E R S

Professional experience:produce graphic, assist in design, coordinate production

Program used:Illustrator

K. P O T T S 25

B E

L I E

F

Page 26: Portfolio_February 2015

BELIEF: legacy wall verse: “Do not conform to the pattern of this world, but be transformed by the renewing of your mind. Then you will be able to test and approve what God’s will is—His good, pleasing and perfect will.” Romans 12:2

1966 CHESS CLUB 2012 WINTER SPORTS SENIOR ATHLETES

26 K. P O T T S

Page 27: Portfolio_February 2015

H I G H S C H O O L L E G A C Y W A L L

Professional experience:Coordinate image selection, production and

installation of lightbox timeline.

Programs used:Revit, Photoshop

photographs by Anne Schnitzenbaumer

K. P O T T S 27

B E

L I E

F

Page 28: Portfolio_February 2015

Finish Floor0' - 0"

1A3

Finish Floor0' - 0"

1A3

Finish Floor0' - 0"

Finish Floor0' - 0"

0' 4' 8' 16'South Elevation

Project number

Date

Drawn by

A2

elevationsProject Number

Proj

ect N

ame

Issue DateAuthor

0' 4' 8' 16'North Elevation

0' 4' 8' 16'East Elevation

0' 4' 8' 16'West Elevation

No. Description Date

BELIEF: spending time observing nature encourages peace and patience

Finish Floor0' - 0"

1A3

Finish Floor0' - 0"

1A3

Finish Floor0' - 0"

Finish Floor0' - 0"

0' 4' 8' 16'South Elevation

Project number

Date

Drawn by

A2

elevationsProject Number

Proj

ect N

ame

Issue DateAuthor

0' 4' 8' 16'North Elevation

0' 4' 8' 16'East Elevation

0' 4' 8' 16'West Elevation

No. Description Date

28 K. P O T T S

Page 29: Portfolio_February 2015

M O N T A N A S T A T E U N I V E R S I T Y B I R D W A T C H I N G F A C I L I T Y

Spring 2015

Two-week design focus:Design a 120’ x 24’, single story, ADA accessible

bird watching facility on the Cherry River site in Bozeman, MT.

K. P O T T S 29

B E

L I E

F

Page 30: Portfolio_February 2015
Page 31: Portfolio_February 2015

[email protected]

K A T I E P O T T S

Page 32: Portfolio_February 2015