46
Portfolio Manuela Ioana Lung Selected Works

Portfolio Lung Manuela

Embed Size (px)

DESCRIPTION

architecture portfolio

Citation preview

  • PortfolioManuela Ioana Lung Selected Works

  • contents

    CURRICULUM VITAE 2

    ACADEMIC PORTFOLIO

    Single family house 4 Center for students 8 Collective housing 12 Office building 15 Creative center for children and puppet theater 19 Case study: furniture survey 22 Industrial area restructure 26 Bussiness project week 28 Models and workshops techniques: chairs 29 The stairs 31 Watertower transformation 32

    WORKSHOP PORTFOLIO

    A|R|A - restauration school 37 Recycle paper workshop 38 Photography workshop 39 Light and landscape workshop 40

    PERSONAL PORTFOLIO

    Amateur photography 42

    pg. 1

  • EDUCATION

    Technical University of Cluj NapocaFaculty of Architecture and Urban planningOctober 2008-presentRestauration specialisation 2011- present

    Windesheim University of Apllied Sciences, Zwolle, The NetherlandsInterior Design MinorErasmus programmeSeptember 2012 - January 2013

    Babes University, Cluj NapocaPsyco-pedagogic module2008-2011

    WORKSHOPS

    A|R|A2 week team/individual work in restaura-tion at Rosia MontanaAugust 2010

    Recycle paper workshopWinter shool, Cluj NapocaFebruary 2012

    Photography workshopWinter school, Cluj NapocaFebruary 2012

    Light and landscape workshopSummer shool, Cluj NapocaSupervised by Ms. Katja Perrey (landscape design) and Dr. Dorin Beu (lighting)June 2011

    curriculum vitae

    SKILL SET

    ArchiCadArtlantisAdobe InDesignAdobe PhotoshopMicrosoft WordMicrosoft Excel

    INTERESTS

    architecture photographydancingskiingice skatingreadingtravelling

    LANGUAGES

    Romanian - mother languageEnglish - goodDutch - beginner

    DRIVING LICENCE BPERSONAL INFORMATION Surname(s)/First name(s): Lung Manuela IoanaAddress: 19 / Tudor Vladimirescu, 415500, Salonta, jud. Bihor (Romania)Mobile: +4 0752 27 89 76 E-mail: [email protected]: Romanian Date of birth: 18/05/1989Gender: Female

    pg. 2

  • Single family house Center for students Collective housing Office building Creative center for children and puppet theater Case study: furniture survey Industrial area restructure Bussiness project week Models and workshops techniques: chairs The stairs Watertower transformation

    academic portfolio pg. 3

  • single family housewith elements of passive house

    pg. 4

  • 4.80

    4.20

    2.40

    2.40

    3.60

    9.00

    9.00

    4.80

    3.60

    3.35 1.30 3.755.10 2.80

    8.40

    5.60 2.805.10 2.80

    8.40

    402.

    7528

    1.50

    283.

    4040

    40 2.50 28 4.80 40

    2

    4

    5

    3

    DCB

    2

    4

    5

    3

    CB

    D

    Pompa de ventilare+centralaS=16.20 m2

    piatra

    SpalatorieS=5.50 m2

    piatra

    DepozitareS=6.85 m2

    piatra

    Pat de rociS=63.90 m2

    A

    A'

    B B'Hol+casa de scaraS=16.30 m2piatra

    F

    5.30 2.30 1.00 90 1.10 1.80 1.004.50 5.10 2.80

    13.40

    9090

    2.90

    601.

    3090

    301.

    451.

    801.

    403.

    002.

    402.

    403.

    6012

    .45

    4.50 70 2.70 2.75 2.75

    13.404.50 5.10 2.80

    8090

    201.

    5045

    1.80

    1.70

    8040

    8040

    801.

    903.

    004.

    803.

    6012

    .45

    653.

    4028

    1.50

    282.

    1028

    3.40

    65

    65 9.35 65 2.30 50

    Atelier de picturaS=16.20 m2

    parchet

    Hol+casa de scaraS=19.00 m2

    parchet

    BucatarieS=19.00 m2

    piatra

    CamaraS=1.60 m2

    parchet

    ToaletaS=3.00 m2

    gresie

    Camera de ziS=25.60 m2

    parchet

    1

    0.00

    SeraS=7.30 m2

    parchet

    Intrare

    Loc de luat masaS=10.00 m2

    parchet

    2

    4

    5

    3

    1

    2

    4

    5

    A

    B C

    D

    DCB

    TerasaS=27.90 m2

    lemn

    FiligorieS=8.75 m2

    lemn

    Pubela

    A

    A'

    B B'

    A

    single family housewith elements of passive house

    pg. 53.

    405.

    701.

    501.

    8512

    .45

    5.30 2.25 5.8513.40

    2.35

    902.

    6060

    2.10

    1.80

    2.10

    12.4

    5

    4.80 2.50 6.1013.40

    653.

    6028

    2.50

    284.

    5065

    65 4.30 28 2.50 28 4.80 65

    Dormitor matrimonialS=21.80 m2

    parchet

    BaieS=7.10 m2

    gresie

    Dormitor copilS=17.80 m2

    parchet

    BaieS=4.20 m2

    gresie

    Dormitor copilS=18.50 m2

    parchet

    TerasaS=6.60 m2

    lemn

    Gol peste camera de ziS=8.40 m2

    Hol+casa scariiS=22.90 m2

    parchet

    +2.94

    A

    A'

    B B'

    N

    Ground floor

    Basement

    1st floor

  • -3.04

    -0.48

    0.00

    +2.30

    +2.94

    +6.60

    +7.80

    -1.10

    -0.48

    0.00

    +2.94

    +5.70

    +6.75 75

    453.

    7024

    2.70

    342.

    7060

    1.00

    1.00

    4.30

    242.

    7034

    2.70

    60

    -3.04

    -1.20

    0.00

    +2.94

    +6.60

    +7.80

    -1.10

    -0.48

    0.00

    +3.04

    +5.70

    Depozitare Hol

    CamaraBucatarie

    Hol

    Hol

    Casa scariiTerasa

    30

    Hol

    Casa scarii Dormitormatrimonial

    Dormitor copil

    Camera de zi

    Hol

    Intrare

    30

    35

    30

    Pat de roci Pat de roci

    parchet 22 mmsapa de egalizare 30 mmfonoizolatie 50 mmplaca b.a. 120 mmtencuiala 1.5 mm

    parchet 22 mmsapa de egalizare 30 mmfonoizolatie 50 mmplaca b.a. 120 mmtencuiala 1.5 mm

    lemn 22 mmbeton de panta 50 mm 2%

    termoizolatie polistiren 100 mm

    placa b.a. 120 mmtencuiala 1.5 mm

    folie bariera contra vaporistrat DDC

    sapa de egalizare 50mm

    protectie pietris rau 50 mmhidroizolatiestrat DDC

    placa b.a. 120 mmtencuiala 1.5 mm

    strat suport

    sapa de egalizare 20mm

    termoizolatie polistiren 150 mmstrat de pozabariera vapori

    beton de panta 30 mm 2 %

    tencuiala int 1.5 mmzidarie caramida plina 250 mmtermoizolatie celuloza 302 mm

    MDF 1.6 mmimpaslitura de lemn 50 mm

    tencuiala int 1.5 mm

    tencuiala int 1.5 mmzidarie caramida plina 250 mmtermoizolatie celuloza 302 mm

    MDF 1.6 mmimpaslitura de lemn 50 mm

    tencuiala int 1.5 mm parchet 22 mmsapa de egalizare 30 mmfonoizolatie 50 mmplaca b.a. 120 mmtermoizolatie 100 mmtencuiala 1.5 mm

    parchet 22 mmsapa de egalizare 30 mmfonoizolatie 50 mmplaca b.a. 120 mmtermoizolatie 10 mmtencuiala 1.5 mm

    piatra 24 mm

    sapa autonivelanta 30 mmvata minerala 50 mm

    termoizolatie polistiren100 mmhidroizolatie

    hidroizolatie

    placa b.a. 150 mmfolie PVC

    strat de rupere a capilaritatii 200 mmpamant natural

    piatra 24 mm

    sapa autonivelanta 30 mmvata minerala 50 mm

    termoizolatie polistiren100 mmhidroizolatie

    hidroizolatie

    placa b.a. 150 mmfolie PVC

    strat de rupere a capilaritatii 200 mmpamant natural

    tencuiala int 1.5 mmzidarie caramida plina 250 mmtermoizolatie 150 mmhidroizolatietefonddren din pietrisgeotextilpamant natural

    tencuiala int 1.5 mmzidarie caramida plina 250 mm

    hidroizolatie

    dren din pietrisgeotextil

    pamant natural

    termoizolatie 150 mm

    tefond

    single family housewith elements of passive house

    pg. 6

    BB section AA section

  • -0.48

    +3.04

    +6.60

    +7.80

    -1.20

    +6.60

    +7.80

    -0.48

    +6.60

    +7.80

    -0.48

    +7.80

    -0.48

    +3.04

    +6.60

    +7.80

    -1.20

    +6.60

    +7.80

    -0.48

    +6.60

    +7.80

    -0.48

    +7.80

    -0.48

    +3.04

    +6.60

    +7.80

    -1.20

    +6.60

    +7.80

    -0.48

    +6.60

    +7.80

    -0.48

    +7.80

    -0.48

    +3.04

    +6.60

    +7.80

    -1.20

    +6.60

    +7.80

    -0.48

    +6.60

    +7.80

    -0.48

    +7.80

    single family housewith elements of passive house

    pg. 7

    South view

    West view

    East view

    North view

  • center for students pg. 8

  • 5.15

    25.15

    3.90

    5.35

    7.00

    1.85

    4.80

    6.2545

    7.10

    5.81

    5.10

    6.40

    34.20

    22.7

    0

    6.80

    20.45

    8.75

    4.90

    Spatiu tehnicS=14 m2granit

    Canalul Morii

    Sala de conferinteS=115 m2

    granit

    Foaier / expozitieS=160 m2

    granit

    Grup sanitarS=40 m2granit

    -3.45

    GarderobaS=12 m2

    1

    2

    3

    4

    5

    5

    4

    3

    2

    1

    A

    C B

    D

    E

    AB

    E

    D

    C

    DepozitS=16 m2

    granit

    -3.45

    TerasaS=45 m2

    lemn

    32.40

    2.85

    25.00

    4.60

    20.1

    0

    8.75

    1.00

    10.3

    5

    5.35

    7.00

    1.85

    4.80

    20.80

    9.45

    1.802.15

    7.40

    6.2545

    7.10

    5.81

    5.355.10

    7.20

    40 6.806.40

    Canalul Morii

    Papetarie/copy sho

    p

    S=23.00 m2

    HolS=43.30 m

    2

    granitInfo point

    +garderoba

    S=12.30 m2

    Grup sanitar

    S=30.00 m2

    granit

    Restaurant/bibliotec

    a

    S=200.00 m2

    granit

    Depozit

    S=7.00 m2

    Vestiar

    S=11.30 m2

    zona cu carti

    zona cu carti

    0.00

    Alee pietonala

    lemn

    piatra cubica

    piatra cubica

    0.00

    1

    2

    3

    4

    5

    5

    4

    3

    2

    1

    A

    C B

    D

    E

    AB

    E

    D

    C

    25.0

    0

    5.00

    15.0

    5

    4.90

    5.35

    7.00

    1.85

    4.80

    6.2545

    7.10

    5.81

    5.10

    6.40

    20.80

    13.40

    7.40

    5.35

    90 90 5.607.45

    4.65

    15.90

    19.20

    3.00

    32.70

    TerasaS=68.00 m

    2

    lemn Hol

    S=16.00 m2

    granit

    Birouri

    S=140.00 m2

    granit

    TerasaS=52.00m

    2

    lemn

    ToaleteS=21.00 m

    2

    granit

    Zona de relaxare/zo

    na de tranzit

    S=35.00 m2

    granit

    1

    2

    3

    4

    5

    5

    4

    3

    2

    1

    A

    C B

    D

    E

    A B

    E

    D

    C

    5.5540

    4.7540

    7.57

    5.81

    5.10

    13.92

    5.55

    13.908.901.80

    3.20

    7.60

    5.80

    5.10

    Sala sedinte

    S=45.00 m2

    granit

    Terasa inierbata

    S=200.00 m2

    iarba

    1

    2

    2

    1

    C B

    D

    E

    E

    D

    C

    Basement Gound floor

    1st floor

    2nd floor

    center for students pg. 9

  • +13.15

    +4.45

    0.00 0.00

    +4.45

    +13.15

    +8.00

    E-09 Elevation

    +13.15

    +4.45

    0.00 0.00

    +4.45

    +13.15

    +8.00

    E-09 Elevation

    Transversal section

    Side view

    center for students pg. 10

  • The model from the concept step

    center for students pg. 11

  • collective housingfor students, middle class, upper class

    Renderings from the concept step step

    pg. 12

  • STRAD

    A LALELELOR

    Sala conferinteS=108.00 m2

    gr. s

    an. b

    arba

    ti

    S=11

    .50

    m2

    BarS=220.00 m2

    DepozitS=6.60 m2

    BaieS=7.20 m2

    gresie

    WCS=2.60 m2

    gresie

    Hol intrareS=6.70 m2

    parchet

    BaieS=5.20 m2

    gresie

    BaieS=5.70 m2

    gresie

    BaieS=5.80 m2

    gresie

    Hol intrareS=2.50 m2

    parchet

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Casa scariiS=30.00 m2

    1 2 3 4 5 6 7 8 9 1011

    12

    13

    14

    15

    16

    17

    18

    19

    Casa scariiS=25.00 m2

    BaieS=6.20 m2

    gresieBaie

    S=5.40 m2gresie

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Casa scariiS=30.00 m2

    Hol intrareS=2.30 m2

    granit

    BaieS=6.00 m2

    gresie

    WCS=2.30 m2

    gresie

    1 2 3 4 5 6 7 8 9 10111213141516171819

    DormitorS=17.10 m2

    parchet

    1 2 3 4 5 6 7 8 9 10 11 13 14 15

    1 2 3 4 5

    6

    7

    8

    11 12

    1314 15

    A

    B

    D

    A

    C

    E

    G

    I

    K

    M

    F

    H

    J

    L

    N

    O

    F

    J

    L

    N

    O

    E

    G

    I

    K

    M

    Casa scariiS=25.60 m2

    BirouS=25 mp

    granit

    BirouS=17 mpparchet

    BirouS=37 mpparchet

    Bancas=75 mp

    granitLibrarie

    S=50 mpgranit

    BirouS=20 mpparchet

    Centrala termicaS=80 mp

    copy shops=80 mpparchet

    gr. s

    an. f

    emei

    S=11

    .50

    m2

    BarS=220.00

    m2

    1 2 3 4 5 6 7 8 9 1011121314151617

    1819

    Spatii tehniceS=80 mp

    18 x 0.19 = 3.50

    6.10 16.52 0.60 5.80 5.80 0.60 4.90 5.50 6.50 4.201.50 1.10 0.90 18.14

    6.505.50

    5.505.50

    5.50

    6.595.49

    4.650.45

    2.751.50

    0.60

    5.505.48

    6.67

    12

    9

    H

    N

    ground floor

    collective housingfor students, middle class, upper class

    pg. 13

  • student apartments

    upper class apartments

    middle class apartments

    Flexibility of the apartments

    student apartments

    family apartment + office

    couple apartment + office

    student apartment

    couple apartment + office

    office

    library

    F

    F

    FF

    F

    FF

    F

    Zona relaxareS=28.00 m2

    parchet DormitorS=19.00 m2

    parchet

    DressingS=3.00 m2

    parchet

    LogieS=9.00 m2

    granit

    BaieS=7.20 m2

    gresie

    DormitorS=17.00 m2

    parchet

    Camera de ziS=30.00 m2

    parchet

    BirouS=18.60 m2

    parchet

    Bucatarie+loc de luat masaS=28.70 m2granit

    WCS=2.60 m2

    gresie

    Hol intrareS=6.70 m2

    parchet

    DormitorS=22.00 m2

    parchet

    BaieS=5.20 m2

    gresie

    BucatarieS=6.10 m2

    granit

    Loc de luat masaS=17.00 m2

    parchet

    Camera de ziS=28.40 m2

    parchet

    Hol intrareS=5.60 m2

    parchet

    DormitorS=29.00 m2

    parchet

    BaieS=5.70 m2

    gresie

    LogieS=8.50 m2

    parchet

    LogieS=10.10 m2

    parchet

    LogieS=6.40 m2

    parchet

    BaieS=5.80 m2

    gresie

    Hol intrareS=2.50 m2

    parchet

    BucatarieS=6.10 m2

    granit

    Loc de luat masaS=6.10 m2

    parchet

    Camera de ziS=10.00 m2

    parchet

    DormitorS=30.00 m2

    parchet

    LogieS=8.20 m2

    parchet

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Casa scariiS=30.00 m2

    Bucatarie+loc de luat masaS=30.20 m2granit

    Zona destinata acvariuluiS=11.00 m2parchet

    Camera de ziS=26.00 m2

    parchet

    DormitorS=19.00 m2

    parchet

    DressingS=3.00 m2

    parchet

    BaieS=7.60 m2

    gresie

    DormitorS=17.00 m2

    parchet

    Zona de studiuS=19.00 m2

    parchetHol intrareS=8.20 m2

    parchet

    WCS=3.20 m2

    gresie

    LogieS=8.20 m2

    granit

    BalconS=5.30m2parchet

    1 2 3 4 5 6 7 8 9 10111

    213141516171819

    Casa scariiS=25.00 m2

    DormitorS=27.60 m2

    parchet

    BaieS=6.20 m2

    gresie

    BucatarieS=6.10 m2

    granit

    Loc de luat masaS=17.00 m2

    parchet

    Camera de ziS=25.30 m2

    parchet

    Hol intrareS=5.60 m2

    parchet

    DormitorS=30.00 m2

    parchet

    BaieS=5.40 m2

    gresie

    LogieS=9.50 m2

    parchet

    LogieS=8.50 m2

    parchet

    LogieS=8.30 m2

    parchet

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Casa scariiS=30.00 m2

    Hol intrareS=2.30 m2

    granit

    BaieS=6.00 m2

    gresie

    WCS=2.30 m2

    gresie

    Bucatarie+loc de luat masaS=16.90 m2

    granit

    Camera de ziS=26.50 m2

    parchet

    Zona studiuS=7.90 m2

    parchet

    DormitorS=12.40 m2

    parchet

    DressingS=7.30 m2

    parchet

    BalconS=14.00 m2

    granit

    DormitorS=20.00 m2

    parchet

    DressingS=9.00 m2

    parchet

    Bucatarie+loc de luat masaS=40.00 m2

    granit

    Camera de ziS=29.00 m2

    parchet

    LogieS=23.10 m2

    granit

    BirouS=22.00 m2

    parchet

    DormitorS=16.50 m2

    parchet

    BaieS=7.90 m2

    gresie

    WCS=3.00 m2

    gresieHol intrareS=4.60 m2

    parchet

    1 2 3 4 5 6 7 8 9 10

    111213141516171819

    BirouS=20.60 m2

    parchet

    Hol intrareS=9.00 m2

    parchet

    WCS=3.15 m2

    gresie

    Bucatarie+loc de luat masaS=37.00 m2

    granitLogie

    S=20.00 m2granit

    Camera de ziS=30.00 m2

    parchet

    DormitorS=17.10 m2

    parchet

    BaieS=6.00 m2

    gresie

    DressingS=5.90 m2

    parchet

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    1 2 3 4 5

    6 7 8

    9 10 11 12

    1314 15

    A

    B

    D

    A

    C

    E

    G

    I

    K

    M

    F

    H

    J

    L

    N

    O

    F

    H

    J

    L

    N

    O

    E

    G

    I

    K

    M

    Casa scariiS=25.60 m2

    1 2 3 4 5 6 7 8 9 10

    11121314151617

    1819

    BibliotecaS=140.00 m2

    piatra

    Casa scariiS=20.00 m2

    F

    Bucatarie+loc de luat masaS=16.10 m2

    parchet

    Camera de ziS=25.40 m2

    parchet

    LogieS=23.10 m2

    granit

    BaieS=6.90 m2

    gresie

    WCS=3.00 m2

    gresieHol intrareS=5.90 m2

    parchet

    1 2 3 4 5 6 7 8 9 10111213141516171819Casa scarii

    S=25.60 m2

    DormitorS=16.50 m2

    parchet

    DormitorS=16.50 m2

    parchet

    DormitorS=15.00 m2

    parchet

    DormitorS=15.00 m2

    parchet

    BaieS=6.90 m2

    gresie

    F

    1 2 3 4 5 6 7 8 9 10

    111213141516171819

    Birou directorS=18.40 m2

    parchet

    Hol intrareS=9.00 m2

    parchet

    WCS=3.15 m2

    gresie

    Bucatarie+loc de luat masaS=23.20 m2

    granit

    LogieS=20.00 m2

    granit

    Camera de ziS=20.30 m2

    parchet

    DormitorS=17.10 m2

    parchet

    BaieS=6.00 m2

    gresie

    DressingS=5.90 m2

    parchet

    Casa scariiS=25.60 m2

    SecretariatS=21.00 m2

    parchet

    Zona de trecereS=14.40 m2

    parchet

    F

    Bucatarie+loc de luat masaS=30.20 m2granit

    Camera de ziS=18.70 m2

    parchet

    DormitorS=19.00 m2

    parchet

    DressingS=3.00 m2

    parchet

    BaieS=7.60 m2

    gresie

    Hol intrareS=11.00 m2

    parchet

    WCS=3.20 m2

    gresie

    LogieS=8.20 m2

    granit

    BalconS=5.30m2parchet

    1 2 3 4 5 6 7 8 9 10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    Birou angajatiS=21.90 m2

    parchet

    SecretariatS=14.10 m2

    parchet

    Birou directorS=15.00 m2

    parchet

    LogieS=9.00 m2

    granit

    WCS=5.10 m2

    gresie

    WCS=2.60 m2

    gresie

    Hol intrareS=6.20 m2

    parchet

    1 2 3 4 5 6 7 8 9 10111

    213141516171819

    Casa scariiS=25.00 m2

    Birou directorS=19.20 m2

    parchet

    Sala conferinteS=20.50 m2

    parchet

    Birou angajatiS=57.50 m2

    parchet

    Birou angajatiS=30.00 m2

    parchet

    SecretariatS=17.70 m2

    parchet

    F

    DormitorS=22.00 m2

    parchet

    BaieS=5.20 m2

    gresie

    BucatarieS=6.10 m2

    granit

    Loc de luat masaS=17.00 m2

    parchet

    Camera de ziS=26.70 m2

    parchet

    Hol intrareS=8.30 m2

    parchetBaieS=5.70 m2

    gresie

    LogieS=8.50 m2

    parchet

    LogieS=10.10 m2

    parchet

    LogieS=6.40 m2

    parchet

    BaieS=5.80 m2

    gresie

    Hol intrareS=2.50 m2

    parchet

    LogieS=8.20 m2

    parchet

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Casa scariiS=30.00 m2

    DormitorS=21.80 m2

    parchet

    2nd floor

    collective housingfor students, middle class, upper class

    pg. 14

  • office building pg. 15

  • office building

    66

    1

    1

    Cat.

    Cat.

    25

    23

    13 15

    17 19 21

    11

    str. M. Kogalniceanu

    Liceul Emil Racovita

    str.Emanuel de M

    artonne

    4

    6

    8

    10

    1

    baz.

    Cat.

    str.M.Kogalniceanu

    Cat.

    7

    gj.

    gj.

    12

    str.K

    ovac

    s D

    ezso

    64

    62

    31

    Biserica Reformata Centrala

    16

    Cat.

    Academia Romana

    9 11

    gj.

    Cat.

    1

    Institutul de Medicina si Farmacie

    Biblioteca

    "

    "Clubul Viitorul

    Liceul Gh.Sincai

    Cat.

    14

    filiala Cluj-Napoca

    gj. gj.

    Cat.

    Cat.

    Arhivele Nationale

    Directia Judeteana

    Cluj

    Cat.

    Cat.

    5

    Univ.Babes Bolyai

    Uni

    v.Ba

    bes

    Boly

    ai

    Serviciu Social

    Filarmonica

    de Stat

    Europene

    Facultatea

    de Studii

    Cat.

    5 7

    Cat.

    Cat.

    gj.

    Cat.

    gj.

    Casa

    Universitarilor

    Cat.

    Cat.

    Parohia

    Reformata

    Catolica

    .v.

    *

    gj.

    gj. gj.

    gj.

    32

    34 3638 40

    36

    Rolicom

    gj. gj.

    42

    44

    Depozit

    48

    5052

    54

    gj.

    Cat.

    m

    56

    58

    60 62

    64

    gj

    19

    19

    21

    21

    21

    23

    gj.

    m

    str.Avram Iancustr.Avram Iancu

    str.A

    viat

    or B

    ades

    cu

    gjAsociatia

    Patronilor

    Meseriasilor

    si

    Cooperativa

    "Constructorul"

    gj.

    4

    Cat.

    .v.

    .v.

    .v.

    .v.

    .v.

    .v.

    .v..v.

    .v.

    .v.

    .v.

    .v.

    .v.

    .v.

    .v. .v.

    .v.

    .v.

    .v.

    .v.

    4

    13 15

    _

    11

    baz

    2

    str. I.C. Bratianu

    2

    nr. 2

    cprs

    Santier

    Cat.

    Cat.

    26-28

    32

    gj.

    R.A.D.P.

    30

    .v.

    .v.

    .v.

    Cimitirul Hajongard

    3S+P+3+1R

    2

    P 2

    1

    3

    P+3 NAccesauto

    Accescafenea

    Accesprincipal

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    FF

    F

    5.80

    5060

    4.40

    601.

    002.

    6060

    2.60

    5080

    351.

    1045

    251.

    8060

    5.85

    5.60

    6.70

    3.20

    3.20

    5.40

    24.5

    0

    27.40

    35 6.20 7.10 95 1.80 4.20 2.80 3.006.40 6.80 7.10 5.30

    26.35

    5.85

    1.00

    3.80

    6019

    .00

    6.40

    6.70

    5.30

    24.3

    0

    A A

    str.K

    ovac

    s D

    ezso

    Iesire adapost

    Iesire adapost

    Holpiatra

    S= 6.20 m

    Iesire adapost

    Casa scariipiatra

    S= 37.00 m

    0.00

    -0.17

    0.00

    -0.70

    0.00

    -0.70

    Gradina1

    2

    3

    4

    5

    4

    3

    2

    1

    A B C D E

    4'

    Holpiatra

    S= 7.00 m

    F

    RG

    RG

    13.30 65 6.20 4.15 3.05

    6.40 6.80 7.10 6.60

    59.

    6015

    2.60

    156.

    505

    11.2

    0

    35 6.20 15 11.97 0.00 10 1.70 25 6.25 30

    BB

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    Birou receptionerpiatra

    S= 12.00 m

    Zona asteptarepiatra

    S= 26.80 m

    Windfangpiatra

    S= 8.60 m

    Birou directorparchet

    S= 16.40 m

    GSgresie

    S= 2.40 m

    Secretariatpiatra

    S= 9.80 m

    Oficiugresie

    S= 16.50 m

    Spatiu birouriparchet

    S= 117.00 m

    Cafeneaparchet

    S= 113.00 m

    Vestiarparchet

    S= 8.10 m

    Barparchet

    S= 8.40 m

    Depozitmozaic

    S= 9.00 mDeseuri

    S= 2.10 m

    WindfangS= 4.30 m

    Platforma auto

    Platforma auto

    Oficiugresie

    S= 2.60 m

    zona de primirepiatra

    S= 31.80 m

    Oficiu FSgresie

    S= 1.85 m

    Ghenagunoi

    Acces principal

    Acces auto

    Accescafenea

    Aprovizionare cafenea

    Acces auto

    Spatiu publicpiatra cubicaS= 240.20 m

    A B

    C D E

    Site map Ground floor

    pg. 16

  • office buildingF

    F

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    A A

    19.5

    05.

    306.

    706.

    40

    1.20 5.00 90 6.00 70 5.00 50 60 50 35 6.30 50 2.806.40 6.80 7.10 6.60

    30.40

    505.

    3535

    2060

    .2.

    402.

    000

    1.30

    4.00

    904.

    10

    5.60

    6.70

    6.40

    22.3

    5

    703.705.10356.6035456.0020356.2035

    5.307.106.806.40

    29.60

    Zona primireS= 20.00 m

    mozaic

    OficiuS= 15.00 m

    gresie

    Zona primireS= 27.20 m

    mozaic

    SecretariatS= 9.40 m

    mozaic

    BirouriS= 122.00 m

    parchet

    BirouriS= 122.00 m

    parchetSecretariatS= 8.20 m

    mozaic

    Holpiatra

    S= 7.00 m

    +8.50

    Casa scariipiatra

    S= 24.80 m

    Spatiu lifturipiatra

    S= 17.17 m

    +8.50

    Birou directorS= 12.75 mparchet

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1B

    B

    RG

    RG

    RG

    305

    3.20

    151.

    4515

    7.60

    122.

    8015

    3.25

    35

    35 13.10 15 3.20 12 1.80 12 1.70 10 .10 15 1.70 10 2.95 35

    Sala sedinteS= 12.40 m

    parchet

    Birou directorS= 12.00 m

    parchet

    Sala sedinteS= 18.40 m

    parchet

    OficiuS= 16.00 m

    gresie

    G SS= 2.60 m

    gresie

    Spatiu de multiplicareS= 8.00 m

    parchet

    Spatiu de multiplicareS= 8.00 m

    parchet

    G SS= 2.70 m

    gresie

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    TerasaS= 5.10 m

    parchet

    OficiuS= 2.00 m

    gresie

    TerasaS= 30.45 m

    parchet

    F

    F

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    A A

    5.30

    6.70

    6.40

    5.60

    6.70

    6.40

    6.40 6.80 7.10 6.60

    5.307.106.806.403.108.1540903.90

    13.60

    26.40

    5.40

    16.5

    0

    21.9

    0

    35 13.10 35 20 6.00 1.05 4.00 2.30 2.65

    27.40

    5.60

    6560

    4.40

    601.

    303.

    001.

    1060

    1.30

    2.90

    22.1

    0

    Zona primireS= 28.30 m

    mozaic

    SecretariatS= 10.15 m

    mozaic

    TerasaS= 151.00 mlemn de tek

    BirouriS= 210.00 m

    parchetOficiu

    S= 10.80 mgresie

    G SS=3.25 m

    gresie

    Holpiatra

    S= 7.00 m

    +16.50

    +16.50

    Casa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    RG

    35 13.10 123.20

    12 1.80 12 1.70 12 .10 15 1.70 10 2.85 35

    5.60

    56.

    8012

    .70

    153.

    4035

    Birou directorS= 12.00 m

    parchet

    Sala sedintes= 12.10 m

    parchet

    Spatiu de multiplicareS=3.00 mparchet

    Spatiu de multiplicareS=3.00 mparchet

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    OficiuS=3.70 m

    gresie

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    13.80 11.60 1.90 20

    27.50

    25.8

    0

    17.5

    0

    7.20

    24.6

    8

    5.30

    6.70

    6.40

    5.40

    5.60

    6.70

    3.20

    3.20

    5.40

    26.40

    6.40 6.80 7.10 5.30

    60 1.90 21.50 1.90 50

    6.40 6.80 7.10 6.60

    355.

    506.

    6012

    11.7

    035

    35 13.10 12 3.30 12 1.80 1.80 12 1.10 15 1.70 10 2.90 35

    Birou administrator + arhivaS= 35.00 m

    1

    2

    3

    4

    5

    6

    7 8 9 10

    1

    A

    11

    12Depozit pt materiale de inventar

    S= 41.40 m

    Depozit scauneS= 32.00 m

    B C D E

    2

    3

    4

    5 5

    4

    3

    2

    1

    A B C D E

    Gura de lup

    Curte de lumina (aerisire)

    ParcareS= 390.70 m

    Casa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    -2.90

    Holpiatra

    S= 7.00 m

    Gura de lup

    Gura de lup

    4'

    -2.90

    -2.90

    A A

    Vestiar Fgresie

    S= 4.00 m

    Vestiar Bgresie

    S= 4.70 m

    GS Bgresie

    S= 9.70 m

    GS Fgresie

    S= 9.15 m

    Ghenagunoi

    BB

    F

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    A A

    19.1

    5

    6.40

    6.70

    5.30

    35 9.80 1.00 2.00 80 6.00 1.00 4.00 5.50

    6.40 6.80 7.10 6.60

    30.40

    1.00

    4.50

    9060

    2.40

    359.

    2035

    5.60

    6.70

    6.40

    19.3

    0

    305

    5.90

    126.

    6012

    3.50

    152.

    6035

    35 13.10 12 3.25 12 1.80 12 1.70 12 1.10 15 1.70 10 2.80 35 0.30

    50 6.00 60 6.00 45 35 6.60 35 5.00 50 3.906.40 6.80 7.10 5.30

    26.40

    Terasapiatra

    S= 29.00 m

    Zona primireS= 35.00 m

    mozaic

    OficiuS= 24.00 m

    gresie

    BirouriS= 290.00 m

    parchet SecretariatS= 12.00 m

    mozaic

    Holpiatra

    S= 7.00 mCasa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    +4.50

    +4.50

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    Birou directorS= 17.00 m

    parchet

    Sala sedinteS= 18.00 m

    parchet

    Spatiu de multiplicareS= 6.00 m

    parchet

    G SS=4.50 m

    gresie

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    FF

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    A A

    19.5

    05.

    306.

    706.

    40

    1.20 5.00 90 6.00 70 5.00 50 60 50 35 6.30 50 2.806.40 6.80 7.10 6.60

    30.40

    505.

    3535

    2060

    .2.

    402.

    000

    1.30

    4.00

    904.

    10

    5.60

    6.70

    6.40

    22.3

    5

    703.705.10356.6035456.0020356.2035

    5.307.106.806.40

    29.60

    Zona primireS= 20.00 m

    mozaic

    OficiuS= 15.00 m

    gresie

    Zona primireS= 27.20 m

    mozaic

    SecretariatS= 9.40 m

    mozaic

    BirouriS= 122.00 m

    parchet

    BirouriS= 122.00 m

    parchetSecretariatS= 8.20 m

    mozaic

    Holpiatra

    S= 7.00 m

    +8.50

    Casa scariipiatra

    S= 24.80 m

    Spatiu lifturipiatra

    S= 17.17 m

    +8.50

    Birou directorS= 12.75 mparchet

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    RG

    RG

    305

    3.20

    151.

    4515

    7.60

    122.

    8015

    3.25

    35

    35 13.10 15 3.20 12 1.80 12 1.70 10 .10 15 1.70 10 2.95 35

    Sala sedinteS= 12.40 m

    parchet

    Birou directorS= 12.00 m

    parchet

    Sala sedinteS= 18.40 m

    parchet

    OficiuS= 16.00 m

    gresie

    G SS= 2.60 m

    gresie

    Spatiu de multiplicareS= 8.00 m

    parchet

    Spatiu de multiplicareS= 8.00 m

    parchet

    G SS= 2.70 m

    gresie

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    TerasaS= 5.10 m

    parchet

    OficiuS= 2.00 m

    gresie

    TerasaS= 30.45 m

    parchet

    F

    F

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    A A

    5.30

    6.70

    6.40

    5.60

    6.70

    6.40

    6.40 6.80 7.10 6.60

    5.307.106.806.403.108.1540903.90

    13.60

    26.40

    5.40

    16.5

    0

    21.9

    0

    35 13.10 35 20 6.00 1.05 4.00 2.30 2.65

    27.40

    5.60

    6560

    4.40

    601.

    303.

    001.

    1060

    1.30

    2.90

    22.1

    0

    Zona primireS= 28.30 m

    mozaic

    SecretariatS= 10.15 m

    mozaic

    TerasaS= 151.00 mlemn de tek

    BirouriS= 210.00 m

    parchetOficiu

    S= 10.80 mgresie

    G SS=3.25 m

    gresie

    Holpiatra

    S= 7.00 m

    +16.50

    +16.50

    Casa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    RG

    35 13.10 123.20

    12 1.80 12 1.70 12 .10 15 1.70 10 2.85 35

    5.60

    56.

    8012

    .70

    153.

    4035

    Birou directorS= 12.00 m

    parchet

    Sala sedintes= 12.10 m

    parchet

    Spatiu de multiplicareS=3.00 mparchet

    Spatiu de multiplicareS=3.00 mparchet

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    OficiuS=3.70 m

    gresie

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    13.80 11.60 1.90 20

    27.50

    25.8

    0

    17.5

    0

    7.20

    24.6

    8

    5.30

    6.70

    6.40

    5.40

    5.60

    6.70

    3.20

    3.20

    5.40

    26.40

    6.40 6.80 7.10 5.30

    60 1.90 21.50 1.90 50

    6.40 6.80 7.10 6.60

    355.

    506.

    6012

    11.7

    035

    35 13.10 12 3.30 12 1.80 1.80 12 1.10 15 1.70 10 2.90 35

    Birou administrator + arhivaS= 35.00 m

    1

    2

    3

    4

    5

    6

    7 8 9 10

    1

    A

    11

    12Depozit pt materiale de inventar

    S= 41.40 m

    Depozit scauneS= 32.00 m

    B C D E

    2

    3

    4

    5 5

    4

    3

    2

    1

    A B C D E

    Gura de lup

    Curte de lumina (aerisire)

    ParcareS= 390.70 m

    Casa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    -2.90

    Holpiatra

    S= 7.00 m

    Gura de lup

    Gura de lup

    4'

    -2.90

    -2.90

    A A

    Vestiar Fgresie

    S= 4.00 m

    Vestiar Bgresie

    S= 4.70 m

    GS Bgresie

    S= 9.70 m

    GS Fgresie

    S= 9.15 m

    Ghenagunoi

    BB

    F

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    A A

    19.1

    5

    6.40

    6.70

    5.30

    35 9.80 1.00 2.00 80 6.00 1.00 4.00 5.50

    6.40 6.80 7.10 6.60

    30.40

    1.00

    4.50

    9060

    2.40

    359.

    2035

    5.60

    6.70

    6.40

    19.3

    0

    305

    5.90

    126.

    6012

    3.50

    152.

    6035

    35 13.10 12 3.25 12 1.80 12 1.70 12 1.10 15 1.70 10 2.80 35 0.30

    50 6.00 60 6.00 45 35 6.60 35 5.00 50 3.906.40 6.80 7.10 5.30

    26.40

    Terasapiatra

    S= 29.00 m

    Zona primireS= 35.00 m

    mozaic

    OficiuS= 24.00 m

    gresie

    BirouriS= 290.00 m

    parchet SecretariatS= 12.00 m

    mozaic

    Holpiatra

    S= 7.00 mCasa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    +4.50

    +4.50

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    Birou directorS= 17.00 m

    parchet

    Sala sedinteS= 18.00 m

    parchet

    Spatiu de multiplicareS= 6.00 m

    parchet

    G SS=4.50 m

    gresie

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    FF

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    A A

    19.5

    05.

    306.

    706.

    40

    1.20 5.00 90 6.00 70 5.00 50 60 50 35 6.30 50 2.806.40 6.80 7.10 6.60

    30.40

    505.

    3535

    2060

    .2.

    402.

    000

    1.30

    4.00

    904.

    10

    5.60

    6.70

    6.40

    22.3

    5

    703.705.10356.6035456.0020356.2035

    5.307.106.806.40

    29.60

    Zona primireS= 20.00 m

    mozaic

    OficiuS= 15.00 m

    gresie

    Zona primireS= 27.20 m

    mozaic

    SecretariatS= 9.40 m

    mozaic

    BirouriS= 122.00 m

    parchet

    BirouriS= 122.00 m

    parchetSecretariatS= 8.20 m

    mozaic

    Holpiatra

    S= 7.00 m

    +8.50

    Casa scariipiatra

    S= 24.80 m

    Spatiu lifturipiatra

    S= 17.17 m

    +8.50

    Birou directorS= 12.75 mparchet

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    RG

    RG

    305

    3.20

    151.

    4515

    7.60

    122.

    8015

    3.25

    35

    35 13.10 15 3.20 12 1.80 12 1.70 10 .10 15 1.70 10 2.95 35

    Sala sedinteS= 12.40 m

    parchet

    Birou directorS= 12.00 m

    parchet

    Sala sedinteS= 18.40 m

    parchet

    OficiuS= 16.00 m

    gresie

    G SS= 2.60 m

    gresie

    Spatiu de multiplicareS= 8.00 m

    parchet

    Spatiu de multiplicareS= 8.00 m

    parchet

    G SS= 2.70 m

    gresie

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    TerasaS= 5.10 m

    parchet

    OficiuS= 2.00 m

    gresie

    TerasaS= 30.45 m

    parchet

    F

    F

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    A A

    5.30

    6.70

    6.40

    5.60

    6.70

    6.40

    6.40 6.80 7.10 6.60

    5.307.106.806.403.108.1540903.90

    13.60

    26.40

    5.40

    16.5

    0

    21.9

    0

    35 13.10 35 20 6.00 1.05 4.00 2.30 2.65

    27.40

    5.60

    6560

    4.40

    601.

    303.

    001.

    1060

    1.30

    2.90

    22.1

    0

    Zona primireS= 28.30 m

    mozaic

    SecretariatS= 10.15 m

    mozaic

    TerasaS= 151.00 mlemn de tek

    BirouriS= 210.00 m

    parchetOficiu

    S= 10.80 mgresie

    G SS=3.25 m

    gresie

    Holpiatra

    S= 7.00 m

    +16.50

    +16.50

    Casa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    RG

    35 13.10 123.20

    12 1.80 12 1.70 12 .10 15 1.70 10 2.85 35

    5.60

    56.

    8012

    .70

    153.

    4035

    Birou directorS= 12.00 m

    parchet

    Sala sedintes= 12.10 m

    parchet

    Spatiu de multiplicareS=3.00 mparchet

    Spatiu de multiplicareS=3.00 mparchet

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    OficiuS=3.70 m

    gresie

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    13.80 11.60 1.90 20

    27.50

    25.8

    0

    17.5

    0

    7.20

    24.6

    8

    5.30

    6.70

    6.40

    5.40

    5.60

    6.70

    3.20

    3.20

    5.40

    26.40

    6.40 6.80 7.10 5.30

    60 1.90 21.50 1.90 50

    6.40 6.80 7.10 6.60

    355.

    506.

    6012

    11.7

    035

    35 13.10 12 3.30 12 1.80 1.80 12 1.10 15 1.70 10 2.90 35

    Birou administrator + arhivaS= 35.00 m

    1

    2

    3

    4

    5

    6

    7 8 9 10

    1

    A

    11

    12Depozit pt materiale de inventar

    S= 41.40 m

    Depozit scauneS= 32.00 m

    B C D E

    2

    3

    4

    5 5

    4

    3

    2

    1

    A B C D E

    Gura de lup

    Curte de lumina (aerisire)

    ParcareS= 390.70 m

    Casa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    -2.90

    Holpiatra

    S= 7.00 m

    Gura de lup

    Gura de lup

    4'

    -2.90

    -2.90

    A A

    Vestiar Fgresie

    S= 4.00 m

    Vestiar Bgresie

    S= 4.70 m

    GS Bgresie

    S= 9.70 m

    GS Fgresie

    S= 9.15 m

    Ghenagunoi

    BB

    F

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    A A

    19.1

    5

    6.40

    6.70

    5.30

    35 9.80 1.00 2.00 80 6.00 1.00 4.00 5.50

    6.40 6.80 7.10 6.60

    30.40

    1.00

    4.50

    9060

    2.40

    359.

    2035

    5.60

    6.70

    6.40

    19.3

    0

    305

    5.90

    126.

    6012

    3.50

    152.

    6035

    35 13.10 12 3.25 12 1.80 12 1.70 12 1.10 15 1.70 10 2.80 35 0.30

    50 6.00 60 6.00 45 35 6.60 35 5.00 50 3.906.40 6.80 7.10 5.30

    26.40

    Terasapiatra

    S= 29.00 m

    Zona primireS= 35.00 m

    mozaic

    OficiuS= 24.00 m

    gresie

    BirouriS= 290.00 m

    parchet SecretariatS= 12.00 m

    mozaic

    Holpiatra

    S= 7.00 mCasa scariipiatra

    S= 20.60 m

    Spatiu lifturipiatra

    S= 14.14 m

    +4.50

    +4.50

    1

    A B C D E

    2

    3

    4

    A B C D E

    4

    3

    2

    1

    BB

    RG

    Birou directorS= 17.00 m

    parchet

    Sala sedinteS= 18.00 m

    parchet

    Spatiu de multiplicareS= 6.00 m

    parchet

    G SS=4.50 m

    gresie

    Oficiu FSgresie

    S= 1.85 m

    GS Bgresie

    S= 14.45 m

    GS Fgresie

    S= 13.50 m

    -1 floor 2nd floor

    South view

    4th floor

    pg. 17

  • office building

    - 8.45

    - 0.70

    +4.50

    + 8.50

    + 12.50

    + 20.25

    -2.90

    - 0.17

    + 16.50

    - 5.45

    - 8.45

    - 5.45

    + 16.50

    +4.50

    -2.90

    +20.25

    + 12.50

    + 8.50

    tencuiala 2 cm

    sapa egalizare beton 3 cm

    pardoseala parchet 2,5 cm

    fonoizolatie (vata minerala) 5 cm

    placa beton armat 15 cm

    tavan fals / structura 70 cm

    sapa egalizare beton 3 cmplaca beton armat 20 cm

    strat de uzura 2 cm

    sapa egalizare beton 3 cmstrat de uzura 2 cm

    placa beton armat 20 cmtencuiala 1 cm

    tencuiala exterioara 2 cm

    zidarie caramida 25 cm

    termoizolatie polistiren expandat 10 cm

    tencuiala interioara 2 cm

    East view BB section

    North view

    pg. 18

  • Creative center for children and puppet theater pg. 19

  • Creative center for children and puppet theater

    strat protectie termoizolatie 3 cm

    bariera vapori

    termoizolatie 15 cm

    sapa egalizare beton 3 cm

    strat suport termoizolatie 6 cm

    strat DDChidroizolatie

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cmsuport prindere tavan falstavan fals placi gips carton

    hidroizolatiestrat d.d.c.(decompresie, difuzie, compensare)strat protectia termoizolatiei 5 cmsapa de egalizarebeton de panta 10%folie PVCtermoizolatie(polistiren extrudat 10 cm)bariera de vaporisapa de egalizareplaca b.a. 20 cmsuport prindere tavan falstavan fals placi gips carton

    turn

    buzunar de fundspatiulexpozitional

    spatiulexpozitional cabina desunet

    buzunar lateral

    scenaavanscena

    tabloulelectric curatatorie atelierproductie

    decoruri fosa actori

    adapost ALA

    5 %

    cabina 3 actori

    sala de lecturavopsea lavabila interiortencuiala mortar varzidarie caramida 15 cmtencuiala mortar varvopsea lavabila interior

    5 % 5 %

    ateliertehnoredactare si

    publicitate

    atelier productiepapusi simarionete

    piatrastrat de poza(adeziv)

    sapa de egalizarefolie PVC

    fonoizolatieplaca b.a. 15 cm

    hidroizolatiesapa suport folie polietilena

    balast compactat 20 cmpamant natural

    strat de uzurasapa de egalizare 2 cmplanseu beton armat 8 cmretea grinzi metalice

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cm

    0.40 0.40 0.40 0.40 0.400.40 0.40

    2 3 4 5 6 7 9 11 12 14 15 17 19 20 21 231

    232120191712119765432 15141

    balast compactat 20 cmpamant natural

    strat suport 3 cmstrat suport 3 cm

    beton panta 10 %placa ba 13 cm

    +0.75+0.45

    0.00-0.15

    +0.75 +0.75

    +5.20

    +1.00+1.50

    +2.00

    +8.40

    +2.00

    +5.20

    +9.00

    +12.00

    +14.00

    +12.00

    +14.00

    +12.00

    +14.00

    +8.50

    +5.80

    +4.80

    +0.75

    -2.75 -2.75 -2.75

    +3.75

    5 %5 %

    Sala de repetitii,sala experimentaladepozit decor

    birou scenograf birou regizorcabina colectiva 6 actoricabina 3 actoricabina colectiva 5 actori

    portarwindfang casa scarii

    KLOR I E

    -2.75

    +0.75+0.75

    strat protectie termoizolatie 3 cm

    bariera vapori

    termoizolatie 15 cm

    sapa egalizare beton 3 cm

    strat suport termoizolatie 6 cm

    strat DDChidroizolatie

    strat suport 3 cmstrat suport 3 cm

    beton panta 10 %placa ba 13 cm

    +4.50

    D B A

    -2.75

    KLOR I E D B A

    -2.75

    -2.00sala de repetitie lectura la masaatelier reparatii si

    intretineredepozit costume

    grup sanitarCafenea/ceainarie+

    spatiu de joaca

    Cafenea/ceainarie+terasa

    -2.75

    +4.00

    -2.75

    0.00

    +5.70

    vopsea lavabila interiortencuiala mortar varzidarie caramida 15 cmtencuiala mortar varvopsea lavabila interior

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cmsuport prindere tavan falstavan fals placi gips carton

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cm

    dusumeasapa de egalizare

    folie PVCfonoizolatie

    placa b.a. 15 cmhidroizolatie

    sapa suport folie polietilenabalast compactat 20 cm

    pamant natural

    parchetsapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmhidroizolatiesapa suport folie polietilenabalast compactat 20 cmpamant natural

    +4.80

    0.00

    +6.00

    +0.75

    strat protectie termoizolatie 3 cm

    bariera vapori

    termoizolatie 15 cm

    sapa egalizare beton 3 cm

    strat suport termoizolatie 6 cm

    strat DDChidroizolatie

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cmsuport prindere tavan falstavan fals placi gips carton

    hidroizolatiestrat d.d.c.(decompresie, difuzie, compensare)strat protectia termoizolatiei 5 cmsapa de egalizarebeton de panta 10%folie PVCtermoizolatie(polistiren extrudat 10 cm)bariera de vaporisapa de egalizareplaca b.a. 20 cmsuport prindere tavan falstavan fals placi gips carton

    turn

    buzunar de fundspatiulexpozitional

    spatiulexpozitional cabina desunet

    buzunar lateral

    scenaavanscena

    tabloulelectric curatatorie atelierproductie

    decoruri fosa actori

    adapost ALA

    5 %

    cabina 3 actori

    sala de lecturavopsea lavabila interiortencuiala mortar varzidarie caramida 15 cmtencuiala mortar varvopsea lavabila interior

    5 % 5 %

    ateliertehnoredactare si

    publicitate

    atelier productiepapusi simarionete

    piatrastrat de poza(adeziv)

    sapa de egalizarefolie PVC

    fonoizolatieplaca b.a. 15 cm

    hidroizolatiesapa suport folie polietilena

    balast compactat 20 cmpamant natural

    strat de uzurasapa de egalizare 2 cmplanseu beton armat 8 cmretea grinzi metalice

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cm

    0.40 0.40 0.40 0.40 0.400.40 0.40

    2 3 4 5 6 7 9 11 12 14 15 17 19 20 21 231

    232120191712119765432 15141

    balast compactat 20 cmpamant natural

    strat suport 3 cmstrat suport 3 cm

    beton panta 10 %placa ba 13 cm

    +0.75+0.45

    0.00-0.15

    +0.75 +0.75

    +5.20

    +1.00+1.50

    +2.00

    +8.40

    +2.00

    +5.20

    +9.00

    +12.00

    +14.00

    +12.00

    +14.00

    +12.00

    +14.00

    +8.50

    +5.80

    +4.80

    +0.75

    -2.75 -2.75 -2.75

    +3.75

    5 %5 %

    Sala de repetitii,sala experimentaladepozit decor

    birou scenograf birou regizorcabina colectiva 6 actoricabina 3 actoricabina colectiva 5 actori

    portarwindfang casa scarii

    KLOR I E

    -2.75

    +0.75+0.75

    strat protectie termoizolatie 3 cm

    bariera vapori

    termoizolatie 15 cm

    sapa egalizare beton 3 cm

    strat suport termoizolatie 6 cm

    strat DDChidroizolatie

    strat suport 3 cmstrat suport 3 cm

    beton panta 10 %placa ba 13 cm

    +4.50

    D B A

    -2.75

    KLOR I E D B A

    -2.75

    -2.00sala de repetitie lectura la masaatelier reparatii si

    intretineredepozit costume

    grup sanitarCafenea/ceainarie+

    spatiu de joaca

    Cafenea/ceainarie+terasa

    -2.75

    +4.00

    -2.75

    0.00

    +5.70

    vopsea lavabila interiortencuiala mortar varzidarie caramida 15 cmtencuiala mortar varvopsea lavabila interior

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cmsuport prindere tavan falstavan fals placi gips carton

    parchet lemn stratificatstrat de poza(adeziv)sapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmtermoizolatie polistiren expandat 10 cm

    dusumeasapa de egalizare

    folie PVCfonoizolatie

    placa b.a. 15 cmhidroizolatie

    sapa suport folie polietilenabalast compactat 20 cm

    pamant natural

    parchetsapa de egalizarefolie PVCfonoizolatieplaca b.a. 15 cmhidroizolatiesapa suport folie polietilenabalast compactat 20 cmpamant natural

    +4.80

    0.00

    +6.00

    +0.75

    -1.30

    rondouri flori

    PP+1

    P+1

    PP

    P

    P

    P

    P+1

    P

    P inaltat

    P inaltat

    P inaltat

    P inaltat

    P inaltat

    P inaltat

    turnul scenei

    14 mAcces

    principal

    Acces depozit

    decoruriAcces

    actori,

    personal

    Iesire de

    incendiu

    Acces

    parcare

    subterana

    Acces auto

    Acces centru

    de creatie

    N'

    iarba

    ornamentala

    amfiteatru in

    aer liber

    amfiteatru in aer liber

    iarba

    ornamentala

    iarba

    ornamentala

    iarba

    ornamentala

    iarba

    ornamentala iarba

    ornamentala

    cafenea

    Acces

    parcare

    subterana

    N

    Site map Transversal section

    Longitudinal section

    pg. 20

  • Creative center for children and puppet theater

    F

    F

    3.60

    3.60

    40

    6.30

    50

    6.00

    6.00

    50

    4.10

    4.50

    4.50

    4.50

    7.80

    6.00

    3.00

    13.20

    9.50

    30 1.3011.20

    1.40 309.60

    0.50

    5.50

    0.50

    6.10

    4.00

    6.09

    50

    7.50

    1.10

    4.90

    9060 30

    1.001.50

    1.00

    2.20

    60 501.00

    2.50

    1.00

    3.40

    6040

    2.25

    801.50

    3.30

    31.30

    10.80

    7.20

    4.00

    1.70

    1.56

    9050

    90

    3.90

    1.00

    5.30

    3.50

    5.20

    60

    8.30

    1.20

    1.70

    2.50

    1.70

    70

    63.30

    17.60

    7.20

    24.70

    11.307.30

    7.40

    7.004.60

    4.70

    13.40

    9.80

    47.40

    14.57

    40

    9.281.70

    40

    depozit decor

    S=15.00 m2

    dusumea

    windfang

    S=20.40 m2

    piatra

    avanscena

    S=9.65 m2

    buzunar lateral

    S=31.20 m2

    buzunar lateral

    S=31.20 m2

    garderoba

    S=20.10 m2

    parchet

    regrupare actori

    S=12.80 m2

    garderoba

    S=33.60 m2

    parchet

    scena

    S=64.00 m2

    lemn

    buzunar de fund

    S=27.70 m2

    cabina proiectie

    S=13.50 m2

    parchet

    cabina lumini

    S=13.50 m2

    parchet

    cabina colectiva 6 actori

    S=30.00 m2

    parchet

    cabina 3 actori

    S=19.00 m2

    parchet

    cabina 2 actori

    S=15.30 m2

    parchet

    cabina colectiva 5 actori

    S=25.70 m2

    parchet

    birou scenograf

    S=12.70 m2

    parchet

    depozit decor

    S=45.00 m2

    dusumea

    portar

    S=13.50 m2

    dusumea

    regrupare actori

    S=12.80 m2

    cabina 4 actori

    S=24.40 m2

    parchet

    masinisti

    S=22.20 m2

    parchet

    cabina machiaj

    S=16.50 m2

    parchet

    cabina sunet

    S=11.10 m2

    parchet

    Casa bilete

    S=10.00 m2

    piatra

    0.00

    +0.45

    +0.75

    +0.45

    +0.75

    +0.45

    +0.75

    sala spectacole

    S=190.00 m2

    parchet

    GS

    S=54.20 m2

    gresie

    Sala de repetitii,

    sala experimentala

    S=145.00 m2

    parchet

    0.00

    0.00

    -0.15

    +0.75

    cabina 2 actori

    S=15.30 m2

    parchet

    +0.75

    -0.95

    +0.75

    portal scena

    fosa papusari

    S=12.00m2hol

    S=73.00 m2

    dusumea

    windfang

    S=7.60 m2

    casa scarii

    S=32.00 m2

    dusumea

    hol

    S=17.00 m2

    dusumea

    casa scarii

    S=25.20 m2

    birou regizor

    S=13.70 m2

    parchet

    scara pt turncortina

    panou expunere

    tablouri

    sculpturi panou expunere

    tablouri

    sculpturi

    spatiu expozitional,

    foaier

    S=230.00 m2

    piatra

    foaier

    S=220.00 m2

    piatra

    GS F

    S=16.20 m2

    gresie

    GS B

    S=18.50 m2

    gresie

    hol

    S=34.00 m2

    dusumea

    A

    E

    GH

    K

    L

    OP

    R

    12

    3

    4

    5

    67

    8

    9

    10

    1112

    14

    13

    15

    17

    16B

    D

    4

    3

    A

    A

    AI

    NR

    -1.80

    -1.30

    -2.75

    +3.20

    +0.70

    -0.30

    +5.30

    +5.80

    +9.80

    -0.80

    +0.70

    +0.70

    +0.70

    +2.20

    vestiar baieti

    S=37.00 m2

    gresie

    vestiar fete

    S=37.00 m2

    gresie

    sala studiu dansuri traditionale

    S=38.30 m2

    parchet

    sala studiu dansuri contemporane

    S=31.00 m2

    parchet

    E 1

    sala studiu instrumente muzicale

    S=39.50 m2

    parchet

    sala studiu limbi straine

    S=29.50 m2

    parchet

    atelier arta teatrala

    S=30.00 m2

    parchet

    atelier pantomima

    S=28.00 m2

    parchet

    GS

    S=36.30 m2

    gresie

    atelier de grafica si pictura

    S=40.00 m2

    pardoseala cauciucata

    atelier fotografie

    S=40.00 m2

    parchet

    atelier sculptura

    S=37.30 m2

    pardoseala cauciucata

    depozit

    S=17.00 m2

    pardoseala

    cauciucata

    atelier lucru manual

    S=30.50 m2

    parchetGS

    S=40.00 m2

    gresie

    atelier de aeromodele

    S=31.00 m2

    parchet

    windfang

    S=18.20 m2

    piatrahol

    S=32.60 m2

    piatra

    cabinet medical

    S=20.00 m2

    piatra

    biblioteca

    S=67.30 m2

    piatra

    club internet

    S=52.00m2

    piatra

    cafenea

    S=76.60 m2

    piatra

    bar

    S=14.00 m2

    piatra

    depozit

    S=4.50 m2

    piatra

    +4.30

    +6.80

    +9.80

    +7.80

    +3.80

    +3.80

    +5.80

    +11.8

    +11.8

    +11.8

    +7.80

    +7.80

    16

    rondouri flori

    Acces principal

    Acces depozit

    decoruri

    Acces actori,

    personal

    Iesire de incendiu

    Acces parcare

    subterana

    Acces auto

    Acces centru de

    creatie

    iarba ornamentala

    iarba ornamentala

    iarba ornamentala

    iarba ornamentala

    iarba ornamentala

    amfiteatru in aer liber

    amfiteatru in aer liber

    iarba ornamentala

    Ground floor

    pg. 21

  • furniture surveychest of drawers, XIX century

    pg. 22

  • furniture surveychest of drawers, XIX century STUDENTE: ALBU DIANA, MERLOI ADINA, LUNG MANUELA, DARABAN PATRICIACOMODA NEOBAROCA - RELEVEU 3

    1,05

    8

    1,05

    3

    480

    465

    Vedere laterala, Sc. 1:5

    A

    A

    fisuri existente

    4042

    6325

    725

    1879

    2512

    20

    1,06

    3

    890

    900.0

    1,05

    3

    S1

    S2

    S2

    S2

    S1

    S1

    S2

    S2

    Vedere frontala, Sc. 1:5

    B B

    S2 S2

    S2 S2

    S1 S2

    S2 S1

    Schema de dispunereactuala a sertarelor

    Side view Front view

    pg. 23

  • STUDENTE: ALBU DIANA, MERLOI ADINA, LUNG MANUELA, DARABAN PATRICIACOMODA NEOBAROCA - RELEVEU 6

    467

    900

    Vedere de sus, Sc. 1:5

    66 346 32 346 66

    466

    856

    Vedere de sus cu capacul deschis Sc. 1:5

    STUDENTE: ALBU DIANA, MERLOI ADINA, LUNG MANUELA, DARABAN PATRICIACOMODA NEOBAROCA - RELEVEU 6

    467

    900

    Vedere de sus, Sc. 1:5

    66 346 32 346 66

    466

    856

    Vedere de sus cu capacul deschis Sc. 1:5

    STUDENTE: ALBU DIANA, MERLOI ADINA, LUNG MANUELA, DARABAN PATRICIACOMODA NEOBAROCA - RELEVEU 6

    467

    900

    Vedere de sus, Sc. 1:5

    66 346 32 346 66

    466

    856

    Vedere de sus cu capacul deschis Sc. 1:5furniture survey

    chest of drawers, XIX century

    Top view

    Top view opened

    pg. 24

  • STUDENTE: ALBU DIANA, MERLOI ADINA, LUNG MANUELA, DARABAN PATRICIACOMODA NEOBAROCA - RELEVEU 7

    38 29 368 21 368 29 38890

    1,06

    3

    1,05

    340

    4263

    688

    6218

    7925

    1224

    145

    2529

    1514

    025

    1513

    025

    1513

    025

    1513

    028

    100

    2012

    900

    820 2

    15 334 152 22 2

    15 334 152 20

    8

    Det 1

    Det 3

    interiorsertar

    interiorsertar

    interior sertar

    interiorsertar

    interiorsertar

    interiorsertar

    interiorsertar

    interiorsertar

    gol gol

    interiorcapac

    interiorcapac

    Sectiuni AA, Sc. 1:5

    sectiune intuitiva

    furniture surveychest of drawers, XIX century

    STUDENTE: ALBU DIANA, MERLOI ADINA, LUNG MANUELA, DARABAN PATRICIACOMODA NEOBAROCA - RELEVEU 8

    890

    900.0

    61 373 21 373 61

    1,06

    340

    4263

    2572

    518

    7925

    1234

    1,05

    3

    Vedere spate intuitiva, Sc. 1:5

    B B

    gol gol

    15.0

    2513

    25

    70

    51

    24 2

    furnir din lemn de nuc

    cadru nou de rezemare capac din lemn de brad

    cornisa profilata din lemn de nuc

    Det 1, Sc. 1:1

    interiorcapac

    exterior

    placa de lemn ce apartine capacului

    antablament furniruit cu lemn de nuc

    STUDENTE: ALBU DIANA, MERLOI ADINA, LUNG MANUELA, DARABAN PATRICIACOMODA NEOBAROCA - RELEVEU 941

    4262

    26

    35 4 29

    58

    17 2 15

    2628

    215

    Det 3, Sc. 1:1

    golexterior

    interior sertar

    perete lateral sertar realizat din lemn de rasinoase

    cadru profilat din lemn de nuc

    perete lateral realizat din lemn de rasinoase

    brau soclu din lemn de nuc

    soclu din lemn de rasinoasefurniruit cu lemn de nuc

    baza soclului din lemn de nuc

    chenar profilat din lemn de nuc

    furnir de lemn de nuc

    Det 1

    Det 3

    pg. 25

  • industrial area restructure pg. 26

  • industrial area restructure

    ETAPIZARE

    1. keeping some existing build-ings

    2. proposal of new streets

    3. parceling proposal having the existing plot as back-

    4. proposal of new buildings on the new plot

    pg. 27

  • bussiness project weekMe and my team had to design a showroom in 2 spaces in which to present the companys products. The first room is also a meeting room and the second room is also a dining room. We created a magnetic wall, a wall with pictures, a place where you could see all the layers of a wall, a wall with boxes for different kind of metal profiles and a special table.

    pg. 28

  • models and workshops techniqueschairsIn the first part of the course I had to work alone and to create several models and prototypes of a lying / sitting / hanging / standing - object. In this way I had to experiment with different ma-terials and techniques in the laboratory. I used: metal, wood, platics and textile.

    pg. 29

  • models and workshops techniqueschairsIn the second part of the course I had to work in a team and to transform an old chair into a new one, by combining the olds chair materials with new materials.

    pg. 30

  • the stairshouse of an architectHere I had to design a living space comprising steps only. The house was meant only for one per-son and it should consist only in staircases, leading from the entrance to the exit. Walls , pil-lars, ramps and ladders were not allowed.

    pg. 31

  • watertower transformationAt this project me and my team had to trasform the watertower from Zwolle into a hostel.

    -2,70

    -1,75

    -0,30

    0,00

    +2,51

    +7,45+7,65

    +10,35

    +10,65+10,85

    +13,55

    +13,85+14,05

    +16,75

    +17,05+17,25

    +19,75

    +20,05+20,25

    +22,95

    +23,80

    +24,90

    +28,20

    +31,30

    +32,10

    +32,40

    +37,90

    950

    1 43

    032

    02

    505

    4 94

    517

    22

    728

    300

    180

    2 72

    030

    018

    02

    720

    300

    180

    2 72

    329

    718

    027

    201

    428

    320

    3 30

    03

    100

    800

    330

    5 47

    6

    STAY OKAY HOTEL ZWOLLEm2: [1447]m3: [4198]stories : [11]

    To rent:rooms: [15]persons: [90]

    meeting rooms [2] - 70m2restaurant [1] - 158m2

    THE NEED TO

    EXPRESS

    We want to create an industrial look

    This is what the watertower represented

    The furniture like desks; topping; ta-bles for self service will have an solid white look. Copro Ned is a good ma-terial, but expensive

    We DEVIDE industrial look into two;

    - warm look where peo-ple are going to be

    - cold industrial water tower look for the other

    Tower section Materials PlansPROJECT: WATERTOWER zwolle - transformationDesigned by: Jorn van Gijssel Manuela David Gert-Jan Post

    WWW

    2.578

    4.172

    4.172

    2.578

    13.500

    1.355 3.549 4.386 3.549 1.355

    14.195

    420

    2.158

    4.172

    4.172

    328

    1.831

    420

    2.578

    4.172

    4.172

    328

    2.25

    1

    13.500

    1.355 451 3.098 4.386 691 837 2.021 1.355

    14.195

    HallS=23,60 m2

    polished concrete-2,70

    StaircaseS=9,50 m2

    polished concrete

    Secondaryentrance

    -1,75

    Storage kitchenS=12,70 m2

    polished concrete

    Technical spaceS=20,40 m2

    polished concrete

    LaundryS=7,50 m2

    polished concrete

    A A

    3.09

    080

    087

    01.4

    501.4

    321.3

    703.22

    13.475

    192

    15.899

    2.26

    184

    688

    584

    64.172

    2.56

    93.49

    282

    7

    15.899

    3.477 1.599 1.440 1.506 1.440 4.904

    14.367

    HallS=28,30 m2

    polished concrete+13,85

    hanging object

    StaircaseS=9,50 m2

    polished concrete

    A A

    perforated sheet

    perforated sheet

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    Toilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    Relaxing areaS=28,30 m2

    perforated sheet

    461.2

    427403

    0233

    8 696

    1.242

    614

    109

    2.44

    029

    633

    346

    4.172

    2.578

    615

    17

    16.15

    9

    1.356 1.165247

    972 1.165420

    654 2.748 21 1.178247

    959 1.709 200 1.663

    14.702

    1.288

    740

    846

    885

    846

    4.172

    1.370

    1.588

    1.581

    2.84

    2

    16.15

    9

    1.032 3.397 475 1.440 1.506 1.440 1.165 1.218 1.165 1.356 507

    14.702

    HallS=38,00 m2

    polished concrete+10,65

    hanging object

    StaircaseS=9,50 m2

    polished concrete

    A A

    perforated sheet

    RoomS=16,55 m2

    polished concreteToilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone2.07

    91.794

    1.975

    4.33

    9749

    465

    850

    885

    2.59

    8

    15.73

    5

    1.360 3.559 2.756 1.637 1.325 928 1.170 589 2.846

    16.169

    447

    2.58

    64.184

    1.376

    1.432

    1.376

    2.58

    61.718

    29

    15.73

    5

    1.359 3.559 568 2.804 2.198 1.218 1.553 1.263 1.617 29

    16.169

    HallS=32,80 m2

    polished concrete+7,45

    hanging object

    Relaxing areaS=13,70 m2

    polished concrete

    Relaxing areaS=9,90 m2

    polished concrete

    Relaxing areaS=7,10 m2

    polished concrete

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    StaircaseS=9,50 m2

    polished concrete

    A A

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    1.360 3.559 4.399 3.559 1.359

    14.237

    202.56

    64.184

    4.184

    2.56

    620

    2.58

    64.184

    4.184

    2.58

    6

    13.540

    1.359 468 2.235 856 4.399 3.559 1.360

    14.237

    1.360 4.672 1.432 4.277 1.137 1.359

    Sitting areaS=11,10 m2

    polished concrete

    SecretaryS=9,70 m2

    polished concrete+2,51

    Slepping roomS=5,40 m2

    polished concrete

    StaircaseS=9,50 m2

    polished concrete

    A A

    Director officeS=15,10 m2

    polished concrete

    2.578

    4.172

    4.172

    657

    1.414

    506

    13.500

    1.355 3.549 4.386 3.549 1.355

    14.195

    5.02

    02.578

    4.172

    4.172

    328

    2.25

    1

    5.02

    013.500

    1.355 451 3.098 4.386 697 1.947 905 1.355

    14.195

    Entrance

    ReceptionS=27,10 m2

    polished concrete

    Waiting areaS=14,00 m2

    polished concrete

    Internet areaS=4,30 m2

    polished concrete

    Luggage roomS=4,30 m2

    Secondaryentrance

    ToiletsS=14,10 m2

    polished concrete

    0,00

    -1,75

    StaircaseS=9,50 m2

    polished concrete

    A A

    [4e] FOURTH FLOOR[3e] THIRD FLOOR

    [2e] SECOND FLOOR[1e] FIRST FLOOR

    GROUND FLOOR

    3.09

    080

    087

    01.4

    501.4

    321.3

    703.22

    13.475

    192

    15.899

    2.26

    184

    688

    584

    64.172

    2.56

    93.49

    282

    7

    15.899

    3.477 1.599 1.440 1.506 1.440 4.904

    14.367

    HallS=28,30 m2

    polished concrete+13,85

    hanging object

    StaircaseS=9,50 m2

    polished concrete

    A A

    perforated sheet

    perforated sheet

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    Toilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    Relaxing areaS=28,30 m2

    perforated sheet

    461.2

    427403

    0233

    8 696

    1.242

    614

    109

    2.44

    029

    633

    346

    4.172

    2.578

    615

    17

    16.15

    9

    1.356 1.165247

    972 1.165420

    654 2.748 21 1.178247

    959 1.709 200 1.663

    14.702

    1.288

    740

    846

    885

    846

    4.172

    1.370

    1.588

    1.581

    2.84

    2

    16.15

    9

    1.032 3.397 475 1.440 1.506 1.440 1.165 1.218 1.165 1.356 507

    14.702

    HallS=38,00 m2

    polished concrete+10,65

    hanging object

    StaircaseS=9,50 m2

    polished concrete

    A A

    perforated sheet

    RoomS=16,55 m2

    polished concreteToilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone2.07

    91.794

    1.975

    4.33

    9749

    465

    850

    885

    2.59

    8

    15.73

    5

    1.360 3.559 2.756 1.637 1.325 928 1.170 589 2.846

    16.169

    447

    2.58

    64.184

    1.376

    1.432

    1.376

    2.58

    61.718

    29

    15.73

    5

    1.359 3.559 568 2.804 2.198 1.218 1.553 1.263 1.617 29

    16.169

    HallS=32,80 m2

    polished concrete+7,45

    hanging object

    Relaxing areaS=13,70 m2

    polished concrete

    Relaxing areaS=9,90 m2

    polished concrete

    Relaxing areaS=7,10 m2

    polished concrete

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    StaircaseS=9,50 m2

    polished concrete

    A A

    RoomS=16,55 m2

    polished concrete

    Toilet+showerS=2,40 m2

    hone

    1.360 3.559 4.399 3.559 1.359

    14.237

    202.56

    64.184

    4.184

    2.56

    620

    2.58

    64.184

    4.184

    2.58

    6

    13.540

    1.359 468 2.235 856 4.399 3.559 1.360

    14.237

    1.360 4.672 1.432 4.277 1.137 1.359

    Sitting areaS=11,10 m2

    polished concrete

    SecretaryS=9,70 m2

    polished concrete+2,51

    Slepping roomS=5,40 m2

    polished concrete

    StaircaseS=9,50 m2

    polished concrete

    A A

    Director officeS=15,10 m2

    polished concrete

    2.578

    4.172

    4.172

    657

    1.414

    506

    13.500

    1.355 3.549 4.386 3.549 1.355

    14.195

    5.02

    02.578

    4.172

    4.172

    328

    2.25

    1

    5.02

    013.500

    1.355 451 3.098 4.386 697 1.947 905 1.355

    14.195

    Entrance

    ReceptionS=27,10 m2

    polished concrete

    Waiting areaS=14,00 m2

    polished concrete

    Internet areaS=4,30 m2

    polished concrete

    Luggage roomS=4,30 m2

    Secondaryentrance

    ToiletsS=14,10 m2

    polished concrete

    0,00

    -1,75

    StaircaseS=9,50 m2

    polished concrete

    A A

    [4e] FOURTH FLOOR[3e] THIRD FLOOR

    [2e] SECOND FLOOR[1e] FIRST FLOOR

    GROUND FLOOR

    MAX4 M

    SPATIAL CONCEPT

    EXISTING OPEN SPACE EXISTING TANK

    MAX30 M

    GROUND FLOOR [1e] FIRST FLOOR

    [3e] THIRD FLOOR

    pg. 32

  • De TUBES die we ontwerpen vormen geen bedreiging voor ons concept. Het voegt juist toe, om zo onze visie nog beter uit te beelden in ons ontwerp.

    Toilet en douche kunnen als een attachement worden gezien. Uitschuifbaar of eraan zetten, beide goed.

    FLEXIBILITEIT

    IMPRESSIES - SFEER

    IS het dak te gebruiken? FLEXIBILITEIT

    INTERESSANT

    Doordat we de trap niet meer spiraal in het gebouw ontwerpen hebben we meer vrijheid in het ontwerpen van de plattegronden.

    Het neerleggen van de tubes in de plattegrond is erg interessant in het to-taal concept. Je kan bijvoorbeeld de normale trap een beleving geven door deze tubes heen. [over, onder, zij e.d.]

    In vooraanzicht gezien zal in de donkere hoek van de toren een vaste kern ontstaan met vluchttrap en liften, zodat er geen problemen ontstaan bij het toetsen van het bouwbesluit.

    watertower transformationThe tubes

    pg. 33

  • watertower transformation

    Tower section

    Ground floor

    pg. 34

  • watertower transformation

    3rd floor 4th floor 5th floor

    9th floor7th floor 8th floor

    pg. 35

  • A|R|A - restauration schoolRecycle paper workshopPhotography workshopLight and landscape workshop

    workshop portfolio pg. 36

  • A|R|A - restauration school/www.simpara.roThe summer school took place in Rosia Montana, Romania. For two weeks the program was aimed at knowing the valuable heritage of the site, observing it in his artistic and technical, social and economic, landscape and natural valences. Theoretical component of the school was supported by lectures and discussions. Practical activities included documenting architectural heritage through surveys, photographs and records, and practical work of restoration materials and traditional techniques .

    pg. 37

  • recycle paper workshopAt this workshop I learned how to recycle paper. In the end I had to make from the paper I created a lamp.

    pg. 38

  • photography workshop pg. 39

  • Light and landscape workshopThe workshop was theoretical and practical. It was supervised by Ms. Katja Perrey (landscape design) and Dr. Dorin Beu (lighting). In the beginning they taught us the rules how to light a landscape and after that we went on the field. The practical part took place during the evening, in Cluj Napoca, Ro-mania, on a hill inside the city, named Cetatuia.

    pg. 40

  • Amateur photography

    personal portfolio pg. 41

  • amateur photographyinterior

    pg. 42

  • pg. 43amateur photographyexterior

    pg. 43

  • amateur photographyexterior

    pg. 44