PORTFOLIO ADDITIONAL
ESTIMATES STATEMENTS 2012-13
DEFENCE PORTFOLIO
EXPLANATIONS OF ADDITIONAL ESTIMATES 2012-13
Defence Portfolio Additional Estimates Statements 2012-13
ii
© Commonwealth of Australia 2012
ISBN 978-0-642-29773-0
This publication is available for your use under a Creative Commons BY Attribution 3.0 Australia licence, with the exception of the Commonwealth Coat of Arms, the Department of Defence and Defence Housing Australia logo, photographs, images, signatures and where otherwise stated. The full licence terms are available from http://creativecommons.org/licenses/by/3.0/au/legalcode.
Use of the Department of Defence’s material under a Creative Commons BY Attribution 3.0 Australia licence requires you to attribute the work (but not in any way that suggests that the Department of Defence endorses you or your use of the work).
Department of Defence material used 'as supplied'
Provided you have not modified or transformed the Department of Defence material in any way including, for example, by changing the text; calculating percentage changes; graphing or charting data; or deriving new statistics from published Department of Defence statistics – then the Department of Defence prefers the following attribution:
Source: The Australian Government Department of Defence
Derivative material
If you have modified or transformed the Department of Defence ‘s material, or derived new material from those of the Department of Defence in any way, then the Department of Defence prefers the following attribution:
Based on The Australian Government Department of Defence’s data.
Defence Housing Australia material used 'as supplied'
Provided you have not modified or transformed the Defence Housing Australia material in any way including, for example, by changing the text; calculating percentage changes; graphing or charting data; or deriving new statistics from published Defence Housing Australia statistics – then the Defence Housing Australia prefers the following attribution:
Source: The Australian Government Defence Housing Australia
Derivative material
If you have modified or transformed the Defence Housing Australia‘s material, or derived new material from those of the Defence Housing Australia in any way, then the Defence Housing Australia prefers the following attribution:
Based on The Australian Government Defence Housing Australia’s data.
iii
Use of the Coat of Arms
The terms under which the Coat of Arms can be used are set out on the It’s an Honour website (see www.itsanhonour.gov.au)
Other Uses
Inquiries regarding this licence and any other use of this document are welcome at:
Director Chief Finance Officer Coordination R1-2-C003 Department of Defence PO Box 7900 Canberra BC ACT 2610 Telephone: (02) 6265 5341 Email: [email protected]
Defence Portfolio Additional Estimates Statements 2012-13
iv
Defence Portfolio Additional Estimates Statements 2012-13
vi
Abbreviations and Conventions
The following notations may be used:
NEC/nec not elsewhere classified
- nil
.. not zero, but rounded to zero
na not applicable (unless otherwise specified)
nfp not for publication
$m $ million
$b $ billion
Figures in tables and in the text may be rounded. Figures in text are generally rounded to one decimal place, whereas figures in tables are generally rounded to the nearest thousand. Discrepancies in tables between totals and sums of components are due to rounding.
Enquiries
Should you have any enquiries regarding this publication please contact:
Chief Finance Officer R1-2-C001 Department of Defence PO Box 7900 Canberra BC ACT 2610 Telephone: (02) 6265 5341 Email: [email protected]
A copy of this document can be located on the Australian Government Budget website at:
<http://www.budget.gov.au>.
References
Previous years’ Defence Portfolio Budget Statements, Portfolio Additional Estimates Statements and Annual Reports can be found at <www.defence.gov.au/budget/>.
vii
User Guide to the
Portfolio Additional Estimates
Statements
Defence Portfolio Additional Estimates Statements 2012-13
viii
User Guide The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget Statements (PB Statements), is to inform Senators and Members of Parliament of the proposed allocation of resources to Government outcomes by agencies within the portfolio. The focus of the PAES differs from the PB Statements in one important aspect. While the PAES include an Agency Resource Statement to inform Parliament of the Revised Estimate of the total resources available to an agency, the focus of the PAES is on explaining the changes in resourcing by outcome(s) since the Budget. As such, the PAES provides information on new measures and their impact on the financial and/or non-financial planned performance of programs supporting those outcomes.
The PAES facilitate understanding of the proposed appropriations in Appropriation Bills (No. 3 and No. 4) 2012-13. In this sense the PAES is declared by the Additional Estimates Appropriation Bills to be a 'relevant document' to the interpretation of the Bills according to section 15AB of the Acts Interpretation Act 1901.
Whereas the Mid Year Economic and Fiscal Outlook 2012-13 is a mid-year budget report which provides updated information to allow the assessment of the Government's fiscal performance against its fiscal strategy, the PAES update the most recent budget appropriations for agencies within the portfolio.
Defence Portfolio Additional Estimates Statements 2012-13
x
Table of Contents
11
Table of Contents User Guide.......................................................................................................................................................... viii
Structure of the Portfolio Additional Estimates Statements........................................................................ ix
Table of Contents .................................................................................................................................................11
PORTFOLIO OVERVIEW..................................................................................................................................14
Ministers and their Portfolio Responsibilities ...............................................................................................15
Portfolio Structure and Outcomes ......................................................................................................................16
Portfolio Resource Statement...............................................................................................................................17
Portfolio Workforce...............................................................................................................................................20
DEPARTMENT OF DEFENCE..........................................................................................................................24
Section 1: Defence Overview and Resources ..................................................................................................24
1.1 Strategic Direction Statement ........................................................................................................................24
1.2 Defence Resourcing.........................................................................................................................................28
1.3 Funding from Government............................................................................................................................36
1.4 Capital Investment Program..........................................................................................................................41
1.5 People................................................................................................................................................................43
Section 2: Outcomes and Planned Performance .............................................................................................48
2.1 Outcomes and Performance Information.....................................................................................................48
Section 3: Explanatory Tables and Budgeted Financial Statements ...........................................................78
3.1 Explanatory Tables..........................................................................................................................................78
3.2 Budgeted Financial Statements .....................................................................................................................82
3.3 Consolidated Budgeted Financial Statements for the Department of Defence (including DMO) .......97
Appendices..........................................................................................................................................................102
Appendix A..........................................................................................................................................................103
Appendix B ..........................................................................................................................................................104
Appendix C..........................................................................................................................................................105
Appendix D..........................................................................................................................................................114
Appendix E ..........................................................................................................................................................118
Appendix F...........................................................................................................................................................125
Defence Portfolio Additional Estimates Statements 2012-13
12
DEFENCE MATERIEL ORGANISATION ...................................................................................................128
Section 1: Agency Overview and Resources .................................................................................................128
1.1 Strategic Direction Statement ......................................................................................................................128
1.2 DMO Resource Statement ............................................................................................................................131
1.3 Agency Measures Table................................................................................................................................132
1.4 Additional Estimates and Variations..........................................................................................................132
1.5 Breakdown of Additional Estimates by Appropriation Bill ....................................................................132
1.6 People..............................................................................................................................................................133
Section 2: Outcomes and Planned Performance ...........................................................................................134
2.1 DMO Outcomes and Performance Information........................................................................................135
Section 3: Explanatory Tables and Budgeted Financial Statements .........................................................165
3.1 Explanatory Tables........................................................................................................................................165
3.2 DMO Budgeted Financial Statements ........................................................................................................168
DEFENCE HOUSING AUSTRALIA ..............................................................................................................176
Section 1: DHA Overview and Resources .....................................................................................................176
Section 2: Outcomes and Planned Performance ...........................................................................................176
Section 3: Explanatory Tables and Budgeted Financial Statements .........................................................176
APPENDICES .....................................................................................................................................................177
Glossary ...............................................................................................................................................................178
Acronyms and Abbreviations ..........................................................................................................................184
13
Portfolio Overview
Defence Portfolio Additional Estimates Statements 2012-13
14
Portfolio Overview The Defence portfolio consists of a number of component organisations that together are responsible for supporting the defence of Australia and its national interests. The three most significant bodies are:
the Department of Defence—a department of state, headed by the Secretary of the Department of Defence
the Australian Defence Force (ADF)—which consists of the three Services, Navy, Army and the Air Force (including Reserves) commanded by the Chief of the Defence Force (CDF). Each Service Chief also administers their respective Cadet service, although the Cadet service is not a component of the parent Service
the Defence Materiel Organisation (DMO)—a prescribed agency within the Department of Defence, headed by its Chief Executive Officer (CEO) DMO.
In practice, these bodies have to work together closely and are broadly regarded as one organisation known simply as Defence (or the Australian Defence Organisation).
The portfolio also contains some smaller entities, including a number of statutory offices created by the Defence Force Discipline Act, 1982 which are independent but reside administratively within Defence and various trusts and companies such as Defence Housing Australia (DHA) and the Australian Strategic Policy Institute.
DHA's main function is to provide adequate and suitable housing for members of the ADF. DHA is an enterprise within the Defence portfolio and has two shareholder Ministers: the Minister for Defence, the Hon Stephen Smith MP; and the Minister for Finance and Deregulation, Senator the Hon Penny Wong.
DHA is required by legislation to perform its functions in accordance with the policies of the Australian Government and in accordance with sound commercial practice. This means that DHA has a targeted rate of return and a requirement to make annual dividends and income tax payments.
The Minister for Defence's portfolio also contains the Department of Veterans' Affairs and associated bodies, as it is designated as part of the Defence portfolio in the Administrative Arrangements Order. The Department of Veterans' Affairs is administered separately to Defence.
Portfolio Overview
15
Ministers and their Portfolio Responsibilities
No changes have been made to Ministers and their Portfolio Responsibilities since the Portfolio Budget Statements 2012-13.
Portfolio Overview
17
Portfolio Resource Statement
Table 1: Portfolio Resources[1]
DepartmentalBill No. 3
$m
AppropriationBill No. 4
$m
Section 10Appropriation
Act (No.1)
2012-13[3]
$m
Return to the OPA
$m
Special Appropriation
$m
Total Appropriation
$m
Non-Appropriation
Receipts
$m
Other Non-Appropriated
Items[2]
$m
TotalResources
Available
$m
Department of Defence
Administered appropriations - - - - - - - - -
Departmental appropriations - 468.8 -366.5 76.2 - 178.5 -60.7 - 117.8
Total Department of Defence - 468.8 -366.5 76.2 - 178.5 -60.7 - 117.8
DepartmentalBill No. 3
$m
AppropriationBill No. 4
$m
Section 10Appropriation
Act (No.1)2012-13
$m
Return to the OPA
$m
Special Appropriation
$m
Total Appropriation
$m
Non-Appropriation
Receipts
$m
Other Non-Appropriated
Items
$m
TotalResources
Available
$m
Defence Materiel Organisation
Administered appropriations[4]- - - - - - - - -
Departmental appropriations - - -17.4 - - -17.4 110.6 - 93.2
Total Defence Materiel Organisation - - -17.4 - - -17.4 110.6 - 93.2
DepartmentalBill No. 3
$m
AppropriationBill No. 4
$m
Section 10Appropriation
Act (No.1)2012-13
$m
Return to the OPA
$m
Special Appropriation
$m
Total Appropriation
$m
Non-Appropriation
Receipts
$m
Other Non-Appropriated
Items
$m
TotalResources
Available
$m
Defence Housing Australia
Administered appropriations - - - - - - - - -
Departmental appropriations - - - - - - - - -
Total Defence Housing Australia - - - - - - - - -
Total Portfolio - 468.8 -383.9 76.2 - 161.1 49.9 - 211.0
Notes 1. Figures shown include inter-agency transactions. 2. Represents interest on DHA loans taken out prior to 30 June 2008 reported against non-appropriation receipts. 3. Defence will seek a determination by the Minister for Finance and Deregulation, under Section 10 of the Appropriation Act (No. 1) 2012-13, to decrease the Departmental outcome appropriation. 4. DMO receives interest receipts from overseas bank accounts which are returned to the OPA and do not form part of DMO's resources. The revised estimate for 2012-13 is $4.3m.
Defence Portfolio Additional Estimates Statements 2012-13
18
Table 2: Total Departmental and Administered Consolidated Cash Budget for the Department of Defence (including DMO)[1]
2012-13RevisedBudget
$m
APPROPRIATIONS AND CAPITAL
Appropriation (Bill 1)[2]23,846.4
Appropriation - Contributed Equity (Bill 2) -
Appropriation (Bill 3) -
Appropriation (Bill 4) 468.8
Appropriations for military superannuation[3]2,019.9
less Returns to the OPA -1,363.0
Total cash available 24,972.0
OPERATING ACTIVITIES
Cash received
Goods and services 475.8
Net GST received 1,186.5
Interest 32.0
Other cash 206.2
Fees 10.0
Total cash received 1,910.4
Cash used
Employees 9,237.9
Suppliers 8,824.6
Net GST paid 1,186.5
Grants 71.7
Other cash 195.4
Subsidies paid 109.2
Military benefits 1,910.6
Total cash used 21,535.9
Net cash from or (used by) operating activities -19,625.5
INVESTING ACTIVITIES
Cash received
Proceeds from sales of land and buildings 44.5
Proceeds from sales of infrastructure, plant and equipment 28.7
Dividends 48.6
Other -
Total cash received 121.9
Cash used
Purchase of land and buildings 859.0
Purchase of infrastructure, plant and equipment 246.2
Purchase of specialist military equipment 3,261.6
Purchase of intangibles 13.8
Purchase of inventory 897.1
Selling costs on sale of assets 8.4
Finance costs 77.5
Total cash used 5,363.5
Net cash from or (used by) investing activities -5,241.7
Portfolio Overview
19
Table 2 (cont’d): Total Departmental and Administered Consolidated Cash Budget for the Department of Defence (including DMO)[1]
2012-13RevisedBudget
$m
FINANCING ACTIVITIES
Cash used
Repayment of debt 79.6
Total cash used 79.6
Net cash from or (used by) financing activities -79.6
Net increase or (decrease) in cash and cash equivalents held 25.3
Cash and cash equivalents at beginning of the reporting period 42.8
Effect of exchange rate movements on cash and cash equivalents -
Cash and cash equivalents at end of the reporting period 68.1
Notes 1. Figures shown eliminate interagency transactions and transactions flowing between Departmental and Administered funding. 2. Includes $943.0m of appropriation planned to be drawn down by DMO. 3. Cross reference with Table 65 Consolidated Budgeted Administered Statement of Cash Flows for the Department of Defence
(including DMO) for the period ended 30 June.
Defence Portfolio Additional Estimates Statements 2012-13
20
Portfolio Workforce
The Portfolio Budget Statements 2012-13 noted that following a period of historically low separation rates which led the Australian Defence Force (ADF) to exceed its budgeted workforce strength, the measures implemented to correct the overachievement had succeeded and the ADF workforce had returned to its budgeted strength.
Since then, changes in labour market conditions have led to increased separations as civilian employment opportunities for ADF personnel continue to grow. Recruiting, while relatively strong, is insufficient to compensate for the increased separations.
Consequently the military workforce has declined, and the Revised Estimate for 2012-13 is some 1,345 lower than the Budget Estimate.
In response, Defence has implemented the Defence Employment Offer project, aiming to provide a mechanism for identifying those elements of their employment that are important to ADF personnel, and facilitating the use of targeted retention initiatives.
The program of reductions to Defence’s Australian Public Service workforce outlined in the Portfolio Budget Statements 2012-13 is on track. From July 2012 to January 2013, Defence’s actual APS workforce has reduced from 22,159 to 21,147 (a reduction of 1,012 staff). During 2012-13, the separation rate for APS staff has been lower than originally anticipated as fewer APS left the department in the first half of the financial year than forecast. Under the DMO’s combined workforce management model, DMO can utilise funding from ADF positions that cannot be filled and this has the effect of increasing Defence’s APS workforce beyond its budgeted strength by an average of 384, even though its total workforce (civilian and military) is within the parameters.
Table 3: Defence and DMO Consolidated Workforce (Average)
2012-13Budget
Estimate
2012-13Revised
Estimate Variation
2013-14ForwardEstimate
2014-15ForwardEstimate
2015-16ForwardEstimate
ADF
ADF Permanent Force[1]58,636 56,751 -1,885 58,235 58,518 58,664
Reserves[2]21,650 22,190 540 22,645 22,895 23,095
1 Total ADF Workforce 80,286 78,941 -1,345 80,880 81,413 81,759
APS
Defence APS 15,651 15,731 80 15,476 15,115 14,934
DMO APS 5,544 5,406 -138 5,368 5,590 5,608
DMO APS Backfill - 384 384 - - -
2 Total APS 21,195 21,521 326 20,844 20,705 20,542
Contractor[3]
Defence Contractor 488 385 -103 448 445 447
DMO Contractor 48 48 - 48 48 46
3 Total Contractor 536 433 -103 496 493 493
Total Workforce (1+2+3) 102,017 100,895 -1,122 102,220 102,611 102,794
Notes 1. Numbers for ADF Permanent Force include ADF members in the DMO and Reservists on full-time service. 2. Numbers for Reserves include Active and High Readiness Reserve members and are actual reservists rendering service not
averages. 3. Contractors are individuals under contract performing agency roles. Contractors are not APS Employees.
21
Agency Resources and
Planned Performance
Department of Defence
Defence Materiel Organisation
Defence Housing Australia
Defence Portfolio Additional Estimates Statements 2012-13
22
Department of Defence
23
Department of Defence
Agency Resources and Planned Performance
Section 1: Defence Overview and Resources
1.1 Strategic Direction Statement
1.2 Defence Resourcing
1.3 Funding from Government
1.4 Capital Investment Program
1.5 People
Section 2: Outcomes and Planned Performance
2.1 Outcomes and Performance Information
Section 3: Explanatory Tables and Budgeted Financial Statements
3.1 Explanatory Tables
3.2 Budgeted Financial Statements
3.3 Consolidated Budgeted Financial Statements for the Department of Defence (including DMO)
Defence Portfolio Additional Estimates Statements 2012-13
24
Department of Defence
Section 1: Defence Overview and Resources
1.1 Strategic Direction Statement A full outline of the Department of Defence’s (Defence) Strategic Direction can be found in the Portfolio Budget Statements 2012-13.
Revised Policy Framework
No changes have been made to Revised Policy Framework since the Portfolio Budget Statements 2012-13.
Contribution to the Fiscal Strategy
No changes have been made to Contribution to the Fiscal Strategy since the Portfolio Budget Statements 2012-13.
Defence Reform
No changes have been made to Defence Reform since the Portfolio Budget Statements 2012-13.
Submarine Program Management
No changes have been made to Submarine Program Management since the Portfolio Budget Statements 2012-13.
Force Posture Review
No changes have been made to Force Posture Review since the Portfolio Budget Statements 2012-13.
Department of Defence
25
Cultural Reviews – Pathway to Change
Defence is continuing to implement its five-year cultural change program to deliver our cultural intent that we are “trusted to defend, proven to deliver, respectful always”. High priority has been given to Pathway to Change: Evolving Defence Culture, which will deliver a workplace culture that promotes diversity and the highest standards of behaviour to assure our people, the community and Government that Defence is fully inclusive, collaborative and professional in all respects. The culture change program now incorporates the 21 recommendations made in the Review into the Treatment of Women in the Australian Defence Force Phase 2 Report 2012, which was tabled in Parliament on 22 August 2012. In total, the program incorporates 175 key actions and culture review recommendations. To date, Defence has completed or implemented 44 of these and good progress is being made to implement the remainder in accordance with the Pathway to Change: Evolving Defence Culture Implementation Strategy.
On 26 November 2012, the Minister for Defence announced the Government's response to the Report of the DLA Piper Review into allegations of sexual or other forms of abuse in Defence. Defence's interaction with the Defence Abuse Response Taskforce will be facilitated by the Organisational Response Unit in the Cultural Reviews Response Branch of the Defence People Group. The Cultural Reviews Response Branch also includes the Organisational Development Unit, responsible for the coordination and facilitation of Pathway to Change: Evolving Defence Culture. Systematic issues highlighted by the response to the Defence Abuse Response Taskforce will be integrated into the Pathway to Change: Evolving Defence Culture strategy.
Relocation of Defence Units from Moorebank to Holsworthy
Defence is implementing a project to relocate units at Moorebank to support the Government's Moorebank Intermodal Freight Terminal (MIMT) project, which will be developed on Commonwealth owned, Defence occupied, land at Moorebank, NSW. The land currently houses thirteen Defence units, the largest of which is the Army's School of Military Engineering. The project is relocating these Defence units from Moorebank to the nearby Holsworthy Barracks by developing new purpose built facilities and enhancing existing barracks infrastructure. This project is being funded from the Government's MIMT initiative and the Defence Portfolio. Construction of the project works commenced in October 2012. The works will allow the relocation of Defence assets from Moorebank to Holsworthy by mid 2015, in accordance with MIMT program requirements. Some additional works not critical to the relocation will be completed by the end of 2015.
Defence Portfolio Additional Estimates Statements 2012-13
26
Senior Executive changes
Changes below reflect senior level movements that have occurred since the publication of the Portfolio Budget Statements 2012-13:
With effect 11 October 2012, Mr Duncan Lewis ceased as the Secretary of the Department of Defence.
With effect 18 October 2012, Mr Dennis Richardson commenced as the Secretary of the Department of Defence.
With effect 23 July 2012, Mr David Gould, commenced as General Manager Submarines within the Defence Materiel Organisation.
With effect 29 January 2013, Mr Steven Grzeskowiak commenced as the Deputy Secretary Defence Support and Reform, Department of Defence.
With effect 16 November 2012, Mr Greg Farr ceased as the Chief Information Officer, Department of Defence.
With effect 26 November 2012, Dr Peter Lawrence commenced as the Chief Information Officer, Department of Defence.
With effect 12 July 2012, Ms Jane Wolfe ceased with the Department of Defence.
Organisational Structure
The following changes have taken place since the Portfolio Budget Statements 2012-13.
On Monday, 22 October 2012 the Defence Support Group was re-named to the Defence Support and Reform Group. The change of the name reflects structural changes in the Chief Operating Officer Organisation, with the Ministerial and Executive Coordination and Communication (MECC) Division and the Strategic Reform and Management Office (SRMO) joining the Defence Support and Reform Group.
Department of Defence
27
Figure 2: Defence Organisational Chart
Notes:
(1) Section 9(3) of the Defence Act 1903 requires the Service Chiefs to advise the Minister on matters relating to their command.(2) Under the agreed business model for DMO as a prescribed agency, the CEO DMO Ministerial Directive identi�es that the CEO DMO is directly accountable to the Minister for DMO’s performance but remains accountable to the Secretary and CDF.
Stars (*) refer to ADF Star rank or SES Band levels
Deputy SecretaryStrategy
Mr Brendan Sargeant***
Deputy SecretaryDefence People
Ms Carmel McGregor***
Deputy SecretaryIntelligence and Security
Mr Stephen Meekin***
Deputy SecretaryDefence Support and Reform
Mr Steve Grzeskowiak***
Chief Capability DevelopmentVADM Peter Jones
***
Chief Information OfficerDr Peter Lawrence
***
Chief Finance OfficerMr Phillip Prior
***
Chief Defence ScientistDr Alex Zelinsky
***
Chief Executive OfficerDefence Materiel Organisation
Mr Warren King***
(2)
Chief of Air ForceAIRMSHL Geoff Brown
***(1)
Chief of ArmyLTGEN David Morrison
***(1)
Chief of NavyVADM Ray Griggs
***(1)
Chief of Joint OperationsLTGEN Ash Power
***
Vice Chief of the Defence ForceAIRMSHL Mark Binskin
***(1)
Chief Operating OfficerMr Simon Lewis
***
Chief of the Defence ForceGEN David Hurley
****
SecretaryMr Dennis Richardson
****
Parliamentary Secretaryfor Defence
The Hon Dr Mike Kelly MP
Parliamentary Secretaryfor Defence
Senator the Hon David Feeney
Minister for Veterans’ Affairs andDefence Science and PersonnelThe Hon Warren Snowdon MP
Minister forDefence Materiel
The Hon Jason Clare MP
Minister for DefenceThe Hon Stephen Smith MP
Defence Senior Management Chart
Defence Portfolio Additional Estimates Statements 2012-13
28
1.2 Defence Resourcing Departmental funding is presented in Serial 14 of Table 4. The total level of departmental funding in 2012-13 has increased by $117.8m to $24,335.2m compared with $24,217.4m in the 2012-13 Budget. Defence Funding is comprised of:
an appropriation for departmental outputs ($22,903.4m) (Table 4, Serial 1)
an equity injection ($468.8m) (Table 4, Serial 2)
return of equity to government (-$14.1m) (Table 4, Serial 7)
net capital receipts ($73.3m) (Table 4, Serial 10)
own source revenue ($903.9m) (Table 4, Serial 11).
There are several measures and adjustments that have affected Defence’s funding. These are:
an increase of $34.0m for Operations (Table 13)
an increase of $144.5m for other budget adjustments (Table 13)
a decrease in capital receipts of -$53.4m (Table 4, Serial 10)
a decrease in own source revenue of -$7.3m (Table 4, Serial 11).
Department of Defence
29
Table 4: Total Defence Resourcing S
eria
l No
2011-12Actual$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
Variation%
2013-14ForwardEstimate
$'000
2014-15ForwardEstimate
$'000
2015-16ForwardEstimate
$'000
Defence resourcing
1 22,434,418 Appropriation for departmental outcomes 23,269,856 22,903,354 -366,502 -1.6 23,222,935 24,350,270 26,349,946
2 2,773,786 Equity injection appropriation - 468,774 468,774 - 329,405 939,329 1,573,185
3 - Prior Year Appropriation - - - - - - -
4 25,208,204 Current year's appropriation (1+2+3) 23,269,856 23,372,128 102,272 0.4 23,552,340 25,289,599 27,923,131
5 50,122 Drawdown of appropriations carried forward - - - - - - -
6 - Other appropriation receivable movements - - - - - - -
7 -4,597 Return to OPA[1] -90,304 -14,077 76,227 -84.4 -48,821 -38,733 -46,042
8 45,525 Funding from/to the OPA (5+6+7) -90,304 -14,077 76,227 -84.4 -48,821 -38,733 -46,042
9 25,253,729 Funding from Government (4+8) 23,179,552 23,358,051 178,499 0.8 23,503,519 25,250,866 27,877,089
10 85,391 Capital receipts 126,683 73,284 -53,399 -42.2 101,666 98,046 173,962
11 921,479 Own source revenue (s31 receipts)[2] 911,206 903,893 -7,313 -0.8 876,827 909,546 945,066
12 83,484 Prior Year Receipts - - - - - - -
13 1,090,354 Funding from Other Sources (10+11+12) 1,037,889 977,177 -60,712 -5.8 978,493 1,007,592 1,119,028
14 26,344,083 Total Defence funding (9+13) 24,217,441 24,335,228 117,787 0.5 24,482,012 26,258,458 28,996,117
Administered
15 4,215,384 Administered special appropriations 4,227,427 4,227,427 - - 4,444,915 4,670,495 4,867,880
16 1,382,678 Own source revenue 1,344,595 1,344,595 - - 1,384,655 1,443,113 1,506,866
17 -1,382,678 Returns to the OPA -1,344,595 -1,344,595 - - -1,384,655 -1,443,113 -1,506,866
18 4,215,384 Total Administered Funding (15+16+17) 4,227,427 4,227,427 - - 4,444,915 4,670,495 4,867,880
19 30,559,467 Total Defence Resourcing (14+18) 28,444,868 28,562,655 117,787 0.4 28,926,927 30,928,953 33,863,997
Appropriation carried forward
20 50,122 Appropriation Receivable including previous year's Outputs 121,517 76,857 -44,660 -36.8 76,857 76,857 76,857
21 64,871 Cash in bank 72,871 18,091 -54,780 -75.2 18,091 18,091 18,091
22 114,993 Total appropriations carried forward (20+21) 194,388 94,948 -99,440 -51.2 94,948 94,948 94,948
23 30,674,460 Total Defence Resourcing (19+22) 28,639,256 28,657,603 18,347 0.1 29,021,875 31,023,901 33,958,945
Notes 1. Represents net transfers to and from the OPA. 2. All figures are net of GST.
Defence Portfolio Additional Estimates Statements 2012-13
30
Table 5: Defence Resource Statement
Ser
ial
No
.
Estimateas at
Budget2012-13
$'000
+
Proposed Additional Estimates
2012-13$'000
=
Total Estimate at Additional
Estimates2012-13
$'000
Total Actual Available
Appropriation2011-12
$'000
ORDINARY ANNUAL SERVICES
Outcome 1 21,919,073 -419,765 21,499,308 21,122,108
Outcome 2 1,341,283 53,263 1,394,546 1,459,492
Outcome 3 9,500 - 9,500 9,829
1 Total Departmental outputs 23,269,856 -366,502 22,903,354 22,591,429
2 Total Ordinary Annual Services (1) 23,269,856 -366,502 22,903,354 22,591,429
OTHER SERVICES
Departmental non-operating
Equity injections - 468,774 468,774 2,773,786
3 Total Departmental non-operating - 468,774 468,774 2,773,786
4 Total Other Services (3) - 468,774 468,774 2,773,786
5 Total Available Annual Appropriation (2+4) 23,269,856 102,272 23,372,128 25,365,215
SPECIAL APPROPRIATIONS
Special appropriations limited by criteria/entitlement
Defence Forces Retirement Benefits Act, 1948 Part 1 s.15D and VIC , s.82ZJ 28,531 - 28,531 28,443
Defence Force Retirement and Death Benefits Act, 1973 Part XII, s.125 1,574,188 - 1,574,188 1,578,799
Military Superannuation and Benefits Act, 1991 Part V, s.17 2,515,472 - 2,515,472 2,473,953
Defence Force (Home Loan Assistance) Act, 1990 Part IV, s.38 2,883 - 2,883 3,547
Defence Home Ownership Assistance Scheme Act 2008 Part VI, s.84 106,353 - 106,353 94,335
6 Total Special Appropriations 4,227,427 - 4,227,427 4,179,077
7 Total Appropriations (5+6) 27,497,283 102,272 27,599,555 29,544,292
Funding from other sources 2,382,484 -60,712 2,321,772 2,415,044
Returns to the OPA (net) -1,434,899 76,227 -1,358,672 -1,460,463
Previous years' outputs (appropriation receivable) 121,517 -44,660 76,857 50,122
Cash Available 72,871 -54,780 18,091 64,871
8 Total Other Available Resources 1,141,973 -83,925 1,058,048 1,069,574
9 Total Resourcing (7+8) 28,639,256 18,347 28,657,603 30,613,866
Special Accounts
Opening Balance 93,567 18,884 112,451 116,531
Appropriation Receipts - - - -
Appropriation Receipts - other agencies - - - -
Non-Appropriation Receipts to Special Accounts 50,064 - 50,064 68,531
10 Total Special Accounts 143,631 18,884 162,515 185,062
Department of Defence
31
Payments to Defence Housing Australia
No changes have been made to Payments to Defence Housing Australia since the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
32
Annual Appropriations
Defence’s annual appropriations will increase by a net $102.3m to $23,372.1m. This increase is related to a net reduction of $366.5m for Departmental outcomes and an increase of $468.8m in equity injection. The net reduction of $366.5m for Departmental outcomes is comprised of a reduction of $419.8m in Outcome 1 offset by an increase of $53.3m in Outcome 2. Defence will seek a determination by the Minister for Finance and Deregulation, under section 10 of the Appropriation Act (No 1) 2012-13, to decrease its Departmental appropriation by a net $366.5m.
Table 6: Appropriation Bill (No 3) 2012-13[1]
2011-12 Available
$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Increase inEstimates
$'000
Decrease inEstimates
$'000
Departmental Outputs
Outcome 1
Australia's national interests are protected and advanced through the provision of military capabilities and the promotion of security and stability 21,122,108 21,919,073 21,499,308 - 419,765
Outcome 2
Military operations and other tasks directed by the Government to achieve the desired results 1,459,492 1,341,283 1,394,546 53,263 -
Outcome 3
Defence's support to the Australian community and civilian authorities to achieve the desired results 9,829 9,500 9,500 - -
Total 22,591,429 23,269,856 22,903,354 53,263 419,765
Note Appropriation Bill (No 3) as the net funding change is negative. $366.5m will be
extinguished against Appropriation Bill (No 1).
Table 7: Appropriation Bill (No 4) 2012-13
2011-12 Available
$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Increase inEstimates
$'000
Decrease inEstimates
$'000
Non-operating
Equity injections 2,773,786 - 468,774 468,774 -
Total non-operating 2,773,786 - 468,774 468,774 -
Drawdown of Appropriations Carried Forward
Table 8: Revised Appropriation Receivable
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
Previous Estimate[1]121,517 121,517 121,517 121,517
Net drawdown -44,660 -44,660 -44,660 -44,660
Closing balance appropriation receivable 76,857 76,857 76,857 76,857
Note 1. As published in Table 10 of the Portfolio Budget Statements 2012-13.
1. No additional appropriation is provided in
Department of Defence
33
Funding from Other Sources
Own Source Revenue
Table 9: Variation in Own Source Revenue
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
Previous Estimate[1]911,206 920,731 954,636 991,593
Variation in own source revenue -7,313 -43,904 -45,090 -46,527
Own source revenue revised estimates 903,893 876,827 909,546 945,066
Prior year receipts - - - -
Total 903,893 876,827 909,546 945,066
Note 1. As published in Table 11 of the Portfolio Budget Statements 2012-13.
Table 10: Variation in Estimates of Net Capital Receipts
2012-13Revised
Estimate$m
2013-14ForwardEstimate
$m
2014-15ForwardEstimate
$m
2015-16ForwardEstimate
$m
Portfolio Budget Statements 2012-13 Estimates[1]37.3 55.5 104.2 125.5
Movement in capital withdrawal associated with capital disposals program 76.2 19.6 -25.8 -32.4
Movement in proceeds from sales associated with the capital disposals program -53.4 -21.3 -18.3 35.6
Variation in net capital receipts 22.8 -1.7 -44.1 3.3
Total net capital receipts 60.1 53.8 60.1 128.8
Note 1. As published in Table 12 of the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
34
Capital Investment Program
Approved Capability Investment Program
Table 11: Approved Capability Investment Program
Ser
ial
No
. 2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m
DMO delivered
1 Major Capital Investment Program (AMCIP) 3,074.2 3,228.0 153.7
Minors program
Navy Minors Program 3.3 3.9 0.6
Army Minors Program 48.2 53.1 4.9
Air Force Minors Program 19.0 20.6 1.5
Joint Logistics Command Minors Program 0.8 2.2 1.4
Chief Information Officer Minors Program 0.5 0.5 -
Office of the Secretary and CDF Minors Program - - -
2 Total Minors program 71.9 80.3 8.4
Sustainment
Navy Sustainment 1,669.5 1,622.0 -47.5
Army Sustainment 1,249.9 1,249.7 -0.1
Air Force Sustainment 1,476.3 1,524.0 47.8
Chief Information Officer Sustainment 65.6 59.9 -5.7
Vice Chief of the Defence Force Sustainment 88.4 83.7 -4.7
Office of the Secretary and CDF Sustainment 18.0 17.3 -0.6
Joint Operations Command Sustainment 6.1 5.9 -0.2
Defence Support and Reform Group Sustainment 27.0 27.0 -
3 Total Sustainment 4,600.7 4,589.6 -11.0
4 Total DMO Delivered (1+2+3) 7,746.8 7,897.9 151.1
Defence Groups and Services delivered
5 Major Capital Investment Programs (AMCIP) 64.1 99.0 35.0
6 Minors program 24.1 12.9 -11.2
7 Total Defence Groups and Services delivered (5+6) 88.2 112.0 23.8
8Government Approved Defence Capability Plan (DCP) projects yet to be allocated to Groups, Services or the DMO 59.3 33.8 -25.5
9 Total approved programs (4+7+8) 7,894.3 8,043.7 149.5
10 Total AMCIP (1+5) 3,138.3 3,327.0 188.7
11 Total Minors (2+6) 96.0 93.3 -2.7
12 Total Sustainment (3) 4,600.7 4,589.6 -11.0
13Government Approved Defence Capability Plan (DCP) projects yet to be allocated to Groups, Services or the DMO (8) 59.3 33.8 -25.5
14 Total approved programs (10+11+12+13) 7,894.3 8,043.7 149.5
Department of Defence
35
Table 12: Unapproved Capability Investment Program
Ser
ial
No
. 2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m
1 DCP Planned Government Approvals in 2011-12 107.9 34.4 -73.5
2 DCP available from 1 July 2012 108.7 182.2 73.5
3 Subtotal Unapproved DCP 216.6 216.6 -
4 DCP Approvals since 1 July 2012 - 185.7 185.7
5 DCP Planned Government Approvals Remaining in 2012-13 - 11.1 11.1
6 Planned Total DCP Approvals in 2012-13 (4+5)[1]- 196.8 196.8
7 Minors 13.5 18.0 4.4
8 Future Sustainment costs associated with AMCIP 124.4 - -124.4
Note 1. Additional Funding for Planned Approvals in 2012-13 of $14.6m will be funded through reprioritisation and reallocation from the
broader Defence Budget.
Defence Portfolio Additional Estimates Statements 2012-13
36
1.3 Funding from Government
2012-13 Budget Measures and Other Budget Adjustments
Table 13: Variations to Defence Funding
Program2012-13
$m2013-14
$m2014-15
$m2015-16
$mTotal FE
$m2016-17
$m2017-18
$m2018-19
$m2019-20
$m2020-21
$m2021-22
$mTOTAL
$m
Budget Measures
Expenditure Measures
Timor-Leste - transition of Australia's security commitment and future Defence engagement
2.1 34.0 3.0 -0.4 - 36.6 - - - - - - 36.6
Australia's Contribution to the Sustainment of the Afghan National Security Forces from 2014-15
2.2 - - 76.8 77.5 154.3 77.5 - - - - - 231.8
Bushmaster vehicles - acquisition[1] 1.3 - - - - - - - - - - - -
Growler electronic warfare system - acquisition[1] 1.4 - - - - - - - - - - - -
Total Budget Measures 34.0 3.0 76.4 77.5 190.9 77.5 - - - - - 268.4
Other Budget Adjustments
DMO Direct Appropriation Adjustments Various 17.4 51.8 58.2 60.6 188.0 60.1 60.3 63.7 65.8 67.9 70.4 576.2Living Away From Home Allowance 1.12 4.3 13.7 19.1 19.1 56.3 19.1 - - - - - 75.4
Fire Services Levy 1.6 -18.8 -19.6 -20.5 -20.5 -79.5 -20.5 -20.5 -20.5 -20.5 -20.5 -20.5 -202.8DFAT Cleaning and Utility Charges 1.1 - 0.6 0.6 0.6 1.8 0.6 0.6 0.7 0.7 0.7 0.7 5.8Foreign Exchange Various 65.4 92.6 83.7 96.1 337.8 141.9 174.1 216.3 215.9 253.9 258.1 1,598.1Property Disposals 1.6 76.2 19.6 -25.8 -32.4 37.7 - - - - - - 37.7
Total Other Budget Adjustments 144.5 158.6 115.4 123.5 542.0 201.3 214.5 260.1 261.9 302.0 308.6 2,090.5
Variation to Defence Funding 178.5 161.6 191.8 201.0 732.9 278.8 214.5 260.1 261.9 302.0 308.6 2,358.9
Note 1. The cost of this measure will be met from within the existing resourcing of the Department of Defence.
Department of Defence
37
2012-13 Budget Adjustments Expenditure Measures
Timor-Leste – transition of Australia’s security commitment and future Defence engagement
The Government provided $37.1m over three years for the net additional cost of the security transition of Operation Astute, Australia’s military contribution to maintaining stability in East Timor through the International Stabilisation Force (ISF).
The Government will support an ongoing Defence engagement with the Government of East Timor through the Defence Cooperation Program, including training and exercises.
The Government had previously approved funding for Operation Astute through to December 2012. On 22 November 2012, the Australian-led ISF ceased its security operations in East Timor and began a staged drawdown following the peaceful East Timorese Parliamentary elections in July 2012. ISF withdrawal was expected to be completed by April 2013.
The cost of this measure reduced by the recovery of $0.5m in 2012-13 from the New Zealand Defence Force for logistics support provided by the ADF, resulting in net funding of $36.6m.
This measure is also expected to lead to a reduction in revenue of $1.1m through to the completion of the withdrawal as ADF personnel are taxed concessionally on their base pay and allowances while on deployment.
Funding for this measure was included as a ‘decision taken but not yet announced’ in the Mid-Year Economic and Fiscal Outlook 2012-13.
Further information can be found in the joint press release of 21 November 2012 issued by the Minister for Defence and the Minister for Foreign Affairs.
Australia's Contribution to the Sustainment of the Afghan National Security Forces from 2014-15
The Government will provide US$100.0m per year from 2014-15 to 2016-17 as part of the international contribution to the sustainment of the Afghan National Security Forces (ANSF). This will be made up of US$80.0m per annum from the Department of Defence and US$20.0m per annum from the Australian Agency for International Development (AusAID).
Australia’s contribution is part of international efforts to help sustain and support the ANSF beyond the transition process.
Bushmaster vehicles – acquisition
The Government will provide $205.7m over five years for the acquisition of up to 214 additional Bushmaster Protected Mobility Vehicles to be built in Bendigo, Victoria.
Bushmaster vehicles provide mobility and protection for Australian forces deployed on overseas operations. The cost of this measure will be met from within existing resourcing of the Department of Defence.
Further information can be found in the joint press release of 2 July 2012 issued by the Minister for Defence and the Minister for Defence Materiel.
This measure was announced at the Mid-Year Economic and Fiscal Outlook 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
38
Growler electronic warfare system – acquisition
The Government has provided $1,458m for the conversion of twelve of Australia’s F/A-18F Super Hornet aircraft into Growler configuration and for associated equipment, training and spares.
The Growler aircraft will give the ADF the capacity to jam electronic systems and an enhanced capacity to undertake intelligence, surveillance and reconnaissance missions.
The cost of this measure will be met from within the existing resourcing of the Department of Defence.
Further information can be found in the joint press release of 23 August 2012 issued by the Minister for Defence and the Minister for Defence Materiel.
This measure was announced at the Mid-Year Economic and Fiscal Outlook 2012-13.
Other Budget Adjustments
DMO Direct Appropriation Adjustments
Due to functions and staff movements between Defence and DMO, DMO will return $17.4m in the budget year, with a net result of DMO transferring $188.0m to Defence across the Budget and Forward Estimates.
Living Away From Home Allowance
This adjustment supplements Defence for the additional Fringe Benefits Tax liability for overseas postings due to changes in the tax treatment of the Living Away From Home Allowance. This provides Defence with supplementation of $4.3m in 2012-13 and $56.3m across the Budget and Forward Estimates.
Fire Services Levy
A review of Commonwealth fire services arrangements with the states and territories will see Defence’s annual appropriation reduced by $18.8m in 2012-13 and $79.5m across the Budget and Forward Estimates with a commensurate reduction in Defence's annual insurance premium.
Department of Foreign Affairs and Trade (DFAT) Cleaning and Utility Charges
Revised Service Level Agreements for management services at DFAT managed posts has resulted in agencies now being responsible for cleaning and utility charges at post. DFAT is devolving funds to relevant agencies that will now be required to pay on a user pays basis. This arrangement takes effect from 2013-14 at a cost of $1.8m across the Budget and Forward Estimates.
Foreign Exchange
Under no win/no loss arrangements, Defence is required to return to the Government any surplus foreign exchange supplementation for an appreciation of the Australian dollar relative to the other currencies as part of the Budget process. Conversely where the Australian dollar depreciates relative to other currencies, the exchange rate set for Defence is supplemented under these arrangements. Defence will receive $65.4m in 2012-13 as a result of movements in exchange rates since the 2012-13 Budget. Over the Budget and Forward Estimates, a total of $337.8m will be received by Defence.
Property Disposals
Adjustments to the Property Disposals Program since the 2012-13 Budget have resulted in a reduced return to Government of $76.2m in 2012-13 and $37.7m across the Budget and Forward Estimates.
Department of Defence
39
Operations Summary
Table 14: Net Additional Cost of Operations from 1999-00 to 2015-16
1999-00 to 2007-08
Actual Result
$m
2008-09 Actual Result
$m
2009-10 Actual Result
$m
2010-11 Actual Result
$m
2011-12 Actual Result
$m
2012-13Revised
Estimate$m
2013-14ForwardEstimate
$m
2014-15ForwardEstimate
$m
2015-16ForwardEstimate
$mTotal
$m
Operation Astute[1]3,611.1 164.7 144.9 155.7 141.7 121.6 3.8 0.2 - 4,343.7
Operation Bel Isi 47.7 - - - - - - - - 47.7
Operation Slipper[2]1,200.2 701.9 1,125.3 1,088.9 1,066.7 1,189.8 351.5 208.3 127.5 7,060.1
Operation Resolute[3][4]103.9 10.0 10.3 8.2 7.9 9.5 - - - 149.8
Operation Catalyst 2,062.2 290.9 11.4 - - - - - - 2,364.5
Operation Anode 171.9 25.1 27.9 35.7 38.5 42.9 1.6 1.1 - 344.6
Operation Sumatra Assist 44.5 - - - - - - - - 44.5
Operation Acolyte 10.5 - - - - - - - - 10.5
Operation Deluge 6.7 - - - - - - - - 6.7
Operation Pakistan Assist 9.8 - - - - - - - - 9.8
Operation Outreach 12.3 2.3 - - - - - - - 14.6
Operation Kruger[5]- - 29.8 13.8 1.8 1.9 - - - 47.2
Enhanced Force Protection in Afghanistan[6][7][8]- - 80.3 196.0 159.1 164.6 10.0 16.2 - 626.3
Total Net Additional Costs 7,280.9 1,194.9 1,429.8 1,498.2 1,415.8 1,530.3 366.9 225.8 127.5 15,069.9
Sources of Funding for Operations
Government Supplementation 7,249.5 112.5 1,386.7 1,320.1 1,246.9 1,354.3 356.9 209.6 127.5 13,364.0
Department of Foreign Affairs and Trade 9.1 - - - - - - - - 9.1
Department of Defence (Absorbed) 22.3 1,082.4 43.1 178.1 168.8 176.0 10.0 16.2 - 1,696.9
Total Cost 7,280.9 1,194.9 1,429.8 1,498.2 1,415.8 1,530.3 366.9 225.8 127.5 15,069.9
Notes 1. Government approved an increase of $34.0m in 2012-13, $3.0m in 2013-14 and a reduction of $0.4m in 2014-15 to extend Operation Astute to April 2013. 2. Government approved an increase of $76.8m in 2014-15, $77.5m in 2015-16 and $77.5m in 2016-17 (not shown in this table) for Australia's Contribution to the sustainment of the ANSF. 3. For 2012-13 Defence will absorb the cost of Operation Resolute. 4. The 2011-12 actual result of $13.5m for Operation Resolute has been reduced to reflect expenditure against Government agreed budget lines. An additional amount of $5.6m in support of
Operation Resolute, was also funded by Defence for the temporary re-opening of the bare base at Learmonth WA. 5. For 2012-13 Defence will absorb the cost of Operation Kruger, which includes costs associated with return of equipment to Australia and its remediation. 6. Government supplementation for Enhanced Force Protection in Afghanistan costs are captured against Operation Slipper. 7. An amount of $16.2m has been reprogrammed from 2012-13 to 2014-15 to align funding with revised acquisition schedules. 8. An additional amount of $30.7m is no longer required and has been returned to the Defence Capability Program (DCP).
Defence Portfolio Additional Estimates Statements 2012-13
40
Operations Summary
The ADF is involved in a number of deployments around the world, including United Nations peacekeeping and regional assistance missions, and border protection and domestic security operations.
Defence plans to spend $1,530.3m on the net additional costs of its operational deployments in 2012-13, or $13.0m less than the Budget Estimate. This is the result of a $34.0m increase to Operation Astute and a $46.9m decrease to Enhanced Force Protection in Afghanistan. The Revised Estimates for all operations are shown in Table 14.
Operation Budget Measures
Budget measures relating to Operations are detailed on Page 36 and are summarised in Table 13.
Department of Defence
41
1.4 Capital Investment Program
Table 15: Total Capital Investment Program
Ser
ial
No
. 2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m
Defence Capability Plan
1 DMO Delivered 248.2 27.3 -221.0
2 Group and Services delivered 27.6 3.0 -24.6
3 Total Defence Capability Plan (1+2) 275.8 30.3 -245.5
Approved Major Capital Investment Program[1]
4 DMO Delivered 3,074.2 3,228.0 153.8
5 Group and Services delivered 64.1 99.0 35.0
6 Total Approved Major Capital Investment Program (4+5) 3,138.3 3,327.0 188.7
Capital Facilities
7 Approved Capital Facilities Projects[2]837.4 953.9 116.5
8 Unapproved Capital Facilities Projects 181.5 65.0 -116.5
9 Total Capital Facilities Program (7+8) 1,018.9 1,018.9 -
10 Other Investment[3]171.9 275.8 103.9
11 Total Capital Investment Program (3+6+9+10)[4]4,604.9 4,651.9 47.1
Capital component 4,237.5 4,377.6 140.1
Operating component 367.4 274.3 -93.1
Notes 1. Includes projects delivered by the DMO and Defence Groups and Services. 2. Includes both Major and Minor Capital Facilities Program. 3. This includes plant and equipment, Minor Capital Investment projects, infrastructure costs, non-capital facilities building
projects, intangibles and purchase of repairable items. 4. The Capital Investment Program funding includes $37.3m (Budget Estimate) and $60.1m (Revised Estimate) in retained
capital receipts. Cross reference with Table 16, Retained Capital Receipts.
Major Capital Investment Program
The $56.8m decrease in the Major Capital Investment Program is comprised of a $245.5m decrease in the Defence Capability Plan (DCP) and a $188.7m increase in the Approved Major Capital Investment Program (AMCIP).
The $245.5m decrease in the DCP relates to transfers following project approvals: $208.2m to the AMCIP; $35.0m for projects delivered by other Groups and Services and; $2.5m to MCF and other minor movements totalling $0.2m.
The $188.7m increase in the AMCIP relates to a $208.2m increase due to transfers from the DCP, a $31.8m increase for foreign exchange, a $25.3m decrease for the 2011-12 payable to the DMO, a decrease of $60.0m due to AMCIP reprogramming, a $35.0m increase in projects delivered by other Groups and Services and other minor movements totalling $1.0m.
Capital Facilities Program
No changes have been made to Capital Facilities Program since the Portfolio Budget Statements 2012-13. Project approvals worth $116.5m have been approved since the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
42
Other Investment
The $103.9m increase in Other Investment is comprised of a $24.1m decrease for the purchase of Buildings, a $247.3m increase in Specialist Military Equipment (SME), a $119.0m decrease in Other Plant and Equipment, a $54.9m decrease in Infrastructure purchase, a $52.2m increase in purchases of Repairable Items and a number of other minor movements totalling $2.4m.
Retained Capital Receipts
The Retained Capital Receipts form part of the Total Capital Investment Program at Table 15: Total Capital Investment Program.
Retained Capital Receipts comprise the net proceeds from property sales which are returned to Government. It also includes proceeds from sale of specialist military equipment, commercial vehicles and other plant and equipment. Adjustments have been made to the property sales program since the 2012-13 Budget that have resulted in Defence’s return to Government reducing by $22.8m.
Table 16: Retained Capital Receipts
Ser
ial
No
. 2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m
Property Sales
Proceeds from the sale of land and buildings 86.9 33.5 -53.4
Proceeds from the sale of housing 11.0 11.0 -
Less return to Government -89.4 -13.2 76.2
1 Proceeds retained by Defence 8.6 31.4 22.8
2Proceeds from sale of specialist military equipment - - -
3Proceeds from sale of infrastructure, plant and equipment 28.7 28.7 -
4 Retained Capital Receipts (1+2+3) 37.3 60.1 22.8
Department of Defence
43
1.5 People
Workforce Overview
No changes have been made to Workforce Overview since the Portfolio Budget Statements 2012-13.
Workforce Summary
The revised strength of the total Defence workforce (including the DMO) is shown in Table 17. The revised strength of the total workforce in 2012-13 is forecast to be 1,119 less than the 2012-13 Budget Estimate of 102,017, including ADF permanent forces (-1,885), Reserve Forces (+540), APS staff (+326), and Contractors (-103).
The reduction in the estimate for permanent forces follows on from the success of measures introduced to return the ADF to its budgeted strength. Since then, changes in labour market conditions have led to increased separations as employment opportunities for ADF personnel, particularly those with professional and/or technical skills, continue to grow. Recruiting, while relatively strong, is insufficient to compensate for the increased separations.
In addition, the reduction in forecast strength is contributed to by the cancellation of the ADF Gap Year program as announced in the Portfolio Budget Statements 2012-13, leading to a reduction for the Navy of -90 from 2012-13 onwards, and for Army -177 AFS in 2012-13 and -264 thereafter. This reduces the gap between the permanent force ADF revised strength estimate and the Budget Estimate to 1,618. This figure also includes some workforce that is awaiting funding through the approval of projects as part of the Defence Capability Plan.
In response to the changes in labour market conditions, Defence has implemented the Defence Employment Offer project, aiming to provide a mechanism for identifying those elements of their employment that are important to ADF personnel, and facilitating the use of targeted retention initiatives.
In relation to its Australian Public Service workforce, Defence has put measures in place to meet the ongoing reductions of 666 Full Time Equivalents in 2012-13 and an additional 334 in 2013-14. These include natural attrition, tightening of recruitment practices and a program of targeted Voluntary Redundancies (VRs), with over 600 VRs being accepted in late 2012.
The program of reductions to Defence’s Australian Public Service workforce outlined in the 2012-13 Portfolio Budget Statement is on track. From July 2012 to January 2013, Defence’s actual APS workforce has reduced from 22,159 to 21,147 (a reduction of 1,012 staff). During 2012-13, the separation rate for APS staff has been lower than originally anticipated as fewer APS left the department in the first half of the financial year than forecast. Under the DMO’s combined workforce management model, DMO can utilise funding from ADF positions that cannot be filled and this has the effect of increasing Defence’s APS workforce beyond its budgeted strength by an average of 384, even though its total workforce (civilian and military) is within the parameters.
Over the Forward Estimates period, the total workforce is expected to grow by 1,899 from the revised estimate of 100,895 in 2012-13 to 102,794 in 2015-16. This consists of a decrease of -919 in the civilian workforce and an increase of +2,818 in the military workforce.
Defence Portfolio Additional Estimates Statements 2012-13
44
Defence People
In a significant step towards delivering people services through a shared services model, in October 2012 consolidation of the human resources (HR) domain saw the movement of a number of HR functions and staff from their previous functional areas across the Groups and Services into the Defence People Group. This change paves the way for future re-design and integration of functions into new service delivery models.
In response to the recommendations of Review into the Treatment of Women in the Australian Defence Force Phase 2 Report, the Sexual Misconduct Prevention and Response Office has been established to ensure members who report abuse are given appropriate support to assist with their immediate safety and well being, their care and recovery, and their return to their full work potential. Defence will also provide an option for ADF members to make restricted (confidential) reports of sexual misconduct through the SeMPRO, with some exceptions in line with Defence’s obligations under the Sex Discrimination Act and the Work Health and Safety Act. This Office will be fully operational from June 2013.
Department of Defence
45
Table 17: Planned Workforce Allocation for the 2012-13 Budget and Forward Estimates (Average)
2012-13Budget
Estimate
2012-13Revised
Estimate Variation
2013-14ForwardEstimate
2014-15ForwardEstimate
2015-16ForwardEstimate
ADF Permanent Force[1]
Navy 14,260 13,772 -488 14,224 14,249 14,270
Army 30,270 29,017 -1,253 29,847 30,143 30,278
Air Force 14,106 13,962 -144 14,164 14,126 14,116
1 Total Permanent Force 58,636 56,751 -1,885 58,235 58,518 58,664
Active Reserve Force
Navy 2,100 2,100 - 2,150 2,200 2,200
Army 16,000 16,350 350 16,200 16,400 16,600
Air Force 2,400 2,400 - 2,500 2,500 2,500
2 Sub-total Active Reserve Force 20,500 20,850 350 20,850 21,100 21,300
High Readiness Reserve
Navy - - - - - -
Army 550 740 190 1,195 1,195 1,195
Air Force 600 600 - 600 600 600
3 Sub-total High Readiness Reserve Force 1,150 1,340 190 1,795 1,795 1,795
4 Total Reserves (2 + 3) 21,650 22,190 540 22,645 22,895 23,095
5 Total ADF Employees (1 + 4) 80,286 78,941 -1,345 80,880 81,413 81,759
Civilian Employees
APS - Defence 15,651 15,731 80 15,476 15,115 14,934
APS - DMO 5,544 5,406 -138 5,368 5,590 5,608
APS - DMO - ADF backfill - 384 384 - - -
6 Total APS 21,195 21,521 326 20,844 20,705 20,542
Contractors - Defence 488 385 -103 448 445 447
Contractors - DMO 48 48 - 48 48 46
7 Total Contractors[2]536 433 -103 496 493 493
8 Total Civilian Employees (6 + 7) 21,731 21,954 223 21,340 21,198 21,035
Total Workforce Strength (5 + 8) 102,017 100,895 -1,122 102,220 102,611 102,794
Notes 1. Numbers for ADF Permanent Force include ADF members in the DMO and Reservists on full-time service. 2. Contractors are individuals under contract performing agency roles. Contractors are not APS employees.
Defence Portfolio Additional Estimates Statements 2012-13
46
Table 18: Breakdown of Personnel Numbers by Service and Rank
2012-13Budget
Estimate
2012-13Revised
Estimate
Navy[1]
One Star and above 57 57
Senior Officers[2]531 543
Officers 2,851 2,808
Other Ranks 10,731 10,364
Gap Year Participants[3]90 -
Sub-Total: Permanent Navy 14,260 13,772
Reserve Forces[4]2,100 2,100
Total Navy 16,360 15,872
Army[1]
One Star and above 77 75
Senior Officers[2]765 814
Officers 5,346 5,379
Other Ranks 23,788 22,632
Gap Year Participants[3]294 117
Sub-Total: Permanent Army 30,270 29,017
Reserve Forces[4]16,550 17,090
Total Army 46,820 46,107
Air Force[1]
One Star and above 53 53
Senior Officers[2]630 650
Officers 3,822 3,910
Other Ranks 9,601 9,349
Gap Year Participants[3]- -
Sub-Total: Permanent Air Force 14,106 13,962
Reserve Forces[4]3,000 3,000
Total Air Force 17,106 16,962
APS[1]
Senior Executives[5]169 168
Senior Officers[2]6,431 6,782
Other APS Staff 14,595 14,571
Total APS 21,195 21,521
Contractors[6]536 433
Total Workforce 102,017 100,895
Notes 1. All Budget and Revised Estimates are forecasts of the average strength for 2012-13, and include the DMO. 2. Senior Officers are of Colonel or Lieutenant Colonel rank equivalent and substantive APS Executive Level 1 and 2. 3. ADF Recruitment and Retention Initiative. 4. Reserve figures represent the actual numbers of Active and High Readiness Reservists who render service. Reservists on
full-time service are reported in the Permanent Force. 5. The figures for Senior Executive Service include the Secretary of the Department of Defence, 17 Chiefs of Division, and 2
Medical Officer Grade 6. 6. Contractors are individuals under contract performing agency roles. Contractors are not APS employees.
Department of Defence
47
Workforce Expenses
Table 19: Workforce Expenses for the Department of Defence (including DMO)
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m
2013-14Forward Estimate
$m
2014-15Forward Estimate
$m
2015-16Forward Estimate
$m
Military employees
Salary, allowances, superannuation and leave[1]6,802.5 6,822.1 19.6 6,778.1 7,081.6 7,709.7
Housing 751.8 723.6 -28.2 839.6 867.3 921.7
Health services 351.2 307.2 -44.0 365.6 380.6 408.3
Fringe Benefits Tax 364.4 363.6 -0.8 405.7 451.1 453.9
Total military employee expense 8,269.9 8,216.5 -53.4 8,389.0 8,780.6 9,493.6
Civilian employees
Salary, allowances, superannuation and leave 2,133.1 2,225.4 92.3 2,220.0 2,361.0 2,563.2
Other expenses including Fringe Benefits Tax 14.2 12.1 -2.1 14.1 15.5 16.3
Total civilian employee expenses 2,147.3 2,237.6 90.3 2,234.0 2,376.4 2,579.4
Total employee expenses 10,417.2 10,454.1 36.9 10,623.0 11,157.0 12,073.2
Note 1. This includes estimates for Reservists.
Defence Portfolio Additional Estimates Statements 2012-13
48
Section 2: Outcomes and Planned Performance
2.1 Outcomes and Performance Information No changes have been made to Defence’s Outcomes and Performance Information since the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
50
Outcome 1 Resources
Table 20: Total Budgeted Resources Available for Outcome 1
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
2013-14ForwardEstimate
$'000
2014-15ForwardEstimate
$'000
2015-16ForwardEstimate
$'000
Program 1.1 Office of the Secretary and CDF
Revenues from other sources 1,389 542 -847 539 538 540
Departmental outputs 168,219 142,888 -25,331 154,959 155,999 188,908
Program 1.2 Navy Capabilities
Revenues from other sources 167,686 168,311 625 176,128 182,541 188,819
Departmental outputs 4,270,118 4,313,495 43,377 4,423,895 4,526,486 4,587,867
Program 1.3 Army Capabilities
Revenues from other sources 146,748 146,878 130 158,621 167,756 176,110
Departmental outputs 5,025,969 5,085,177 59,208 5,387,355 5,701,671 6,106,036
Program 1.4 Air Force Capabilities
Revenues from other sources 263,467 244,791 -18,676 280,798 293,143 303,238
Departmental outputs 4,217,797 4,185,485 -32,312 4,245,960 4,392,903 4,635,566
Program 1.5 Intelligence Capabilities
Revenues from other sources 12,813 12,492 -321 13,308 12,800 13,452
Departmental outputs 474,357 525,429 51,072 511,269 556,081 618,473
Chief Operating Officer
Revenues from other sources 303,300 304,328 1,028 333,321 357,056 437,449
Departmental outputs 4,845,092 5,048,574 203,482 5,064,657 5,147,115 5,634,715
Program 1.6 Chief Operating Officer - Defence Support and Reform
Revenues from other sources 295,193 292,227 -2,966 319,509 342,102 421,718
Departmental outputs 3,688,491 3,703,112 14,621 3,741,845 3,752,037 4,075,122
Program 1.8 Chief Operating Officer - Chief Information Officer
Revenues from other sources 8,107 12,101 3,994 13,812 14,954 15,731
Departmental outputs 833,021 945,992 112,971 880,786 936,194 1,101,825
Program 1.13 Chief Operating Officer - Defence People
Revenues from other sources - - - - - -
Departmental outputs 323,580 399,470 75,890 442,026 458,884 457,768
Program 1.7 Defence Science and Technology
Revenues from other sources 34,039 39,694 5,655 35,231 36,252 37,275
Departmental outputs 439,548 440,698 1,150 427,267 427,232 452,612
Program 1.9 Vice Chief of the Defence Force
Revenues from other sources 244,528 230,703 -13,825 211,518 207,104 203,474
Departmental outputs 1,013,394 1,183,294 169,900 1,210,386 1,201,222 1,219,980
Program 1.10 Joint Operations Command
Revenues from other sources 374 1,131 757 372 384 396
Departmental outputs 43,274 49,631 6,357 54,417 51,157 54,434
Program 1.11 Capability Development
Revenues from other sources 87,544 71,019 -16,525 85,407 103,404 126,689
Departmental outputs 987,597 240,157 -747,440 1,012,523 1,566,707 2,303,825
Program 1.12 Chief Finance Officer
Revenues from other sources 151,354 931,876 780,522 963,003 1,009,905 1,046,960
Departmental outputs 458,100 284,480 -173,620 363,352 414,111 420,042
Department of Defence
51
Table 20 (Cont): Total Budgeted Resources Available for Outcome 1
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
2013-14ForwardEstimate
$'000
2014-15ForwardEstimate
$'000
2015-16ForwardEstimate
$'000
Defence Force Retirement Benefits Act, 1948 Part 1, s.15D and VIC, s.82ZJ (1) - - - - - -
Defence Force Retirements and Death Benefits Act, 1973 Part XII, s.125 (3) 92,344 92,344 - 81,122 71,342 62,592
Military Superannuation and Benefits Act, 1991 Part V, s.17 1,210,709 1,210,709 - 1,299,327 1,389,354 1,443,959
Total Administered expenses 1,303,053 1,303,053 - 1,380,449 1,460,696 1,506,551
Administered revenues from other sources 1,215,188 1,215,188 - 1,256,539 1,309,468 1,366,639
Total Program 1.14 87,865 87,865 - 123,910 151,228 139,912
Defence Force Retirement Benefits Act, 1948 Part 1, s.15D and VIC, s.82ZJ (1) 28,531 28,531 - 26,912 25,344 23,828
Defence Force Retirements and Death Benefits Act, 1973 Part XII, s.125 (3) 1,481,844 1,481,844 - 1,486,254 1,488,450 1,488,484Military Superannuation and Benefits Act, 1991 Part V, s.17 1,304,763 1,304,763 - 1,433,947 1,572,738 1,721,098
Total Administered expenses 2,815,138 2,815,138 - 2,947,113 3,086,532 3,233,410
Administered Revenues from other sources - - - - - -
Program 1.15 2,815,138 2,815,138 - 2,947,113 3,086,532 3,233,410
Program 1.16 Housing AssistanceDefence Force (Home Loan Assistance) Act , 1990 Part IV, s.38 2,883 2,883 - 2,306 1,845 1,476Defence Home Ownership Assistance Scheme Act 2008 Part VI, s.84 106,353 106,353 - 115,047 121,422 126,443
Total Administered expenses 109,236 109,236 - 117,353 123,267 127,919
Administered Revenues from other sources 9,963 9,963 - 10,228 10,502 10,695
Total Program 1.16 99,273 99,273 - 107,125 112,765 117,224
Program 1.17 Other Administered
Administered Revenues from other sources 116,719 116,719 - 121,848 125,788 136,011
Program 1.17 -116,719 -116,719 - -121,848 -125,788 -136,011
Total resourcing
Total Departmental outputs 21,943,465 21,499,308 -444,157 22,856,040 24,140,684 26,222,458
Total Administered 2,885,557 2,885,557 - 3,056,300 3,224,737 3,354,535
Total Departmental revenue from other sources 1,413,242 2,151,765 738,523 2,258,246 2,370,883 2,534,402
Total Administered revenue from other sources 1,341,870 1,341,870 - 1,388,615 1,445,758 1,513,345
Equity Injection - 468,774 468,774 329,405 939,329 1,573,185
Total resources for Outcome 1 27,584,134 28,347,274 763,140 29,888,606 32,121,391 35,197,925
Program 1.14 Defence Force Superannuation Benefits
Program 1.15 Defence Force Superannuation Nominal Interest
Department of Defence
53
Program 1.1 Deliverables
The following changes have been made to Program 1.1 Deliverables since the Portfolio Budget Statements 2012-13:
ensure Group-specific reform and savings initiatives have been achieved
on behalf of the Secretary and CDF undertake independent audits of Defence activities, and coordinate Australian National Audit Office activity in Defence
on behalf of the Secretary and CDF, take a leading role in the prevention and detection of fraud, undertake fraud investigations, and produce the Defence Fraud Control Plan.
The following Deliverables transferred to the Chief Operating Officer Organisation since the Portfolio Budget Statements 2012-13:
oversee, integrate and coordinate reforms
ensure policy advice provided to the Government is accurate, timely and responsive, and offers practical and cost-effective approaches to fulfil the Government's defence responsibilities
continue implementation of the reforms to the Military Justice System
promote and protect Defence's reputation by increasing public awareness of Defence activities and achievements and strengthen Defence capabilities in media-related activities
provide overarching strategic guidance, policy and supporting plans to implement the recommendations of the reviews into the culture of the ADF and Defence. Not withstanding, the SEC and CDF retain personal accountability for Pathway to Change which is executed through the Culture Reform Steering Committee. Resourcing of individual initiatives in support of the Pathway to Change Strategy comes from the individual Groups and Services as appropriate.
Program 1.1 Key Performance Indicators
The following Key Performance Indicator transferred to the Chief Operating Officer Organisation since the Portfolio Budget Statements 2012-13:
the Ministers are satisfied with the timeliness and quality of advice, including Cabinet documentation, provided by the Department.
Department of Defence
55
Table 23: Navy Deliverables (Unit Ready Days)[1]
Deliverables
2012-13
Budget
Estimate
2012-13
Revised
Estimate
18 Major Combatants 4,304 3,804[2]
22 Minor Combatants 5,323 5,188[3]
12 Amphibious and Afloat Support 2,417 1,817[4]
9 Hydrographic Force 2,967 2,563[5]
Notes 1. Unit Ready Days (URD) are the aggregate number of days that constituent force elements are available for tasking. 2. Major Combatants include the Adelaide class frigates, Anzac class frigates, and submarines. The decrease in the URD target
is due to significant schedule changes to major maintenance periods. 3. Minor Combatants include Armidale Class Patrol Boats (ACPB), coastal mine hunters and auxiliary minesweepers. ACPB
URD target adjusted downward to accommodate refinements to the ACPB maintenance remediation program. 4. Amphibious and Afloat Support comprises the oil tanker, replenishment ship, landing ship dock, heavy landing ship, and
heavy landing craft. The decrease in the URD target is due to significant schedule changes to major maintenance and repair periods for HMA Ships Success, Tobruk, Choules and heavy landing craft; and refinements to targets arising from promulgation of formal paying off dates for HMA Ships Balikpapan, Betano and Wewak.
5. Hydrographic Force comprises the hydrographic ships, survey motor launches, chart production office and meteorological and oceanographic centres. The decrease in the URD target is attributable to replacement of Variable Speed Drives in HMA Ships Melville and Leeuwin and major repairs to HMA Ships Mermaid and Paluma coincident with HMA Ships Benalla and Shepparton major maintenance periods.
Table 24: Navy Deliverables (Products)
Deliverables
2012-13
Budget
Estimate
2012-13
Revised
Estimate
Nautical Charting 156 93[1]
Note 1. Paper chart production target reduced to enable resource redistribution to emergent high priority Electronic Navigational
Chart remediation project.
Table 25: Navy Deliverables (Flying Hours)
Deliverables
2012-13
Budget
Estimate
2012-13
Revised
Estimate
13 Squirrels 4,000 3,600[1]
Note 1. Inability to sustain Squirrel serviceability at the level required to achieve flying hours allocation due to shortfalls in logistics
support and higher than expected rate of unscheduled maintenance.
Program 1.2 Key Performance Indicators
No changes have been made to the Program 1.2 Key Performance Indicators since the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
58
Program 1.4 Key Performance Indicators
The following changes have been made to Program 1.4 Key Performance Indicators since the Portfolio Budget Statements 2012-13:
provide accurate, timely and considered advice that meets CDF, Secretary and Government requirements.
Department of Defence
61
Table 30: Cost Summary for Chief Operating Officer
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
2013-14ForwardEstimate
$'000
2014-15ForwardEstimate
$'000
2015-16ForwardEstimate
$'000
Expenses
Employees 1,315,568 1,284,797 -30,771 1,361,410 1,385,807 1,481,345
Suppliers 2,636,945 2,857,782 220,837 2,830,342 2,840,949 3,184,139
Grants 1,473 1,643 170 1,509 1,548 1,584
Depreciation and amortisation 1,021,350 1,007,941 -13,409 994,936 1,042,523 1,097,884
Finance Cost 67,100 67,592 492 96,878 107,467 103,806
Write-down of assets and impairment of assets 72,059 77,139 5,080 91,830 97,548 102,312
Net losses from sale of assets - 3,446 3,446 - - -
Other expenses 33,897 52,562 18,665 21,073 28,329 101,094
Total expenses 5,148,392 5,352,902 204,510 5,397,978 5,504,171 6,072,164
Income
Revenues
Goods and services 278,771 279,610 839 290,979 302,830 314,196
Other revenue 8,053 8,253 200 6,428 6,601 6,782
Total Revenue 286,824 287,863 1,039 297,407 309,431 320,978
Gains
Assets now recognised 12,076 16,465 4,389 23,914 25,625 26,471
Net gains from sale of assets 4,400 - -4,400 12,000 22,000 90,000
Other gains - - - - - -
Total gains 16,476 16,465 -11 35,914 47,625 116,471
Total income 303,300 304,328 1,028 333,321 357,056 437,449
Chief Operating Officer 4,845,092 5,048,574 203,482 5,064,657 5,147,115 5,634,715
Program Deliverables
The following Deliverables transferred from Program 1.1 Office of the Secretary and CDF to the Chief Operating Officer Organisation since the Portfolio Budget Statements 2012-13:
oversee, integrate and coordinate reforms
ensure policy advice provided to the Government is accurate, timely and responsive, and offers practical and cost-effective approaches to fulfil the Government's defence responsibilities
continue implementation of the reforms to the Military Justice System
promote and protect Defence's reputation by increasing public awareness of Defence activities and achievements and strengthen Defence capabilities in media-related activities
provide overarching strategic guidance, policy and supporting plans to implement the recommendations of the reviews into the culture of the ADF and Defence. Not withstanding, the SEC and CDF retain personal accountability for Pathway to Change which is executed through the Culture Reform Steering Committee. Resourcing of individual initiatives in support of the Pathway to Change Strategy comes from the individual Groups and Services as appropriate.
Program Key Performance Indicators
The following Key Performance Indicator transferred from Program 1.1 Office of the Secretary and CDF to the Chief Operating Officer Organisation since the Portfolio Budget Statements 2012-13:
the Ministers are satisfied with the timeliness and quality of advice, including Cabinet documentation, provided by the Department.
Department of Defence
63
Program 1.6 Deliverables
The following changes to DSRG's core responsibilities focus on day-to-day support to the ADF to enable Defence capability. Particular deliverables for 2012-13 and the Forward Estimate years include:
provision of timely, accurate and high quality advice on Defence Support and Reform matters to the CDF, the Secretary and the Government
ensure Defence input to Cabinet and the National Security Committee of Cabinet is timely, relevant and appropriately robust
ensure policy advice provided to the Government is accurate, timely and responsive, and offers practical and cost-effective approaches to fulfil the Government’s defence responsibilities
promote and protect Defence’s reputation by increasing public awareness of Defence activities and achievements and strengthen Defence capabilities in media-related activities
ensure that Defence complies fully with its obligations under the Archives and Freedom of Information Acts, including the pro-disclosure and accessibility requirements of the Information Publication scheme
continue to drive reform including in areas of the non-materiel procurement shared services and the Estate Shared Services reform
development and delivery of the 2012-13 Major Capital Facilities Program within scope and budget as outlined in Appendices C, D and E
provision of facilities, housing and other DSRG support services
Strategic Reform Management Office (SRMO) is responsible for the high-level integration, coordination and oversight of the Strategic Reform Program
development of environmental policies and strategies in accordance with Defence obligations towards the Environment and Biodiversity Conservation Act 1999 and other environmental policies as outlined in the Defence Environmental Strategic Plan 2010-2014
management of Defence's property leasing, acquisition and disposal programs
ongoing development of options for changes to the estate which inform and are informed by Force Structure Review 2013, the Australian Defence Force Posture Review, agreed US Global Force Posture Review initiatives, and Defence White Paper 2013 considerations
provision of, through the centre of expertise, non-materiel procurement and contracting advice and support, and continuation of the improvement of procurement practices across Defence
provision of garrison and other base support services to support Defence bases and establishments throughout Australia including the management of the Base Services Retender
provision of nationally delivered whole-of-Defence corporate services, including printing and publishing, and travel
administration of the Defence Home Ownership Assistance Scheme
continue implementation of the Base Accountabilities Model across all Defence bases to provide a clear separation of responsibility for base management and support services from responsibility for capability
implementation of DSRG elements of the base security improvement program.
Defence Portfolio Additional Estimates Statements 2012-13
64
Program 1.6 Key Performance Indicators
The following changes to Program 1.6 Key Performance Indicators since the Portfolio Budget Statements 2012-13 are:
improve business outcomes as part of broader Defence reform, including ongoing implementation of the revised responsibilities and accountabilities for base support
the Ministers are satisfied with the timeliness and quality of advice, including Cabinet documentation, provided by the Department
deliver products and services on time and on budget to support the development and delivery of Defence capability
develop industry engagement and collaborative relationships to ensure the effective and efficient delivery of products and services
support ADF operational capability, including through the deployment of ADF lawyers to provide access to relevant and timely legal support
Provide ADF members with high quality service residences, relocation and travel services using cost-effective contract arrangements
manage, develop and sustain the Defence estate to meet Defence and Government requirements by developing and delivering major estate and environment programs on time, to budget and compliant with all appropriate regulatory requirements.
Department of Defence
67
Program 1.13 Deliverables
The following changes to Program 1.13 Deliverables since the Portfolio Budget Statements 2012-13 are:
establishment of an Organisational Response Unit within Defence People group to facilitate Defence's interaction with the Defence Abuse Response Taskforce established by Government in response to the Report of the DLA Piper Review into allegations of sexual or other forms of abuse in Defence
establishment of a Sexual Misconduct Prevention and Response Office to ensure members who report abuse are given appropriate support to assist with their immediate safety and well being, their care and recovery, and their return to their full work potential.
Program 1.13 Key Performance Indicators
The following changes to Program 1.13 Key Performance Indicators since the Portfolio Budget Statements 2012-13 are:
provide professional support services to ADF members and families, including delivery of family support programs and bereavement support in the event of death and serious casualties
ensure timely recognition of ADF members and ex-serving members in accordance with the Australian and Imperial Honours and Awards systems and civilian long service recognition.
Defence Portfolio Additional Estimates Statements 2012-13
78
Section 3: Explanatory Tables and Budgeted Financial Statements
3.1 Explanatory Tables
Table 42: Summary of Estimated Special Account Balances[1][2][3]
Outcome
Opening2012-132011-12
$'000
Receipts2012-132011-12
$'000
Payments2012-132011-12
$'000
Adjustments2012-132011-12
$'000
Closing Balance2012-132011-12
$'000
1 110,744 49,968 -49,873 -34,778 76,061
114,880 55,736 -59,872 - 110,744
1 328 28 -39 - 317
322 29 -23 - 328
1 162 8 -6 - 164
162 8 -8 - 162
1 1,217 60 - - 1,277
1,167 58 -8 - 1,217
Total Special Accounts 2012-13 112,451 50,064 -49,918 -34,778 77,819
2011-12 actual 116,531 55,831 -59,911 - 112,451
Services for Other Entities and Trust Moneys - Defence Special Account– Financial Management and Accountability Act 1997
Defence Endowments Special Account – Financial Management and Accountability Act 1997
Fedorczenko Legacy Special Account – Financial Management and Accountability Act 1997
Young Endeavour Youth Program Special Account – Financial Management and Accountability Act 1997
Notes 1. 2012-13 estimates in bold. 2. 2011-12 actuals in italics. 3. These are all Special Public Monies.
Department of Defence
79
3.1.1 Australian Government Indigenous Expenditure
Table 43: Australian Government Indigenous Expenditure
ProgramBill No. 1
$'000
Outcome 1
Defence Indigenous Employment Strategy 1.13
Departmental 2012-13 Revised Estimate 2,783
Departmental 2012-13 Budget Estimate 2,783
Defence Indigenous Development Program 1.13
Departmental 2012-13 Revised Estimate 6,174
Departmental 2012-13 Budget Estimate 6,174
Army Aboriginal Community Assistance Program[1][2]1.3
Departmental 2012-13 Revised Estimate 6,527
Departmental 2012-13 Budget Estimate 7,800
Total 2012-13 Revised Estimate 15,484
Total 2012-13 Budget Estimate 16,757
Notes 1. All amounts are GST exclusive. 2. The majority of costs are subsequently recovered from Department of Families, Housing, Community Services and Indigenous
Affairs.
Defence Indigenous Employment Strategy
No changes have been made to Defence Indigenous Employment Strategy since the Portfolio Budget Statements 2012-13.
Defence Indigenous Development Program
No changes have been made to Defence Indigenous Development Program since the Portfolio Budget Statements 2012-13.
Army Aboriginal Community Assistance Program
No changes have been made to Army Aboriginal Community Assistance Program since the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
80
3.1.2 Grants
The following changes to the grants program since the Portfolio Budget Statements 2012-13 total $1,628.0m, with two new grant programs and four grants approved.
Table 44: Grants Approved Since the 2012-13 Budget
Total Approvals
$'000[1]
2012-13Revised
Estimate
$’000[1]
Defence Family Support Funding Program - approved in 2011-12[2]24 -
Defence Family Support Funding Program[3]1,272 1,430
Army Military History Research Grants Scheme 82 82
International Institute for Strategic Studies (IISS) – for 2013 Shangri-La Dialogue[4]85 84
Kokoda Foundation[5]115 115
The Sir Richard Williams Foundation 50 50
Total additional grants 1,628 1,761
Notes 1. Approvals and Revised Estimate are as at 31 December 2012 and exclude GST. 2. Approved 4 June 2012 and payment made in 2011-12. 3. Revised Estimate includes funds for Seeding Grants. 4. This grant was approved for US$80,875. 5. Payment of $115,000 was made. $15,000 reimbursement received for the cancellation of the November 2012 Young Strategic
Leaders Congress.
Defence Family Support Program
Since the publication of the Portfolio Budget Statements 2012-13, the Defence Family Support Funding Program has approved $24,000 in seeding grants at the end of 2011-12 and approved grants totalling $1,272,000 in 2012-13. The Program provides funds to support projects and services initiated by Defence families. It is also available to existing groups in the community composed of, or benefiting, Defence families.
Army Military History Research Grants Scheme
Grants totalling $82,000 were approved for the Army Military History Research Grants Scheme. The purpose of the scheme is to support and encourage research into the role and involvement of the Army in the development of the nation. The scheme has been in operation since 1992.
International Institute for Strategic Studies (IISS) - Shangri-La Dialogue
A grant of $85,000 (US$80,875) was awarded to the IISS for the 2013 Shangri-La Dialogue, which is a major annual Ministerial level meeting of defence and security officials from the Asia-Pacific and wider region. It provides an opportunity for regional states' defence establishments to exchange views on security in the region. IISS is a registered charity based in London and is a leading authority on political-military conflict and an independent source of objective information on international strategic issues.
Department of Defence
81
Kokoda Foundation
A grant of $85,000 was awarded to the Kokoda Foundation to support the Australia-United States Trilogy Dialogue held on 14 to 17 November 2012. A further grant of $30,000 was also awarded for two weekend congresses of the Kokoda Foundation Young Strategic Leaders program (one of which was cancelled and funding reimbursed to Defence). The Kokoda Foundation is a not-for profit organisation that focuses on issues relating to national security and whole-of-nation responses to crises and threats, and fosters research and innovative thinking on Australia's future security challenges.
The Sir Richard Williams Foundation
A grant of $50,000 was provided to the Sir Richard Williams Foundation to undertake independent research and analysis of national security issues facing Australia in today's complex security environment. The outcome of this research will be a series of published reports and publications for public education and discussion.
Defence Portfolio Additional Estimates Statements 2012-13
82
3.2 Budgeted Financial Statements
3.2.1 Departmental and Administered Budgeted Financial Statements
Table 45: Variation in Budgeted Departmental Comprehensive Income Statement (showing net cost of services) for the period ended 30 June
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
Variation%
EXPENSES
Employee benefits 9,862,642 9,850,793 -11,849 -0.1
Supplier expenses 9,640,819 10,230,282 589,463 6.1
Grants 43,870 43,782 -88 -0.2
Depreciation and amortisation 3,883,375 3,677,486 -205,889 -5.3
Finance costs 92,591 99,244 6,653 7.2
Write-down of assets and impairment of assets 1,085,305 1,105,141 19,836 1.8
Losses from sale of assets - 7,565 7,565 -
Other 123,279 65,717 -57,562 -46.7
Total expenses 24,731,881 25,080,010 348,129 1.4
LESS:
OWN-SOURCE INCOME
Own-source revenue
Sales of goods and rendering of services 840,972 798,644 -42,328 -5.0
Other revenue 70,234 851,480 781,246 1,112.3
Total own-source revenue 911,206 1,650,124 738,918 81.1
Gains
Reversals of previous asset write-downs 521,145 521,531 386 0.1
Sale of assets 281 - -281 -100.0
Other gains 5,001 5,001 - -
Total gains 526,427 526,532 105 -
Total own-source income 1,437,633 2,176,656 739,023 51.4
Net cost of (contribution by) services 23,294,248 22,903,354 -390,894 -1.7
Revenue from Government 23,269,856 22,903,354 -366,502 -1.6
Surplus (Deficit) attributable to the Australian Government -24,392 - 24,392 -100.0Total comprehensive income attributable to the Australian Government -24,392 - 24,392 -100.0
Department of Defence
83
Table 46: Variation in Budgeted Departmental Balance Sheet (as at 30 June)
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
Variation%
ASSETS
Financial assets
Cash and cash equivalents 72,871 18,091 -54,780 -75.2
Trade and other receivables 90,967 132,631 41,664 45.8
Tax assets 112,449 84,060 -28,389 -25.2
Appropriation receivable 121,517 76,857 -44,660 -36.8
Other receivables 232,507 153,969 -78,538 -33.8
Total financial assets 630,311 465,608 -164,703 -26.1
Non-financial assets
Land and buildings 15,905,773 15,950,564 44,791 0.3
Infrastructure, plant and equipment 6,763,225 6,852,428 89,203 1.3
Specialist military equipment 39,847,374 40,738,740 891,366 2.2
Intangibles 438,992 511,014 72,022 16.4
Heritage and cultural 965,944 984,939 18,995 2.0
Inventories 5,388,990 5,576,003 187,013 3.5
Prepayments 154,833 154,166 -667 -0.4
Total non-financial assets 69,465,131 70,767,854 1,302,723 1.9
Assets held for sale 53,512 25,698 -27,814 -52.0
Total assets 70,148,954 71,259,160 1,110,206 1.6
LIABILITIES
Payables
Suppliers 872,433 912,961 40,528 4.6
Other 365,640 418,700 53,060 14.5
Total payables 1,238,073 1,331,661 93,588 7.6
Interest bearing liabilities
Leases 1,015,758 1,086,866 71,108 7.0
Total interest bearing liabilities 1,015,758 1,086,866 71,108 7.0
Provisions
Employee provisions 2,310,942 2,235,790 -75,152 -3.3
Restoration, decontamination and decommissioning 879,277 897,853 18,576 2.1
Other 6,358 3,822 -2,536 -39.9
Total provisions 3,196,577 3,137,465 -59,112 -1.8
Total liabilities 5,450,408 5,555,992 105,584 1.9
NET ASSETS 64,698,546 65,703,168 1,004,622 1.6
EQUITY
Contributed equity 16,521,019 17,713,203 1,192,184 7.2
Reserves 14,565,010 14,715,576 150,566 1.0
Retained surplus (accumulated deficit) 33,612,517 33,274,389 -338,128 -1.0
Total equity 64,698,546 65,703,168 1,004,622 1.6
Defence Portfolio Additional Estimates Statements 2012-13
84
Table 47: Variation in Budgeted Departmental Statement of Cash Flows (for the period ended 30 June)
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
Variation%
OPERATING ACTIVITIES
Cash received
Appropriations 23,269,856 22,903,354 -366,502 -1.6
Goods and services 840,972 798,675 -42,297 -5.0
Net GST received 637,848 627,693 -10,155 -1.6
Other cash received 70,234 105,218 34,984 49.8
Cash transfer from the Official Public Account (receivables) - - - -
Total cash received 24,818,910 24,434,940 -383,970 -1.5
Cash used
Employees 9,841,548 9,843,469 1,921 -
Suppliers 8,910,692 8,955,219 44,527 0.5
Net GST paid 637,848 627,693 -10,155 -1.6
Grants 43,870 43,782 -88 -0.2
Other cash used 33,897 52,568 18,671 55.1
Cash transfer to the Official Public Account (receivables) 90,304 14,077 -76,227 -84.4
Total cash used 19,558,159 19,536,808 -21,351 -0.1
Net cash from (used by) operating activities 5,260,751 4,898,132 -362,619 -6.9
INVESTING ACTIVITIES
Cash received
Proceeds from sales of land and buildings 97,936 44,537 -53,399 -54.5
Proceeds from sales of infrastructure, plant and equipment 28,747 28,716 -31 -0.1
Other cash received - 31 31 -
Total cash received 126,683 73,284 -53,399 -42.2
Cash used
Purchase of land and buildings 873,245 858,956 -14,289 -1.6
Purchase of infrastructure, plant and equipment 416,946 243,295 -173,651 -41.6
Purchase of specialist military equipment 2,936,004 3,261,572 325,568 11.1
Purchase of intangibles 11,306 13,754 2,448 21.7
Purchase of inventory 988,753 897,108 -91,645 -9.3
Selling costs on sale of assets 4,154 8,382 4,228 101.8
Finance costs 77,434 77,531 97 0.1
Total cash used 5,307,842 5,360,598 52,756 1.0
Net cash from (used by) investing activities -5,181,159 -5,287,314 -106,155 2.0
FINANCING ACTIVITIES
Cash received
Appropriations - contributed equity - 468,774 468,774 -
Total cash received - 468,774 468,774 -
Cash used
Repayment of debt 79,592 79,592 - -
Cash to the Official Public Account - - - -
Total cash used 79,592 79,592 - -
Net cash from (used by) financing activities -79,592 389,182 468,774 -589.0
Net increase (decrease) in cash and cash equivalents held - - - -
Cash and cash equivalents at the beginning of the reporting period 72,871 18,091 -54,780 -75.2
Effect of exchange rate movements on cash and cash equivalentsat the beginning of the reporting period - - - -
Cash and cash equivalents at the end of the reporting period 72,871 18,091 -54,780 -75.2
Department of Defence
85
3.2.2 Departmental Budgeted Financial Statements
Table 48: Budgeted Departmental Comprehensive Income Statement (showing net cost of services) for the period ended 30 June
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
EXPENSES
Employee benefits 9,841,400 9,850,793 10,060,697 10,543,742 11,431,814
Supplier expenses 10,665,998 10,230,282 10,632,442 11,118,700 12,075,280
Grants 71,305 43,782 44,208 82,590 83,425
Depreciation and amortisation 3,630,984 3,677,486 3,411,495 3,590,476 3,771,849
Finance costs 100,547 99,244 126,209 141,101 145,739
Write-down of assets and impairment of assets 933,464 1,105,141 1,137,194 1,178,335 1,229,980
Losses from sale of assets 13,216 7,565 - - -
Other 97,415 65,717 68,936 66,209 146,261
Total expenses 25,354,329 25,080,010 25,481,181 26,721,153 28,884,348
LESS:
OWN-SOURCE INCOME
Own-source revenue
Sales of goods and rendering of services 778,992 798,644 806,597 837,512 871,155
Other revenue 985,639 851,480 878,636 923,492 958,493
Total own-source revenue 1,764,631 1,650,124 1,685,233 1,761,004 1,829,648
Gains
Foreign exchange 368 - - - -
Reversals of previous asset write-downs 479,573 521,531 551,980 577,905 603,742
Sale of assets - - 15,907 26,720 95,626
Other gains 84,348 5,001 5,126 5,254 5,386
Total gains 564,289 526,532 573,013 609,879 704,754
Total own-source income 2,328,920 2,176,656 2,258,246 2,370,883 2,534,402
Net cost of (contribution by) services 23,025,409 22,903,354 23,222,935 24,350,270 26,349,946
Revenue from Government 22,466,427 22,903,354 23,222,935 24,350,270 26,349,946
Surplus (Deficit) attributable to the Australian Government -558,982 - - - -Total comprehensive income attributable to the Australian Government -558,982 - - - -
Defence Portfolio Additional Estimates Statements 2012-13
86
Table 49: Budgeted Departmental Balance Sheet (as at 30 June)
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
ASSETS
Financial assets
Cash and cash equivalents 18,091 18,091 18,091 18,091 18,091
Trade and other receivables 121,937 132,631 132,631 132,631 132,631
Tax assets 84,062 84,060 84,060 84,060 84,060
Appropriation receivable 76,857 76,857 76,857 76,857 76,857
Other receivables 193,533 153,969 153,790 153,232 152,294
Total financial assets 494,479 465,608 465,429 464,871 463,933
Non-financial assets
Land and buildings 15,695,215 15,950,564 16,154,168 16,454,927 16,845,783
Infrastructure, plant and equipment 6,730,403 6,852,428 7,212,724 7,018,486 6,693,348
Specialist military equipment 40,327,792 40,738,740 41,136,509 42,161,404 44,433,168
Intangibles 575,006 511,014 453,778 406,454 406,985
Heritage and cultural 984,939 984,939 984,939 984,939 984,939
Inventories 5,686,425 5,576,003 5,480,855 5,388,433 5,312,879
Prepayments 154,178 154,166 154,149 154,131 154,113
Total non-financial assets 70,153,958 70,767,854 71,577,122 72,568,774 74,831,215
Assets held for sale 25,698 25,698 25,698 25,698 25,698
Total assets 70,674,135 71,259,160 72,068,249 73,059,343 75,320,846
LIABILITIES
Payables
Suppliers 1,182,758 912,961 915,805 931,683 1,011,532
Other 434,503 418,700 426,910 437,883 440,650
Total payables 1,617,261 1,331,661 1,342,715 1,369,566 1,452,182
Interest bearing liabilities
Leases 748,717 1,086,866 1,501,518 1,424,981 1,386,383
Total interest bearing liabilities 748,717 1,086,866 1,501,518 1,424,981 1,386,383
Provisions
Employee provisions 2,227,657 2,235,790 2,271,288 2,349,281 2,443,807
Restoration, decontamination and decommissioning 876,140 897,853 917,291 941,602 975,105
Other 3,822 3,822 3,822 3,822 3,822
Total provisions 3,107,619 3,137,465 3,192,401 3,294,705 3,422,734
Total liabilities 5,473,597 5,555,992 6,036,634 6,089,252 6,261,299
NET ASSETS 65,200,538 65,703,168 66,031,615 66,970,091 69,059,547
EQUITY
Contributed equity 17,245,351 17,713,203 18,041,650 18,980,126 20,552,436
Reserves 14,715,576 14,715,576 14,715,576 14,715,576 14,715,576
Retained surplus (accumulated deficit) 33,239,611 33,274,389 33,274,389 33,274,389 33,791,535
Total equity 65,200,538 65,703,168 66,031,615 66,970,091 69,059,547
Department of Defence
87
Table 50: Budgeted Departmental Statement of Cash Flows (for the period ended 30 June)
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
OPERATING ACTIVITIES
Cash received
Appropriations 22,484,540 22,903,354 23,222,935 24,350,270 26,349,946
Goods and services 751,279 798,675 806,597 837,512 871,155
Net GST received 540,888 627,693 625,414 651,005 701,055
Interest 4 - - - -
Other cash received 253,680 105,218 70,230 72,034 73,911
Cash transfer from the Official Public Account (receivables) 1,665,917 - - - -
Total cash received 25,696,308 24,434,940 24,725,176 25,910,821 27,996,067
Cash used
Employees 9,641,223 9,843,469 10,016,989 10,454,776 11,334,521
Suppliers 9,135,283 8,955,219 8,922,704 9,287,795 10,001,853
Net GST paid 626,715 627,693 625,414 651,005 701,055
Grants 70,569 43,782 44,208 82,590 83,425
Other cash used 69,879 52,568 21,073 28,329 101,094
Cash transfer to the Official Public Account (receivables) 1,670,514 14,077 48,821 38,733 46,042
Total cash used 21,214,183 19,536,808 19,679,209 20,543,228 22,267,990
Net cash from (used by) operating activities 4,482,125 4,898,132 5,045,967 5,367,593 5,728,077
INVESTING ACTIVITIES
Cash received
Proceeds from sales of land and buildings 51,165 44,537 65,506 61,675 136,685
Proceeds from sales of infrastructure, plant and equipment 25,698 28,716 36,160 36,371 37,277
Proceeds from sales of specialist military equipment 6,929 - - - -
Proceeds from sales of heritage and cultural assets 573 - - - -
Other cash received 1,026 31 - - -
Total cash received 85,391 73,284 101,666 98,046 173,962
Cash used
Purchase of land and buildings 675,386 858,956 882,824 1,010,239 653,026
Purchase of infrastructure, plant and equipment 424,253 243,295 394,657 322,816 197,900
Purchase of specialist military equipment 4,967,268 3,261,572 2,973,544 3,734,893 5,113,499
Purchase of intangibles 34,465 13,754 5,661 11,228 56,346
Purchase of inventory 1,153,994 897,108 1,054,038 1,130,670 1,302,101
Selling costs on sale of assets 13,443 8,382 5,643 1,795 1,518
Finance costs 52,766 77,531 106,771 116,790 112,236
Total cash used 7,321,575 5,360,598 5,423,138 6,328,431 7,436,626
Net cash from (used by) investing activities -7,236,184 -5,287,314 -5,321,472 -6,230,385 -7,262,664
FINANCING ACTIVITIES
Cash received
Appropriations - contributed equity 2,773,786 468,774 329,405 939,329 1,573,185
Total cash received 2,773,786 468,774 329,405 939,329 1,573,185
Cash used
Repayment of debt 66,982 79,592 53,900 76,537 38,598
Cash to the Official Public Account - - - - -
Total cash used 66,982 79,592 53,900 76,537 38,598
Net cash from (used by) financing activities 2,706,804 389,182 275,505 862,792 1,534,587
Net increase (decrease) in cash and cash equivalents held -47,255 - - - -
Cash and cash equivalents at the beginning of the reporting period 64,871 18,091 18,091 18,091 18,091
Effect of exchange rate movements on cash and cash equivalents at beginning of the reporting period 475 - - - -
Cash and cash equivalents at the end of the reporting period 18,091 18,091 18,091 18,091 18,091
Defence Portfolio Additional Estimates Statements 2012-13
88
Table 51: Departmental Statement of Changes in Equity — Summary of Movements (Budget year 2012-13)
Retained Earnings
$'000
Asset Revaluation
Reserve$'000
Contributed Equity/Capital
$'000
Total Equity
$'000
Opening balance as at 1 July 2012
Balance carried forward from previous period 33,239,611 14,715,576 17,245,351 65,200,538
Adjustment for changes in accounting policies - - - -
Adjusted opening balance 33,239,611 14,715,576 17,245,351 65,200,538
Comprehensive income
Comprehensive income recognised directly in equity:
Gain/loss on revaluation of property - - - -
Subtotal comprehensive income - - - -
Surplus (Deficit) for the period - - - -
Total comprehensive income recognised directly in equity - - - -
Transactions with owners
Distribution to owners
Returns on capital:
Restructuring - - - -
Other - - -922 -922
Contributions by owners
Appropriation (equity injection) - - 468,774 468,774
Other 34,778 - - 34,778
Sub-total transaction with owners 34,778 - 467,852 502,630
Transfers between equity components - - - -
Estimated closing balance as at 30 June 2013 33,274,389 14,715,576 17,713,203 65,703,168
Department of Defence
89
Table 52: Departmental Capital Budget Statement
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
CAPITAL APPROPRIATIONS
Equity injection 2,773,786 468,774 329,405 939,329 1,573,185
Total capital appropriations 2,773,786 468,774 329,405 939,329 1,573,185
Represented by:
Purchase of non-financial assets 2,706,804 389,182 275,505 862,792 1,534,587
Annual finance lease costs 66,982 79,592 53,900 76,537 38,598
Other items - - - - -
Total Items 2,773,786 468,774 329,405 939,329 1,573,185
PURCHASE OF NON-FINANCIAL ASSETS
Funded by capital appropriations 2,773,786 468,774 329,405 939,329 1,573,185
Funded by finance lease costs - 404,287 468,552 - -
Funded internally from departmental resources[1]3,336,392 3,908,803 3,927,281 4,139,847 4,447,586
Total 6,110,178 4,781,864 4,725,238 5,079,176 6,020,771Reconciliation of cash used to acquire assets to asset movement table
Total purchases 6,110,178 4,781,864 4,725,238 5,079,176 6,020,771
less additions by finance lease 8,806 404,287 468,552 - -
less additions by creditors/borrowings - - - - -
plus borrowing/finance costs 52,766 77,531 106,771 116,790 112,236
plus Annual finance lease costs 66,982 79,592 53,900 76,537 38,598
less Gifted assets - - - - -
less s32/restructuring - - - - -
Total cash used to acquire assets 6,221,120 4,534,700 4,417,357 5,272,503 6,171,605
Note 1. Includes the following sources of funding:
- annual and prior year appropriations - donations and contributions - gifts - internally developed assets - s31 relevant agency receipts - proceeds from the sale of assets.
Defence Portfolio Additional Estimates Statements 2012-13
90
Table 53: Statement of Departmental Asset Movements (2012-13)
Land$'000
Buildings
$'000
Specialist Military
Equipment$'000
Infrastructure, Plant and
Equipment$'000
Intangibles$'000
Heritage and Cultural
Assets $'000
Assets Held for
Sale$'000
Total$'000
As at 1 July 2012
Gross book value 4,579,475 11,354,224 74,914,928 7,121,243 1,084,316 984,939 25,698 100,064,823
Accumulated depreciation/amortisation and impairment - 238,484 34,587,136 390,840 509,310 - - 35,725,770
Opening net book balance 4,579,475 11,115,740 40,327,792 6,730,403 575,006 984,939 25,698 64,339,053
CAPITAL ASSET ADDITIONS
Estimated expenditure on new or replacement assets
By purchase - appropriation equity - 858,956 3,261,572 243,295 13,754 - - 4,377,577
By purchase - donated funds - - - - - - - -
By finance lease - - - 404,287 - - - 404,287
Total Additions - 858,956 3,261,572 647,582 13,754 - - 4,781,864
Other Movements
Assets held for sale - - - - - - - -
Reclassifications[1]- - 392,553 23,039 - - - 415,592
Depreciation and amortisation - 542,500 2,579,209 478,031 77,746 - - 3,677,486
Disposal of entities or other operations (including restructuring) - 10,761 - 32,866 - - - 43,627
Other disposals[2]- 50,346 663,968 37,699 - - - 752,013
As at 30 June 2013
Gross book value 4,579,475 12,152,073 77,905,085 7,721,299 1,098,070 984,939 25,698 104,466,639
Accumulated depreciation/amortisation and impairment - 780,984 37,166,345 868,871 587,056 - - 39,403,256
Closing net book value 4,579,475 11,371,089 40,738,740 6,852,428 511,014 984,939 25,698 65,063,383
Notes 1. Reclassifications include asset first found. 2. Other disposals includes write-offs.
Department of Defence
91
Table 54: Variation in Schedule of Budgeted Income and Expenses Administered on Behalf of Government (for the period ended 30 June)
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
Variation%
EXPENSES ADMINISTERED ON BEHALF OF GOVERNMENT
Subsidies 109,236 109,236 - -
Military retention benefits 64,223 64,223 - -
Military superannuation benefits 4,053,968 4,053,968 - -
Total expenses administered on behalf of Government 4,227,427 4,227,427 - -
INCOME ADMINISTERED ON BEHALF OF GOVERNMENT
Revenue
Non-taxation
Interest 31,849 31,849 - -
Dividends 45,813 45,813 - -
Military superannuation contributions 1,215,188 1,215,188 - -
Fees 9,963 9,963 - -
Other 39,057 39,057 - -
Total Non-taxation 1,341,870 1,341,870 - -
Total revenues administered on behalf of Government 1,341,870 1,341,870 - -
Defence Portfolio Additional Estimates Statements 2012-13
92
Table 55: Variation in Schedule of Budgeted Assets and Liabilities Administered on Behalf of Government (as at 30 June)
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
Variation%
ASSETS ADMINISTERED ON BEHALF OF GOVERNMENT
Financial assets
Cash and cash equivalents - - - -
Trade and other receivables 65,475 61,393 -4,082 -6.2
Investments accounted for using the equity method 2,311,926 2,277,654 -34,272 -1.5
Loans 509,580 509,580 - -
Total financial assets 2,886,981 2,848,627 -38,354 -1.3
Non-financial assets
Prepayments 165,226 164,772 -454 -0.3
Total Non-financial assets 165,226 164,772 -454 -0.3
Total assets administered on behalf of Government 3,052,207 3,013,399 -38,808 -1.3
LIABILITIES ADMINISTERED ON BEHALF OF GOVERNMENT
Payables
Other - 5,159 5,159 -
Total Payables - 5,159 5,159 -
Provisions
Superannuation - DFRB[1]475,271 471,514 -3,757 -0.8
Superannuation - DFRDB[2]25,475,645 25,344,837 -130,808 -0.5
Superannuation - MSBS[3]23,472,268 23,363,587 -108,681 -0.5
Total Provisions 49,423,184 49,179,938 -243,246 -0.5
Total Liabilities administered on behalf of Government 49,423,184 49,185,097 -238,087 -0.5
Notes 1. Defence Force Retirement Benefits. 2. Defence Force Retirement and Death Benefits. 3. Military Superannuation and Benefits Scheme.
Department of Defence
93
Table 56: Variation in Schedule of Budgeted Administered Cash Flows (for the period ended 30 June)
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000
Variation%
OPERATING ACTIVITIES
Cash received
Interest 31,849 31,849 - -
Military superannuation contributions 1,215,132 1,215,132 - -
Fees 9,963 9,963 - -
Other 39,057 39,057 - -
Total cash received 1,296,001 1,296,001 - -
Cash used
Subsidies paid 109,236 109,236 - -
Military benefits 1,910,631 1,910,631 - -
Total cash used 2,019,867 2,019,867 - -
Net cash from or (used by) operating activities -723,866 -723,866 - -
INVESTING ACTIVITIES
Cash received
Dividends 48,594 48,594 - -
Total cash received 48,594 48,594 - -
Net cash from or (used by) investing activities 48,594 48,594 - -
Net increase (decrease) in cash held -675,272 -675,272 - -
Cash at the beginning of the reporting period - - - -
Cash from the Official Public Account for appropriations 2,019,867 2,019,867 - -
Cash to the Official Public Account -1,344,595 -1,344,595 - -
Effect of exchange rate movements on cash and cash equivalents - - - -
Cash and cash equivalents at end the of the reporting period - - - -
Defence Portfolio Additional Estimates Statements 2012-13
94
Table 57: Schedule of Budgeted Income and Expenses Administered on Behalf of Government (for the period ended 30 June)
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
EXPENSES ADMINISTERED ON BEHALF OF GOVERNMENT
Subsidies 96,585 109,236 117,353 123,267 127,919
Military retention benefits 56,525 64,223 77,103 95,883 77,940
Military superannuation benefits 4,062,274 4,053,968 4,250,459 4,451,345 4,662,021
Other 141 - - - -
Total Expenses administered on behalf of Government 4,215,525 4,227,427 4,444,915 4,670,495 4,867,880
INCOME ADMINISTERED ON BEHALF OF GOVERNMENT
Revenue
Non-taxation
Interest 35,517 31,849 31,849 31,849 31,849
Dividends 49,654 45,813 49,717 52,306 59,456
Military superannuation contributions 1,158,903 1,215,188 1,256,539 1,309,468 1,366,639
Fees 12,251 9,963 10,228 10,502 10,695
Other 59,751 39,057 40,282 41,633 44,706
Total Non-taxation 1,316,076 1,341,870 1,388,615 1,445,758 1,513,345
Total Revenues administered on behalf of Government 1,316,076 1,341,870 1,388,615 1,445,758 1,513,345
Department of Defence
95
Table 58: Schedule of Budgeted Assets and Liabilities Administered on Behalf of Government (as at 30 June)
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
ASSETS ADMINISTERED ON BEHALF OF GOVERNMENT
Financial assets
Cash and cash equivalents - - - - -
Trade and other receivables 64,118 61,393 65,353 67,998 74,477
Investments accounted for using the equity method 2,275,236 2,277,654 2,279,257 2,280,457 2,283,126
Loans 509,580 509,580 509,580 509,580 509,580
Total Financial assets 2,848,934 2,848,627 2,854,190 2,858,035 2,867,183
Non-financial assets
Prepayments 170,095 164,772 152,069 150,086 178,546
Total Non-financial assets 170,095 164,772 152,069 150,086 178,546
Total Assets administered on behalf of Government 3,019,029 3,013,399 3,006,259 3,008,121 3,045,729
Payables
Other 5,159 5,159 5,159 5,159 5,159
Total Payables 5,159 5,159 5,159 5,159 5,159
Provisions
Superannuation - DFRB[1]634,100 471,514 444,171 417,713 392,162
Superannuation - DFRDB[2]38,677,000 25,344,837 25,400,766 25,419,660 25,401,389
Superannuation - MSBS[3]46,479,000 23,363,587 25,663,834 28,129,133 30,757,752
Total Provisions 85,790,100 49,179,938 51,508,771 53,966,506 56,551,303
Total Liabilities administered on behalf of Government 85,795,259 49,185,097 51,513,930 53,971,665 56,556,462
LIABILITIES ADMINISTERED ON BEHALF OF GOVERNMENT
Notes 1. Defence Force Retirement Benefits. 2. Defence Force Retirement and Death Benefits. 3. Military Superannuation and Benefits Scheme.
Defence Portfolio Additional Estimates Statements 2012-13
96
Table 59: Schedule of Budgeted Administered Cash Flows (for the period ended 30 June)
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
OPERATING ACTIVITIES
Cash received
Interest 32,173 31,849 31,849 31,849 31,849
Military superannuation contributions 1,212,438 1,215,132 1,256,483 1,309,412 1,367,310
Fees 11,216 9,963 10,228 10,502 10,695
Other 74,472 39,057 40,282 41,633 44,706
Total Cash received 1,330,299 1,296,001 1,338,842 1,393,396 1,454,560
Cash used
Subsidies paid 92,061 109,236 117,353 123,267 127,919
Military benefits 1,899,936 1,910,631 1,986,025 2,087,510 2,183,624
Total Cash used 1,991,997 2,019,867 2,103,378 2,210,777 2,311,543
Net cash from or (used by) operating activities -661,698 -723,866 -764,536 -817,381 -856,983
INVESTING ACTIVITIES
Cash received
Dividends 52,379 48,594 45,813 49,717 52,306
Total Cash received 52,379 48,594 45,813 49,717 52,306
Net cash from (used by) investing activities 52,379 48,594 45,813 49,717 52,306
Net increase (decrease) in cash held and cash equivalents held -609,319 -675,272 -718,723 -767,664 -804,677
Cash at the beginning of reporting period - - - - -
Cash from the Official Public Account for appropriations 1,991,997 2,019,867 2,103,378 2,210,777 2,311,543
Cash to the Official Public Account -1,382,678 -1,344,595 -1,384,655 -1,443,113 -1,506,866
Effect of exchange rate movements on cash and cash equivalents - - - - -
Cash and cash equivalents at end of reporting period - - - - -
Department of Defence
97
3.3 Consolidated Budgeted Financial Statements for the Department of Defence (including DMO)
Table 60: Consolidated Comprehensive Departmental Income Statement (showing net cost of services) for the Department of Defence (including DMO) for the period ending 30 June
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14ForwardEstimate
$'000
2014-15ForwardEstimate
$'000
2015-16ForwardEstimate
$'000
EXPENSES
Employee benefits 10,433,665 10,454,078 10,623,040 11,157,021 12,073,191
Supplier expenses 9,809,285 9,406,170 9,773,014 10,183,252 11,126,037
Grants 92,105 71,693 66,368 113,130 86,806
Depreciation and amortisation 3,632,664 3,680,013 3,414,085 3,593,130 3,774,570
Finance costs 100,547 99,244 126,209 141,101 145,739
Write-down of assets and impairment of assets 934,701 1,105,141 1,137,194 1,178,335 1,229,980
Losses from sale of assets 13,216 7,565 - - -
Other 97,768 65,717 68,936 66,209 146,261
Total expenses 25,113,951 24,889,621 25,208,846 26,432,178 28,582,584
LESS:
OWN-SOURCE INCOME
Own-source revenue
Sales of goods and rendering of services 429,695 476,797 432,009 444,640 461,598
Rental Income 9,481 - - - -
Other revenue 197,500 70,434 70,230 72,034 73,911
Total own-source revenue 636,676 547,231 502,239 516,674 535,509
Gains
Foreign exchange 1,300 - - - -
Reversals of previous asset write-downs 479,632 521,531 551,980 577,905 603,742
Sale of assets - - 15,907 26,720 95,626
Other gains 85,748 6,401 6,526 6,654 6,786
Total gains 566,680 527,932 574,413 611,279 706,154
Total own-source income 1,203,356 1,075,163 1,076,652 1,127,953 1,241,663
Net cost of (contribution by) services 23,910,595 23,814,458 24,132,194 25,304,225 27,340,921
Revenue from Government 23,397,697 23,814,458 24,132,194 25,304,225 27,340,921
Surplus (deficit) attributable to the Australian Government -512,898 - - - -Total comprehensive income (loss) attributable to the Australian Government -512,898 - - - -
Defence Portfolio Additional Estimates Statements 2012-13
98
Table 61: Consolidated Budgeted Departmental Balance Sheet for the Department of Defence (including DMO) as at 30 June
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14ForwardEstimate
$'000
2014-15ForwardEstimate
$'000
2015-16ForwardEstimate
$'000
ASSETS
Financial assets
Cash and cash equivalents 42,813 68,091 68,091 68,091 68,091
Trade and other receivables 124,180 124,180 124,180 124,180 124,180
Tax assets 199,973 199,971 199,971 199,971 199,971
Appropriation receivable 378,781 346,857 349,924 353,579 340,444
Other receivables 181,813 140,601 140,422 139,864 138,926
Total financial assets 927,560 879,700 882,588 885,685 871,612
Non-financial assets
Land and buildings 15,695,215 15,950,564 16,154,168 16,454,927 16,845,783
Infrastructure, plant and equipment 6,737,274 6,859,627 7,220,259 7,026,366 6,701,581
Specialist military equipment 40,327,792 40,738,740 41,136,509 42,161,404 44,433,168
Intangibles 575,062 511,153 454,002 406,766 407,387
Heritage and cultural 984,939 984,939 984,939 984,939 984,939
Inventories 5,686,425 5,576,003 5,480,855 5,388,433 5,312,879
Prepayments 1,520,202 1,520,190 1,520,173 1,520,155 1,520,137
Total non-financial assets 71,526,909 72,141,216 72,950,905 73,942,990 76,205,874
Assets held for sale 25,698 25,698 25,698 25,698 25,698
Total assets 72,480,167 73,046,614 73,859,191 74,854,373 77,103,184
LIABILITIES
Payables
Suppliers 2,351,977 2,174,627 2,177,471 2,193,349 2,273,198
Other 502,498 381,495 392,149 405,590 389,349
Total payables 2,854,475 2,556,122 2,569,620 2,598,939 2,662,547
Interest bearing liabilities
Leases 748,717 1,086,866 1,501,518 1,424,981 1,386,383
Total interest bearing liabilities 748,717 1,086,866 1,501,518 1,424,981 1,386,383
Provisions
Employee provisions 2,421,944 2,423,060 2,459,602 2,539,215 2,640,057
Restoration, decontamination and decommissioning 876,140 897,853 917,291 941,602 975,105
Other provisions 9,520 9,520 9,520 9,520 9,520
Total provisions 3,307,604 3,330,433 3,386,413 3,490,337 3,624,682
Total liabilities 6,910,796 6,973,421 7,457,551 7,514,257 7,673,612
NET ASSETS 65,569,371 66,073,193 66,401,640 67,340,116 69,429,572
EQUITY
Contributed equity 17,400,719 17,868,571 18,197,018 19,135,494 20,707,804
Reserves 14,715,815 14,715,815 14,715,815 14,715,815 14,715,815
Retained surplus (accumulated deficits) 33,452,837 33,488,807 33,488,807 33,488,807 34,005,953
Total equity 65,569,371 66,073,193 66,401,640 67,340,116 69,429,572
Department of Defence
99
Table 62: Consolidated Budgeted Departmental Statement of Cash Flows for the Department of Defence (including DMO) for the period ended 30 June
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14ForwardEstimate
$'000
2014-15ForwardEstimate
$'000
2015-16ForwardEstimate
$'000
OPERATING ACTIVITIES
Cash received
Appropriations 23,354,540 23,846,383 24,129,127 25,300,570 27,354,056
Goods and services 424,837 475,767 429,560 443,746 460,681
Net GST received 1,217,247 1,186,489 1,214,938 1,325,364 1,502,416
Other cash received 282,305 162,926 130,799 132,559 136,010
Cash transfer from the Official Public Account (receivables) - - - - -
Total cash received 25,278,929 25,671,565 25,904,424 27,202,239 29,453,163
Cash used
Employees 10,211,933 10,452,990 10,575,844 11,063,967 11,988,590
Suppliers 9,003,659 8,824,614 8,928,402 9,262,036 9,996,974
Net GST paid 1,318,611 1,186,489 1,214,938 1,325,364 1,502,416
Grants 91,017 71,693 66,368 113,130 86,806
Other cash used 69,883 195,354 21,073 28,329 101,094
Cash transfer to the Official Public Account (receivables) 4,597 14,077 48,821 38,733 46,042
Total cash used 20,699,700 20,745,217 20,855,446 21,831,559 23,721,922
Net cash from or (used by) operating activities 4,579,229 4,926,348 5,048,978 5,370,680 5,731,241
INVESTING ACTIVITIES
Cash received
Proceeds from sales of land and buildings 51,165 44,537 65,506 61,675 136,685
Proceeds from sales of infrastructure, plant and equipment 26,271 28,716 36,160 36,371 37,277
Proceeds from sales of specialist military equipment 6,929 - - - -
Other cash received 1,026 31 - - -
Total cash received 85,391 73,284 101,666 98,046 173,962
Cash used
Purchase of land and buildings 675,386 858,956 882,824 1,010,239 653,026
Purchase of infrastructure, plant and equipment 426,143 246,233 397,668 325,903 201,064
Purchase of specialist military equipment 4,967,268 3,261,572 2,973,544 3,734,893 5,113,499
Purchase of intangibles 34,465 13,754 5,661 11,228 56,346
Purchase of inventory 1,153,994 897,108 1,054,038 1,130,670 1,302,101
Purchase of heritage and cultural assets - - - - -
Selling costs on sale of assets 13,443 8,382 5,643 1,795 1,518
Finance costs 52,766 77,531 106,771 116,790 112,236
Total cash used 7,323,465 5,363,536 5,426,149 6,331,518 7,439,790
Net cash from or (used by) investing activities -7,238,074 -5,290,252 -5,324,483 -6,233,472 -7,265,828
FINANCING ACTIVITIES
Cash received
Appropriations - contributed equity 2,773,786 468,774 329,405 939,329 1,573,185
Total cash received 2,773,786 468,774 329,405 939,329 1,573,185
Cash used
Repayment of debt 66,982 79,592 53,900 76,537 38,598
Cash to the Official Public Account - - - - -
Total cash used 66,982 79,592 53,900 76,537 38,598
Net cash from or (used by) financing activities 2,706,804 389,182 275,505 862,792 1,534,587
Net increase or (decrease) in cash and cash equivalents held 47,959 25,278 - - -Cash and cash equivalents at the beginning of the reporting period -5,621 42,813 68,091 68,091 68,091Effect of exchange rate movements on cash and cash equivalents 475 - - - -
Cash and cash equivalents at the end of the reporting period 42,813 68,091 68,091 68,091 68,091
Defence Portfolio Additional Estimates Statements 2012-13
100
Table 63: Consolidated Budgeted Income and Expenses Administered on Behalf of Government for the Department of Defence (including DMO) for the period ended 30 June
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
INCOME ADMINISTERED ON BEHALF OF GOVERNMENT
Revenue
Non-taxation
Interest 36,059 31,855 31,855 31,855 31,855
Dividends 49,654 45,813 49,717 52,306 59,456
Military superannuation contributions 1,158,903 1,215,188 1,256,539 1,309,468 1,366,639
Fees 12,251 9,963 10,228 10,502 10,695
Other 59,793 39,057 40,282 41,633 44,706
Total non-taxation 1,316,660 1,341,876 1,388,621 1,445,764 1,513,351
Total revenues administered on behalf of Government 1,316,660 1,341,876 1,388,621 1,445,764 1,513,351
EXPENSES ADMINISTERED ON BEHALF OF GOVERNMENT
Subsidies 96,585 109,236 117,353 123,267 127,919
Military retention benefits 56,525 64,223 77,103 95,883 77,940
Military superannuation benefits 4,062,274 4,053,968 4,250,459 4,451,345 4,662,021
Other 846 - - - -
Total expenses administered on behalf of Government 4,216,230 4,227,427 4,444,915 4,670,495 4,867,880
Table 64: Consolidated Budgeted Assets and Liabilities Administered on Behalf of Government for the Department of Defence (including DMO) as at 30 June
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
ASSETS ADMINISTERED ON BEHALF OF GOVERNMENT
Financial assets
Receivables 68,460 61,393 65,353 67,998 74,477
Investments accounted for using the equity method 2,275,236 2,277,654 2,279,257 2,280,457 2,283,126
Loans 509,580 509,580 509,580 509,580 509,580
Total financial assets 2,853,276 2,848,627 2,854,190 2,858,035 2,867,183
Non-financial assets
Prepayments 170,095 164,772 152,069 150,086 178,546
Total non-financial assets 170,095 164,772 152,069 150,086 178,546
Total assets administered on behalf of Government 3,023,371 3,013,399 3,006,259 3,008,121 3,045,729
Payables
Other 5,159 5,159 5,159 5,159 5,159
Total payables 5,159 5,159 5,159 5,159 5,159
Provisions
Superannuation - DFRB[1]634,100 471,514 444,171 417,713 392,162
Superannuation - DFRDB[2]38,677,000 25,344,837 25,400,766 25,419,660 25,401,389
Superannuation - MSBS[3]46,479,000 23,363,587 25,663,834 28,129,133 30,757,752
Total provisions 85,790,100 49,179,938 51,508,771 53,966,506 56,551,303
Total liabilities administered on behalf of Government 85,795,259 49,185,097 51,513,930 53,971,665 56,556,462
LIABILITIES ADMINISTERED ON BEHALF OF GOVERNMENT
Notes 1. Defence Force Retirement Benefits. 2. Defence Force Retirement and Death Benefits. 3. Military Superannuation and Benefits Scheme.
Department of Defence
101
Table 65: Consolidated Budgeted Administered Statement of Cash Flows for the Department of Defence (including DMO) for the period ended 30 June
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
OPERATING ACTIVITIES
Cash received
Interest 35,846 31,979 31,855 31,855 31,855
Military superannuation contributions 1,212,438 1,215,132 1,256,483 1,309,412 1,367,310
Fees 11,216 9,963 10,228 10,502 10,695
Other 74,472 43,275 40,282 41,633 44,706
Total cash received 1,333,972 1,300,349 1,338,848 1,393,402 1,454,566
Cash used
Subsidies paid 92,061 109,236 117,353 123,267 127,919
Military benefits 1,899,936 1,910,631 1,986,025 2,087,510 2,183,624
Total cash used 1,991,997 2,019,867 2,103,378 2,210,777 2,311,543
Net cash from or (used by) operating activities -658,025 -719,518 -764,530 -817,375 -856,977
INVESTING ACTIVITIES
Cash received
Dividends 52,379 48,594 45,813 49,717 52,306
Total cash received 52,379 48,594 45,813 49,717 52,306
Cash used
Loans - - - - -
Total cash used - - - - -
Net cash from (used by) investing activities 52,379 48,594 45,813 49,717 52,306
Net increase (decrease) in cash held -605,646 -670,924 -718,717 -767,658 -804,671
Cash at the beginning of the reporting period - - - - -
Cash from the Official Public Account for appropriations 1,991,997 2,019,867 2,103,378 2,210,777 2,311,543
Cash to the Official Public Account -1,386,351 -1,348,943 -1,384,661 -1,443,119 -1,506,872
Effect of exchange rate movements on cash and cash equivalents - - - - -
Cash and cash equivalents at the end of the reporting period - - - - -
Defence Portfolio Additional Estimates Statements 2012-13
102
Appendices
Appendix A Defence Portfolio Bodies
Appendix B Defence Cooperation Program
Appendix C Major Capital Facilities Program
Appendix D Status of Major Projects Foreshadowed For Government and Parliamentary Standing Committee on Public Works (PWC) Consideration in 2012-13
Appendix E Approved Projects Being Developed for Private Financing Arrangements
Appendix F The Unapproved Major Capital Investment Program (also known as the Defence Capability Plan)
Department of Defence
103
Appendix A
Defence Portfolio Bodies
Royal Australian Navy Central Canteens Board
Chairman: Commodore Clinton Thomas AM CSC is now Rear Admiral Clinton Thomas AM CSC.
Defence Portfolio Additional Estimates Statements 2012-13
104
Appendix B
Defence Cooperation Program
No changes have been made to Defence Cooperation Program since the Portfolio Budget Statements 2012-13.
Department of Defence
105
Appendix C
Major Capital Facilities Program
Information is as reported in the Portfolio Budget Statements 2012-13.
Approved Major Capital Facilities Projects
Table 66 and the following descriptions provide details on progress and expenditure during 2012-13 on major capital facilities projects.
Table 66: Approved Major Capital Facilities Projects by State and Federal Electorate
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
NEW SOUTH WALES
Gilmore
HMAS Albatross
Redevelopment Stage 3 192.0 - 19.1 0.5 -18.6The financial variation is due to protracted negotiations in establishing the delivery phase contracts.
Hughes
Moorebank Units Relocation 352.9 - 64.8 49.6 -15.2The financial variation is due to estimated 2012-13 spend being refined through detailed design and contract award.
Defence Logistics
Transformation Project[1][11] - - - 45.9 45.9Project has been approved since the Portfolio Budget Statements 2012-13 .
Liverpool Military Area High Voltage Reticulation Systems
Upgrade [11]19.6 - - 8.0 8.0
Project has been approved since the Portfolio Budget Statements 2012-13 .
Facilities for Joint Counter Improvised Explosive Device
Capability[1][12] - - - 0.3 0.3
Project has been approved since the Portfolio Budget Statements 2012-13 .
Defence Portfolio Additional Estimates Statements 2012-13
106
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
Hunter
SingletonEnhanced Land Force Stage
2 Works[1][3] - 97.6 24 21.2 -2.8The financial variation is as a result of extended procurement activities that have delayed the delivery of an element of work.
Facilities for Joint Counter Improvised Explosive Device
Capability[1][12] - - - 0.1 0.1
MacKellar
Pittwater AnnexeHMAS Penguin and Pittwater
Annexe Redevelopment[1][4] - 2.7 4.3 4.3 -
Riverina
KapookaEnhanced Land Force Stage
1 Works[1][2] - 102.1 1.2 2.0 0.8The financial variation is a result of achieving some accelerated works outcomes. The project is now in the Defects Liability Period.
Warringah
HMAS PenguinHMAS Penguin and Pittwater
Annexe Revelopment[1][4] - 20.0 20.5 28.0 7.5The financial variation is due to earlier then expected delivery of construction works being achieved on site.
Total New South Wales 564.5 222.4 133.9 159.9 26.0
Department of Defence
107
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
VICTORIA
Gippsland
East SaleRAAF Base East Sale Redevelopment
185.6 - 25.0 25.0 -
Indi
Bandiana
Facilities for Replacement
Towed Artillery (Land 17)[1][5] - 0.1 2.8 0.9 -1.9The financial variation is due to a delay in finalising the delivery phase contracts. The expected completion date has slipped to financial year 2014-15.
Joint Logistics Unit Warehousing
36.4 32.2 - 2.2 2.2
Gaza Ridge Barracks
Facilities for Project
Overlander (LAND 121)[1][7] - 1.4 7.8 8.0 0.2The financial variation is attributable to contractor performance and unforeseen inground conditions.
Jagajaga
WatsoniaDefence Force School of Signals
101.3 90.9 2.4 3.0 0.6The financial variation is a result of the delay in the delivery of the final scope element, which is being reassessed.
McEwen
PuckapunyalEnhanced Land Force Stage
1 Works[1][2] - 43.9 32.5 20.2 -12.3 The financial variation is due to delivery schedule reprogramming.
Facilities for Replacement
Towed Artillery (Land 17)[1][5] - 0.1 2.5 1.2 -1.3The financial variation is due to a delay in finalising the delivery phase contracts. This has delayed the completion date to financial year 2014-15.
Total Victoria 323.3 168.6 73.0 60.5 -12.5
Defence Portfolio Additional Estimates Statements 2012-13
108
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
QUEENSLAND
Blair
AmberleyRAAF Base Amberley Redevelopment Stage 3
331.5 297.2 29.2 17.0 -12.2 The financial variation is due to delivery schedule reprogramming.
Australian Super Hornet
Facilities[8] 110.1 106.9 0.9 0.9 -
Heavy Airlift Capability
Permanent Facilities[1][9] - 148.8 5.2 4.1 -1.1The financial variation is a result of the payment profile for the Cargo Compartment Trainer differing from that assumed at the time of the publication of the Portfolio Budget Statements 2012-13 .
Facilities for Project
Overlander (Land 121)[1][7] - 7.9 3.9 3.2 -0.7Amberley works are now complete. The financial variation can be attributed to favourable tender outcomes.
Enhanced Land Force Stage
1 Works[1][2] - 98.4 3.1 4.2 1.1
The financial variation is a result of a delay in delivery of the Air Point of Disembarkation facilities. It was necessary to recontract for project manager services and this has impacted on the 2012-13 financial year spend.
Defence Logistics
Transformation Project[1][11] - - - 5.0 5.0Project has been approved since the Portfolio Budget Statements 2012-13 .
Enoggera
Enhanced Land Force Stage
2 Works[1][3] - 441.3 119.5 202.6 83.1The financial variation is attributed to beneficial programming of the delivery schedule, allowing works elements to be brought forward.
Facilities for Replacement
Towed Artillery (Land 17)[1][5] - 0.1 13 8.7 -4.3The financial variation is due to a delay in finalising the delivery phase contracts. This has delayed the completion date to financial year 2014-15.
Forde
Canungra
Enhanced Land Force Stage
2 Works[1][3] - 16.8 28.3 24 -4.3The financial variation is attributed to reduced activity as a result of contractor insolvency. The contract has been retendered and works are anticipated to be delivered on schedule.
Department of Defence
109
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
Herbert
TownsvilleEnhanced Land Force Stage
1 Works[1][2] - 168.4 8.8 13.1 4.3The financial variation is the result of costs associated with Information and Communications Technology (ICT) works.
Enhanced Land Force Stage
2 Works[1][3] - 58.5 2.9 1.6 -1.3The financial variation is a result of savings realised in the delivery of some elements of these works.
Facilities for Replacement
Towed Artillery (Land 17)[1][5] - 0.1 4.0 2.0 -2.0The financial variation is due to a delay in finalising the delivery phase contracts. This has delayed the completion date to financial year 2014-15.
Facilities for Joint Counter Improvised Explosive Device
Capability[1][12] - - - 0.2 0.2
Project has been approved since the Portfolio Budget Statements 2012-13 .
Lilley
Damascus Barracks
Facilities for Project
Overlander (Land 121)[1][7] - 11.9 6.2 2.8 -3.4The financial variation is a result of delays to the program due to asbestos being found on site. These delays are not anticipated to impact the construction completion date.
Moncrief
Facilities for Joint Counter Improvised Explosive Device
Capability[1][12] - - - 0.1 0.1
Project has been approved since the Portfolio Budget Statements 2012-13 .
Rankin
Greenbank Training AreaEnhanced Land Force Stage
2 Works[1][3] - 13.2 83.2 79.2 -4.0The financial variation is attributed to reduced activity on site related to a contractual dispute.
RyanFacilities for Joint Counter Improvised Explosive Device
Capability[1][12] - - - 0.1 0.1
Project has been approved since the Portfolio Budget Statements 2012-13 .
Wide Bay
Wide Bay Training AreaEnhanced Land Force Stage
2 Works[1][3] - 44.6 38.7 14.2 -24.5The financial variation is due to delays in the agreement of the preferred site which has delayed works scheduled for 2012-13.
Total Queensland 441.6 1,414.1 346.9 383.0 36.1
Defence Portfolio Additional Estimates Statements 2012-13
110
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
SOUTH AUSTRALIA
Barker
Murray Bridge Training AreaHardened and Networked
Army Facilities[1][10] - 16.5 7.1 10.3 3.2The financial variation is a result of work to resolve environmental issues.
Wakefield
Edinburgh Defence PrecinctHardened and Networked
Army Facilites[1][10] - 544.1 3.8 0.7 -3.1 The financial variation is due to delivery schedule reprogramming.
Facilities for Replacement
Towed Artillery (Land 17)[1][5] - 0.1 3.2 1.1 -2.1The financial variation is due to a delay in finalising the delivery phase contracts. This has delayed the completion date to financial year 2014-15.
RAAF Base Edinburgh
Redevelopment Stage 2 99.6 86.2 6.1 12.0 5.9The financial variation is due to the prompt resolution of design and licensing issues related to the construction of Ordnance Loading Aprons at RAAF Base Edinburgh .
Enhanced Land Force Stage
1 Works[1][2] - 19.5 5.8 4.1 -1.7The financial variation is due to an extended design period for the remaining elements. Construction of these elements will continue into financial year 2013-14.
Enhanced Land Force Stage
2 Works[1][3] - 14.1 19.9 21.2 1.3The financial variation is due to some decontamination works undertaken on site.
Total South Australia 99.6 680.5 45.9 49.4 3.5
WESTERN AUSTRALIA
Pearce
RAAF Base Pearce
Redevelopment Stage 1 142.2 130.8 7.6 3.5 -4.1The financial variation is a result of delays to the program caused by the design non compliance of one element of the project.
PearceFacilities for Joint Counter Improvised Explosive Device
Capability[1][12] - - - 0.1 0.1
Project has been approved since the Portfolio Budget Statements 2012-13 .
Total Western Australia 142.2 130.8 7.6 3.5 -4.1
Department of Defence
111
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
TASMANIA
BassScottsdale Specific Nutritional Capability
18.7 0.9 9.9 7.1 -2.8The financial variation is attributed to contingency being retired as risks are mitigated.
Total Tasmania 18.7 0.9 9.9 7.1 -2.8
NORTHERN TERRITORY
Solomon
Darwin
Robertson Barracks
Redevelopment 72.1 60.3 0.4 1.6 1.2The financial variation is as a result of additional compliance works required to address Work Health and Safety risk.
Robertson Barracks Electrical Reticulation System Upgrade
43.4 3.6 32.0 33.7 1.7The financial variation is due to an allowance calculated for advance payments on long lead time items.
Facilities for Replacement
Towed Artillery (Land 17)[1][5] - 0.1 4.4 1.0 -3.4The financial variation is due to a delay in finalising the delivery phase contracts. This has delayed the completion date to financial year 2014-15.
Defence Logistics
Transformation Project[1][11] - - - 10.0 10.0Project has been approved since the Portfolio Budget Statements 2012-13 .
RAAF Base Darwin
Redevelopment Stage 2 48.7 43.0 0.7 2.1 1.4The financial variation is due to some remediation works undertaken on site.
Heavy Airlift Capability
Permanent Facilities[1][9] - 40.8 1.7 1.7 -
Facilities for Joint Counter Improvised Explosive Device
Capability[1][12] - - - 0.1 0.1
Project has been approved since the Portfolio Budget Statements 2012-13 .
Total Northern Territory 164.2 147.8 39.2 50.2 11.0
Defence Portfolio Additional Estimates Statements 2012-13
112
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
AUSTRALIAN CAPITAL TERRITORY
CanberraDefence Facilities at HMAS Harman and Other
Locations[5] - 25.9 103.9 130.0 26.1
The financial variation reflects a more accurate spend spread based on the current delivery program.
Australian Defence Force Academy: Living-In Accommodation Refurbishment
34.7 21.7 9.5 9.3 -0.2The financial variation is due to savings realised in the delivery of the project.
Australian Defence Force Academy Redevelopment
98.5 4.8 41.6 40.0 -1.6The financial variation is result of delays in construction. Work is being accelerated and the original program will be met.
Fraser
HMAS Creswell
Redevelopment 83.6 82.5 0.1 0.7 0.6The financial variation is as a result of additional compliance works required to address Work Health and Safety risk.
Total Australian Capital Territory 216.8 134.9 155.1 180.0 24.9
VARIOUS LOCATIONS[1]
Enhanced Land Force Stage
1 Works[1][2] 793.1 - - - -
Enhanced Land Force Stage
2 Works[1][3] 1,457.8 - - - -
HMAS Penguin and Pittwater
Annexe Redevelopment[1][4] 63.3 - - - -
Facilities for Replacement
Towed Artillery (Land 17)[1][5] 46.5 - - - -
Defence Facilities at HMAS Harman and Other
Locations[6] 163.5 - - - -
Department of Defence
113
TotalEstimated
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m Project Performance Update and Explanation of Variation
Facilities for Project
Overlander (Land 121)[1][7] 50.3 - - - -
Heavy Airlift Capability
Permanent Facilities[1][9] 268.2 - - - -
Hardened and Networked
Army Facilites[1][10] 597.4 - - - -
Facilities for Joint Counter Improvised Explosive Device
Capability[1][12]13.4 - - - -
Defence Logistics
Transformation Project[11] 752.7 - - - -
Projects in or about to enter Defects Liability Period
801.0 - 3.5 19.3 15.8
Total Various 5,007.2 - 3.5 19.3 15.8
TOTAL 6,978.1 2,900.0 815.0 912.9 97.9
Notes 1. These projects cross state and electoral boundaries. Expenditure estimates for 2012-13 are provided in the table per location. 2. Enhanced Land Force Stage 1 has an approved budget of $793.1m covering the following locations: RAAF Base Richmond (completed), Holsworthy, Singleton (completed), Kapooka,
Puckapunyal, RAAF Base Amberley, Lavarack Barracks, Townsville High Range Training Area (completed), RAAF Base Edinburgh and Campbell Barracks. 3. Enhanced Land Force Stage 2 Works has an approved budget of $1,457.8m covering the following locations: Singleton, Garden Island (completed), HMAS Penguin (completed), Watsonia
(completed), Puckapunyal (completed), RAAF Base Amberley (completed), Enoggera, Canungra, Lavarack Barracks, Townsville Field Training Area (completed), Greenbank Training Area, Wide Bay Training Area, Cultana Training Area, RAAF Base Edinburgh, Majura Field Training Area (completed) and Royal Military College Duntroon (completed).
4. HMAS Penguin and Pittwater Annexe Redevelopment has an approved budget of $63.3m covering two locations: HMAS Penguin and the Pittwater Annexe. 5. Facilities for Replacement Towed Artillery (LAND 17) has an approved budget of $46.5m. This project covers six sites: Enoggera, Puckapunyal, Townsville, Edinburgh, Darwin and Bandiana. 6. Defence Facilities at HMAS Harman and Other Locations project covers two locations: Army facilities in Victoria (completed) and Defence facilities at HMAS Harman, ACT. 7. Facilities for Project Overlander (LAND 121) has an approved budget of $50.3m. This project covers three locations: Gaza Ridge Barracks North Bandiana, Damascus Barracks Meeandah and
RAAF Base Amberley. 8. Australian Super Hornet Facilities has a budget of $117.1m that includes both the development and delivery phase budgets leaving a delivery budget of $110.1m . 9. Heavy Airlift Capability - Permanent Facilities has an approved budget of $268.2m covering five locations: RAAF Base Amberley, RAAF Base Edinburgh, RAAF Base Darwin, RAAF Base
Townsville and RAAF Base Pearce. Construction works at RAAF Bases Amberley, Townsville, Edinburgh and Darwin are complete. Outstanding Defects Liability works remain to be completed at RAAF Base Darwin. The Cargo Compartment Trainer is an approved additional scope item being delivered at RAAF Base Amberley.
10. Hardened and Networked Army Facilities has a budget of $623.7m, which includes the development and delivery phase budgets leaving a delivery phase budget of $597.4m. Hardened and Networked Army Facilities project covers two locations: Edinburgh Defence Precinct and Murray Bridge Training Area. The project does not include similarly named works at Robertson Barracks.
11. Project has been approved since publication of Portfolio Budget Statements 2012-13. 12. Facilities for Joint Counter Improvised Explosive Device Capability has an approved budget of $13.4m. The project covers seven locations across three States.
Defence Portfolio Additional Estimates Statements 2012-13
114
Appendix D
Status of Major Projects Foreshadowed For Government and Parliamentary Standing Committee on Public Works (PWC) Consideration in 2012-13
Table 67: Program of Major Works by State, Federal Electorate and Locality
Actual/IndicativeReferral Date
Actual/Indicative
Hearing Date[1] Current Status
NEW SOUTH WALES
Hughes
Liverpool Military Area High Voltage Upgrade Early 2012 08 August 2012 Approved
Moorebank - Units Relocation Early 2012 09 August 2012 Approved
Newcastle
RAAF Base Williamtown Redevelopment Stage 2 Late 2013 Early 2014 In development
QUEENSLAND
Blair
17 Construction Squadron Redevelopment/Relocation to Amberley Deferred
VICTORIA
Corio
Point Wilson Waterside Infrastructure Remediation Deferred
Melbourne Ports
Human Protection Performance Division Early 2013 Mid 2013 In development
VARIOUS LOCATIONS
Base Security Improvement Program Mid 2012 10 August 2012 Approved
Defence Logistics Transformation Program Mid 2012
26, 28 September and 04 October
2012 Approved
Aircraft Pavements and Airfield Lighting at RAAF Base Amberley, RAAF Base Williamtown, RAAF Base Darwin and RAAF Base
Townsville[2]Mid 2012 27-Sep-12 Approved
Aircraft Pavements and Airfield Lighting at RAAF Base Edinburgh,
RAAF Base Williams and Woomera[2]Late 2012 Mid 2013 In development
Facilities for Chinook Helicopter (AIR 9000 Phases 5B and 5C) Mid 2013 Deferred
Facilities for Force Protection Research and Training (JP154) Early 2013 Mid 2013 In development
Facilities for Air Warfare Destroyer (SEA 4000) Early 2013 Mid 2013 In development
Facilities for Amphibious Deployment and Sustainment (JP 2048) Early 2013 Mid 2013 In development
Facilities for Future Naval Aviation Combat System Support (AIR 9000 Phase 8) Early 2013 Mid 2013 In development
Notes 1. Hearing dates will be subject to the Committee's consideration and agreement. 2. Defence proposes to seek exemption from the Public Works Committee scrutiny of this project on the grounds that the work is
declared repetitive in accordance with Section 18(8A) of the Public Works Act 1969.
Department of Defence
115
New South Wales
Liverpool Military Area High Voltage Upgrade
The Liverpool Military Area High Voltage Upgrade project received expediency on 17 September 2012. The project is providing improved energy supply and distribution to the Liverpool Military Area, primarily at Holsworthy Barracks. This project will provide a necessary increase in electrical supply to the Liverpool Military Area and improved electrical reticulation within Holsworthy Barracks. Construction is scheduled to commence in early 2013 and be completed in mid 2014.
Moorebank – Units Relocation
The Moorebank Units Relocation Project received expediency on 17 September 2012. The project is delivering new facilities at Holsworthy Barracks to relocate affected Defence units and facilities from the proposed Moorebank Inter-Modal Transport site, including the School of Military Engineering. Construction commenced in late 2012 and is programmed to be completed in late 2015.
RAAF Base Williamtown Redevelopment Stage 2
The project is supporting and improving the functionality and capability of the Base, while at the same time upgrading or replacing ageing infrastructure to meet future requirements. Subject to Government approval and Parliamentary clearance, construction is scheduled to commence in late 2014 and be completed in late 2017.
Queensland
17 Construction Squadron Redevelopment/Relocation to Amberley
The project is providing new facilities to accommodate 17 Construction Squadron at RAAF Base Amberley. The 17 Construction Squadron is currently located at Holsworthy Barracks in the precinct marked for the future base entry under the Moorebank Units Relocation project. Subject to Government approval and Parliamentary clearance, construction is scheduled to commence in late 2014 and be completed in mid 2017. This project has been deferred.
Victoria
Point Wilson Waterside Infrastructure Remediation
The project will construct upgraded Explosive Ordnance waterside infrastructure (new wharf, refurbished jetty, associated mooring and berthing infrastructure) at Point Wilson Explosive Area (PWEA), Victoria. Subject to Government approval and Parliamentary clearance, construction is scheduled to commence in late 2014 and be completed late 2017. This project has been deferred.
Human Protection Performance Division
This project aims to provide new and upgraded site security and to rectify identified accommodation shortfalls within on-site Human Protection Performance Division facilities located at the Defence Science and Technology Organisation site at Fishermans Bend in Melbourne. Subject to Government and Parliamentary clearance, construction is scheduled to commence in mid 2013 and be completed in late 2015.
Defence Portfolio Additional Estimates Statements 2012-13
116
Various Locations
Base Security Improvement Program
The Base Security Improvement Program received expediency on 17 September 2012. The project is providing infrastructure works at 16 high security risk bases in order to achieve an acceptable level of security. Construction is scheduled to commence in 2013 and be completed in 2014.
Defence Logistics Transformation Program
The Defence Logistics Transformation Program received expediency on 26 November 2012. The project is modernising and enhancing the wholesale storage, distribution and land materiel functions of Joint Logistic Command units nationally to provide optimum support to Defence operations. The project will provide enhanced logistics facilities at Moorebank New South Wales, Bandiana Victoria, Amberley and Townsville Queensland, Palmerston Northern Territory, Edinburgh South Australia and Guilford and Garden Island Western Australia. Construction is scheduled to commence in early 2013 and be completed in late 2015.
Aircraft Pavements and Aircraft Lighting at RAAF Base Amberley, RAAF Base Darwin, RAAF Williamtown and RAAF Base Townsville
The Aircraft Pavements and Aircraft Lighting at RAAF Base Amberley, RAAF Base Darwin, RAAF Williamtown and RAAF Base Townsville project received exemption and approval on 27 September 2012. The project is resurfacing asphalt pavements and replacing airfield lighting at RAAF Base Amberley, RAAF Base Darwin and RAAF Base Townsville. Construction is scheduled to commence in early 2013 and be completed in late 2013.
Aircraft Pavements and Aircraft Lighting at RAAF Base Edinburgh, RAAF Base Williams and Woomera
The project will resurface asphalt pavement and replace airfield lighting at RAAF Base Edinburgh, RAAF Base Williams, Point Cook and Woomera. Subject to Government approval and Parliamentary clearance, construction is scheduled to commence in late 2013, and be completed in mid 2014.
Facilities for Chinook Helicopter (AIR 9000 Phases 5B and 5C)
The project will provide new and upgraded facilities to support the introduction into service of the Chinook Helicopter. The works will be primarily at 5 Aviation Regiment at RAAF Base Townsville. Subject to Government approval and Parliamentary clearance, construction is scheduled to commence in early 2014 and be completed in late 2016. This project has been deferred.
Facilities for Force Protection Research and Training (JP 154)
This project will provide test and evaluation facilities at Nurrungar (Woomera, South Australia) and Edinburgh (Adelaide, South, Australia), plus storage and training facilities at 14 other sites across Australia. Subject to Government and Parliamentary approval, construction is scheduled to commence in late 2013 and be completed in late 2014.
Facilities for Air Warfare Destroyer (SEA 4000)
This project will provide new and upgraded wharf-side facilities to support berthing and sustainment at Garden Island, Sydney, for the new Hobart Class Air Warfare Destroyer. The works also include the provision of training facilities at HMAS Watson and Randwick Barracks. Subject to Government approval and Parliamentary clearance, construction is scheduled to commence in mid 2013 and be completed in mid 2015.
Department of Defence
117
Facilities for Amphibious Deployment and Sustainment (JP 2048)
This project will provide new and upgraded wharf-side facilities to support berthing and sustainment at Garden Island, Sydney, for the new Canberra Class Landing Helicopter Dock Ship. The works also include the provision of training facilities at Randwick Barracks. Subject to Government approval and Parliamentary clearance, construction is scheduled to commence in mid 2013 and be completed in mid 2015.
Facilities for Future Naval Aviation Combat System Support (AIR 9000 Phase 8)
This project will provide new and upgraded facilities for operational maritime helicopter squadrons at HMAS Stirling and HMAS Albatross. The works include the provision of facilities for explosive ordnance storage, aircraft hangars, aircraft workshops, synthetic training, and working accommodation. Subject to Parliamentary clearance, construction is scheduled to commence in late 2013 and be completed in late 2016.
Defence Portfolio Additional Estimates Statements 2012-13
118
Appendix E
Approved Projects Being Developed for Private Financing Arrangements
Project Single Living Environment and Accommodation Precinct (Single LEAP Phase 2)
No changes have been made to Project Single Living Environment and Accommodation Precinct (Single LEAP Phase 2) since the Portfolio Budget Statements 2012-13.
Table 68: Single LEAP Phase 2[1] by State, Federal Electorate and Locality
State Electorate Locality
NEW SOUTH WALES Gilmore Nowra: HMAS Albatross
Riverina RAAF Base Wagga Kapooka: Blamey Barracks
VICTORIA Indie Albury/Wodonga:Bandiana
Jagajaga Watsonia: Simpson Barracks
McEwen Puckapunyal
QUEENSLAND Herbert Townsville: Lavarack Barracks
SOUTH AUSTRALIA Wakefield RAAF Base Edinburgh
WESTERN AUSTRALIA Brand Garden Island: HMAS Stirling
Curtin Swanbourne: Campbell Barracks
NORTHERN TERRITORY Solomon Darwin: Robertson Barracks
Darwin: HMAS Coonawarra (Larrakeyah Barracks)
AUSTRALIAN CAPITAL TERRITORY
Fraser Royal Military College Australian Defence Force Academy
Note 1. Work has commenced at all sites, with the last site due for completion by February 2014. Under the Public Private
Partnership arrangement, annual payments to the Strategic Partner will commence after Commercial Acceptance of each site.
Department of Defence
119
Approved Medium Capital Facilities Projects
Table 69: Spending in 2012-13 for Medium Facilities Projects
TotalEstimated
Expenditure$'000
CumulativeExpenditure
to 30 June 2012$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000 Project Performance Update and Explanation of Variation
NEW SOUTH WALES
Hughes
Holsworthy - - - - -6th Aviation Regiment - Expanded 171 Aviation Squadron Facilities
11,684 235 9,396 8,846 -550The financial variation is due to a delay in finalising design. Construction has commenced and facilities are anticipated to be delivered on schedule.
Newcastle
RAAF WilliamtownCorrosion Control Facility and Spray Paint Booth Facilities Upgrade
6,280 - - 4,616 4,616Project approved in 2012 and commenced to meet anticipated handover from current tenant.
Total New South Wales 17,964 235 9,396 13,462 4,066
VICTORIA
Melbourne PortsThermal Test Facility - Fishermans Bend
6,600 - - 3,630 3,630This project was recently approved with a forecast expenditure in financial year 2012-13.
Lalor
RAAF Williams - - - - -Australian Operational Concept Contingency and
Stores[1][3]- 42 616 716 100
The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
Total Victoria 6,600 42 616 4,346 3,730
Defence Portfolio Additional Estimates Statements 2012-13
120
TotalEstimated
Expenditure$'000
CumulativeExpenditure
to 30 June 2012$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000 Project Performance Update and Explanation of Variation
QUEENSLAND
Capricornia
Shoalwater Bay Training AreaTriangular Island Facility Upgrade 2,150[4] 93 1,160 2,057 897
The financial variation and budget increase is a reflection of the higher than expected cost to deliver the facilities.
Herbert
Lavarack BarracksCountermine Capability
Facilities (LAND 144)[1][2] - 18 87 389 302The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
RAAF TownsvilleAustralian Operational Concept Contingency and
Stores[1][3]- 17 610 716 106
The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
Rankin
Greenbank Training AreaCountermine Capability
Facilities (LAND 144)[1][2] - 1 120 304 184The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
Ryan
EnoggeraAustralian Operational Concept Contingency and
Stores[1][3]- 10 490 716 226
The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
Total Queensland 2,150 139 2,467 4,182 1,715
Department of Defence
121
TotalEstimated
Expenditure$'000
CumulativeExpenditure
to 30 June 2012$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000 Project Performance Update and Explanation of Variation
SOUTH AUSTRALIA
Wakefield
RAAF EdinburghAustralian Operational Concept Contingency and
Stores[1][3]- 19 605 716 111
The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
P&EE Port Wakefield
Explosive Ordnance Storage 13,182 - - 1,700 1,700
Total South Australia 13,182 19 605 2,416 1,811
WESTERN AUSTRALIA
Pearce
RAAF Base PearcePotable Water Supply Upgrade
3,144 373 1,533 3,978 2,445The financial variation is due to tender prices being higher than pre tender estimates.
Total Western Australia 3,144 373 1,533 3,978 2,445
TASMANIA
Denison
Derwent BarrackAustralian Operational Concept Contingency and
Stores[1][3]- 18 695 716 21
The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
Total Tasmania - 18 695 716 21
Defence Portfolio Additional Estimates Statements 2012-13
122
TotalEstimated
Expenditure$'000
CumulativeExpenditure
to 30 June 2012$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000 Project Performance Update and Explanation of Variation
NORTHERN TERRITORY
Lingiari
RAAF Base Tindal
Mount Bundey Training Area -Medical Facility
4,260 524 2,677 3,611 934The financial variation is a result of payment profile for delivery phase being different to that assumed at the time of the publication of the Portfolio Budget Statements 2012-13 .
Corrosion Control Facility 4,465[4] 3 2,675 1,964 -711The financial variation is due to preliminary design being added as a requirement in request for tender documents. This has resulted in an increased budget and financial year spend.
Solomon
DarwinAustralian Operational Concept Contingency and
Stores[1][3]- 18 1,377 716 -661
The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
Naval Fuel Installation Rectification
10,690 7,418 10 1,027 1,017The financial variation is due to essential WHS and environmental works being prioritised for delivery in 2012-13.
Larrakeyah BarracksStormwater Infrastructure Works
2,463 1,354 - 900 900
Robertson BarracksCountermine Capability
Facilities (LAND 144)[1][2] - 5 235 430 195The financial variation is the result of a reconsidered delivery methodology for warehousing facilities.
1st Aviation Regiment Facilities Upgrade
2,250 1,026 95 - -95The variation is a reflection of savings achieved during delivery. The project is in Defects Liability Period and financial close is anticipated in the 2012-13 financial year.
Total Northern Territory 19,663 10,348 7,069 8,648 1,579
Department of Defence
123
TotalEstimated
Expenditure$'000
CumulativeExpenditure
to 30 June 2012$'000
2012-13Budget
Estimate$'000
2012-13Revised
Estimate$'000
Variation$'000 Project Performance Update and Explanation of Variation
VARIOUS LOCATIONS[1]
Countermine Capability
Facilities (LAND 144)[1][2] 1,420 - - - -
Australian Operational Concept Contingency and
Stores[1][3]7,900 - - - -
Projects in or about to enter Defects Liability Period
- - - 3,251 3,251
Total Various 9,320 - - 3,251 3,251
TOTAL 72,023 11,174 22,381 40,999 18,618
Notes 1. This project crosses state and electoral boundaries. 2. Countermine Capabilities Facilities (LAND 144) has a budget of $1.420m covering five locations: Holsworthy Barracks; Lavarack Barracks; Greenbank Training Area; Gallipoli Barracks,
Enoggera; and Robertson Barracks. Construction works at Holsworthy and Enoggera are complete. 3. Australian Operational Concept Special Operation Contingency Vehicles & Stores has a budget of $7.900m covering six locations; RAAF Bases Williams, Darwin, Townsville, Edinburgh, and
Gallipoli and Derwent Barracks. 4. This project received budget increase approval since the publication of the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
124
Proposed Medium Capital Projects for Consideration in 2012-13
Table 70 lists new medium capital facilities projects foreshadowed for consideration in 2012-13.
Table 70: Proposed Medium Capital Projects for Consideration in 2012-13
StateFederalElectorate Locality Status
New South Wales Calare Bathurst Regional Airport: Australian Air Force Cadets In developmentNewcastle RAAF Base Williamtown: Corrosion Control Facility Upgrade Approved
Warringah HMAS Penguin – ADF Centre for Mental Health Facility In development
South Australia Grey Woomera Prohibited Area: Disposal Explosive Ordnance Storage Facilities Withdrawn
Wakefield Port Wakefield: Vibration Test Facility In development
Northern Territory Solomon RAAF Base Darwin: Flood Mitigation Works In development
Various ASLAV Additional Facilities In development
JP 2048 Phase 3LHD Landing Craft Support Facilities In development
Defence Portfolio Additional Estimates Statements 2012-13
126
Defence Materiel Organisation
127
Defence Materiel Organisation
Agency Resources and Planned Performance
Section 1: Agency Overview and Resources
1.1 Strategic Direction Statement
1.2 DMO Resource Statement
1.3 Agency Measures Table
1.4 Additional Estimates and Variations
1.5 Breakdown of Additional Estimates by Appropriation Bill
1.6 People
Section 2: Outcomes and Planned Performance
2.1 DMO Outcomes and Performance Information
Section 3: Explanatory Tables and Budgeted Financial Statements
3.1 Explanatory Tables
3.2 DMO Budgeted Financial Statements
Defence Portfolio Additional Estimates Statements 2012-13
128
Defence Materiel Organisation
Section 1: Agency Overview and Resources
1.1 Strategic Direction Statement In December 2012, the CEO DMO released details of a new strategic framework to enhance accountability, re-balance the structure and deliver further reform across the DMO.
The new strategic framework aims to enhance the DMO’s ability to deliver outcomes efficiently and effectively and includes key themes to shape and inform behavior. These include personal accountability, managed urgency, and for the DMO to be cost aware in every element of DMO business. The new strategic framework also supports the whole of Defence Pathway to Change initiative to ensure the DMO is fair, inclusive and respectful for all, and to all.
Organisational structure
One of the DMO’s key objectives is to re-balance the workload across the organisation and provide better support to the people which the DMO is accountable to. To achieve this, the CEO has re-balanced the workload across the General Managers.
Effective 1 February 2013, the major changes to the DMO structure are:
The role and responsibilities of the Deputy CEO (DCEO)/General Manager Commercial (GMCOM) will be expanded to manage reform, governance and the day to day operations of the organisation. The DCEO/GMCOM will be responsible for: Special Counsel Commercial and Industry Programs Commercial Enabling Services Business Operations Division DMO Reform (the re-titled Acquisition and Sustainment Reform Division)
General Manager Systems will be re-titled General Manager Joint, Systems and Air (GM JSA) and will be responsible for: Aerospace Systems Division (including Wedgetail program) Electronic Systems Division New Air Combat Capability Program Helicopter Systems Division Standardisation Office
General Manager Programs will be re-titled General Manager Land and Maritime (GM LM) and will be responsible for: Land Systems Division Maritime Systems Division (including the Amphibious Deployment and Sustainment Program) Air Warfare Destroyer Program Explosive Ordnance Division
Head Acquisition and Sustainment Reform has been re-named DMO Reform and will report to the DCEO.
Defence Materiel Organisation
129
Figure 3: The DMO Organisational Structure as at 15 January 2013
Defence Portfolio Additional Estimates Statements 2012-13
130
Senior Executive Changes
The following changes have occurred to the DMO senior leadership group since 1 July 2012:
With effect 23 July 2012, Mr David Gould commenced as General Manager Submarines.
On 28 September 2012, RADM Tony Dalton was appointed to the position of Head Helicopter Systems Division.
On 11 December 2012, RADM Mark Purcell was appointed to the position of Head Maritime Systems Division.
Defence Materiel Organisation
131
1.2 DMO Resource Statement The Resource Statement details the resourcing for the DMO at Additional Estimates. Table 74 outlines the total resourcing available from all sources for the 2012-13 Budget year.
Table 74: DMO Resource Statement for the 2012-13 Additional Estimates
Estimateas at
Budget2012-13
$'000
+
ProposedAdditionalEstimates
2012-13$'000
=
TotalEstimate atAdditionalEstimates
2012-13$'000
TotalAppropriation
Actual2011-12
$'000
ORDINARY ANNUAL SERVICES
Departmental appropriation
Prior year departmental appropriation[1]415,486 -88,839 326,647 436,932
Departmental appropriation[2]928,466 -17,362 911,104 931,270
Total Departmental appropriation 1,343,952 -106,201 1,237,751 1,368,202
Total Ordinary Annual Services A 1,343,952 -106,201 1,237,751 1,368,202
Total Available Annual Appropriations 1,343,952 -106,201 1,237,751 1,368,202
Special Accounts
Opening Balance[3]415,486 -88,839 326,647 436,932
Appropriation Receipts[4]928,466 -17,362 911,104 931,270
Appropriation Receipts - other agencies[5]8,132,945 110,518 8,243,463 10,221,149
Non-Appropriation Receipts to Special Accounts 57,668 40 57,708 114,716
Total Special Accounts B 9,534,565 4,357 9,538,922 11,704,067
Total Resourcing (A + B) 10,878,517 -101,844 10,776,673 13,072,269
Less appropriations drawn from annual appropriations above and credited to special accounts 1,343,952 -106,201 1,237,751 1,368,202
Total Net Resourcing for DMO 9,534,565 4,357 9,538,922 11,704,067
Notes 1. Estimated adjusted balance carried forward from previous year for annual appropriations. 2. Appropriation Bill (No. 1) 2012-13. 3. Estimated opening balance for special accounts (less Services for Other Entities and Trust Moneys Special accounts
(SOETM)). For further information on special accounts see Table 90. 4. Direct appropriation for Workforce and Operating Expenses. 5. Appropriation receipts from Defence credited to DMO's special accounts.
Reader Note: All figures are GST exclusive.
Defence Portfolio Additional Estimates Statements 2012-13
132
Table 75: Third Party Payments From and On Behalf of Other Agencies
Estimateas at
Budget2012-13
$'000
Estimate atAdditionalEstimates
2012-13$'000
Receipts received from the Department of Defence for the provision of goods and services 8,132,945 8,243,463
Payments made to the Department of Defence for the provision of
services[1]440,227 366,788
Note 1. Primarily relates to the payment of military staff posted to the DMO and services provided by the
Department of Defence to the DMO in accordance with the Defence Services Agreement.
1.3 Agency Measures Table There are no measures impacting the DMO during the 2012-13 Additional Estimates.
1.4 Additional Estimates and Variations
Table 76: Additional Estimates and Variations to Outcomes From Other Variations
Program Impacted
2012-13$'000
2013-14$'000
2014-15$'000
2015-16$'000
Outcome 1
Decrease in Estimates (Departmental) Adjustments to agreed level of activity All 17,362 51,731 58,213 60,569
Net impact on Estimates for Outcome 1 (Departmental) -17,362 -51,731 -58,213 -60,569
1.5 Breakdown of Additional Estimates by Appropriation Bill The following table details changes sought by DMO during the 2012-13 Additional Estimates. The DMO will seek a determination by the Minister of Finance and Deregulation, under Section 10 of the Appropriation Act (No.1) 2012-13, to decrease the Departmental appropriation by $17.362m.
Table 77: Appropriation Bill (No 3) 2012-13
2011-12 Actual$'000
2012-13 Budget
$'000
2012-13 Revised
$'000
AdditionalEstimates
$'000
ReducedEstimates
$'000
Departmental Programs
Outcome 1
Contributing to the preparedness of Australian Defence Organisation through acquisition and through-life support of military equipment and supplies 931,270 928,466 911,104 - 17,362
Total 931,270 928,466 911,104 - 17,362
Defence Materiel Organisation
133
1.6 People
Workforce Summary
The DMO combined APS, ADF and Contractor workforce forecast is 7,220. This is a decrease of 165 below the 2012-13 Budget Estimate of 7,385. The DMO manages its workforce under a combined ADF, APS and Contractor model. Through this arrangement, where the Services are unable to provide agreed military personnel to contribute to acquisition and sustainment activities, DMO can use funding from unfilled ADF positions (384) to fill and resource positions with APS staff. The decrease in the estimated APS workforce is generally due to voluntary redundancies and intergroup transfers under Shared Services programs. The forecast DMO workforce is shown in Table 78.
Table 78: DMO Consolidated Workforce Statement
2012-13Budget
Estimate
2012-13Revised
Estimate Variation
2013-14ForwardEstimate
2014-15ForwardEstimate
2015-16ForwardEstimate
Navy 368 303 -65 356 360 366
Army 485 377 -108 478 488 493
Air Force 940 702 -238 919 932 942
Sub Total Permanent Force[1] A 1,793 1,382 -411 1,753 1,780 1,801
DMO - APS 5,544 5,406 -138 5,368 5,590 5,608
APS - ADF Backfill - 384 384 - - -
Total DMO APS B 5,544 5,790 246 5,368 5,590 5,608
DMO - Contractor[2] C 48 48 - 48 48 46
Total Workforce Strength (A+B+C) 7,385 7,220 -165 7,169 7,418 7,455
Notes 1. Numbers for ADF Permanent Force include the DMO ADF Permanent Force and Reservists on continuous full-time service. 2. Contractors (formerly known as Professional Service Providers) are individuals under contract performing agency roles.
Contractors are not APS Employees.
Defence Portfolio Additional Estimates Statements 2012-13
134
Section 2: Outcomes and Planned Performance
No changes have been made to DMO’s Outcomes and Planned Performance since the Portfolio Budget Statements 2012-13.
Figure 4: Contributions to Outcomes and Programs
Defence Materiel Organisation
Total Price of Programs: $8,895.950m
(PBS 2012-13: $9,100.652m)
Total Departmental Appropriation: $911.104m
(PBS 2012-13: $928.466m)
Administered Appropriation: Nil
Outcome 1
Contributing to the preparedness of Australian Defence Organisation through acquisition and
through-life support ofmilitary equipment and supplies
Total Price: $8,895.950m
(PBS 2012-13: $9,100.652m)
Total Departmental Outcome Appropriation: $911.104m
(PBS 2012-13: $928.466m)
Program 1.2
Management of Capability Sustainment
Total Price: $5,164.957m
(PBS 2012-13: $5,295.299m)
Total Departmental Program Appropriation: $551.054m
(PBS 2012-13: $549.750m)
Program 1.1
Management of Capability Acquisition
Total Price: $3,618.427m
(PBS 2012-13: $3,676.094m)
Total Departmental Program Appropriation: $254.727m
(PBS 2012-13: $259.374m)
Program 1.3
Provision of Policy Advice and Management Services
Total Price: $112.566m
(PBS 2012-13: $129.259m)
Total Departmental Program Appropriation: $105.323m
(PBS 2012-13: $119.342m)
Defence Portfolio Additional Estimates Statements 2012-13
136
Outcome Expenses and Resource Statement
Table 79: Budgeted Expenses and Resources for Outcome 1
Outcome 1: Contributing to the preparedness of Australian Defence Organistion through acquisition and through-life support of military equipment and supplies
2011-12Actual
Expenses
$'000
2012-13Revised
EstimatedExpenses
$'000
Program 1.1 Management of Capability Acquisition
Departmental expenses
Departmental appropriation[1]214,978 254,727
Special Accounts 4,359,127 3,353,530
Expenses not requiring appropriation in the Budget year[2]10,297 10,170
Total for Program 1.1 4,584,403 3,618,427
Program 1.2 Management of Capability Sustainment
Departmental expenses
Departmental appropriation[1]567,566 551,054
Special Accounts 4,798,566 4,590,907
Expenses not requiring appropriation in the Budget year[2]23,283 22,996
Total for Program 1.2 5,389,415 5,164,957
Program 1.3 Provision of Policy Advice and Management Services
Departmental expenses
Departmental appropriation[1]103,897 105,323
Special Accounts - 1,061
Expenses not requiring appropriation in the Budget year[2]4,841 6,182
Total for Program 1.3 108,738 112,566
Outcome 1 Total by appropriation type
Departmental expenses
Departmental appropriation[1]886,441 911,104
Special Accounts 9,157,693 7,945,498
Expenses not requiring appropriation in the Budget year[2]38,421 39,348
Total Expenses for Outcome 1 10,082,556 8,895,950
2011-12 2012-13
Average Staffing Level (number)[3]5,989 5,790
Notes 1. Departmental Appropriation combines "Ordinary annual services (Appropriation Bills No. 1)" and "Revenue from independent
sources (s31)". 2. Expenses not requiring appropriation in the Budget year is made up of resources received free of charge. 3. Average staffing levels do not include military staff posted to DMO, as military staff remain employees of the Department of
Defence and are included in its staffing.
Defence Portfolio Additional Estimates Statements 2012-13
138
Program 1.1 Deliverables
Changes to the detailed descriptions of deliverables for the top 30 DMO projects is contained in Table 81 Top 30 Projects by 2012-13 Forecast Expenditure. A status update on other major projects included in the previous five years is provided at Table 83.
Information relating to the DMO's Program 1.1 Deliverables remains as reported in the Portfolio Budget Statements 2012-13, except for the following:
The DMO is currently managing 182 major capital acquisition projects. A major capital project is defined as a project with strategic importance and is funded through the Defence Capability Plan (DCP). Key deliverables are specified in a Joint Project Directive (JPD) issued by the Secretary and Chief of the Defence Force (for projects approved after March 2010). The DMO’s element of the major capital project is described in more detail in a Materiel Acquisition Agreement (MAA) between the DMO, the Capability Development Group and the relevant Capability Manager.
Program 1.1 Key Performance Indicators
No changes have been made to Program 1.1 Key Performance Indicators since the Portfolio Budget Statements 2012-13.
Defence Materiel Organisation
139
Top 30 Projects by 2012-13 Forecast Expenditure
Table 81: Top 30 Projects by 2012-13 Forecast Expenditure
Projectnumber/phase
ApprovedProject
Expenditure
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Project Performance Update and Explanation of Variation
Air to Air Refuelling Capability AIR 5402 1,802 1,466 174 119 -56
Testing of the military avionics modifications has been successfully completed. The variation is primarily due to delays to other program elements that are expected to extend completion of boom testing and re-delivery of the first (prototype) aircraft to later in 2013.
Additional C-17AGlobemaster III
AIR 8000 Phase 4
553 419 51 4 -48
Australia's sixth C-17A has been delivered and is now in ADF operational service. Installation of enhanced US-common electronic warfare self-protection systems for the fifth and sixth C-17A is on schedule to achieve Final Operational Capability by mid 2013. The variation is primarily due to a large Foreign Military Sales (FMS) case payment that was previously brought forward into 2011-12 and retirement of cost risk associated with the two acquisition FMS cases.
Bridging Air Combat CapabilityAIR 5349 Phase 1
3,281 2,697 49 29 -20
Final Operational Capability was achieved in December 2012. The variation is primarily due to cost reductions against the principal Foreign Military Sales case and delays in additional spares purchases.
C-17 Globemaster IIIAIR 8000 Phase 3
1,847 1,336 40 10 -31
All four C-17A aircraft acquired under Phase 3 are in operational service and all remaining capability elements are anticipated to be met. The variation is primarily due to retirement of cost risk associated with the primary Foreign Military Sales acquisition case, and reprogramming of spare engines and major support equipment procurements into later financial years.
Maritime Patrol and Response Aircraft System
AIR 7000 Phase 2
172 72 31 27 -4
A Project Arrangement was signed with the United States Navy in September 2012 to formalise Australia's participation in the development of the Increment 3 upgrade to the P-8A aircraft weapons and sensors. The variation is due to a lower than forecast contribution to the Increment 3 Project Arrangement and other minor budget variations.
General Manager Systems
Aerospace Systems
Defence Portfolio Additional Estimates Statements 2012-13
140
Projectnumber/phase
ApprovedProject
Expenditure
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Project Performance Update and Explanation of Variation
Airborne Surveillance for Land Operations
JP 129 Phase 2
93 47 27 17 -10
The initial delivery of additional equipment for the Australian configuration of the Shadow 200 System occurred in September 2012, with final deliveries scheduled for mid 2013. Forecast variation is associated with the delivery of the Attrition Air Vehicles being scheduled in 2013-14 rather than 2012-13 and savings against other budget elements.
Battlespace Communications Systems (LAND)
JP 2072 Phase 2A
442 59 156 101 -55
Harris Corporation has successfully delivered the first batches of radios and ancillaries. The Harris' Communications Logistic Centre formally opened in August 2012 to support the equipment. Introduction Into Service of this new capability into Army has commenced. The variation is a result of milestone schedule adjustments.
Next Generation Satellite Communications System
JP 2008 Phase 4
864 468 116 90 -26
Production and testing of the Wideband Global Satellite (WGS) 6 satellite has been completed and WGS 6 was delivered into storage in August 2012 and is now awaiting delivery to the launch site. The Remote Monitoring and Control system at HMAS Harman and Geraldton has been installed allowing access to the WGS constellation.
The variation relates to negotiated price reductions under the launch vehicle contract and savings achieved in the delivery of the WGS 6 satellite.
Joint Command Support Environment
JP 2030Phase 8
256 123 47 25 -22
The contract for the development of Evolution 2 of the system was signed in early 2012. Evolution 2 Release 1 was successfully delivered in November 2012.
The variation is due to an update to the expenditure plan based on the contracted payment schedule and removal of planned Evolution 3 capability development work following its removal from the Defence Capability Development Plan.
Ultra High Frequency Satellite Communications
JP 2008 Phase 5A
436 312 43 18 -25
The payload is fully operational and on station. The project entered into a contract with ViaSat in May 2012 to deliver the ground infrastructure to support payload operations (the Network Control System). The variation was primarily caused by the early acceptance of the Payload in 2011-12. Final acceptance was initially scheduled for 2012-13.
Electronic Systems
Defence Materiel Organisation
141
Projectnumber/phase
ApprovedProject
Expenditure
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Project Performance Update and Explanation of Variation
Battle Management SystemLAND 75 Phase 3.4
308 132 33 52 18
Following Operational Test and Evaluation, Initial Operational Capability was declared by the Chief of Army in April 2012. The variation is primarily due to action being taken to recover schedule changes to contractual and payment arrangements and the realisation of risks that have required mitigation.
Achievement of Final Operational Capability of two motorised infantry Battle Groups in 7 Brigade is planned for December 2013.
Bridging Air Combat CapabilityAIR 5349 Phase 2
275 123 54 14 -41
Final Materiel Release was achieved in August 2012 for AIM 9X, Advanced Medium Range Air-to-Air Missile and Joint Stand-off Weapon. The variation is primarily due to Advanced Medium Range Air-to-Air Missile and Joint Stand-off Weapon C1 missile production schedule delays.
Lightweight Torpedo Replacement
JP 2070 Phase 2
335 250 33 26 -7
The scheduled Operational Test and Evaluation was completed successfully and Initial Operational Capability was declared by Chief of Navy on 30 November 2012. Work continues to establish in-service support arrangements, with budget variance relating to completion of ship modifications and delivery of spares.
Mulwala Redevelopment Project
JP 2086Phase 1
370 314 28 17 -11The project was added as a Project of Concern in December 2012. Budget variance is primarily due to delays in Mulwala infrastructure works.
Multi Role HelicopterAIR 9000 Phase 2
3,635 2,048 260 156 -104
The eighteenth aircraft was accepted in December 2012. The variation results from reduced aircraft acceptances due to technical deficiencies and contractual non-compliances as well as delays in other areas of the project. Achievement of the Initial Operational Capability for Navy has also been affected but is still expected to be achieved within 2012-13.
Future Naval Aviation Combat System Helicopter
AIR 9000Phase 8
2,958 254 145 207 63The variation results from an acceleration to the aircraft delivery schedule which has brought forward payments for aircraft, spares, training devices and other support.
Armed Reconnaissance Helicopter
AIR 87 Phase 2
2,032 1,813 72 51 -21The final retrofit aircraft was accepted in December 2012. The variation primarily results from early closure of the Project Office and replanning of a number of planned procurements.
Explosive Ordnance
Helicopter Systems
Defence Portfolio Additional Estimates Statements 2012-13
142
Projectnumber/phase
ApprovedProject
Expenditure
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Project Performance Update and Explanation of Variation
Field Vehicles and Trailers – Overlander Program
LAND 121 Phase 3
987 233 132 152 20
Light/lightweight capability: As at 19 December 2012, 338 G-Wagons and 207 trailers have been delivered to ADF units. The variation in Approved Project Expenditure of $3,191m in the PBS to $987m in the PAES is due to the incorporation of an additional 959 Mercedes-Benz G-Wagons and 826 trailers approved by Government in August 2011 to meet the DCP LAND 121 Phase 5A requirement and the removal of the Medium Heavy Capability. The Medium Heavy capability will now be managed separately under LAND 121 Phase 3B, while the approved Light/lightweight capability will be managed under Phase 3A. The variation in 2012-13 expenditure reflects additional contract deliverables received in 2012-13.
Bushmaster Protected Mobility Vehicle
LAND 116 Phase 3
1,033 771 58 57 -1
Project Expenditure relates to provision for 737 PMV approved under Phase 3 and 70 PMV approved under Phase 3.1. A further but separate phase, LAND 116 Phase 3.2 to acquire up to 214 PMV was approved in mid 2012. Variation in planned expenditure is primarily due to accelerated vehicle and spare parts deliveries brought forward to 2011-12, offset by slippages of support equipment and increased estimate for price escalation.
Counter Rocket, Artillery and Mortar (C-RAM)
LAND 19 Phase 7A
254 147 55 30 -26
This rapidly delivered capability has been operating effectively in Afghanistan since December 2010. Final Operational Capability (FOC) in Afghanistan was achieved in September 2012 and FOC in Australia is scheduled from January 2013. The variation is primarily due to additional expected savings against the C-RAM Foreign Military Sales case.
Digital Terminal Control System
LAND 17Phase 1B
115 33 35 8 -27
This project will deliver 152 digital terminal control systems. A contract was signed in June 2012 for the delivery of 96 digital terminal control systems, comprising the residual requirement. The variation is primarily due to a revised payment schedule reflecting the finalisation of negotiations.
Artillery Replacement 155mm Howitzer
LAND 17 Phase 1A
324 122 29 15 -15
This project has delivered 35 M777A2 lightweight towed howitzers and a command and control battle management system and will complete these deliveries into Army units during 2012-13. The variation is primarily due to additional expected savings against the lightweight towed howitzer Foreign Military Sales case.
Land Systems
Defence Materiel Organisation
143
Projectnumber/phase
ApprovedProject
Expenditure
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Project Performance Update and Explanation of Variation
Australian Protected Route Clearance Capability
JP 154 Phase 3A
74 13 29 18 -11
All 12 Husky vehicles, all 8 High Mobility Engineer Excavators and all 11 Special Mobility Radar II mine rollers have been delivered. Initial Materiel Release was achieved in November 2012. The variation is primarily due to revised Foreign Military Sales payment schedule, including incorporation of anticipated savings.
Upgrade of M-113 Armoured Vehicles
LAND 106 885 768 26 23 -3
The final of 431 M113 AS4 vehicle was accepted in September 2012. All technical risks for the project have been retired. The project is finalising delivery of documentation and spare parts, moving towards closure by mid 2013. The variation is primarily due to accelerated delivery of vehicles and support system elements into 2011-12.
Anzac Ship Anti-Ship Missile Defence
SEA 1448 Phase 2B
676 340 52 67 15
Development of the Stage 2 Phased Array Radar software continues. HMAS Arunta has commenced system installation work. The variation is due to the rescheduling of prefabrication work from 2011-12 until 2012-13 following Government approval to proceed with the upgrade of all eight ships.
Air Warfare Destroyer BuildSEA 4000 Phase 3
7,868 3,840 622 621 -1
A re-baselining of the AWD schedule was announced in September 2012, with the three ships set to be delivered in March 2016, September 2017 and March 2019. Hull consolidation commenced for the first destroyer, Hobart, and will progress to completion by the end of 2013. Fit-out of Platform and Combat System elements in the hull continue with main machinery alignment expected to be completed in 2012-13. Brisbane block construction continues with the first blocks delivered from BAES; Sydney blocks continue production.
Air Warfare Destroyer
General Manager Programs
Maritime Systems
Defence Portfolio Additional Estimates Statements 2012-13
144
Projectnumber/phase
ApprovedProject
Expenditure
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Project Performance Update and Explanation of Variation
Amphibious Deployment and Sustainment
JP 2048 Phase 4A/4B
3,073 2,185 158 210 53
The hull of the first arrived in Melbourne in October 2012. BAE Systems completed the lifting of the Superstructure blocks onto the hull in December 2012, with full consolidation to be complete by March 2013. Installation and integration of the communication and combat systems has now begun. The hull of the second ship was launched in Spain in July 2012. The revised estimate reflects current schedule and end of year milestone payments.
Amphibious Watercraft Replacement
JP 2048Phase 3
226 17 59 33 -26
Cutting of steel for the first Landing Craft occurred, on schedule, in October 2012 with both Detailed Design Review and System Subsystem Detail Design Review exiting in December 2012 on schedule. The revised estimate now reflects the actual contracted schedule.
Airborne Early Warning and Control Aircraft
AIR 5077 Phase 3
3,845 3,255 289 209 -80
The test and evaluation program was completed in May 2012. However, the technical documentation required to support design acceptance was only achieved in October 2012, together with agreement on a final commercial settlement, resulting in further slippage to project schedule of eight months against Budget Estimates. Final acceptance of the sixth aircraft was achieved in November 2012 and final acceptance of the associated ground support systems is planned for January 2013.
Joint Strike Fighter AircraftAIR 6000 Phase 2A/2B
2,590 130 103 111 8
Contracting and production of the first two aircraft and support is now well underway to enable a 2014 aircraft delivery and commencement of United States based pilot training in 2015. The variation reflects a project assessment of forecast expenditure requirements in order to maintain schedule to deliver Australia's first two F-35 aircraft in 2014.
41,611 23,785 3,007 2,515 -491Total -Top 30 Projects (Gross Plan)
Amphibious Deployment and Sustainment
Collins and Wedgetail
New Air Combat Capability
Defence Materiel Organisation
145
Table 82: Major Capital Investment Program by 2012-13 Forecast Expenditure
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m
Top 30 Projects Gross Plans A 3,007 2,515 -491
Other Approved Project Gross Plans B 683 892 209
Total Gross Plan Project Estimates C = A + B 3,690 3,407 -283
Management Margin: Slippage[1]D -616 -179 436
Payments Required from Defence for Approved Programs E = C + D 3,074 3,228 154
Projects Planned for Government Consideration and Transfer to the DMO F 248 27 -221
Total Estimated Funds Available G = E + F 3,322 3,255 -67
Note 1. Management margin is an estimate of possible overall approved capital program expenditure slippage
that may accrue as the 2012-13 financial year progresses.
Defence Portfolio Additional Estimates Statements 2012-13
146
Acquisition Projects not included in the Top 30 Projects-Current Status
Table 83 provides an update on the status of major projects reported in previous financial years. These projects were not ranked in the top 30 projects by expenditure in 2012-13.
Table 83: Current Status of Previously Reported Top 30 Projects (Projects Reported in the Last Five Financial Years)
Projectnumber/phase
LastFinancial
YearReported in
Top 30
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Status Report
AP-3C Electronic Support Measure Upgrade
AIR 5276 Phase 8B
2009-10 130 79 13 14 1
The project is being managed as a Project of Concern. Rework and retesting of software deficiencies identified during laboratory testing in March 2012 is forecast for completion in early 2013. Delivery of the first upgraded aircraft is expected by late 2013 and supporting ground systems and simulators by mid 2014.
F/A-18 Hornet Upgrade
AIR 5376 Phase 2
2011-12 1,879 1,612 25 26 ..Final Materiel Release was achieved in September 2012. Updates to the flight simulator for F/A-18 aircrew training will be undertaken to better align the simulator with the upgraded aircraft capability.
AP-3C Capability Assurance Program
AIR 5276 CAP 1
2009-10 88 65 4 6 2Fleet installation has commenced and is expected to be complete by mid 2015. Modification of the supporting ground systems and simulators was completed in July 2012.
General Manager Systems
Aerospace Systems
Defence Materiel Organisation
147
Projectnumber/phase
LastFinancial
YearReported in
Top 30
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Status Report
Battlespace Communications Systems
JP 2072 Phase 1
2011-12 257 187 15 24 9All major equipment has been delivered. The final ancillary procurement, arising from final design, testing and feedback from initial deployment, is underway.
High Frequency Modernisation
JP 2043 Phase 3A
2010-11 580 438 11 4 -7
The Mobiles Platform scope was removed following the 2012-13 Budget. The focus is now on completing the direction finding and signal enhancement (null steering) capability to the Fixed Network, as well as completing the Information Technology and 10kW Transmitter Refresh works.
ADF Deployable Logistics Systems
JP 2077 Phase 2B.2
2011-12 49 21 .. .. .. The project was cancelled following the 2012-13 Budget.
Dismounted Battlegroup and Below Command, Control Communication System
LAND 125 Phase 3A
2011-12 106 55 6 27 21
Following Operational Test and Evaluation, an Initial Operational Capability was declared by the Chief of Army in April 2012. The variance is primarily through reprogramming largely as a result of slippage arising from contractor production difficulties which moved expenditure from 2011-12.
Tactical information Exchange Domain
JP 2089 Phase 2A
2010-11 103 60 6 8 2
HMAS Perth equipment installation was completed by December 2012. Tasking of combat mission system software is underway. The variation is due to additional work required for the implementation of Electronic Warfare Coordination Messaging.
Electronic Systems
Defence Portfolio Additional Estimates Statements 2012-13
148
Projectnumber/phase
LastFinancial
YearReported in
Top 30
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Status Report
New Air Defence Command and Control Systems for Control Units 2 & 3
AIR 5333 2011-12 274 246 2 .. -1
The project achieved Final Materiel Release in August 2012 and transitioned the capability to the in-service support organisation. Variation is due to the successful remediation of negating the need to purchase new equipment. Final Operational Capability was declared by the Chief of Air Force on 19 December 2012. Project Closure is expected to be achieved in December 2013.
MILSATCOM Terrestrial Infrastructure
JP 2008 Phase 3E
2007-08 208 207 .. .. ..
The Maritime Advanced Satellite Communications Terrestrial Infrastructure System interference remediation to manufacture and install Radio Frequency Barriers has been completed. Discussions are underway to finalise the financial arrangements for through-life support of the barriers.
Electronic Warfare Self Protection for Selected Aircraft
AIR 5416 Phase 2
2009-10 292 276 - - -All asset rollout action has been completed and Project closure is underway.
Improvements to the Logistics Information Systems
JP 2077 Phase 2B
2009-10 153 152 - - - Project is being closed.
Lightweight Torpedo Replacement
JP 2070 Phase 3
2011-12 300 258 16 13 -3The procurement of MU90 Torpedo war stock inventory continues and is due to be completed this financial year; however, the contractor has advised that delivery of some batches of weapons may be delayed.
Explosive Ordnance Reserve Stocks
JP 2085Phase 1B
2008-09 235 205 10 1 -9
The final delivery of Excalibur projectiles was received in October 2012. Preparation for confirmatory firing of Excalibur at Woomera range in March 2013 is progressing. Work on upgrading Advanced Field Artillery Tactical Data System (AFATDS) is complete, and AFATDS integration with the Bushmaster Protected Mobility Vehicle is progressing.
Explosive Ordnance
Defence Materiel Organisation
149
Projectnumber/phase
LastFinancial
YearReported in
Top 30
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Status Report
Follow-On Stand Off Weapon
AIR 5418 Phase 1
2011-12 317 277 4 7 3Fuze issues are delaying finalisation of production and delivery of the final quantity of weapons. Final Materiel Release is planned to occur in 2013.
Evolved Sea Sparrow Missiles
SEA 1428 Phase 4
2009-10 88 84 .. .. -All orders for Evolved Sea Sparrow Missiles and canisters for the Anzac/FFG frigates have been placed. Deliveries have commenced and the project is expected to close in 2016.
Australian Light Armoured Vehicle Additional
LAND 112 Phase 3
2007-08 651 608 21 22 1
The project has delivered: 144 new Australian Light Armoured Vehicle Phase 3 vehicles; 59 behind armour Commander's Weapon Stations; 9 crew procedural trainers; and has standardised the Phase 2 fleet to an approximate Phase 3 build standard. Delivery of 18 Multi Spectral Surveillance Suites has commenced and the project is progressing towards Initial Materiel Release of six surveillance variants.
Tank Replacement Project
LAND 907 Phase 1
2007-08 558 446 4 5 1
All key milestones have been achieved. Delivery of the two remaining elements of Tank Urban Survivability Kit - the Commander's Weapon Station and Remote Thermal Sight, together with Mine Ploughs and Deep Water Fording Kits, will occur between 2013 and 2014.
Direct Fire Support Weapons
LAND 40 Phase 2
2010-11 145 37 2 2 ..
The purchase of the M3 Carl Gustaf and its sight are complete and the system is being introduced into service. The project was added as a Project of Concern in December 2012 due to delays in the acquisition of the Automatic Grenade Launches component of the project.
Land Systems
Defence Portfolio Additional Estimates Statements 2012-13
150
Projectnumber/phase
LastFinancial
YearReported in
Top 30
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Status Report
Anzac Ship ProjectSEA 1348 Phase 2
2007-08 5,381 5,371 5 9 3Finalisation of the warranty and safety upgrade work is progressing, prior to Project Closure.
Armidale Class Patrol Boat
SEA 1444 Phase 1
2007-08 537 488 1 1 ..Final Operational Capability was declared by Chief of Navy inOctober 2012.
Guided Missile Frigate Upgrade Implementation
SEA 1390 Phase 2.1
2010-11 1,450 1,349 23 4 -19
The Adelaide class frigates have achieved Navy Operational Release except for the Underwater Warfare System component. A Navy-directed solution to satisfy this requirement is being progressed.
Standard Missile Replacement
SEA 1390 Phase 4B
2011-12 400 307 19 28 9Test and evaluation of the Mid Course Guidance System software was completed in December 2012. Installation in the Adelaide class frigates continues for the remainder of 2012-13, pending ship availability.
Ships Self Defence Capability
SEA 1779 Phase 1
2007-08 44 44 - - - This project closed in August 2012.
Maritime Systems
Defence Materiel Organisation
151
Projectnumber/phase
LastFinancial
YearReported in
Top 30
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012
$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Status Report
New Heavyweight Torpedo
SEA 1429 Phase 2
2009-10 425 293 13 7 -6
The project expects to reach Spiral 4 Operational Requirement (OR) in June 2013. Remaining project budget will be used for the final boat modifications, associated activities including test and evaluation, as well as project closure activities. Further software upgrades, post Spiral 4 OR will be paid through sustainment organisation. Replacement Heavyweight Torpedo System installations continue. However, as each installation is dependent on the Full Cycle Docking program, completion dates may vary according to changes in the submarine Integrated Master Schedule. The final installation will be in HMAS Collins during full cycle docking commencing in 2013. The project will be completed in 2016.
Collins Class Submarine Reliability and Sustainability
SEA 1439 Phase 3
2008-09 411 327 13 11 -2System modifications continue as scheduled in the Integrated Master Schedule. Development of the Hedemora diesel engine land based test facility is in progress.
Collins Replacement Combat System
SEA 1439 Phase 4A
2007-08 450 429 5 5 ..
Replacement Combat System installations continue. However, as each installation is dependent on the Full Cycle Docking program, completion dates may vary according to changes in the submarine Integrated Master Schedule. The final installation will be in HMAS Collins during her full cycle docking commencing in 2013. The project will be completed in 2016.
Detailed Analysis and Acquisition Planning
AIR 6000 Phase 1B
2009-10 103 98 - - - Project has been completed.
Collins and Wedgetail
General Manager Programs
New Air Combat Capability
Defence Portfolio Additional Estimates Statements 2012-13
152
Top 10 Minor Capital Investment Projects by 2012-13 Forecast Expenditure
Table 84 lists the top 10 approved Minor Capital Investment Projects by forecast expenditure for 2012-13.
Table 84: Top 10 Approved Minor Projects by 2012-13 Forecast Expenditure
Projectnumber/
phase
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
Enhanced Static Line Parachute Capability
AMP058.08 28 .. 15 14 ..
The United States Government has completed the initial contract with Airborne Systems North America for delivery of the first tranche of 500 Static Line Parachute Systems. Contract signature for the remaining systems is anticipated in early 2013. All Dispatcher Parachutes have been delivered and Rigger training on both parachute systems has been completed. The variation is due to billing from United States being less than planned.
Australian Light Armoured Vehicle Crew Procedural Trainers
AMP002.12 44 11 14 15 1
The project remains within budget and on schedule to deliver all elements of the required capability in accordance with the approved contract and Materiel Acquisition Agreement. Testing of the first article of equipment has been successfully completed. The variation is primarily due to prime contract progressing ahead of schedule.
Army
Defence Materiel Organisation
153
Projectnumber/
phase
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
Enhanced Land Force (ELF) Weapons Training Simulator System (WTSS)
AMP029.44 34 1 9 12 3
The project remains within budget to deliver all elements of the required capability. Installation of the new facilities at Edinburgh, Townsville and Singleton is complete and the sites have been accepted. The variation is due to schedule acceleration to include installation at Kapooka in February 2013, previously scheduled in 2013-14.
Chinook Passenger and Crew Seating
AMP015.36 8 .. 4 2 -2Design Acceptance of the modification remains scheduled to complete in 2012-13 but only two aircraft will now be modified in 2012-13 with trial results used to determine future requirements.
Army Field Catering Equipment
AMP500.09 4 - 3 1 -2
Deliveries for the Barbeques and Roasters contract will occur as forecast in 2012-13. Further detailed planning and industry feedback has resulted in a delay in contracting other elements with signature now anticipated to occur in March 2013 and deliveries in 2013-14.
Kiowa Pilot Seating AMP015.58 7 1 2 1 -1Pilot seating modification design is planned for completion in 2012-13. The variation is due to improved expenditure estimates based on final contract payment milestones.
Defence Portfolio Additional Estimates Statements 2012-13
154
Projectnumber/
phase
ApprovedProject
Expenditure$m
CumulativeExpenditure
to 30 June 2012$m
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
Traffic Alert and Collision Avoidance System (TCAS)
AFM01001 25 16 3 4 ..
Modification of the first AP-3C aircraft was completed in June 2012. Installation of the capability onto the remaining AP-3C aircraft has commenced and is forecast for completion by mid 2015. Modification of the supporting ground simulator was completed in November 2012.
Broadband AFM01004 6 3 3 3 ..
Broadband modification to the first aircraft was successfully conducted. Functional Test, Performance and Handling Flights with broadband rodome were successfully conducted September 2012. Modifications have no effect on the performance and handling of the aircraft. Broadband capability testing confirmed the system is performing to specification. Second and final aircraft modifications to commenceMarch 2013.
462SQN Electronic Combat and Monitoring System
AFM00977 3 .. 2 .. -2 The project has now been cancelled.
RAAF Intelligence Deployable LAN (RIDL)
AFM01003 5 2 2 3 1
Initial Materiel Release was achieved in October 2012, which delivered 16 fixed desktops and 11 deployable Local Area Networks to Air Force Tactical Intelligence Flights. The variation is due to the project progressing slightly ahead of originally planned expenditure, which is expected to continue throughout the remainder of the year. There is a low risk relating to the delivery of Final Materiel Release by mid 2013.
164 34 58 55 -3
Air Force
Total - Top 10 Minor Projects
Defence Materiel Organisation
155
Table 85: Minor Capital Investment Program by 2012-13 Forecast Expenditure
2012-13Budget
Estimate$m
2012-13Revised
Estimate$m
Variation$m
Top 10 Projects Gross Plans 58 55 -3
Other Approved Project Gross Plans 26 29 3
Total Gross Plan Project Estimates 84 84 -
Management Margin: Slippage[1]-12 -4 8
Payments Required from Defence for Approved Programs 72 80 8
Projects Planned for Government Consideration and Transfer to the DMO 14 18 4
Total Estimated Funds Available 85 98 13
Note 1. Management margin is an estimate of possible overall approved capital program expenditure
slippage that may accrue as the 2012-13 financial year progresses.
Defence Materiel Organisation
157
Program 1.2 Deliverables
Information relating to Program 1.2 Deliverables remains as reported in the Portfolio Budget Statements 2012-13, except for the following.
Key deliverables are specified under each Materiel Sustainment Agreement (MSA). There are now seven MSAs as one MSA has been transferred to Chief Information Officer Group (CIOG). These seven MSAs incorporate 118 product schedules.
Changes to the detailed descriptions of deliverables for the top 20 DMO Sustainment products are contained in Table 87.
Program 1.2 Key Performance Indicators
No changes have been made to Program 1.2 Key Performance Indicators since the Portfolio Budget Statements 2012-13.
Defence Portfolio Additional Estimates Statements 2012-13
158
Top 20 Sustainment Products by 2012-13 Forecast Expenditure
Table 87: Top 20 Sustainment Products by 2012-13 Forecast Expenditure
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
General Manager Systems
Aerospace Systems
Airborne Early Warning & Control 161 138 -23
The sustainment system for the E-7A Wedgetail fleet, associated simulators and software laboratories has sufficiently matured to support Initial Operational Capability. The variation is primarily due to successful warranty claims for the repair of two engines and a number of other repairable items.
F/A-18A Hornet Weapons System 153 148 -5
Recommendations from Phase 1 of the Classic Hornet Ageing Aircraft Systems Audit were delivered in mid 2012 and are being actioned. Phase 2 of the Audit, which is a targeted inspection of aircraft and components, commenced in September 2012. Classic Hornet Deeper Maintenance contract negotiations are complete. The variation is primarily due to the reimbursement of an over-achievement in 2011-12.
F/A-18F Block II Super Hornet Weapons System 111 103 -8
Sustainment systems continue to mature as further spares are delivered and management systems are established in support of declaration of Full Operational Capability in December 2012. Refinement of performance measurements on all Foreign Military Sales programs and commercial support contracts has furnished effective data, which has also assisted in the maturity of the support system. The variation is primarily due to the reimbursement of an over-achievement in 2011-12.
Defence Materiel Organisation
159
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
P-3C/AP-3C Orion Weapons System 105 118 13
The aircraft 16,000 hour safety-by-inspection program continues with most of the fleet completed. Fatigue cracking detected in the aft fuselage of some aircraft will require some components to be replaced. The variation is primarily due increases in the cost of fatigue inspections and repairs, additional aircraft paintings being planned and increases in the cost of hydraulic and engine maintenance.
C-130J-30 Weapons System 81 81 -The planned servicing schedule review to optimise the maintenance required on the C-130J-30 is on schedule for implementation in 2013.
Lead-in Fighter Hawk 127 Weapons System 73 56 -17
A new total logistic support contract for the Lead-in Fighter capability will replace the current contract with BAE Systems Australia when it expires in June 2013. Activities for the remainder of 2012-13 will focus on implementation of the new contract. The variation is due to budget reductions as a result of shared efficiencies.
Electronic Systems
Wide Area Surveillance Capability 83 80 -3
Wide Area Surveillance continues to consistently achieve a high level of availability. Variance is due to reduction in planned activities in 2012-13 with no impact to capability and expenditure planned for 2012-13 was incurred earlier in 2011-12.
Defence Portfolio Additional Estimates Statements 2012-13
160
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
Explosive Ordnance
Explosive Ordnance - Navy, Army, Air Force 323 296 -27
Explosive Ordnance Division continues to improve munitions inventory serviceability in support of ADF operations and training, including resolving issues with engineering capacity and certification. The focus remains on longer term procurement planning and more strategic contracting to build security and certainty into the munitions supply chain to achieve better value for money. The variation is primarily due to return of sustainment funding for reallocation by the Capability Managers to higher sustainment priorities and transfer of funds to Defence Support Group for Mulwala facilities remediation works.
Helicopter Systems
Armed Reconnaissance Helicopter Weapons System
96 86 -10
The Tiger capability is recovering well from a temporary suspension of flying operations in late 2011-12 that delayed the achievement of a deployable squadron resulting in the variation. This key capability milestone is now planned for achievement by the end 2012-13.
Multi Role Helicopter 93 88 -5
Sixteen MRH90 have been accepted; five are based in Townsville, four in Oakey, four in Nowra, and three are at Australian Aerospace’s Brisbane facility for retrofit. Rectification of the key technical deficiencies is progressing, although more slowly than anticipated which continues to delay delivery of the full aircraft capability. Variation is primarily due to these delays.
S70A-9 Black Hawk Weapons System 86 85 -1The Black Hawk continues to perform as expected across 2012-13. Variation is due to more efficient replenishment arrangements and reduced costs following withdrawal from East Timor.
S70B-2 Seahawk Weapons System 62 63 1The Seahawk continues to perform as expected across 2012-13. Variation is due to additional funding to cover for Seahawk capability assurance program.
Defence Materiel Organisation
161
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
Land Systems
General Service B Vehicle Fleet 66 80 14
Priority is directed to operations and sustaining the fleet to meet ADF capability requirements. The variation is due to the Lead Capability Manager providing additional funding for the support of Enhanced Equipment Pools, procurement of Up Armoured Sports Utility Vehicles for the MEAO, and additional sustainment support for training exercises.
ADF Clothing 56 46 -10
Standing offers with Australian manufacturers have been established for:• Slouch hats• The new operational combat uniform printed in the Australian Multicam camouflage pattern.• The Standard Combat Uniform and Accessories.
Tender evaluation for combat and cold weather boots is ongoing, with signature scheduled for late 2013.
Expenditure against budget has reduce this financial year due to reductions in operational demand and the consumption of existing stock as part of ongoing inventory rationalisation.
Maritime Systems
Fuels and Lubricants - Navy, Army, Air Force 412 390 -22
Optimal holdings continue to be reviewed. The fuel card process has progressed incrementally towards the introduction of the new single fuel card and management system, and the inventory and financial accounting system in active trial. Implementation of procedures to align responsibilities under the Australian Standards and Work Health and Safety Act continues.The variation is due to a reduced requirement for Air Force and Navy fuels.
Anzac Class Frigate 206 215 9
Materiel maintenance of eight ships and inventory management reform are ongoing and aligned with operational requirements. The Group Maintenance Contract has been implemented. The variation is due to funding of the preparations for installation of Project SEA 1448 Phases 2A and 2B.
Defence Portfolio Additional Estimates Statements 2012-13
162
BudgetEstimate2012-13
$m
RevisedEstimate2012-13
$mVariation
$m Product Performance Update and Explanation of Variation
Adelaide Class Frigate 139 125 -14
Materiel maintenance of four ships is ongoing and aligned with operational requirements. A Draft Request for Tender for the Group Maintenance Contract is with Industry for comment. The FFG System Program Office is the lead business unit for the rollout of the Rizzo Reform Lifecycle Reference Model. The variation is due to there now being a higher level of confidence in the work to be undertaken across the remainder of 2012-13, including work already under contract with industry.
Auxiliary Oiler Replenishment 91 73 -18
Ongoing materiel support continues with HMAS Success currently undertaking a major refit until May 2013. The variation is due to the rephasing of Maintenance Availabilities for HMAS Success through to planned withdrawal from service, and a corresponding rebalancing of the maintenance effort across 2012-13
Mine Hunter Coastal 61 60 -1Materiel maintenance of four ships is ongoing and concurrent with design development for installation of upgrades to ship firefighting and combat systems.
General Manager Programs
Collins Class Submarines 516 501 -15
Reform activities aimed at improving Collins Class availability and reliability are ongoing and will be adjusted to accommodate the recommendations of the Coles Phase 3 report. Variation is due to realignment of priorities across other Chief of Navy products and an injection of Net Personnel and Operating Costs related to SEA 1439 Phase 3 (Collins Class Submarine Reliability and Sustainability).
Total - Top 20 Products 2,974 2,832 -142
Other Approved Sustainment Product Estimates 1,268 1,367 99
Total Sustainment Product Funds Available 4,242 4,199 -43
Support to Operations 359 391 32
Total Sustainment and Operations Funding 4,601 4,590 -11
Defence Portfolio Additional Estimates Statements 2012-13
164
Information relating to the Program 1.3 Provision of Policy Advice and Management Services remains as reported in the Portfolio Budget Statements 2012-13, except for the following.
More broadly, the DMO will continue to pursue its wider industry development initiatives, including the establishment of an Australian Military Sales Office to provide a one stop shop for the facilitating export opportunities for Australian industry.
Defence Materiel Organisation
165
Section 3: Explanatory Tables and Budgeted Financial Statements
3.1 Explanatory Tables
3.1.1 Special Accounts
Special accounts provide a means to set aside and record amounts used for specified purposes. Table 89 shows the expected additions (receipts) and reductions (payments) for each account used by the DMO. The corresponding table in the Portfolio Budget Statements 2012-13 is Table 101.
Table 89: Estimates of Special Account Flows and Balances
Outcome
Opening2012-132011-12
$'000
Receipts2012-132011-12
$'000
Payments2012-132011-12
$'000
Adjustments2012-132011-12
$'000
Closing Balance2012-132011-12
$'000
1 326,647 9,216,623 9,223,270 - 320,000
436,932 11,267,137 11,304,928 -72,494 326,647
1 - - - - -
- - - - -
Total Special Accounts 2012-13 326,647 9,216,623 9,223,270 - 320,000
2011-12 actual 436,932 11,267,137 11,304,928 -72,494 326,647
Defence Materiel Special Account (A & D)
Services for Other Entities and Trust Moneys - Defence Materiel Organisation (S)
Notes (A) = Administered (D) = Departmental (S) = Special Public Money
Defence Portfolio Additional Estimates Statements 2012-13
166
3.1.2 Australian Government Indigenous Expenditure
No changes have been made to this section since the Portfolio Budget Statements 2012-13, as the Australian Government Indigenous Expenditure Statement is not applicable to the DMO.
Defence Materiel Organisation
167
3.1.3 Grants
Table 90 shows Approved Grants for 2012-13. Detailed information on Grant programs and recipients provided by DMO can be found at:
<www.defence.gov.au/dmo/id/sadi/index.cfm>
<www.defence.gov.au/dmo/id/picip/>
<www.defence.gov.au/dmo/id/industry_skilling>
<www.defence.gov.au/dmo/jsf/NACC_ISP.cfm>
Table 90: Approved Grants for 2012-13
2011-12Actual
Expenses$’000
2012-13Revised
EstimatedExpenses
$’000
Skilling Australia’s Defence Industry (SADI) 8,879 12,090
Priority Industry Capability Innovation Program (PIC IP) 7,100 9,403
Industry Skilling Program Enhancement (ISPE) 2,916 3,186
New Air Combat Capability Industry Support Program (NACC ISP) 1,905 3,232
Total 20,800 27,911
Defence Portfolio Additional Estimates Statements 2012-13
168
3.2 DMO Budgeted Financial Statements
3.2.1 Budgeted Financial Statements Tables
Table 91: Comprehensive Income Statement (Showing Net Cost of Services) for the period ended 30 June
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
EXPENSES
Employee benefits 592,265 603,285 562,343 613,279 641,377
Supplier expenses 9,466,221 8,262,227 8,889,124 10,165,171 12,115,356
Grants 20,800 27,911 22,160 30,540 3,381
Depreciation and amortisation 1,680 2,527 2,590 2,654 2,721
Write-down of assets and impairment of assets 1,237 - - - -
Other 353 - - - -
Total expenses 10,082,556 8,895,950 9,476,217 10,811,644 12,762,835
LESS:
OWN-SOURCE INCOME
Own-source revenue
Sales of goods and rendering of services 9,156,761 7,945,498 8,526,661 9,816,419 11,729,593
Interest 1,444 - - - -
Other revenue 37,966 37,948 38,897 39,870 40,867
Total own-source revenue 9,196,171 7,983,446 8,565,558 9,856,289 11,770,460
Gains
Foreign exchange 932 - - - -
Other gains 1,459 1,400 1,400 1,400 1,400
Total gains 2,391 1,400 1,400 1,400 1,400
Total own-source income 9,198,562 7,984,846 8,566,958 9,857,689 11,771,860
Net cost of (contribution by) services 883,994 911,104 909,259 953,955 990,975
Revenue from Government 931,270 911,104 909,259 953,955 990,975
Surplus (Deficit) attributable to the Australian Government 47,276 - - - -
OTHER COMPREHENSIVE INCOME
Changes in asset revaluation reserves 239 - - - -
Total other comprehensive income 239 - - - -Total comprehensive income (loss) attributable to the Australian Government 47,515 - - - -
Defence Materiel Organisation
169
Table 92: Budgeted Departmental Balance Sheet (as at 30 June)
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
ASSETS
Financial assets
Cash and cash equivalents 24,722 50,000 50,000 50,000 50,000
Trade and other receivables 684,228 496,063 499,130 502,785 489,650
Total financial assets 708,950 546,063 549,130 552,785 539,650
Non-financial assets
Property, plant and equipment 6,871 7,199 7,535 7,880 8,233
Intangibles 56 139 224 312 402
Other 1,366,024 1,366,024 1,366,024 1,366,024 1,366,024
Total non-financial assets 1,372,951 1,373,362 1,373,783 1,374,216 1,374,659
Total assets 2,081,901 1,919,425 1,922,913 1,927,001 1,914,309
LIABILITIES
Payables
Suppliers 1,429,807 1,273,567 1,273,567 1,273,567 1,273,567
Grants 5,161 5,161 5,161 5,161 5,161
Other 76,923 77,704 80,148 82,616 63,608
Total payables 1,511,891 1,356,432 1,358,876 1,361,344 1,342,336
Provisions
Employee provisions 194,287 187,270 188,314 189,934 196,250
Other 5,698 5,698 5,698 5,698 5,698
Total provisions 199,985 192,968 194,012 195,632 201,948
Total liabilities 1,711,876 1,549,400 1,552,888 1,556,976 1,544,284
NET ASSETS 370,025 370,025 370,025 370,025 370,025
EQUITY
Contributed equity 155,368 155,368 155,368 155,368 155,368
Reserves 239 239 239 239 239
Retained surplus (accumulated deficit) 214,418 214,418 214,418 214,418 214,418
Total parent entity interest 370,025 370,025 370,025 370,025 370,025
Total equity 370,025 370,025 370,025 370,025 370,025
Defence Portfolio Additional Estimates Statements 2012-13
170
Table 93: Departmental Statement of Changes in Equity - Summary of Movement (Budget year 2012-13)
Retained Earnings
$'000
Asset Revaluation
Reserve$'000
Other Reserves
$'000
Contributed Equity/Capital
$'000
Total Equity
$'000
Opening balance as at 1 July 2012
Balance carried forward from previous period 214,418 239 - 155,368 370,025
Adjustment for changes in accounting policies - - - - -
Adjusted opening balance 214,418 239 - 155,368 370,025
Surplus (Deficit) for the period - - - - -
Total comprehensive income recognised directly in equity - - - - -
Transactions with owners
Contributions by owners
Appropriation (equity injection) - - - - -
Departmental Capital Budget (DCBs) - - - - -
Sub-total transaction with owners - - - - -
Estimated closing balance as at 30 June 2013 214,418 239 - 155,368 370,025
Table 94: Budgeted Departmental Statement of Cash Flows (for the period ended 30 June)
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
OPERATING ACTIVITIES
Cash received
Goods and services 10,517,058 8,243,463 8,524,212 9,815,525 11,728,676
Appropriations 870,000 943,029 906,192 950,300 1,004,110
Net GST received 676,359 558,795 589,524 674,361 801,361
Other 28,621 57,708 60,569 60,525 62,099
Total cash received 12,092,038 9,802,995 10,080,497 11,500,711 13,596,246
Cash used
Employees 570,710 609,521 558,855 609,191 654,069
Suppliers 9,853,657 8,435,766 8,906,947 10,183,532 12,134,271
Grants 20,448 27,911 22,160 30,540 3,381
Net GST paid 691,896 558,795 589,524 674,361 801,361
Other 858,223 142,786 - - -
Total cash used 11,994,934 9,774,779 10,077,486 11,497,624 13,593,082
Net cash from (used by) operating activities 97,104 28,216 3,011 3,087 3,164
INVESTING ACTIVITIES
Cash used
Purchase of property, plant and equipment 1,890 2,938 3,011 3,087 3,164
Total cash used 1,890 2,938 3,011 3,087 3,164
Net cash from (used by) investing activities -1,890 -2,938 -3,011 -3,087 -3,164
Net increase (decrease) in cash held 95,214 25,278 - - -
Cash and cash equivalents at the beginning of the reporting period -70,492 24,722 50,000 50,000 50,000
Cash and cash equivalents at the end of the reporting period 24,722 50,000 50,000 50,000 50,000
Defence Materiel Organisation
171
Table 95: Departmental Capital Budget Statement
2011-12ActualResult
$'000
2012-13Revised
Estimate$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
PURCHASE OF NON-FINANCIAL ASSETS
Funded internally from departmental resources[1]1,890 2,938 3,011 3,087 3,164
Total 1,890 2,938 3,011 3,087 3,164Reconciliation of cash used to acquire assets to asset movement table
Total purchases 1,890 2,938 3,011 3,087 3,164
Total cash used to acquire assets 1,890 2,938 3,011 3,087 3,164
Note 1. Includes the following sources of funding:
- annual and prior year appropriations - donations and contributions - gifts - internally developed assets - s31 relevant agency receipts (for FMA agencies only) - proceeds from the sale of assets.
Table 96: Statement of Asset Movements (2012-13)
OtherProperty, Plant and
Equipment$'000
Intangibles$'000
Total$'000
As at 1 July 2012
Gross book value 7,120 1,393 8,513
Accumulated depreciation/amortisation and impairment -249 -1,337 -1,586
Opening net book balance 6,871 56 6,927
CAPITAL ASSET ADDITIONS
Estimated expenditure on new or replacement assets
By purchase - internal sources 2,370 568 2,938
Total Additions 2,370 568 2,938
Other Movements
Depreciation and amortisation -2,042 -485 -2,527
As at 30 June 2013
Gross book value 9,490 1,961 11,451
Accumulated depreciation/amortisation and impairment -2,291 -1,822 -4,113
Closing net book value 7,199 139 7,338
Asset Category
Defence Portfolio Additional Estimates Statements 2012-13
172
3.2.2 Analysis of budgeted financial statements
Revisions to the budgeted financial statements for the DMO since the Portfolio Budget Statements 2012-13 are presented in this section.
Income Statement
Analysis of the comprehensive income statement (Table 91) show a difference of $1,186.6m between the revised expense estimate for 2012-13 of $8,895.9m, and the 2011-12 actual expenses of $10,082.5m. This difference is largely as a result of the reprogramming of approved majors and reduction in unapproved majors that occurred during the Portfolio Budget Statements 2012-13 update.
A decrease in the DMO’s estimated income and expenditure for 2012-13 of $204.7m since the original budget is largely as a result of the following:
a reduction by Defence of the estimated value of projects to be approved and transferred to DMO for delivery during the remainder of 2012-13 of $56.4m
a decrease in sustainment funding of $62.6m reflecting customer demand and requirements
a reduction by Defence to the provision for personnel and operating costs of $123.1m anticipated to be transferred to DMO during the remainder of 2012-13
offset by increase in estimates due to foreign exchange rate movements of $51.1m.
Balance Sheet
The balance sheet has been updated to reflect the 2011-12 audited financial statements and adjustments to the income statement as described above.
Whereas the receivables and creditors are anticipated to reduce from the 30 June 2012 balances, the prepayments to suppliers are expected to increase.
Statement of Cash Flows
The estimated cash flow has been updated to reflect the changes in the income statement and balance sheet as noted above.
Defence Materiel Organisation
173
3.2.3 Administered Budgeted Financial Statements Tables
Table 97: Schedule of Budgeted Income and Expenses Administered on Behalf of Government (for the period ended 30 June)
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
EXPENSES ADMINISTERED ON BEHALF OF GOVERNMENT
Foreign exchange losses 705 - - - -
Total Expenses administered on behalf of Government 705 - - - -
INCOME ADMINISTERED ON BEHALF OF GOVERNMENT
Revenue
Non-taxation
Interest 542 6 6 6 6
Other 42 - - - -
Total Non-taxation 584 6 6 6 6Total Revenues administered on behalf of Government 584 6 6 6 6
Table 98: Schedule of Budgeted Assets and Liabilities Administered on Behalf of Government (as at 30 June)
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
ASSETS ADMINISTERED ON BEHALF OF GOVERNMENT
Financial assets
Receivables 4,342 - - - -
Total Financial assets 4,342 - - - -
Total Assets administered on behalf of Government 4,342 - - - -
Defence Portfolio Additional Estimates Statements 2012-13
174
Table 99: Schedule of Budgeted Administered Cash Flows (for the period ended 30 June)
2011-12ActualResult
$'000
2012-13RevisedBudget
$'000
2013-14Forward Estimate
$'000
2014-15Forward Estimate
$'000
2015-16Forward Estimate
$'000
OPERATING ACTIVITIES
Cash received
Interest 3,673 4,348 6 6 6
Total Cash received 3,673 4,348 6 6 6
Net cash from or (used by) operating activities 3,673 4,348 6 6 6
Net increase (decrease) in cash held and cash equivalents held 3,673 4,348 6 6 6
Cash and cash equivalents at the beginning of reporting period - - - - -
Cash to the Official Public Account for:
- Transfers to other entities (Finance - Whole of Government) 3,673 4,348 6 6 6
Cash and cash equivalents at end of reporting period - - - - -
3.2.4 Notes to the Financial Statements
The notes on the budgeted financial statements (income, balance sheet, cash flows and capital budget statement) remain as reported in the Portfolio Budget Statements 2012-13.
Defence Housing Australia
175
Defence Housing Australia
Agency Resources and Planned Performance
Section 1: Agency Overview and Resources
1.1 Strategic Direction
1.2 DHA Resourcing
Section 2: Outcomes and Planned Performance
2.1 Outcomes and Performance Information
Section 3: Explanatory Tables and Budgeted Financial Statements
3.1 Explanatory Tables
3.2 Budgeted Financial Statements
Defence Portfolio Additional Estimates Statements 2012-13
176
Defence Housing Australia
Section 1: DHA Overview and Resources
DHA advises no significant changes to targets published in the Portfolio Budget Statement 2012-13. However, the DHA Board and Advisory Committee compositions have changed and are detailed below.
The DHA Board members are:
Chairman Mr Derek Volker AO
Managing Director Mr Peter Hammond
Commercial Director Ms Margaret Walker
Commercial Director Ms Carol Holley
Commercial Director Hon JAL (Sandy) Macdonald
Commercial Director Hon Arch Bevis
Nominee Secretary of Defence Mr. Peter Sharp
Nominee Chief of Defence Force Air Vice Marshal Gary Beck AO (Rtd)
Nominee Secretary of Finance and Deregulation
Ms Janice Williams
DHA has an Advisory Committee which has the following members:
Chairman Air Vice Marshal Gary Beck AO (Rtd)
Convenor of Defence Families Australia Ms Julie Blackburn
Appointee of Chief of Navy RADM Trevor Jones AM, CSC, RAN
Appointee of Chief of Army Major General Angus J. Campbell, DSC, AM
Appointee of Chief of Air Force Air Vice Marshal Gavin (Leo) Davies CSC
Appointee of Defence Housing Australia Mr Peter Hammond
Section 2: Outcomes and Planned Performance
DHA advises no significant changes to targets published in the Portfolio Budget Statements 2012-13.
Section 3: Explanatory Tables and Budgeted Financial Statements
DHA advises no significant changes to targets published in the Portfolio Budget Statements 2012-13.
177
Appendices
Glossary
Acronyms and Abbreviations
Defence Portfolio Additional Estimates Statements 2012-13
178
Glossary Accumulated depreciation
The aggregate depreciation recorded for a particular depreciating asset.
Additional estimates Where amounts appropriated at Budget time are required to change, Parliament may make adjustments to portfolios through the Additional Estimates Acts.
Administered appropriation
Revenue, expenses, assets and liabilities administered by an agency for the Commonwealth (such as taxes, benefits payments and public debt) that are not concerned with running the agency or its commercial activities.
Administered items Expenses, revenues, assets or liabilities managed by agencies on behalf of the Commonwealth. Agencies do not control administered items. Administered expenses include grants, subsidies and benefits. In many cases, administered expenses fund the delivery of third party outputs.
Agency Assets, liabilities, revenues and expenses that are controlled by Defence or a subsidiary. Includes officials allocated to the organisation.
Amortisation A term used interchangeably with depreciation, except that it applies to a non-current physical asset under finance lease, or a non-current intangible asset, over its limited useful life.
Appropriation An authorisation by Parliament to spend money from the Consolidated Revenue Fund (the principal working fund of the Commonwealth) for a particular purpose.
Annual appropriation
Two Appropriation Bills are introduced into Parliament in May and comprise the Budget for the financial year beginning 1 July. Further Bills are introduced later in the financial year as part of the Additional Estimates.
Assets Future economic benefits controlled by Defence as a result of past transactions or other past events. Assets are initially recognised at the cost of acquisition. Non-financial assets are subject to ongoing revaluation assessment.
Assets under construction
Assets under construction by Defence for Defence, or for the use of another entity according to a construction contract where Defence controls the asset until completion, or assets under construction or otherwise being made ready by another entity for use by Defence.
Australian Accounting Standards
Specify techniques of accounting practice and the method of presenting financial information about a reporting entity.
Average funded strength
A budgetary measure used to count the average number of ADF members paid on a full-time equivalent basis during a financial year.
Capability The combination of military equipment, personnel, logistics support, training, resources, etc. that provides Defence with the ability to achieve its operational aims.
Capability Manager A Capability Manager is responsible for raising, training and sustaining in-service capabilities through the coordination of fundamental inputs to capability. Capability Managers include the Service Chiefs, the Chief of Joint Operations and the Chief Information Officer.
Capital budget All proposed capital expenditure funded by appropriation for outcomes, by equity injections or loans and/or appropriations for administered capital, or by other sources.
Glossary
179
Capital expenditure Expenditure by an agency on capital projects, for example purchasing a building.
Coalition Countries including Australia who provide troops, logistical support or assistance in Military Operations, peacekeeping or reconstruction efforts.
Combined exercise An exercise or activity involving one or more Services of the ADF with the forces of other countries.
Consolidated Revenue Fund
Section 81 of the Constitution stipulates that all revenue raised or money received by the Commonwealth forms the one consolidated revenue fund. The fund is not a bank account. The Official Public Account reflects most of the operations of the fund.
Corporate governance
The process by which agencies are directed and controlled. It is generally understood to encompass authority, accountability, stewardship, leadership, direction and control.
Defence Capability Plan
The Defence Capability Plan is a costed, detailed development plan for Australia’s military capabilities over a ten-year period. The plan is reviewed regularly to take account of changing strategic circumstances, new technologies and changed priorities, in the context of the overall Defence budget.
Defence information environment
Encompasses all of Defence’s computing and communication capabilities at all classification levels. It supports all Defence warfighting functions, including overseas deployed elements and connection to Coalition networks, as well as the day-to-day management functions.
Defence Management and Finance Plan
The Defence Management and Finance Plan provide Ministers and central agencies with a clear oversight of Defence planning and financing strategies. It describes the strategies agreed through the 2000 Defence White Paper and subsequent Strategic Review papers. As a compendium of information attached to Defence’s annual Portfolio Budget Submission, it is intended to help Ministers make informed strategic and budgetary decisions on Defence, by bringing into one document the expected financial position of the portfolio taking into account existing commitments and proposed new investments. The Plan also provides the Government with the information necessary to ensure that its investment in Defence is both affordable and sustainable.
Defence Procurement Review
An independent review initiated by the Government in December 2002 to examine the procurement process for major acquisitions in Defence. The review was led by Mr Malcolm Kinnaird and is also known as the Kinnaird Review.
Departmental items Assets, liabilities, revenues and expenses that are controlled by the agency in providing its outputs. Departmental items would generally include computers, plant and equipment assets used by agencies in providing goods and services and most employee expenses, supplier costs and other administrative expenses incurred.
Depreciation Apportionment of an asset’s capital value as an expense over its estimated useful life to take account of normal usage, obsolescence, or the passage of time.
Discretionary grants Payments where the portfolio Minister and paying agency have discretion in determining whether or not a particular applicant should receive funding and may or may not impose conditions in return for the grant. There is a central discretionary grants register.
Employee Any Australian Public Service officer of Defence or serving Defence Force member who receives a salary or wage, along with other benefits, for the provision of services whether on a full-time, part-time, permanent, casual or temporary basis.
Defence Portfolio Additional Estimates Statements 2012-13
180
Employee expenses Include, but are not limited to, benefits provided to employees in the form of salaries and wages, performance pay, senior officers’ allowances, leave, and superannuation, but does not include amounts paid or owed to employees as reimbursement of out-of-pocket expenses.
Equity injection An additional contribution, over and above the cost of outputs. Equity injections form part of the Commonwealth’s investment in Defence.
Expense Total value of all of the resources consumed in producing goods and services or the loss of future economic benefits in the form of reductions in assets or increases in liabilities of an entity.
Fair value The amount for which an asset could be exchanged, or a liability settled, between knowledgeable and willing parties in an arm’s length transaction. The fair value can be affected by the conditions of the sale, market conditions and the intentions of the asset holder.
Financial Management and Accountability Act 1997
The Act establishes the regulatory framework for financial management within Defence and other public sector agencies.
Force element A component of a unit, a unit or an association of units having common prime objectives and activities.
Force element group
A grouping of force elements with an appropriate command and control structure for a specified role or roles (eg the Navy Submarine Group).
Forward Estimates The level of proposed expenditure for future years, based on relevant demographic, economic and other future forecasting assumptions. The Government required Forward Estimates for the following three financial years to be published in each annual Federal Budget paper.
Garrison support services
Includes a range of base support services such as ground maintenance, hospitality, training area management, base security, transport, air support and fire fighting and rescue services.
Group A high-level organisational grouping of functions and activities used by the Defence Executive as its primary management grouping (e.g. the Capability Development Group).
Hardened and Networked Army
The Army’s key initiative to modernise and meet future operations demands and requirements of the Government. It will increase the size and firepower of the land force, improve the protection provided to troops, and allow them to communicate better on the future battlefield.
Infrastructure Items owned, leased or otherwise under the control of Defence in support of activities on land and within buildings. Infrastructure includes items such as runways, roads, car parks, parade grounds, ovals, lighting, water, sewerage and other general service related items. It does not include land upon which, or within which, it is constructed or those fixed items integral to, and under, buildings.
Interoperability The ability of systems, units or forces to provide the services to, and accept services from, other systems, units or forces and to use the services so exchanged to enable them to operate effectively together.
Glossary
181
Inventory Inventory is comprised of consumable stores and supplies, fuel and explosive ordnance used in the delivery of Defence services. These are items which are consumed in normal use, lose their identity during periods of use by incorporation into, or attachment upon, another assembly, as a result of wear and tear, cannot be reconditioned because their design does not make it possible or their specific values do not justify it.
Joint exercise An exercise involving two or more Services of the ADF.
Liabilities Sacrifices of future economic benefits that Defence is presently obliged to make to other entities as a result of past transactions or other past events.
Materiel Acquisition Agreements
Materiel Acquisition Agreements cover the Defence Materiel Organisation’s acquisition services to Defence for both major and minor capital equipment.
Materiel Sustainment Agreements
Materiel Sustainment Agreements are between the Capability Managers and the Chief Executive Officer of the Defence Materiel Organisation. These agreements cover the sustainment of current capability, including good and services such as repairs, maintenance, fuel and explosive ordnance.
Military response options
A set of generic tasks that describe the range of military options the Government could consider as a basis for a response to a particular situation or contingency.
Net assets See Equity.
Network Centric Warfare
The aim of Network Centric Warfare is to improve the ability of the ADF to collaborate internally with supporting agencies and with coalition partners across organisation and geographic boundaries. Network Centric Warfare would allow Defence to harness recent development in computing and communications technologies to enhance decision making and warfighting capability.
Operating result Equals revenue less expense.
Operational tempo The rate at which the ADF is able to deliver its operations effects, for example, the rate at which forces are dispatched and the time in which they are turned around for their next task. At the local level, this might translate to the crew of an aircraft spending a very small amount of time on the ground before it is re-tasked for its next mission. At the organisational level, this translates to available fighting forces spending very little time at home before they are deployed again for their next operation.
Outcomes The results that the Government seeks from Defence, and are achieved by the successful delivery of its outputs, to the standards set in the Portfolio Budget Statements. For more information, see Defence’s Section 2 - Planned Outcome Performance.
Permanent forces The permanent Navy, the regular Army and the permanent Air Force.
Platforms Refers to air, land, surface or sub-surface assets that are discrete and taskable elements within the ADF.
Portfolio Additional Estimates Statements
Similar to the portfolio budget statement and prepared at Additional Estimates time to support and update on the Government’s original annual budget for Defence.
Defence Portfolio Additional Estimates Statements 2012-13
182
Portfolio Budget Statements
The document presented by the Minister for Defence to Parliament to inform Senators and Members of the basis for the Defence budget appropriations in support of the provisions in Appropriations Bills 1 and 2. The statements summarise the Defence budget and provides detail of outcome performance forecasts and resources in order to justify expenditure for Defence.
Prescribed agency An agency established by regulation under the Financial Management and Accountability Act 1997. The Act provides financial management authority to, and requires accountability by the Chief Executive of an agency.
Price One of the three key efficiency indicators. The amount the government or the community pays for the delivery of agreed outputs.
Professional Service Providers
Individuals with specialist skills contracted to fill a line position.
Purchaser-provider arrangements
Arrangements under which the outputs of one agency are purchased by another agency to contribute to outcomes. Purchaser-provider arrangements can occur between Commonwealth agencies and state/territory government or private sector bodies.
Quality One of the three key efficiency indicators. Relates to the characteristics by which customers or stakeholders judge an organisation, product or service. Assessment of quality involves use of information gathered from interested parties to identify differences between user's expectations and experiences.
Quantity One of the three key efficiency indicators. Examples include: the size of an output; count or volume measures; how many or how much.
Readiness The readiness of forces to be committed to operations within a specified time, dependent on the availability and proficiency of personnel, equipment, facilities and consumables.
Reserves The Naval Reserve, the Army Reserve and the Air Force Reserve.
Revenues Inflows or other enhancements, or savings in outflows, of future economic benefits in the form of increases in assets or reductions in liabilities of Defence, other than those relating to contributions by the Commonwealth, that result in an increase in equity during the reporting period.
Risk management At the highest level, involves the identification and mitigation of those risks that have the potential to adversely affect the achievement of agreed output performance at the agreed output price.
Special account Balances existing within the Consolidated Revenue Fund, that are supported by standing appropriations (Financial Management and Accountability Act 1997, ss.20 and 21). Special accounts allow money in the Consolidated Revenue Fund to be acknowledged as set-aside (hypothecated) for a particular purpose. Amounts credited to a Special Account may only be spent for the purposes of the Special Account. Special Accounts can only be established by a written determination of the Finance Minister (s.20 of the Financial Management and Accountability Act 1997) or through an Act of Parliament (referred to in s.21 of the Financial Management and Accountability Act 1997).
Glossary
183
Special Appropriations (including Standing Appropriations)
An amount of money appropriated by a particular Act of Parliament for a specific purpose and number of years. For special appropriations the authority to withdraw funds from the Consolidated Revenue Fund does not generally cease at the end of the financial year. Standing appropriations are a sub-category consisting of ongoing special appropriations — the amount appropriated will depend on circumstances specified in the legislation.
Specialist military equipment
Items of a specific military nature and that are not available though the normal external market in their current form to other than government military purchasers. It includes the prime military equipment plus the direct support items associated with the equipment.
Standard Defence Supply System (SDSS)
A key information system for the financial management of inventory, general stores, repairable items and other assets associated with Defence’s logistic capability.
System Program Office
The office of the Program Manager. It serves as the single point of contact with industry, government agencies, and other activities participating in the acquisition process of a given system.
Theatre The area in which military operations and activities take place.
Two-pass approval process
The process by which major capital investment proposals are developed for consideration and approval by the Government.
Unit ready days The number of days that a force element is available for tasking, by the Maritime commander, either outside of major maintenance and within planned readiness requirements, or in accordance with contracted availability. Planned unit ready days are determined for each Force Element Group by aggregating total days for the unit in commission, less all days when the unit is programmed to be in major maintenance and conducting associated pre-workup (preparations for initial operational training) or based on the total number of days the force element is contracted to be available to Defence. Contracted availability applies to the Armidale-class patrol boats and may apply to other classes in the future.
Weighted average cost
An inventory valuation method which considers the fluctuating prices and quantities of acquired goods in computing of the cost of inventory. The weighted average method takes the prices of units at the beginning inventory and the varying prices of purchases made and are weighted by the number of units to determine the weighted average cost per unit. It may be computed as the weighted average cost of all available goods present in a given period, or as a weighted moving average cost adjusted when new goods are delivered.
Write-downs The reduction in the value of assets.
Defence Portfolio Additional Estimates Statements 2012-13
184
Acronyms and Abbreviations
A
ACPB Armidale Class Patrol Boats
ADF Australian Defence Force
AGIMO Australian Government Information Management Office
AMCIP Approved Major Capital Investment Program
AMSO Australian Military Sales Office
ANAO Australian National Audit Office
ANSF Afghan National Security Forces
AUSAID Australian Agency for International Development
C
CDF Chief of the Defence Force
CEO Chief Executive Office
CIOG Chief Information Officer Group
COO Chief Operating Officer
D
DCBs Departmental Capital Budget
DCEO Deputy Chief Executive Officer
DCP Defence Capability Plan
DFAT Department of Foreign Affairs and Trade
DHA Defence Housing Australia
DMO Defence Materiel Organisation
DPG Defence People Group
DSRG Defence Support and Reform Group
F
FMA Financial Management and Accountability
G
GMCOM General Manager Commercial
GM LM General Manager Land and Maritime
GM JSA General Manager Joint, Systems and Air
Acronyms and Abbreviations
185
I
ICT Information and Communications Technology
IISS International Institute for Strategic Studies
J
JPD Joint Project Directive
L
LEAP Living Environment and Accommodation Precinct
M
MECC Ministerial and Executive Coordination and Communication
MIMT Moorebank Intermodal Freight Terminal
MSA Materiel Sustainment Agreement
MSBS Military Superannuation and Benefits Scheme
O
OPA Official Public Account
P
PAES Portfolio Additional Estimates Statement
PBS Portfolio Budget Statements
PWEA Point Wilson Explosive Area
R
RADM Rear Admiral
S
SeMPRO Sexual Misconduct Prevention and Response Office
SOETM Services for Other Entities and Trust Moneys
SME Specialist Military Equipment
U
URD Unit Ready Days
V
VRs Voluntary Redundancies
Defence Portfolio Additional Estimates Statements 2012-13
186