Upload
shuang-wu
View
216
Download
1
Tags:
Embed Size (px)
DESCRIPTION
My small collection of works from my Undergraduate Studies in Architecture at the University of Sydney.
Citation preview
SHUANG WUph 0422 322 501e [email protected]
conceptual designtechnical projectsartistic exploration
CONCEPTUAL DESIGN
1. Deep Visualisation
Rendering a completely foreign landscape to capture an evasive narrative of an abandoned structure suspended in both time and space.
Left to right: final Photoshopped renders, conceptual montage, final presentation panels.
CONCEPTUAL DESIGN
2. Flinder’s Station Masterplan, Melbourne
Conceptual analysis and masterplanning of Flinder’s Station using the concept of ‘surveillance’ and ‘fractals’. A space within the masterplan was then formed through experiments with visual connections.
Left to right: Render of masterplan and section, mapping of Melbourne, conceptual representation of fractals, conceptual model, overlayed plans, sketch of spatial qualities.
N
12
34
5
67
8
9
1
2
3
4
5
6
7
8
9
Shops & CafeShops & Cafe
GalleryGallery
CinemaCinema
Open SpaceOpen Space
Library/Work AreasLibrary/Work Areas
Multimedia Booths + WorkshopsMultimedia Booths + Workshops
Artists ResidenceArtists Residence
Offi ces + Staff FacilitiesOffi ces + Staff Facilities
Private CourtyardPrivate Courtyard
CONCEPTUAL DESIGN
3. Carriageworks Cinematheque, Redfern
A project translating key aspects of film into a three-dimensional cinematheque space. Ideas of movement, spatial tectonics and tension were explored through a distorted system of columns and walls.
Left to right: 3D digital model of final design, diagrams analysing the design, mapping, model, conceptual montage, final panels.
conceptual designtechnical projectsartistic exploration
2200
400
2200
2200
2300
2050
2300
24000
A B C D E F G H I
H1
H2
H3
H4
H5
H6
H7
H8
H9
'BRADFORD MULTITEL' INSULATION
CENTOR E4 FOLDING DOORS WITH BLACK ALUMINIUM FRAME
STRACTO 75 X 75MM ZINC COATED STEEL DOWNPIPE
STRIP GRATE FIXED ON ALUMINIUM ANGLES FIXED TO TIMBER BOARDS
REINFORCED CONCRETE SLAB 200MM
REFER TO STRUCTURAL ENGINEERS DOCUMENTATION FOR DETAILS ON FOOTINGS
'EDMONS HURRICANE' TURBINE VENTILATOR
STRACO QUARTER ROUND ZINC COATED STEEL GUTTER
'STRACO' SQUARE ZINC COATED STEEL GUTTER SPREADER 75 X 75MM
STRACO QUARTER ROUND ZINC COATED STEEL GUTTER
R680 'WATER TANK FACTORY' RAINWATER TANK
SPOTTED GUM TIMBER DECK PANNELS 70 X 19MM
STRACTO 75 X 75MM ZINC COATED STEEL DOWNPIPE
STRACO QUARTER ROUND ZINC COATED STEEL GUTTER
HAMMERSMITH HANDRAIL POST, 45X 45MM, SPOTTED GUM
12-24MM INTERNAL WALL CLADDING FIXED TO HIDDEN FRAMED STUDWORK BETWEEN MULLIONS
NATURAL (UNPRIMERED) TEXTURED 12MM SHADOWCLADPANEL TO BE STAINED WITH DARK MADISONOIL VAPOUR PERMEABLE BUILDING PAPER BEHINDFULL LENGHT OF SHADOW CLAD PANELS
LVL PORTAL FRAME 4 X 45 LVL & 2 X 62MM LVL
'COLT' SHADOWGLASS' OPERABLE GLASS LOUVERS
HAMMERSMITH MONO HANDRAIL, ASPOTTED GUM, CLEAR LAQUER
LVL TIMBER FRAME 4 X 45MM, DANISH OIL FINISH
TREATED RADIATA PINE PURLINS 220 X 90MM
HIDDEN TIMBER STUD FRAME USING 90 X 45MM
'COLT' OPERABLE BLACK ALUMINIUM LOUVERS
SHADOWCLAD SHEETS FIXED TO HIDDEN FRAMED STUDWORK
LYSAGHT 'LONGLINE 305' METAL SHEET CLADDING
INSULATION AND SARKING IN GAPS BETWEEN PURLINS
12MM INTERNAL CEILING CLADDING FIXED DIRECTION TO PURLINS
'COLT' SHADOGLASS' FIXED GLASS LOUVERS
TONGUE-IN-GROOVE PARQUET BOARDS
REINFORCED CONCRETE SLAB FOOTINGS 400 X 400MM EXTERIOR STRUCTURAL GRADE PLYWOOD
'HAMMERSMITH' STAINLESS STEEL WIRE CABLE ROPE 1X19X3.2
90x180 MM LVL END WALL MULLIONS
3000
1000
R. L. 0
R. L. 8.9
RUBBER MEMBRANE 20MM THICKNESS, MANU. SPEC.
90mm TIMBER STUD WALL WITH PLASTERBOARD LINING
THE SET SQUARESGroup: ETutor: Jo HurleyStudents:Katherine Bylett, Matt Haddrick,Felise Reakes, Shuang Wu
Lindfield Scout Hall SectionDRAWING:
STAGE:
SCALE:
Construction Drawing1:50 at A1
DRAWING NO.: 02
02 Section AA1:50
LEGEND
FLOORSLT Laminated Timber (Plywood)
BATHROOM FITTINGSBA1 Vanity Basin Semi Rec. (Type 1)BA2 Vanity Basin Disabled Access. (Type 2)GSC Frameless Glass Shower ScreenHR Hand RailMI MirrorTB Timber Bench
WALLS PB PlasterboardPBMR Moisture-Resistant PlasterboardWINDOWSLVL Laminated Veneer Lumber
KITCHEN FITTINGSCT CooktopDW DishwasherSBT Stone Bench TopSSS Stainless Steel Sink
AMENITIES(MALE)
PRIMARY ENTRANCE
12345678
RW
STORAGE KITCHEN AMENITIES(FEMALE)
AMENITIES(DISABLED)
BA1BA1BA1BA1BA1BA1
WC
WC
WC
WC
WC
WC
BA2
DW
PBMR
PBMR
CTCTGSC
GSC
WC
PBMR PBMR
PBMR
HR
HR
TBTBPBMR
PBMR
PBMR
PBMR
PBMR
PB
SBT
MI MI
90 X 45MM PINE STUD FRAME
PBMR PBMR
PBMR
SSS
75 x 75mm ZINC COATED ALUMINIUM DOWNPIPE MANU. SPEC.
C
D
E
F
G
H
I
A
B
RW
R680 'WATER TANK FACTORY' RAINWATER TANKMANU. SPEC.
RW 75 x 75mm ZINC COATED ALUMINIUM DOWNPIPE
RW
R680 'WATER TANK FACTORY' RAINWATER TANK
1000mm ROOF OVERHANG
90x180 MM LVL ENDWALL MULLIONS
90x50 MM ALUMINIUMWINDOW MULLIONS
EXTERNAL CLADDING NATURAL (UNPRIMERED) TEXTURED 12MM SHADOWCLAD MANU. SPEC. PANEL TO BE STAINED WITH DARK MADISONOIL VAPOUR PERMEABLE BUILDING PAPER BEHINDFULL LENGHT OF SHADOW CLAD PANELS
LVL PORTAL FRAME 4 X 45mm LVL & 2 X 62MM LVL
HAMMERSMITH MONO HANDRAIL, ASPOTTED GUM, CLEAR LAQUER
LVL TIMBER FRAME 4 X 45MM, DANISH OIL FINISH
SPOTTED GUM TIMBER DECK PANNELS 70 X 19MM MANU. SPEC.
EXTERNAL CLADDING NATURAL (UNPRIMERED) TEXTURED 12MM SHADOWCLADPANEL TO BE STAINED WITH DARK MADISONOIL VAPOUR PERMEABLE BUILDING PAPER BEHINDFULL LENGHT OF SHADOW CLAD PANELS
'BRADFORD MULTITEL' INSULATION
LVL TIMBER FRAME 4 X 45MM, DANISH OIL FINISH MANU. SPEC.
CENTOR E4 FOLDING DOORS WITH BLACK ALUMINIUM FRAMEMANU. SPEC.
MANU. SPEC.
BLACK ALUMINIUM WINDOW MULLIONSMANU. SPEC.
FIXED LOW-E GLASS 1000x2000MM PANELS 4MM THICK MANU. SPEC.
FIXED LOW-E GLASS 1000x2000MM PANELS 4MM THICK MANU. SPEC.
30
00
24
00
0
15
00
0
28000
6000
30
00
THE SET SQUARESGroup: ETutor: Jo HurleyStudents:Katherine Bylett, Matt Haddrick,Felise Reakes, Shuang Wu
Lindfield Scout Hall Floor PlanDRAWING:
STAGE:
SCALE:
Construction Drawing1:100 at A2
DRAWING NO.: 01
TECHNICAL PROJECTS
1. Scout Hall Project, Lindfi eld
Designing a structural system to support a large hall for the Scouts of Lindfi eld. The design responded to the natural landscape as well as primary weather conditions on site.
Left to right: construction section, rendered 3D models, constructions plans, detail, axonometric diagram showing structural components.
THE SET SQUARESGroup: ETutor: Jo HurleyStudent:Shuang Wu
Roof Corner DetailDRAWING:
STAGE:
SCALE:
Detail DrawingDetail Drawing1:5 at A3
DRAWING NO.: 01
01 Roof Corner Detail 1:5
Lysaght metal sheet roof as spec.
Stratco zinc coated steel gutterwith support as spec.
2 mm aluminium flashing riveted to purlin and fascia board
1 mm aluminium gutter strap
timber fascia board as spec.
Stratco 75x75 mm zinc coated steel downpipe
gutter overflow
1 mm aluminium fascia flushing
LVL portal frame
12mm internal ceiling cladding fixed to purlins
12-24 mm internal wall cladding fixed to studwork
220x90 mm radiata pine purlins
External shadowclad panels
timber studwork as spec.
adjoining two storeyresidence
no. 41
balc
ony
balc
ony
PALING FENC(2m HIGH)
balcony
FACE OF WALL
sillhead
headhead
sill
balc
ony
MAC
DO
NAL
DST
REE
T
single storeyextension
adjoining two storeyresidence
top
of g
utte
r
top
of g
utte
r
adjoining two storeyresidence
no. 45adjoining two storey
residence
+RL 8.17
+FFL 8.77
+RL 8.23
+RL 8.14
+RL 8.14
L 8. 0
+RL 8.26
+RL 8.27
+ 5
L .
+RL 8.30
adjoiningadjoiningadjoiningadjoiningadjoiningadjoiningadjoining t twowo sttoreoreyadjoiningadjoiningadjoiningadjoiningreres
adjoiningsidenidenidencee
singlesinglesinglesingleeextxtensio
singlesingle st storeensio
oreensio
oreyensio
yension
adjoiningadjoiningadjoiningadjoiningadjoiningadjoiningreres
nono
adjoiningadjoining t twosiden
woiden
wo siden
no
storeidenc
no 4
oree
41
orey
1
y
+RRRL 8
adjoiningadjoiningadjoiningadjoiningadjoiningadjoiningadjoining tre
tworesiden
woiden
no
wo siden
no
storeidenc
no. 4
oree
45
orey
5
y
88
+RL 8.26
+RL 8.17
+RL 8.23
UP
UP
001 Ground Floor Plan & Demolition Plan1:100
living room
kitchenliving & dining room
bathroom
bedroom 1
laundry
garden
courtyard
vertical garden
exg
vera
ndah
path
garden
garden
rainwater tankas spec.
exg brick wall retained
existing treeretained
plantable area and gravel
new timber framed window, low-e glazed
new cavity masonry walls
timber decking with step down as spec.
new timber framed pb walls
new r.c. slabto eng. detail
new cavity masonry walls timber decking
with step down as spec.
newly decked verandah
tc
additional layer of brick
stormwater tank as spec.
vertical garden as spec.
tc
sd
sd
sd
sd
sdsd
rw
sw
line of mezzanine over
outdoor deck
new timber stairs
storage
AA04
AA04
AB04
AB04
ftl
Project Greenfield ResidenceClient Bob & Jane GreenfieldScale
1:100 at A3
Drawing
Ground Floor Plan +Demolition Plan
Date 17.10.12
43 Macdonald Street,Erskineville
Shuang Wu Architect Pty LtdSID: 310241952
Tutor: Paul BerkemeierGroup: A2
Legend
conc- concreteexg- existingFFL- finished floor levelftl- fixed timber louvershr- handrailpb- plasterboardsd- sliding doorrc- reinforced concreterw- rainwater tanksw- stormwater tankt- timbertc- timber column
- exg
- new cavity masonry walls
- new timber frame walls
- new brick work
- new columns
- new floor
- roof
- garden
- hedge
- vertical garden
- timber decking
- gravel/soil
- rainwater tank
- site boundary
- demolition
Notes
Drawing No. 01
Project Greenfield ResidenceClient Bob & Jane Greenfield
Scale 1:100 at A3
Drawing
Sections
Date 17.10.12
43 Macdonald Street,Erskineville
Shuang Wu Architect Pty LtdSID: 310241952
Tutor: Paul BerkemeierGroup: A2
Legend
conc- concreteexg- existingFFL- finished floor levelftl- fixed timber louvershr- handrailpb- plasterboardsd- sliding doorsp- solar panelsrc- reinforced concreterw- rainwater tanksw- stormwater tankt- timber tc- timber columntsf- timber strip flooring
- exg
- new cavity masonry walls
- new timber frame walls
- new brick work
- timber column
- new floor
- roof
- glass
- timber
- site boundary
- demolition
Notes
Drawing No. 04
001 Section AA1:100
002 Section AB1:100
bedroom 2
new cavity masonry walls
new r.c. slabto eng. detail
new timber framed pitched roof w/ insulation
new timber framed window, low-e glazed
new timber framed floor with tsf
timber strip flooring
new cavity masonry walls
new timber framed pitched roof w/ insulation
pitched solar panelsas spec.
timber column
paneled glass wall as spec.
gutter
existing balcony awning repainted
new timber framed pitched roof w/ insulation
existing side wall retained
new timber handrail 1m high
balcony
verandah
new timber fence
line of existing roof pitch
ensuite living & studyroom
bedroom 1 living room
vertical gardenlight well
laundry bathroom
sd
sdsd ftl
existing side wall retained
vertical gardenas spec.
fixed timberlouvers
external timber cladding as spec.
hand rail 1m high as spec.
rendered masonry as spec.
timber framed awning as spec.gutter
timber framed sliding door
timber decking with step down as spec.
new timber framed pitched roof w/ insulation
gutter
new stairs
- vertical garden
- gravel/soil
- garden
TECHNICAL PROJECTS
2. Macdonald St Residence, Erskineville
Mock Development Application featuring alterations and additions to the existing terrace house. The design had a sustainable focus and featured a vertical garden and light well.
Left to right: montage of new facade, fl oorplan of ground fl oor, section, fl oorplan of fi rst fl oor, North & South elevations, shadow diagrams.
adjoining two storeyresidence
no. 41
balc
ony
balc
ony
PALING FEN(2m HIGH)
balcony
FACE OF WALL
sillhead
headhead
sill
balc
ony
MAC
DO
NAL
DST
REE
Tsingle storey
extension
adjoining tworesiden
top
of g
utte
r
top
of g
utte
r
adjoining two storeyresidence
7
+FFL 8.77
+RL 8.14
14
+RL 8.27
+RL 8.30
adjoiningadjoiningadjoiningadjoiningadjoiningadjoiningadjoining t twowoadjoiningadjoiningadjoiningadjoiningreres
adjoiningsidenideniden
singlesinglesinglesingleeextxtensio
singlesingle st storeensio
oreensio
oreyensio
yension
adjoiningadjoiningadjoiningadjoiningadjoiningadjoiningreres
nono
adjoiningadjoining t twosiden
woiden
wo siden
no
storeidenc
no 4
oree
41
orey
1
y
7
UP
UP
001 Ground Floor Plan & Demolition Plan1:100
living room
kitchenliving & dining room
bathroom
bedroom 1
laundry
garden
courtyard
vertical garden
exg
vera
ndah
path
garden
garden
rainwater tankas spec.
exg brick wall retained
existing treeretained
plantable area and gravel
new timber framed window, low-e glazed
new cavity masonry walls
timber decking with step down as spec.
new timber framed pb walls
new r.c. slabto eng. detail
new cavity masonry walls timber decking
with step down as spec.
newly decked verandah
tc
additional layer of brick
stormwater tank as spec.
vertical garden as spec.
tc
sd
sd
sd
sd
sdsd
rw
sw
line of mezzanine over
outdoor deck
new timber stairs
storage
AA04
AA04
AB04
AB04
ftl
Project Greenfield ResidenceClient Bob & Jane GreenfieldScale
1:100 at A3
Drawing
Ground Floor Plan +Demolition Plan
Date 17.10.12
43 Macdonald Street,Erskineville
Shuang Wu Architect Pty LtdSID: 310241952
Tutor: Paul BerkemeierGroup: A2
Legend
conc- concreteexg- existingFFL- finished floor levelftl- fixed timber louvershr- handrailpb- plasterboardsd- sliding doorrc- reinforced concreterw- rainwater tanksw- stormwater tankt- timbertc- timber column
- exg
- new floor
- roof
- garden
- hedge
- vertical garden
- timber decking
- gravel/soil
- rainwater tank
- site boundary
- demolition
Notes
Drawing No. 01
Project Greenfield ResidenceClient Bob & Jane GreenfieldScale
1:100 at A3
Drawing
Elevations
Date 17.10.12
43 Macdonald Street,Erskineville
Shuang Wu Architect Pty LtdSID: 310241952
Tutor: Paul BerkemeierGroup: A2
Legend
conc- concreteexg- existingFFL- finished floor levelftl- fixed timber louvershr- handrailpb- plasterboardsd- sliding doorsp- solar panelsrc- reinforced concreterw- rainwater tanksw- stormwater tankt- timber tc- timber columntsf- timber strip flooring
- exg
- site boundary
- demolition
Notes
Drawing No. 05 A
- vertical garden
- gravel/soil
- gardennew timber fenceas spec.
new timber framed window, low-e glazed
rendered masonry
new timber framed door maintaining existing characteristics
new timber hand rail as spec.
symmetrical arrangement w/ sds in the middle
adjoining building
paint job to existing balcony awning
facade detail retained
adjoining building
new timber hand rail as spec.
timber framed awning as spec.
tall hedging for privacy
001 North Elevation1:100
exg ground floor ffl rl 8.77
parapet rl 15.60
ridge rl 18.35
exg first floor ffl rl 12.25
adjoining building
light well through roof
new timber framed pitched roof as spec.
timber framed windows
new timber framed pitched roof over extension
rainwater tank system
rendered masonry
rendered masonry
glazed timber framed sliding doors
timber decking with step down as spec.
new timber hand rail as spec.
002 South Elevation1:100
adjoining building
balc
ony
balc
ony
balcony
balc
ony
MAC
DO
NAL
DST
REE
T
adjoining two storeyresidence
top
of g
utte
r
top
of g
utte
r
adjoining two storeyresidence
adjoining two storeyadjoining two storeyadjoining two storeyadjoining two storeyresidenceresidenceresidence
adjoining two storeyadjoining two storeyadjoining two storeyadjoining two storeyadjoining two storey
001 Shadow Diagram 9am 1:100
Project Greenfield ResidenceClient Bob & Jane Greenfield
Scale 1:100 at A3
Drawing
Shadow Diagrams(9am, 12pm, 3pm June 21st)
Date 17.10.12
43 Macdonald Street,Erskineville
Shuang Wu Architect Pty LtdSID: 310241952
Tutor: Paul BerkemeierGroup: A2
Legend
conc- concreteexg- existingFFL- finished floor levelftl- fixed timber louvershr- handrailpb- plasterboardsd- sliding doorrc- reinforced concreterw- rainwater tanksw- stormwater tankt- timbertc- timber column
- shadow from adjoining buildings
- shadow cast by existing
- new shadows of proposal
- proposed
- existing
- site boundary
Notes
Drawing No. 07 A
9am
12pm
3pm
minor additional shadow
reduced shadow on Western edge
+ RL 14.85
+ RL 14.74
+ RL 15.60
+ RL 16.80
+ RL 11.23
+ RL 14.85+ RL 14.85
balc
ony
balc
ony
PALING FENCE(2m HIGH)
sillhead
headhead
sill
balc
ony
MAC
DO
NAL
DST
REE
T
top
of g
utte
r
top
of g
utte
r
adjoining two storeyresidence
002 Shadow Diagram 12pm 1:100
Project Greenfield ResidenceClient Bob & Jane Greenfield
Scale 1:100 at A3
Drawing
Shadow Diagrams(9am, 12pm, 3pm June 21st)
Date 17.10.12
43 Macdonald Street,Erskineville
Shuang Wu Architect Pty LtdSID: 310241952
Tutor: Paul BerkemeierGroup: A2
Legend
conc- concreteexg- existingFFL- finished floor levelftl- fixed timber louvershr- handrailpb- plasterboardsd- sliding doorrc- reinforced concreterw- rainwater tanksw- stormwater tankt- timbertc- timber column
- shadow from adjoining buildings
- shadow cast by existing
- new shadows of proposal
- proposed
- existing
- site boundary
Notes
Drawing No. 07 B
9am
12pm
3pm
+ RL 14.85
+ RL 15.60
+ RL 16.80
+ RL 14.85
balc
ony
balc
ony
PALING FENCE(2m HIGH)
sillhead
headhead
sill
balc
ony
MAC
DO
NAL
DST
REE
T
top
of g
utte
r
top
of g
utte
r
adjoining two storeyresidence
003 Shadow Diagram 3pm 1:100
Project Greenfield ResidenceClient Bob & Jane Greenfield
Scale 1:100 at A3
Drawing
Shadow Diagrams(9am, 12pm, 3pm June 21st)
Date 17.10.12
43 Macdonald Street,Erskineville
Shuang Wu Architect Pty LtdSID: 310241952
Tutor: Paul BerkemeierGroup: A2
Legend
conc- concreteexg- existingFFL- finished floor levelftl- fixed timber louvershr- handrailpb- plasterboardsd- sliding doorrc- reinforced concreterw- rainwater tanksw- stormwater tankt- timbertc- timber column
- shadow from adjoining buildings
- shadow cast by existing
- new shadows of proposal
- proposed
- existing
- site boundary
Notes
Drawing No. 07 C
9am
12pm
3pm
+ RL 14.85
+ RL 16.80
+ RL 11.23
+ RL 14.85+ RL 14.85
minor additional overshadowing ontounused land
conceptual designtechnical projectsartistic exploration
ARTISTIC EXPLORATION
collage, screenprinting, painting, digital, sculpture
Using artistic mediums to explore design possibilities, especially those relating to architecture. My collages have been exhibited at the Tate (Toxteth Hotel) and featured in Sydney University’s Arts Publication, ARNA.
Left to right: ‘Disembodied’, collage, 2012; ‘Dystopian NK’, collage, 2013; ‘Forgotten Faces’, screenprint, 2011; ‘Woven Chaos’, mixed media, 2012; ‘Hipster Lovechild’, mixed media, 2013; life painting, 2011; ‘Spiral’, cotton buds, 2011; Zine Publication, 2013