Upload
sara-gistelinck
View
215
Download
0
Tags:
Embed Size (px)
DESCRIPTION
A portfolio of first and second bachelor year design assignments. This portfolio was made for an application to a masters programme at an international university
Citation preview
SELECTED W
OR
KS
Sara Gistelinck
TABLE OF CONTENTS
STUDIO
PUBLIC BUILDING
STRUCTURE
DEPARTMENT BUILDING
ABOUT ME
p. 3-8
p. 9-13
p. 14-17
p. 18-29
p. 30
STUDIO
Design a studio no bigger than 6x4x10m that can be used by an artist/guest professor/writer/architect to work, but also occasionally to sleep over.
LOCATION
ASSIGNMENT
Arenbergpark, Heverlee, Belgium. The grass field north east to the castle of Arenberg.
GRADES EARNED
LEVEL & EXACT CONTRIBUTION• Academic project• BSc 1• November - December 2010• Individual project• Design & elaboration were all
my responsibility
15 out of 20
SUPERVISORSHead supervisor: Hans [email protected]: Geert De [email protected]
4
The choice of location was influenced by several factors. I wanted to give the artist/guest professor/... the time to get calm and concentrated on his way to the studio. I tried to do this by pulling it away from the roads. Also I wanted to give him an inspirational view. I thaught the Dijle, the river on the south of the terrain, would serve perfectly for this. Behind the Dijle lies a road that has a lot of circulation. This way the artist can see movement without being disturbed by it.
CONCEPT & INSPIRATION
©Sara Gistelinck
At the Arenbergpark, there are many buildings in an industrial style. As the design project concerned a workspace, I decided to adopt this industrial style in my design. I used red bricks like the ones used in the surrounding buildings, I used rhythmic placement of high windows, and I gave my studio a clean look, without any ornaments.
Spatially, my concept was to design my studio as an architectural walk. You start from pure workspaces downstairs, one on ground level and one 90cm sunken into the ground, looking over the Dijle. Then, spiraling upwards, you go to the living spaces. First, there is a kitchenette with a table that can also be used to work at. Then you get into the bedroom at the other side of the studio. This is a space purely devoted to the human needs, with only a bed and a shower. The idea of the walk, ending in the bedroom, was that if a person would stay overnight after a hard day of work, he would have time to pipe down during his walk to his bedroom.
5
On the ground floor, the hallway is used as a buffer. It gives you the time to step out of the busy world and enter into the serene work space. The main work space is the most spacious one with the largest area and a double height. A more enclosed work space lies five steps downward with a desk over the whole length in front of an equally large window viewing over the Dijle.
FINISHED DRAWINGS
Sara Gistelinck - 2 Bira - A
rchitectural Com
puting - BIM
- Atelier
Atelier
123451 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
150 14 548 100 200
116
180
1410
2
150
180
150
1.080
A A
BB
0. gelijkvloers1:50
Sara Gistelinck - 2 Bira - A
rchitectural Com
puting - BIM
- Atelier
Atelier
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A A
BB
196 120 50 120 50 120 50 120 50 120 84
480
164 148 400 300
7026
280
1. eerste verdieping1:50
+1
On the first floor, the kitchenette is on the southeast side and the bedroom on the northwest side. ©Sara Gistelinck
6
0
Sara Gistelinck - 2 Bira - A
rchitectural Com
puting - BIM
- Atelier
Atelier
123451 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
150 14 548 100 200
116
180
1410
2
150
180
150
1.080
A A
BB
0. gelijkvloers1:50
Within this small volume I succeeded to diversify the levels.This way, I created different atmospheres without having to close off any rooms.
FINISHED DRAWINGS
©Sara Gistelinck
7
On section B-B, you get a good feel of how deep the smaller workspace has sunken into the ground.
FINISHED DRAWINGS
©Sara Gistelinck
Sara Gistelinck - 2 Bira - A
rchitectural Com
puting - BIM
- Atelier
Atelier
123451 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
150 14 548 100 200
116
180
1410
2
150
180
150
1.080
A A
BB
0. gelijkvloers1:50
8
PUBLIC BUILDING
Design a sculptural building with a chosen public function within a cube of 15x15x15m.
LOCATION
ASSIGNMENT
No specific location assigned. We made a building that would be collapsable and rebuildable anywhere in the world.
GRADES EARNED
LEVEL & EXACT CONTRIBUTION• Academic project• BSc 3• October 2011• Group project (group members:
Jolien Claes, Evi Lambie, and Wouter Luysterman)
• Design and elaboration were done in group. Wouter Luysterman made the presentation booklet, Evi Lambie made the finished drawings, and Jolien Claes and I made the models.
14 out of 20
SUPERVISORSHead supervisor: Joke [email protected]: David [email protected]
The concept to this design was to make a “culture box” that would be collapsable, and so, would be able to travel around the world. Also, it would be possible to rebuild it so that it would be on a different side. (See first picture)
CONCEPT & INSPIRATION
We chose for a composition of several “open boxes”. The different positions of the open boxes allow for different ways to experience them. (See second picture)
For the design of the open boxes, we found inspiration in the work of the artist Donald Judd, who has designed different objects with a serene exterior and a notable, colorful interior. We too chose for a white exterior, and different colored materials for the interiors.
We had to choose a public function for this building. As said already, we wanted to make a “culture box”. The boxes can be used for expositions, but also for concerts or even theaters. Also, the big white walls could be used to project movies on.
FUNCTION
The first picture is made by Wouter Luysterman. The sketch is made by Evi Lambie.
10
On this collage, you can see our culture box being used for an exposition of Auguste Rodin in Hyde Park, London. The collage was made by Wouter Luysterman.
COLLAGES
11
The white exterior walls make our project perfect for an outdoor filmfestival. The collage was made by Wouter Luysterman.
COLLAGES
12
This is a section of the building made by Evi Lambie.
FINISHED DRAWING
13
STRUCTURE
Design a structure with wooden slats of 4x2mm that can hold a pétanque ball at a hight of 1.2m using only two tables put on their sides as fulcrums, standing 1.2m apart. No glue may be used
ASSIGNMENT
GRADES EARNED
LEVEL & EXACT CONTRIBUTION• Academic project• BSc 3• November 2011• Group project (group members:
Sarah Beuls, Pieter Bieghs, and Wouter Luysterman)
• Design and elaboration were entirely done in group.
14 out of 20
SUPERVISORSHead supervisor: Joke [email protected]: Francis [email protected]
The farther away the slats are from the fulcrum the more effect their weight will have on the balance
Revisie E:Revisie D:
#CAD Technician
Revisie C:
Bouwheer: Naam bouwheer
Plannummer:
Revisie A:
Titel: Layout
Datum: ##/##/####
Project
Dossier:
ProjectnaamNaam stad
Revisie B:
Revisie F:
Eigen tekst 1
Eigen tekst 2
Dossier nr.
15
wandlichtpunt
bel
plafondlichtpunt
ptt-aansluiting
cai-aansluiting
dubbele wandcontactdoos geaard
enkele wandcontactdoos geaard
enkelpolige schakelaar
wisselschakelaar
dubbelpolige schakelaar
MV
meterkast
mechanische toe- en afvoer
CV HR-combiketel (HR 107)
wm opstelplaats wasmachine
kamerthermostaatkt
g gas (keuken)
ptt
cai
loze leiding wasdrogerwd
afzuigpunt mech.vent.
aansluiting wasmachinewm
vloerluik 600x800
M.K.
electra conform NEN 1010
bouwkundig
aansluiting koelkastkk
schakelaars op 1050+ / wcd op 300+
aansluiting afzuigkap2400+aansluiting cv-ketelcvaansluiting mechanische ventilatiemv
: ontspanningsleiding, op dak aansluiten
: liggende leiding tbv vuilwater
: inspectieput
ca-40
gst-75
ft-50
wc-110
dp-50
wst-50
wm-75
: gootsteen; diameter 75mm
: toilet; diameter 110mm
: fontein; diameter 50mm
: douchput; diameter 50mm
: wastafel; diameter 50mm
: wasmachine; diameter 75mm
: condensafvoer; diameter 40mm
: leiding mechanische ventilatie
: onstoppings stuk
100mm kalkzandsteen
100mm lichte scheidingswand
riolering/vloerleidingen
hwa-80 : hemelwaterafvoer; diameter 80mm
kantplank
latei
versterkte strookvs
0.1 ruimte volgens bouwbesluit terminologie
LEGENDE (Voorbeeld)
os
is
wandlichtpunt waterdicht
1 wcd per vertrek op 1050+
loze leiding div.ll div.
: muisdicht ventilatierooster
ONDERDEEL MATERIAAL AFWERKING
kleur- en materiaalstaat
KLEUR NUMMER OPMERKING
gevel metselwerk 80/20 - - rood/bruin - verhouding 80% rood, 20% bruin
gevel metselwerk 40/60 - - roob/bruin - verhouding 40% rood, 60% bruin
baksteen rood T 14-02 code Ubbens
prefab rollagen
voegen
kozijnen
draaiende delen
voordeur
plaatmat.(kader)
plaatmat.(voorgevel)
beton
mortel
hout
Eternit
steenstrips
doorstrijken
schilderwerk
natura
bruin
roob/bruin
l-grijs
wit
grijs
G 17-38
-
-
RAL 7036
N 191
N 271
N 191
baksteen
-
- code Ubbens
verhouding 80% rood, 20% bruin
hout
hout
schilderwerk
schilderwerk
d-grijs
d-grijs
Eternit natura
overstekken
goot + dakrand
dakbedekking (hellend)
aluminium
keramisch vlak engobe
grijs
grijs
zwartbruin
RAL 7036
RAL 7036
G-10
platinagrijs
Nelskamp Nibra G-10
witEternit natura
aluminium platinagrijs
Kegro 9163
loze leiding ptt-aansluiting
loze leiding cai-aansluiting
ptt
cai
v ventilatierooster
RAL 7012
RAL (ntb)
grijs
waterslagen aluminium l-grijs RAL 7036
dakbedekking (plat) bitumen grijs voorzien van ballast
daktrim aluminium grijs RAL 7036
Woonfunctie
Gebruiksoppervlak(GO)
Verblijfsgebied(VG)
Gebruiksoppervlak(GO)
Verblijfsgebied(VG)
Overige functies
100-140-100gevelsteen-spouw-isolatie-kalkzandsteen
tegelwerk: badkamer tot aan plafond; keuken; wc 1500+
wand-/rookmelder (aangesloten op lichtnet)conform NEN 2555
170-150HSB-element-kalkzandsteen
stalen montagekozijn met bovenlicht, volle bovendorpel + plafondregeldeur dagmaat 900x2300
215HSB-element
: liggende leiding tbv HWA (gescheiden syst.)
plaatmat.(zij- en achtergevel)
TIP:Bureaustempels enlegendes kunnen snel enmakkelijk gewijzigdworden als deze opWorksheets staan.Op elk masterlayout isdezelfde view geplaatst.De legende of de stempelhoeft zo bij wijzigingenalleen een keeraangepast te worden enniet meerdere keren perMasterlayout.
combinatie!
hoe verder de latjes van de tafel verwijderd zijn, hoe meer hun gewicht effect zal hebben op het evenwicht
analyse schaal: 1/10
momentenwerking
max Fbal
moment
evenwicht
structuur
+
uiteindelijke vorm schaal: 1/16
15 cm 65 cm 320 cm
Fbal
tegengewicht
versteviging steunpunt
om vervorming tegen te gaan
bovenaanzicht schaal: 1/16
Presentatiebundel
Presentatiebundel
Presentatiebundel
COMBINATION
Form derived from equation of momentum of a beam
Fbal
CONCEPT & INSPIRATIONWe started from the concept of a balance. With only the weight of the slats, we would support the ball. For the design itself, we started from the equation of momentum of a beam supporting the ball. This diagram shows that the structure would have less slats farther away from the fulcrum. Yet, the farther the slats are positioned from the fulcrum, the greater the lever effect is. We wanted to combine these two strategies.
The sketches on this page as well as the next are all made by Sarah Beuls.
15
broadening for reinforcement of the fulcrum
diagonals to counteract distortion
equation of momentum
counterweight for balance
counterweight
Fbal
structure
CONCEPT & INSPIRATIONWe followed the equation of momentum by using a wire to connect the highest part above the fulcrum with the end of the structure. The extra weight was reached by giving the structure a “belly”. The wire was now also necessary for the stabilization of the structure. Our structure was eventualy 4m long.
16
MODELUsing only the weight of the slats, we got our structure to hold the pétanque ball 70cm away from the fulcrum.
17
DEPARTMENT BUILDING
Make a design for a new builbing for the department of architecture of KU Leuven. This building has to include two auditoria, about 2000m² of studio space, a library, ten offices, two meeting rooms, a bike station, etc. An area of a maximum of 25% of the assigned program is left free to design and fill in as you wish.
LOCATION
ASSIGNMENT
This assignment was situated next to the railway station in Leuven. A project named “City Gate” was already being built there, yet the southern part was unfinished at the time. This is where we had to design our project. (see red area on picture)
GRADES EARNED
LEVEL & EXACT CONTRIBUTION• Academic project• BSc 4• February - May 2012• Individual project• Design and elaboration were all
my responsibility
16 out of 20
SUPERVISORSHead supervisor & mentor: Joke [email protected]
19
CONCEPT & INSPIRATIONI wanted to use the benefits of the location as much as possible. Being right at the border of the city center meant having a superb view over a continuously changing city. By not building against the existing buildings I created a square which allows for a “slow entrance” and I guaranteed a view for every side of the building.
For the organization of the building, I started by thinking of what I would want to improve and what I missed in the current department building. I made the studios to be the heart of my building and pronounced some clear statements: the library had to have a clear connection to the studios as well as the offices for researchers. Also, the studios had to have a view overlooking the city so students would see the world they are designing for. Another statement was that the studios should all be connected to each other so students would learn as much as possible from each other.
It was a logic decision to put the studios at the top of the building. I chose to make one big spiraling studio over the four top floors. At the heart of the spiral I located a patio with beneath it, the library. The library is spread over three floors, one of which is situated on the office floor to connect the library to the researchers’ offices.©Sara Gistelinck 20
1 2 3 41 2 3 4
1
2
3
4
5
6
7
12345 12345
This is a plan of my project in its surroundings and a section through my own project and the City Gate project.
FINISHED DRAWINGS
©Sara Gistelinck
21
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17181920212223242526
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17181920212223242526
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
A A
BB
This is a section through the long side of the project. The ground floor has a bike station. The main entrance to the building is on the first floor. This floor houses the information desk and a sandwich bar. The auditoria, the secretariat and some offices are on the second and third floor. Starting on the fourth floor are the rest of the offices and the library, and starting from the fifth floor, the studios.
FINISHED DRAWINGS
©Sara Gistelinck
22
FINISHED DRAWINGS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17181920212223242526
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17181920212223242526
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
A A
BB
The spiraling of the studios is clearily noticeable in this section. The studios on the left and right are also connected by sights through the library and the patio.
FINISHED DRAWINGS
©Sara Gistelinck
23
1x
3x
1x
5x
Basisstructuur
Sara Gistelinck | 2BIRA | 2011-2012 | Architectuurontwerpen 2C
1x
3x
1x
5x
Basisstructuur
Sara Gistelinck | 2BIRA | 2011-2012 | Architectuurontwerpen 2C
This is an axonometry of the basic structure of the building. I used the grid of columns from the existing parking underneath.
FINISHED DRAWINGS
©Sara Gistelinck
24
This is a fragment of the facade where you can see the eave and a part of the curtain wall with a sun blind system in front of it. I proposed a new kind of sun blind system. You can see two sorts of lamellae in front of the curtain wall. One is a normal lamella in aluminium, the other is a lamella made of frosted glass. They are placed alternately and at half of the normal distance from each other. This way light and sight can be controlled seperately. Air can be controled by opening windows in the curtain wall.
FINISHED DRAWINGS
©Sara Gistelinck
25
1 eave profile in aluminium2 fold plate in aluminium3 plywood4 beams for fixation5 curtain wall profile in aluminium6 lamella in aluminium7 hydraulic pump8 water en wind seal9 block for support10 airshaft
patio tile
water barrier
thermic inculation 2 x 8cm
vapor barrier
lean concrete 12cm
bearing concrete slab 25cm
This is a vertical section through the eave and a part of the curtain wall with lamellae.
FINISHED DRAWINGS
©Sara Gistelinck
26
Horizontale snede vliesgevelprofiel met raam en zonnewering1/5
raam: glas bevestigd in aluminium vliesgevelprofielzonnewering: lamellen, afwisselend aluminium en mat glas, met hydraulische pomp ter besturing
Sara Gistelinck | 2BIRA | 2011-2012 | Architectuurontwerpen 2C
This is a horizontal section through a part of the curtain wall and the lamellae. You can see the hydraulic pump necessary to control the different lamellae. For the system to actually work, you would need two hydraulic pumps. One would operate the glass lamellae and one would operate the aluminium lamellae.
FINISHED DRAWINGS
©Sara Gistelinck
27
This is an image taken, standing in one of the top studios, looking towards the patio. You can see there are no strict borders between studios, only stairs and ramps. This makes it easy for students to go and see what others are working on. You can even see through the patio to the studios on the other side.
RENDERINGS
©Sara Gistelinck
This is an image taken, standing in one of the lower studios, looking towards the library book room and the upper library reading room. Again, you can look through the library to the studios on the other side.
RENDERINGS
©Sara Gistelinck
This is an image taken standing in the lower library reading room. As it lies on top of the auditoria, there was a great span to overcome. The first idea was to solve this with a lattice girder on top of the building, but because of the studios spiraling up with terraces on top of the roof, this wasn’t possible. The best solution was to use Vierendeel beams on the floor right above the auditoria. As you can see on the picture, the tectonics of the reading room are greatly defined by these beams.
RENDERINGS
©Sara Gistelinck
29
ABOUT ME
I am social, studious, persistent, curious, and rational. I am an optimist, but I keep realistic. I am not scared of hard work, or raising the bar for myself. I like to compete and win, but even if I lose, I know I will have learned a lot.
PERSONALITYSince I was six, I have been going to different camps. Sometimes I would go with friends, but often I would go alone. I liked meeting new and different people, being independent, and exploring new things. I have been to camps in Belgium, France, Spain, Germany, and Switzerland.
TRAVELLING
My most important travelling adventure was when my parents wanted to show me and my brothers Brazil, the country where they had lived and worked with missionaries for a big part of their lives. I was seven and we travelled through the country. I saw the extreme gap between rich and poor in real life. This trip influenced my worldview heavily. This is where I got my interest in third and fourth world problems.
I have had a lot of hobbies over time. I took a year of dance and a year of public speaking, I partook in a musical, I played badminton in a club for three years, I went to art academy for seven years, and I was part of two youth movements and was the head of one of them for a year. I also worked at a local store on saturdays for two years. I like to go surfing in France or Spain during the summer, and over the last two years, I have been taking Spanish classes in part time adult education.
HOBBIES
I am interested in a lot of different things. I am interested in national and international politics, third and fourth world problems, music, specifically (hard) rock and grunge from the late 80’s and early 90’s, movies and books based on true stories, the books of John Steinbeck, parkour ( a sport related to freerunning), travelling, etc.
INTERESTS
Over the last two summers, I have been travelling more independently. I went on two trips with a friend to Bilbao and Barcelona. These destinations were chosen inter alia because of their architecture.
30