8
ST. JAMES’S CHURCH, PICCADILLY, LONDON – section and elevations for planning application report A B C E A B C D E 2007-2009 - SHORT AND ASSOCIATES, LONDON, UK Elevation from Piccadilly Elevation from churchyard North-south section £8.5 million and 2,700 sq. m. of re-development for St. James’s Church. Consists of two separate buildings adjacent to the Grade 1 listed building by Sir Christopher Wren. Includes space for office, retail, community/parish use, cafe and accommodation. Incorporates natural ventila- tion and passive cooling inside the London heat island. Assisted in the design and preparation of plans for planning application. Attended meetings with client and Westminster planners.

Portfolio

Embed Size (px)

Citation preview

  • 1. 2007-2009 - SHORT AND ASSOCIATES, LONDON, UK ST. JAMESS CHURCH, PICCADILLY, LONDON section and elevations for planning application report 17 . 47 17 . 4117 . 3717 . 33 17 . 5217 . 25 17 . 2717 . 20 Elevation from Piccadilly 8.5 million and 2,700 sq. m.of re-development for St.Jamess Church. Consists of two separatebuildings adjacent to the ABC DEGrade 1 listed building by SirChristopher Wren. Includes space for office,16retail, community/parish use,01cafe and accommodation. Incorporates natural ventila-tion and passive coolinginside the London heat island. 36 Assisted in the design and 18preparation of plans for 1planning application. ABCE Attended meetings with clientand Westminster planners. Elevation from churchyard North-south section

2. 2007-2009 - SHORT AND ASSOCIATES, LONDON, UK 62&63 PALL MALL, LONDON section and elevations for planning application report PALL MALL SW1 North - South Section Pall Mall Elevation 10.2 million and 2070 square meters of office building on Pall Mall Situated in a historical context, across form St. Jamess Palace, adjacent to a Grade 2 listed building by architect Norman Shaw. New building to replace two existing ones, 62 & 63 Pall Mall. Faade of 62 is retained while 63 Pall Mall is rebuilt. New rear faade to Georgian style listed Pickering Place. Have been granted planning consent. Assisted in the design, attended meetings with client, consultants and planners. Perspective view from Pickering PlaceElevation to Pickering Pl. 3. 2007-2009 - SHORT AND ASSOCIATES, LONDON, UK DEPARTMENT OF HEALTH research project for low energy medical buildingsPerpectivated sectionA Research project funded by the1 2 31 2 31 231231 231 2 1 A Department of Health Estates and Facilities Division Research and 231Open Courtyard3 Development Fund3 3 3 Investigates design strategies for low energy ventilation and3 3 3cooling of health buildings2 2 2 Formedand led an2 2 2 interdisciplinary panel of 11 1 architects, doctors and engineersA for this purpose. 11 1A Attended panel meetings and assited in preparation of the report presented to the NHS. Section through thick wall in courtyard Ground floor and air labirynth plans 4. 2006-2007 MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA CENTRO CONGRESSI ITALIA - EUR Tender drawings Piazza del Monte di Piet 3085 rue du Temple 00186 RomaF 75003 Paris Tel 39 06 6880 7871 Tel 33 1 446 18383 Fax 39 06 6880 7872 Fax 33 1 446 18389 [email protected]@fuksas.frConsulente Progettazione Strutturale:Project & Construction Management: Studio Ing. Massimo Majowiecki Drees & Sommer AG Via Tizziano 46/2Via Piave, 66 40033 Casalecchio di Reno - BO 00187 RomaStudio Ing. Gilberto Sarti Validatore: Via Circoncallazione Meridionale 54, Italsocotec S.p.A. 47900 Rimini Pzza. Stia, 8 - 00138 RomaConsulente Progettazione Impianti ed Antincendio:Committente: AI Engineering Eur S.p.A. Via Lamarmora 80 Via Ciro il Grande, 16 10128 Torino - Italy 00144 Roma 5. 2006-2007 MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA CENTRO CONGRESSI ITALIA EUR progetto esecutivo Livello N-0 pianta +32,15 6. 2006-2007 MASSIMILIANO FUKSAS ARCH, ROMA, ITALIA CENTRO CONGRESSI ITALIA EUR progetto esecutivo Longitudinal section 300 million Congress Center project in Rome with a capacity for 10.000 people and 55.000 square meters. Assistedinthe preparation of detailed drawings for tender and constructionstages throughto project delivery,building is currently under construction. Involved in the approval of urban, fire and accessibility plans by the city authorities Assisted in building the model.Cross section 7. 2005 - UNIVERSIDAD DE BELGRANO, BUENOS AIRES, ARG. SCIENCE & ARTS MUSEUM - RETIRO 5th year project 8. 2005 - UNIVERSIDAD DE BELGRANO, BUENOS AIRES, ARG. SCIENCE & ARTS MUSEUM - RETIRO 5th year project