PDA-IV TM Periodic On-line Partial Discharge Monitoring Using a Portable Instrument for Hydro Generators IRIS POWER ON-LINE PRODUCTS A USER’S PERSPECTIVE: “By combining on-line monitoring and a diminished schedule of off-line testing, the utility has switched from time-based to a condition-based procedure for allocating resources for testing and maintenance…, the maintenance staff can discern more thoroughly the condition of the insulation and what, if any, repairs or changes in operating procedures need to be done to increase the lifespan of the unit.” IRIS POWER, THE WORLD’S LARGEST PROVIDER OF ON-LINE PERIODIC AND CONTINUOUS PARTIAL DISCHARGE MEASUREMENT SYSTEMS

Portable Instrument for Hydro Generators - … · Portable Instrument for Hydro Generators ... PDA-IV IRIS POWER LP HAS BEEN THE WORLD LEADER IN MOTOR AND GENERATOR WINDING DIAGNOSTICS

  • Upload
    hadang

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Portable Instrument for Hydro Generators - … · Portable Instrument for Hydro Generators ... PDA-IV IRIS POWER LP HAS BEEN THE WORLD LEADER IN MOTOR AND GENERATOR WINDING DIAGNOSTICS

PDA-IVTM

Periodic On-line Partial Discharge Monitoring Using a Portable Instrument for Hydro Generators

IRIS POWER ON-LINE PRODUCTS

A USER’S PERSPECTIVE:

“By combining on-line monitoring and a diminished schedule of off-line testing, the utility hasswitched from time-based to a condition-based procedure for allocating resources for testing andmaintenance…, the maintenance staff can discern more thoroughly the condition of the insulationand what, if any, repairs or changes in operating procedures need to be done to increase thelifespan of the unit.”

IRIS POWER, THE WORLD’S LARGEST PROVIDER OF ON-LINE PERIODIC AND CONTINUOUS PARTIAL DISCHARGE MEASUREMENT SYSTEMS

Page 2: Portable Instrument for Hydro Generators - … · Portable Instrument for Hydro Generators ... PDA-IV IRIS POWER LP HAS BEEN THE WORLD LEADER IN MOTOR AND GENERATOR WINDING DIAGNOSTICS

PDA-IV

The test enables predictivemaintenance on hydro generatorstator windings, resulting in theincreased availability andextension of operating life. Thetechnique was introduced morethan three decades ago and hassince been used on over 5000hydro generators to identifydeteriorated stator windings.

The method is non-destructiveand based on proven scientificand empirical principles and isrecommended by manufacturersand industry standards such asthe IEEE Std. 1434-2000.

The monitoring technique isbased on the application of 80pFcapacitive couplers, resulting in ahigh frequency measurement

range and a favorable signal-to-noise ratio. This enables theautomatic separation andrecording of both partialdischarges and noise, so that testresults can be easily interpretedby users. The most commonmethod of monitoring hydrogenerators involves using a PDA-IV portable instrument withmultiple sets of permanentlyinstalled capacitive couplers. Theinstrument is controlled by meansof a computer and includesWindowsTM–based control anddata display software.

Alternatively, continuousmonitoring systems are availablefrom Iris Power. They can beintegrated with plant SCADA andfacilitate remote monitoring.

IRIS POWER ON-LINE PRODUCTS

PERIODIC ON-LINE PARTIAL DISCHARGE MONITORING OFHYDRO GENERATORS

Noise Pulse

PD Pulse

C1 C2 Ring Bus

Neutral

Circuit Parallels

Coupler Termination Box

PDA-IV

HOW THE PDA-IVINSTRUMENTMEASURES ANDANALYZES PARTIALDISCHARGES

The PDA-IV test has beendesigned to monitor partialdischarges during normalgenerator operation, i.e.under normal electrical,mechanical, thermal andenvironmental operatingstresses. The readings arenot affected by externalinterference (or noise) suchas power system corona,output bus arcing or othercommon noise sources. Thetests are typically performedsemi-annually and take about30 minutes per generator.

“Differential” Coupler Configurationfor Hydro Generators

HYDRO GENERATOR TESTING

The 80pF capacitors block the 50/60Hz power frequency voltage allowing high frequency fast rise-time voltagepulses (which are caused by partial discharges in the winding) to pass through. Couplers are normally installedin a “differential” configuration. For example, in a winding with two parallel circuits per phase, two couplersare installed, one on each parallel, as shown in the diagram below. The lengths of the coaxial cables betweenthe couplers and the termination box are trimmed so that noise pulses originating outside the machine arriveat the two instrument inputs simultaneously. Partial discharge pulses originating in the winding arrive at thetwo instrument inputs at different times. Consequently, the system can digitally distinguish between noise andwinding partial discharge.

Page 3: Portable Instrument for Hydro Generators - … · Portable Instrument for Hydro Generators ... PDA-IV IRIS POWER LP HAS BEEN THE WORLD LEADER IN MOTOR AND GENERATOR WINDING DIAGNOSTICS

PDA-IV

IRIS POWER ON-LINE PRODUCTS

PDA-IV TEST PROCEDURE

With the generator operating under normal service conditions, theoperator connects the PDA-IV instrument to a coupler terminationbox and to a portable computer running the Iris Power software. Themagnitude, phase position and number of partial discharge pulsesdetected at each coupler are then recorded and can be viewedimmediately, or stored for a subsequent analysis. The resultspresented to the user include:

• graphs depicting the nature and severity of particular insulationaging mechanisms

• trend curves highlighting the progression of these mechanismsover time

• statistical values which can be compared with historical databasesfor similar generators.

In most cases, the assessment of the condition of the stator windinginsulation, based on the on-line partial discharge measurement, canbe performed independently by the user after a short training course.Iris Power can also assist the user with result interpretation using itsunique database of over 140,000 results, collected over 20 years ongenerators of all makes and sizes.

Stator winding insulationproblems occur in 40% of allhydro generators and are one ofthe principal causes of forcedoutages, which result in lostrevenues. On-line partialdischarge (PD) monitoring, aproven technique developed byOntario Hydro and the CanadianElectrical Association in the late1970s, helps to minimize the risksof unexpected stator windingfailure. Using permanentlyinstalled couplers and a portableinstrument (the PDA-IV), utilityplant personnel worldwide havefound this method reliable andeasy to use.

In its 30-year history, the on-linepartial discharge test hasproduced results on thousands ofhydro generators. Published casestudies by dozens of PDA testusers have confirmed thefollowing benefits:

• the root causes of statorproblems can be identified andoften repaired at an earlierstage.

• the monitoring can increasethe availability of generators,and can contribute to theextension of the useful life ofthe unit stator winding

• intervals between generatorinspection outages can beincreased, if the PDA resultsare good

• most stator winding in-servicefailures can be avoided

• there is an exceptionally lowrate of false indications

• clear levels at which machinesneed maintenance have beenestablished

• can be applied to existingand new hydro generators.

PLANNING PREDICTIVE MAINTENANCE USING ON-LINE PARTIAL DISCHARGE MONITORING

PDA CAPACITIVECOUPLERS

The PDA-IV instrument is usedin conjunction with 80pF, highvoltage capacitors,permanently installed atspecific locations on the statorwinding. Iris Power suppliesthe compact capacitivecouplers made of high qualitymica splittings, encapsulatedin a specifically formulatedepoxy compound. These arecertified to be discharge freeat twice the operating voltageand are resistant to surfaceelectrical tracking.

Installed PDA couplers within a hydro generator

Page 4: Portable Instrument for Hydro Generators - … · Portable Instrument for Hydro Generators ... PDA-IV IRIS POWER LP HAS BEEN THE WORLD LEADER IN MOTOR AND GENERATOR WINDING DIAGNOSTICS

PDA-IV

IRIS POWER LP HAS BEEN THE WORLD LEADER IN MOTOR AND GENERATOR WINDING DIAGNOSTICS SINCE 1990,PROVIDING A FULL LINE OF ON-LINE AND OFF-LINE TOOLS, AS WELL AS COMISSIONING AND CONSULTING SERVICES.

PDA-IV is a trademark of Iris Power LP

Windows is a registered trademark of MicrosoftCorporation in the United States and other countries.

HEAD OFFICEIRIS Power LP3110 American DriveMississauga, ON L4V 1T2CanadaPhone: 1-905-677-4824Fax: 1-905-677-8498

irispower.com

Ver 6 • 11/09

[email protected]

DETECTION OF PARTIAL DISCHARGES

Partial discharges in degrading high voltage stator windings give rise tosmall voltage pulses which travel through the stator winding. Themagnitude and number of these pulses depends on the degree ofinsulation deterioration. That is, as the magnitude and number of partialdischarge voltage pulses increase, the rate of the electrical insulationdeterioration must also be increasing. The partial discharge signals areoften mixed with electrical noise from sources such as corona andoutput bus arcing, but are separated for analysis by the PDA-IVinstrument.

WORLDWIDE INDUSTRYACCEPTANCE OF ON-LINE PDMONITORING

The PDA partial discharge test has won worldwideacceptance with all majorutilities. This generalacceptance has beenachieved because:

• the test has been proveneffective in thousands ofinstallations, by identifyinghydro generators whichrequire maintenance

• the test equipment is cost-effective

• the test is performed on-line and requires nogenerator shut-down

• generator station staff canperform the test andinterpret the results withminimal training.

PD in Parallel C1

PD in Parallel C2