Port of Redwood Port of Redwood CityCity
Mitigated Negative DeclarationMitigated Negative DeclarationEagle Rock AggregatesEagle Rock Aggregates
Marine Receiving TerminalMarine Receiving TerminalPrepared by AMEC Earth & Environmental Inc.Prepared by AMEC Earth & Environmental Inc.
April 25, 2007April 25, 2007
OverviewOverview
Project Definition and Project Definition and Applicant-Proposed Applicant-Proposed MeasuresMeasures
Initial StudyInitial Study Supplemental Technical Supplemental Technical
Analyses PerformedAnalyses Performed Public Circulation and Public Circulation and
CommentsComments
Project Definition andProject Definition andApplicant-Proposed Applicant-Proposed
MeasuresMeasures
Eagle Rock Aggregates ProjectEagle Rock Aggregates Project Receive, store and distribute Receive, store and distribute
aggregateaggregate Use of Wharf 5Use of Wharf 5 Conveyance to storage areaConveyance to storage area Load to and delivery by trucks to Load to and delivery by trucks to
locations within and outside of locations within and outside of Port complexPort complex
Project Definition andProject Definition andApplicant-Proposed Applicant-Proposed
Measures Measures (cont’d)(cont’d)Key Applicant-Proposed MeasuresKey Applicant-Proposed Measures Suspended truck traffic during afternoon Suspended truck traffic during afternoon
peak hourspeak hours Dust-control measures: covered Dust-control measures: covered
conveyance, hoppers, dry fog, sprinklers conveyance, hoppers, dry fog, sprinklers over stockpiles, and BAAQMD standard over stockpiles, and BAAQMD standard measuresmeasures
Use of recycled water for dust Use of recycled water for dust suppressionsuppression
Notice prior to pile-drivingNotice prior to pile-driving Vessel positioning away from marinaVessel positioning away from marina
Initial StudyInitial Study
CEQA ChecklistCEQA Checklist Evaluate project Evaluate project
as proposedas proposed Additional studiesAdditional studies Impact Impact
assessmentassessment Port reviewPort review Public circulationPublic circulation
Supplemental Technical Supplemental Technical Analyses PerformedAnalyses Performed
Air QualityAir Quality Estimate combustion and particulate Estimate combustion and particulate
emissions emissions Compared against BAAQMD standards Compared against BAAQMD standards
and thresholdsand thresholds Identified emissions that would exceed Identified emissions that would exceed
applicable standards (NOx)applicable standards (NOx) Mitigations to be defined and established Mitigations to be defined and established
during permitting process for BAAQMD during permitting process for BAAQMD prior to initiating constructionprior to initiating construction
Supplemental Technical Supplemental Technical Analyses Performed Analyses Performed (cont’d)(cont’d)
NoiseNoise Identified noise sources and closest Identified noise sources and closest
receptorsreceptors Estimated noise levels of sources Estimated noise levels of sources
and at receptorsand at receptors Applied City of Redwood City noise Applied City of Redwood City noise
level standardslevel standards Noise levels at receptors within land Noise levels at receptors within land
use compatibility standardsuse compatibility standards
Supplemental Technical Supplemental Technical Analyses Performed Analyses Performed (cont’d)(cont’d)
Traffic AnalysisTraffic Analysis Traffic specialists conducted analysis Traffic specialists conducted analysis Estimated truck and passenger trips for Estimated truck and passenger trips for
initial and maximum throughput levels, and initial and maximum throughput levels, and peak-hour suspensionpeak-hour suspension
Impacts not significant:Impacts not significant: Intersection impact: <5-second delayIntersection impact: <5-second delay Freeway segment analysis: below Congestion Freeway segment analysis: below Congestion
Management Program thresholdsManagement Program thresholds Truck traffic on Seaport Blvd: no criteria for Truck traffic on Seaport Blvd: no criteria for
structural impacts; Fair Share Program structural impacts; Fair Share Program provision in leaseprovision in lease
Public Circulation and Public Circulation and CommentsComments
Draft MND and Initial Study Draft MND and Initial Study circulated for public circulated for public review and comment review and comment March 7, 2007:March 7, 2007:
State ClearinghouseState Clearinghouse AgenciesAgencies Port TenantsPort Tenants Port websitePort website
Public Circulation and Public Circulation and Comments Comments (cont’d)(cont’d)
Comments ReceivedComments Received State ClearinghouseState Clearinghouse BCDC regarding designated BCDC regarding designated
useuse Port TenantsPort Tenants Redwood Shores ResidentRedwood Shores Resident
Thank YouThank You