Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program Manager, POLB, Janna Watanabe, Environmental Specialist, POLB Jim Fields, U.S. Army Corps of Engineers, Alan Alcorn, Moffatt & Nichol Todd Graham, KPFF, Steve Cappellino, Anchor QEA

Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Port of Long Beach 76 Foot Main Channel Dredging Project

Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program Manager, POLB, Janna Watanabe, Environmental Specialist, POLB Jim Fields, U.S. Army Corps of Engineers, Alan Alcorn, Moffatt & Nichol Todd Graham, KPFF, Steve Cappellino, Anchor QEA

Page 2: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,
Page 3: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Project Goal

• Improve navigation and environmental safety

– Economical sediment remediation (IR Site 7)

• Deepen and widen

turning Basin and Main Channel

• Create Port property for commerce

Page 4: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Project Sites

Page 5: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Disposal Site: Pier G North Slip

Page 6: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Pier G North Slip Fill

Page 7: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Pier G Fill

Page 8: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Catalina Express Terminal Maintenance Dredging

Page 9: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Target Dredge Depths Area A = 4’+2’ OD Area C (west) = 4’+2” OD Area C (east) = 2’+2’ OD

Final Removal Volume Area A = 147,000 CY Area C (west) = 221,000 CY Area C (east) = 134,000 CY Total = 502,000 CY

IR Site 7 West Basin Dredge Areas

IR Site 7 West Basin Dredge Areas

Page 10: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Clamshell Dredge at IR Site -7

Page 11: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

IR Site -7 Material in Dump Scow

Page 12: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

IR Site -7 Material at Pier G Fill

Page 13: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Phase 2 – Dredging Turning Basin

PIER G

80’ STEELPIPE

SCHEDULE: 4/6/2011 – 4/26/2011 (21 DAYS – 24/7) EQUIPMENT: H.R. MORRIS (CUTTER HEAD) DREDGE POWER: ELECTRIC (from Pier T) DREDGE QUANTITY: 430,000 CY DISPOSE METHOD: PUMP (24” PIPE) PRODUCTION: 17,000 PER DAY

Page 14: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Dike Construction

Page 15: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

HR Morris Cutterhead

Page 16: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Channel Dredging

Page 17: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Turning Basin Dredging

Page 18: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Hydraulic Discharge within Fill

Page 19: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Emergent Fill at Pier G

Page 20: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Surcharge Material

• Originally planned to use Western Anchorage sand mine

• Revised to include rolling surcharge using Port supplied crushed miscellaneous base (CMB)

• 2/3 of CMB left on-site for use in developing site

• Excess material used for other Port project (Middle Harbor)

Page 21: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

Construction Costs

Engineer’s Cost Estimate: $44M

Area Cost

Fill Area (Wall, Dike, dredging) $15.7 Million

Catalina Express Terminal $0.8 Million

IR Site 7 $11.5 Million

Turning Basin and Channel (50/50 Fed Funded project)

$9.6 Million

Miscellaneous Items $2.2 Million

Total Bid Amount: $39.8 Million

Army Corps of Engineers cost share amount:

$4.8 Million

Page 22: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,

http://www.polb.com

Questions