Port MacKenzie Rail Extension
October 132020
Project ScopeThe Matanuska-Susitna Borough (MSB) and
the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough’s Port MacKenzie to ARRC’s rail system. The port lies about 30 miles southwest of Wasilla and about 5 miles due north of Anchorage, across Cook Inlet. The selected route involves 32 miles of new rail line extending from Port MacKenzie to the Alaska Railroad’s main-line just south of Houston.
Port MacKenzie has a deep draft dock (60 feet at low tide) that requires no dredging and can serve the world’s largest ships (Panamax and Cape Class vessels). The port’s 8,940 upland acres and 1,300 tide-land acres provide ample room to accommodate bulk resource storage, transport and processing facilities, as well as rail and terminal facilities for efficient train loading and unloading.
The project includes an Environmental Im-pact Statement (EIS) as required by the National
Environmental Policy Act (NEPA). The EIS and associated studies identified and analyzed feasible alignment alternatives, completed preliminary engi-neering design on alternatives, estimated construc-tion costs, and determined the project’s economic, financial and engineering feasibility.
When complete, the new rail line would oper-ate as part of the Alaska Railroad system.
Project Benefits• With the longest rail car loop in Alaska, the
extension offers highly-efficient offloading of bulk resources from train to ship.
• For Interior shippers, the new rail link shortens the distance to tidewater.
• Increased rail freight activity, and development stimulated by the rail link, would benefit railbelt communities through increased employment, contributions to the state and community tax base, and overall economic health.
Segment 4: 2015 summer work on a 140-foot 5-span concrete girder bridge over a tributary to the Little Susitna River.
Port MacKenzie Rail Extension • Page 2
• With ample room for staging and assembling, Port MacKenzie is an ideal site for large construction projects, such as oilfield modules or pipeline assembly.
Project Status & Timeline• In June 2007, MSB and ARRC signed a Memorandum of
Agreement to pursue environmental work, engineering and alternative analysis in support of the Surface Trans-portation Board (STB)-led environmental document for a Port MacKenzie rail line extension.
• 2011: After an extensive environmental review process, the STB issued a record of decision recommending the Mac East Variant (Mac Central) and Houston South route.
• 2011-2013: Construction bids awarded to Bristol Construc-tion (Segments 1 and 4), Quality Asphalt Paving (Segment 3), and Granite Construction (Segment 6).
• June 4, 2013: Ground-breaking ceremony.
• 2014: Segments 1, 3 and 6 substantially complete.
• 2015-2016: Construction bid awarded to Quality Asphalt Paving (Segment 5) in 2015. Segments 4 and 5 substan-tially completed by fall 2016.
• 2020: Estimate 2 years to complete project, if funded.
Project Participants
• Matanuska-Susitna Borough (MSB) – The local govern-ment that owns Port MacKenzie land and facility. The MSB is the project Sponsor and has raised funds through requests for State grants. The MSB co-manages the proj-ect and is responsible for public and government relations, and land use planning for the project.
• Alaska Railroad Corporation (ARRC) – Self-sustaining corporation owned by State of Alaska. The ARRC is the
project’s Applicant, responsible for rail-related technical expertise, and for support of the EIS effort. ARRC co-manages the project.
• Surface Transportation Board (STB) – STB is the lead federal agency on the project with the authority to approve construction of new rail lines (including extensions) in the United States. Because the project requires federal approval, an environmental document was prepared to meet NEPA requirements. The STB, through its Section of Environmental Analysis (SEA) was responsible for preparing the EIS.
Cost and Funding• The total project budget estimate is $314 million.
• From 2008 to 2015, $184 million has been funded via state grants. No funding allocated after 2015.
• An additional $125-$130 million in funding is needed to complete design and construction of the project.
For More Information
Mat-Su Borough: • Borough Manager John Moosey at 907.745.9577
Alaska Railroad: • Regulatory & Corporate Communications Officer
Stephenie Wheeler at 907.265.2671
www.portmacrail.com • Joint MSB-ARRC web site established in 2007 to facili-
tate the public process prior to STB application submit-tal. The web site continues to incorporate project status updates and visual information.
August 2015: Machinery at work on Segment 5. Segment 5 grade work June 2015.
Port MacKenzie Rail Extension • Page 3
Project Milepost and Segment Summary
PORTMACKENZIE
Point Mackenzie Rd
PORTMACKENZIE
DISTRICT
Knik G
oose
Ba
W. Susitna Pkwy
Hollywood
CowLake
POINTMACKENZIE
AGRICULTURE DISTRICT
PARKS HWY
SEGMENT 1(4.9 miles)
SEGMENT 2(7.1 miles)
SEGMENT 3(7.7 miles)
SEGMENT 6(1.8 miles)
S U S I T N A
F L A T S
S T A T E G A M E
R E F U G EG O O S E B A Y
S T A T E G A M E
R E F U G E
SEGMENT 5(3.5 miles)
SEGMENT 4(8.0 miles)
L I T T L E S U S I T N A
R E C R E A T I O N
R I V E R
N A N C Y L A K E
S T A T E
R E C R E A T I O N
A R E A
Big Lake Rd
Goose CreekCorrectional Center
BigLake
PapooseTwin Lakes
HorsehoeLake
RedShirtLake
Ayrshire Ave
Holstein Ave
Gue
rnse
y R
d
ReddaneRd
K1K2K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
K14
K15
K16
K17
K18
K19
K20
K21
K22
K23
K24
K25
K26
K27K28 K29
K30
K31
K32
0 1 2 3 Miles
PORT MACKENZIERAIL EXTENSION
PROJECT DECADMARE
MARCH 2019CONSTRUCTION STATUS
SE GM ENT S 1 , 3 , 4 , 5 & 6STATUS: Funded. Embankment completed. Little Susitna bridge, ties, rail, signals andnorth communication tower installed onSegment 6.
SE GM ENT 7
STATUS: Funding Required. Procurementand placement of ties, ballast and rail forSegments 1, 2, 3, 4 and 5.
SE GM ENT 8
STATUS: Funding Required. Placement ofsubballast; south communications tower;fiber optic cable; Terminal Reservebuildings; moose mitigation.
SE GM ENT 2STATUS: Funded. All right-of-way purchasedand agricultural covenants removed.Clearing of rail corridor and Reddane RoadExtension completed early winter 2017.Funding Required. Embankment construction.
Z:\09585 ARRC\67879 Pt MacKenzie Rail Environmental Services\GIS\map_docs\mxd\permitting\Open House - 2014_2016\construction status_segments_March_2017.mxd
Port MacKenzie Rail Extension • Page 4
Segm
ent
One
Scope and Contractor• Length: 4.9 miles• ~ 4 million cubic yards (CY) of earth moved • Construct 3-span, 84-foot long bridge crossing over an
unnamed stream at Baker Farm.• Install 19-foot diameter 146-foot long steel multi-plate
pipe to create winter crossing at Lake Loop Trail.
• Contractor: Bristol Construction Services
Status• Began construction in spring 2012.• Completed in summer 2015.
Lake Loop Trail Oversize Culvert Winter Crossing
Baker Farm Creek 3-span Bridge
Building a Segment 1 winter trail culvert crossing fall 2013.
Port MacKenzie Rail Extension • Page 5
Scope and Contractor• Length: 7.7 miles; ~ 1.1 million CY of earth moved • Construct three bridges:
— 5-span, pre-cast girder and steel beam bridge over Diamond Lake Outlet/Outfall.
— 3-span, pre-cast girder bridge over Historic Iditarod Trail.
— 3-span, pre-cast girder bridge over Iditarod Race Trail.
• Install 18-foot diameter 128-foot long steel multi-plate pipe to cross unnamed trail.
• Contractor: Quality Asphalt Paving (QAP)
Status• Construction began spring 2013.• Completed in summer 2015.
Diamond Lake Outlet 5-span Girder/Steel Bridge
Iditarod Trail 3-span Girder Bridge
Segm
ent
Thre
e
2013 Segment 3 grade work north of W. Susitna Parkway.
Port MacKenzie Rail Extension • Page 6
Scope and Contractor• Length: 7.4 miles• 1.0 million cubic yards (CY) of earth moved • Construct three bridges:
— 5-span, concrete girder 140-foot bridge over Tributary to Little Susitna River.
— 5-span, concrete girder 140-foot bridge over Iron Dog Trail.
— 4-span, concrete girder 112-foot bridge over Houston Loop Trail.
• Closest residence is 970 feet.
• Contractor: Bristol Construction Services
Status• Began construction winter 2013.• Completed in summer 2016.
Little Su Tributary 5-span Concrete Girder Bridge
Segm
ent
Four
2015 Segment 4 grade work on trail relocation.
Port MacKenzie Rail Extension • Page 7
Scope and Contractor• Length: 3.5 miles• 500,000 CY of earth moved • One trail crossing and two at-grade road crossings
• Contractor: Quality Asphalt Paving (QAP)
Status• Began construction summer 2015.• Completed in spring 2016.
Segm
ent
Five
Segment 5 grade work in September 2015.
Port MacKenzie Rail Extension • Page 8
Scope and Contractor• Length: 1.8 miles new embankment and widen 2.9 miles of
existing mainline embankment• ~ 630,000 cubic yards (CY) of earth moved • Construct single-span 118-foot long steel girder bridge
over the Little Susitna River.• Construct a “Y” rail connection and a new siding
adjacent to the Alaska Railroad main line.
• Contractor: Granite Construction
Status• Begin construction spring 2013.• Completed in fall 2014.
IDate: January 2011
Projection: Alaska State Plane Zone 4, NAD 83Author: HDR Alaska, Inc.
Sources: DNR, MSB, HDR Alaska, Inc., Hanson
EngineeringDesign Details
Profile View
FIGURE
Baker Farm Rd.
H-0.8 - Outlet ofDiamond Lake
H-4.3 - Tributary ofthe Little Susitna River
MP 174.3- Little SusitnaRiver
HS-1.0 - Tributaryof Horseshoe Lake
H-9.6 - Outflow ofMuleshoe Lake
MP 175
H-6.3 - Tributary ofthe Little Susitna River
3
Map Extent
MP 174.3- Little Susitna River
NOT TO SCALE
KNIK ARM
120-foot Single-Span Bridge over Little Susitna River
Segm
ent
Six
Seeding new embankment along Segment 6 in July 2013.