Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office

Poplar Street Bridge City Arch River Consultant Presentation

  • Upload
    cyndi

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

Poplar Street Bridge City Arch River Consultant Presentation. December 16, 2011 Room 160, St. Louis District Office. MRB Phase 1 . MRB Phase 1 . PSB Interchange Scope. Remove EB I-70 Ramp Remove and Replace PSB ramp to Memorial/WB I-70 ramp - PowerPoint PPT Presentation

Citation preview

Page 1: Poplar Street Bridge  City Arch River Consultant Presentation

Poplar Street Bridge City Arch River Consultant PresentationDecember 16, 2011Room 160, St. Louis District Office

Page 2: Poplar Street Bridge  City Arch River Consultant Presentation

MRB Phase 1

Page 3: Poplar Street Bridge  City Arch River Consultant Presentation

MRB Phase 1

Page 4: Poplar Street Bridge  City Arch River Consultant Presentation

PSB Interchange Scope Remove EB I-70 Ramp Remove and Replace PSB ramp to Memorial/WB I-70

ramp Remove and Replace SB I-55 Ramp with New Dual

Lane Ramp Remove and Replace NB I-55 Ramp with New Dual

Lane Ramp Convert I-70 Depressed Lanes from 4-Lane to 5-

Lane Section Add Auxiliary Lane Between PSB and New I-70 Exit

Ramp to Washington Avenue

Page 5: Poplar Street Bridge  City Arch River Consultant Presentation

2011 Improvements to PSB

Page 6: Poplar Street Bridge  City Arch River Consultant Presentation

2011 Proposed PSB Interchange Improvements

Page 7: Poplar Street Bridge  City Arch River Consultant Presentation

2011 Proposed PSB Interchange Improvements

Page 8: Poplar Street Bridge  City Arch River Consultant Presentation

I-70 Typical Section in Depressed Area

Page 9: Poplar Street Bridge  City Arch River Consultant Presentation

City Arch River 2015

Page 10: Poplar Street Bridge  City Arch River Consultant Presentation
Page 11: Poplar Street Bridge  City Arch River Consultant Presentation

Land Bridge Over I-70

Page 12: Poplar Street Bridge  City Arch River Consultant Presentation

City Arch River Land Bridge Scope

Improvements to I-70, Memorial Drive, and City Streets

Remove and Replace Walnut Street Bridge Remove Market, Chestnut, and Pine Street Bridges Construct Land Bridge over I-70 Between Market &

Chestnut Remove NB Memorial Drive between Walnut and

existing WB I-70 ramp

Remove SB Memorial Drive between Chestnut and Market

Page 13: Poplar Street Bridge  City Arch River Consultant Presentation
Page 14: Poplar Street Bridge  City Arch River Consultant Presentation

Land Bridge Over I-70

Page 15: Poplar Street Bridge  City Arch River Consultant Presentation

City Arch River I-70 Ramps and 3rd Street /MLK Bridge

Intersection Modifications Remove EB I-70 exit ramp to Memorial Drive and

Replace with new EB I-70 entrance ramp from Washington Ave.

Remove WB I-70 entrance ramp from Memorial Drive and Replace with a new WB I-70 exit ramp to Washington Ave.

Geometric revision to the 3rd Street / MLK Bridge Intersection.

Page 16: Poplar Street Bridge  City Arch River Consultant Presentation

I-70 Ramps to/from Washington Avenue

Page 17: Poplar Street Bridge  City Arch River Consultant Presentation

3rd Street / MLK Intersection Improvements

Page 18: Poplar Street Bridge  City Arch River Consultant Presentation

Schedule for CAR Proposals Due -

1/13/12 Interview Selection-

1/20/12 Interviews- 2/1/12 Final Selection- 2/3/12 Negotiations Done- 3/2/12 Notice to Proceed- 3/9/12

Page 19: Poplar Street Bridge  City Arch River Consultant Presentation

Schedule for PSB Proposals Due -

1/27/12 Interview Selection- 2/7/12 Interviews-

2/17/12 Final Selection-

2/21/12 Negotiations Done-

3/22/12 Notice to Proceed-

3/27/12

Page 20: Poplar Street Bridge  City Arch River Consultant Presentation

Schedule for Ramps & MLK

Proposals Due -2/17/12

Interview Selection- 2/24/12

Interviews- 3/2/12 Final Selection- 3/5/12 Negotiations Done- 4/4/12 Notice to Proceed-

4/11/12

Page 21: Poplar Street Bridge  City Arch River Consultant Presentation

AJR and NEPA Process Combined AJR for PSB / CAR Projects Separate NEPA documents AJR Submittal to FHWA by end of December NEPA for PSB Interchange requires Re-Evaluation

of NMRB EIS NEPA for City Arch River requires EA Approved AJR and Signed NEPA Documents by

May 2012 Some Risk in Moving Forward

Page 22: Poplar Street Bridge  City Arch River Consultant Presentation

Contingencies

CAR – Funding from TIGER Grant

PSB- Approval on TIP ALL 3 – Approval of NEPA and

AJR

Page 23: Poplar Street Bridge  City Arch River Consultant Presentation

Diversity

Page 24: Poplar Street Bridge  City Arch River Consultant Presentation

DBE & Workforce PSB – 20% DBE CAR (Land Bridge) – 20%

DBE Ramps & MLK – 20% DBE

Monthly Workforce Plan

Page 25: Poplar Street Bridge  City Arch River Consultant Presentation

Baseline Survey Control Points to be

provided by City Arch River to insure consistency on all projects.

Page 26: Poplar Street Bridge  City Arch River Consultant Presentation