    CITY AND COUNTY OF

    SWANSEAPUBLIC CONSULTATION

    EXERCISE

    September 28th-30th 2010

    LAND SOUTH OF THE

    A48 PONTARDDULAIS

    A draft Development Assessment is being prepared by the

    City and County of Swansea which considers the potential

    for further development opportunities on land south

    of the A48 and the wider context of the regeneration of

    Pontarddulais.

    The aim of this exhibition is to involve local residents,

    traders, businesses, stakeholders, and statutory

    organisations to assist in clarifying

    What the issues are for the area

    Constraints on development

    Public views on the future regeneration and infrastructure

    needs of the area.

    Testing of public opinion is an important first step in the

    evaluation process.The responses will contribute to the

    preparation of a regeneration and infrastructure strategy for

    Pontarddulais.

    Mae Asesiad Datblygu drafft yn cael ei baratoi gan Ddinas

    a Sir Abertawe syn ystyried y potensial ar gyfer cyfleodd

    datblygu pellach ar dir ir de or A48 a chyd-destun ehangach

    adfywio Pontarddulais.

    Nod yr arddangosfa hon yw cynnwys trigolion lleol,

    masnachwyr, busnesau, rhanddeiliaid a sefydliadau statudol

    er mwyn helpu i egluro

    Beth ywr materion ar gyfer yr ardal

    Cyfyngiadau ar y datblygiad

    Barn y cyhoedd am ddyfodol anghenion adfywio ac

    isadeiledd yr ardal.

    Mae profi barn y cyhoedd yn gam cyntaf pwysig yn y

    broses werthuso. Bydd yr ymatebion yn cyfrannu at baratoi

    strategaeth adfywio ac isadeiledd ar gyfer Pontarddulais.

    DINAS A SIR ABERTAWE

    YMARFERYMGYNGHORIAD

    CYHOEDDUS

    28-30 Medi 2010

    TIR IR DE OR A48

    PONTARDDULAIS

  • 8/2/2019 Pontarddulais Consultation Boards Sept 2010 4

    2/6

    Datblygu yn y Dyfodol

    a Pholisi Cynllunio

    The current statutory planning policies for Pontarddulais

    as set out in the Swansea Unitary Development Plan (UDP)which was adopted by the City and County of Swansea in

    2008.

    Beyond the clearly defined built up area of Pontarddulais

    there is

    Open countryside (covered by policies EV20, EV21, EV22),

    Land allocated for recreational use (policy HC23 and

    EV24) at Coebach Park

    Sensitive estuarine environment associated with the River

    Loughor flood plain.

    Current Unitary Development Plan policies seek to protect

    these areas from further development.

    Housing allocations are identified under policy HC1, and

    Policy EC5 identifies the shopping core.

    These policy references are shown on the plan below:

    Maer polisiau statudol presennol ar gyfer Pontarddulais yn

    cael eu cyflwyno yng Nghynllun Datblygu Unedol Abertawe(CDU) a fabwysiadwyd gan Ddinas a Sir Abertawe yn 2008.

    Y tu hwnt i ardal adeiledig Pontarddulais mae

    Ardal cefn gwlad agored (o dan bolisiau EV20, EV21, EV22),

    Tir a ddyrennir at ddefnydd hamdden (polisi HC23 a EV24)

    ym Mharc Coedbach.

    Amgylchedd morydol sensitif syn gysylltiedig

    gorlifdiroedd Afon Casllwchwr.

    Mae polisiau Cynllun Datblygu Unedol presennol yn ceisio

    diogelur meysydd hyn rhag datblygu pellach.

    Nodir dyraniadau tai o dan bolisi HC1 ac mae polisi EC5 yn

    nodir craidd siopa.

    Dangosir y cyfeiriadau polisi yma ar y cynllun isod:

    Future Development

    and Planning Policy

    EXTRACT FROM SWANSEA UNITARY DEVELOPMENT PLAN RHAN O GYNLLUN DATBLYGU UNEDOL ABERTAWE

  • 8/2/2019 Pontarddulais Consultation Boards Sept 2010 4

    3/6

    Key issues affecting

    future regeneration

    and development

    An initial assessment of physical and environmental

    characteristics and the policy framework for the areasuggests that development opportunities south of the A48

    will be very limited.

    The proximity of the River Loughor flood plain and

    associated flood risk issues will prevent development west

    of the dismantled railway line.

    Two high pressure gas mains south of the A48 present

    a significant physical constraint with associated cost

    implications on any future road infrastructure and future

    development.

    Mae asesiad cychwynnol o nodweddion ffisegol ac

    amgylcheddol a fframwaith y polisi ar gyfer yr ardal ynawgrymu y bydd cyfleoedd datblygu ir de or A48 yn

    gyfyngedig iawn.

    Bydd agosrwydd gorlifdiroedd Afon Casllwchwr a materion

    peryglon llifogydd cysylltiedig yn atal datblygu ir gorllewin

    or hen reilffordd.

    Mae dwy bibell nwy gwasgedd uchel ir de or A48 yn

    gyfyngiad corfforol sylweddol gyda goblygiadau costau

    cysylltiol ar unrhyw isadeiledd y ffordd a datblygu yn y

    dyfodol.

    Materion allweddol syn

    effeithio ar adfywio a

    datblygiad yn y dyfodol

  • 8/2/2019 Pontarddulais Consultation Boards Sept 2010 4

    4/6

    Town Centre

    Regeneration - what

    are the issues?

    The town centre is currently affected by a number of issues

    which are key considerations in evaluating the futureregeneration potential of areas in and adjacent to the town

    centre and in terms of highway infrastructure needs.

    Some of the main issues are:

    It is a retail centre which is not delivering its full potential,

    providing primarily a local top up shopping role, with

    substantial leakage of main shopping activity to other

    retail centres.

    The one way system is subject to high traffic volumes

    and the movement of heavy vehicles. It suffers

    consequently from traffic congestion with an associated

    impact on the shopping environment.

    Lack of parking

    Vacant retail units and gaps in the commercial frontage.

    Ar hyn o bryd, effeithir ar ganol y dref gan cynifer o brif

    faterian brif fater, ac maer materion hyn yn ystyriaethauallweddol wrth werthuso potensial adfywio ardaloedd yng

    nghanol y dref a gerllaw canol y dref yn y dyfodol ac o ran

    anghenion isadeiledd y briffordd. Dyma rai or prif faterion:

    Maen ganolfan fanwerthu nad ywn cyflawni ei photensial

    llawn, gan ddarparun bennaf rl siopa ychwanegol,

    gydar prif weithgareddau siopan treiglo i ganolfannau

    masnachu eraill.

    Mae llif uchel o draffig a symudiad cerbydau trwm ar y

    system unffordd. Maen dioddef felly o dagfeydd traffig

    gydag effaith gysylltiedig ar yr amgylchedd siopa.

    Diffyg mannau parcio

    Unedau manwerthu gwag a bylchau yn y ffryntiadau

    masnachol.

    Adfywio canol y dref -

    beth ywr materion?

    There is considered to be potential for further environmental

    enhancement of the centre, incorporating the work

    previously implemented and also for upgrading the fabric of

    retail frontages.

    What are your views?

    Ystyrir bod potensial i wella amgylchedd canol y dref

    ymhellach, gan gynnwys gwaith a roddwyd ar waith yn

    flaenorol a hefyd ar gyfer diweddaru ffryntiadau manwerthu.

    Beth yw eich barn?

    2.

    1.

    3.

    4.

    2.

    1.

    3.

    4.

  • 8/2/2019 Pontarddulais Consultation Boards Sept 2010 4

    5/6

    Does Pontarddulais

    need a bypass?

    The bypass scheme was originally highlighted in the 1990

    Halcrow Fox report as a potential mechanism for accessingthe development land south of the town centre. However the

    bypass has no formal policy status or protection and many

    changes have taken place since that time which need full

    consideration as part of the Development Assessment.

    Further technical studies would be needed to fully

    understand the impacts and costs of the bypass scheme.

    The plan below shows two potential locations for a bypass

    route.

    Amlygwyd y cynllun ffordd osgoi yn wreiddiol yn adroddiad

    Halcrow Fox ym 1990 fel mecanwaith posib ar gyfer caelmynediad ir tir datblygu ir de o ganol y dref. Fodd bynnag,

    nid oes gan y ffordd osgoi unrhyw statws bolisi ffurfiol nac

    amddiffyniad ac mae sawl newid wedi digwydd ers yr amser

    hwnnw y bydd angen eu hystyried yn llawn fel rhan or

    Asesiad Datblygu.

    Byddai angen astudiaethau technolegol pellach er mwyn

    deall effeithiau a chostaur cynllun ffordd osgoi yn llawn.

    Maer cynllun isod yn dangos dau leoliad posib ar gyfer

    llwybr y ffordd osgoi.

    A oes angen

    ffordd osgoi ar

    Bontarddulais?

    Potential Highway Options Opsiynau Priffordd Posib

    Detail layout of Tesco Store

    and Land Off Trinity Place

    Cynllun manwl o Siop

    Tesco a Thir Ger Trinity

    Place

  • 8/2/2019 Pontarddulais Consultation Boards Sept 2010 4

    6/6

    Your Views

    What Next

    Your views on the future regeneration of Pontarddulais are

    important to us.

    We would be grateful if you could provide us with your

    thoughts and comments, and we would ask if you could

    kindly leave the feedback forms in the box provided or

    return them to the address below by October 8th.

    Please feel free to ask representatives at the exhibition

    about anything you wish to know.

    Thank you for visiting.

    We will analyse all your comments and fully consider them

    as part of the preparation of any future regeneration strategy

    for Pontarddulais.

    This information contained on this exhibition is available in

    other formats on request.

    Eich barnMae eich barn ynghylch adfywio Pontarddulais yn y dyfodol

    yn bwysig i ni.

    Byddwn yn ddiolchgar petaech yn gallu cyflwynoch

    barn ach sylwadau, a gofynnwn yn garedig i chi gadael y

    ffurflenni adborth yn y blwch atodedig neu dychwelyd nhw

    ilr cyfeiriad isod erbyn Hydref 8fed.

    Mae croeso i chi ofyn unrhyw beth rydych yn dymuno ei

    wybod in cynrychiolwyr yn yr arddangosfa.

    Beth NesafDiolch am ymweld.

    Byddwn yn dadansoddi eich holl sylwadau ac yn eu

    hystyried fel rhan or paratoadau ar gyfer unrhyw

    strategaeth adfywio yn y dyfodol ar gyfer Pontarddulais.

    Maer wybodaeth sydd yn yr arddangosfa hon ar gael mewn

    fformatau eraill ar gais.

    City and County of Swansea - Dinas A Sir Abertawe

    Are there impacts on trade and businesses in the town

    centre?

    Are there regeneration benefits? Will it encourage new

    jobs and investment?

    Will it improve highway circulation?

    What would be your preferred route option for a bypass?

    What are the cost implications and how can the bypass

    scheme be funded?

    What are the Key

    Considerations for a

    bypass scheme?

    A oes effeithiau ar fasnach a busnesau yng nghanol y

    dref?

    A oes manteision adfywio? A fydd yn annog swyddi a

    chyfleoedd buddsoddi newydd?

    A fydd yn gwella cylchrediad y briffordd?

    Pa opsiwn llwybr fyddai orau gennych ar gyfer ffordd

    osgoi?

    Beth ywr goblygiadau cost a sut gellir ariannur cynllun

    ffordd osgoi?

    Beth ywr Ystyriaethau

    Allweddol ar gyfer

    cynllun ffordd osgoi?

    For further information visit www.swansea.gov.uk/pontarddulais

    City and County of Swansea

    Regeneration & Planning

    The Civic Centre, Room 2.7.1

    Oystermouth Road

    Swansea SA1 3SN

    Am fwy o wybodaeth, ewch i wefan www.abertawe.gov.uk/pontarddulais

    Dinas A Sir Abertawe

    Pennaith Adfywio a Cynllunio

    Canolfan Dinesig, Ystafell 2.7.1

    Ffordd Ystumllwynarth

    Abertawe SA1 3SN