OverviewThe City of Charlottesville has collaborated with residents and partner agencies to develop this Pollocks Branch Walkable Watershed Concept Plan. The Walkable Watershed process links the concepts of clean waters and healthy communities to improve creeks and neighborhoods simultaneously.
Building on the design goals from the 2013 Strategic Investment Area Plan (SIA Plan), this concept plan integrates pedestrian, cyclist and watershed improvements into a collective vision to improve both Pollocks Branch and neighborhood quality of life.
Working together, the City, the James River Association, Skeo Solutions, the Center for Watershed Protection, and The Bridge PAI have identified a set of near-term action steps, and are beginning to implement improvements over the course of the next year. The Pollocks Branch Walkable Watershed Concept Plan aims to: • Connect the neighborhood to Pollocks Branch,
Moores Creek and the surrounding natural areas/parks;
• Provide safe passage and routes for pedestrians and cyclists;
• Clean stormwater runoff using green infrastructure before it enters the creeks;
• Engage and educate residents to celebrate Pollocks Branch and promote watershed stewardship.
Please visit: www.walkablewatershed.com or contact Dan Frisbee, City of Charlottesville at (434) 970-3997 or [email protected] for more information.
Project Partners
Moores Creek
Pollo
cks
Bran
ch
6TH
ST S
E
RIAL
TO S
T
RIDG
E ST
OAK ST
ALTAVISTA AVE
DICE ST
E WATER ST
BOLLING AVE
BLENHEIM AVE
MONTROSE AVE
GARRETT ST
DRUID AVE
5TH
ST S
W
BELMONT AVE
MER
IDIA
N ST
HINTON AVE
ROCKLAND AVE
EARL
Y ST
HARTMANS MILL RD
CHERRY AVE
LANKFORD AVE
LEVY AVE
6TH
ST S
W
MO
NTICELLO RD
RAYO
N ST
6 1/
2 ST
SW
9TH
ST S
E
GRAVES ST
STONEHENGE AVE
9TH ST NE
GRE
EN S
T
2ND S
T SE
CHUR
CH S
T
4TH
ST
SE
PALATINE AVE
GO
ODM
AN S
T
BAYL
OR LN
W SOUTH ST
4TH
ST S
W
BURN
ET S
T
ROUGEMONT AVE
ROSA
TER
BERRING ST
E MARKET ST
GLE
ASO
N S
T
WAR
E ST
CAST
ALIA
ST
OAK
MO
NT S
T
E SOUTH ST
ROYS PL
7TH
ST
SW
LINDEN ST
BELM
ONT
PAR
K
ROBINSON PL
BARKSDALE ST
1ST
ST S
ROCKLAND AVE
5TH ST SW
RIAL
TO S
T
RIDG
E ST
2ND
ST
SE
ELLIOTT AVE 1ST
ST S
MONTICELLO AVE
6TH
ST
AVO
N ST
Parks and Open Space
Pollocks Branch Watershed
Study Area
OakwoodCemetery
Ix
JordanPark
BelmontPark
TonslerPark
D o w n t o w nD o w n t o w n
Study Area
0 1/4 Mile1/8
Rain that falls within Pollocks Branch watershed (shown in blue above) flows to the Pollocks Branch, then to Moores Creek, the Rivanna and James Rivers and ultimately the Chesapeake Bay.
In urban areas, the stormwater drainage system, which includes a series of underground pipes, open stream channels, street gutters and ditches, can carry pollutants from streets, yards and businesses to the creek.
A walkable watershed includes neighborhood amenities that improve stormwater and pedestrian safety simultaneously.
Pollocks Branch Walkable Watershed Concept Plan
DRAFT
September 2015 - DRAFT
2
C o n C e p t p l a n
B
A
6TH
ST S
E
AVO
N ST
1ST
ST S
1ST
ST S
ELLIOTT AVE
ELLIOTT AVE
RIDG
E ST
OAK STDICE ST
GARRETT ST
MONTICELLO AVE5T
H ST
SW
RIAL
TO S
T
ALTAVISTA AVE
CHERRY AVE
ROCKLAND AVE
EARL
Y ST
HARTMANS MILL RD
LANKFORD AVE
E WATER ST
6TH
ST S
W
MONTROSE AVE
BLENHEIM AVE
RAYO
N ST
6 1/
2 ST
SW
BOLLING AVE
STONEHENGE AVE
STONEHENGE AVE
DRUID AVE
DRUID AVEG
REEN
ST
2ND S
T SE
BAYLOR LN
4TH
ST
SE
PALATINE AVE
W SOUTH ST
4TH
ST S
W
BURN
ET S
T
ROUGEMONT AVE
ROSA
TER
BELMONT AVE
GLE
ASO
N S
T
WAR
E ST
OAK
MO
NT S
T
ROYS PL
NALLE ST
HINTON AVE
7TH
ST
SW
E SOUTH ST
BELM
ONT
PAR
K
ROBINSON PL
1ST
ST S
ROCKLAND AVE
RIAL
TO S
T
RIDG
E ST
5TH ST SW
2ND
ST
SE
PALATINE AVEMoores Creek
Pollo
cks
Bran
ch
Existing Trails
Parks
Study Area0 0.250.125
Miles
OakwoodCemetery
Daughtersof Zion
Cemetery
Ix
Mt ZionChurch
JordanPark
6th St SEHousing
S. 1st St. Housing
CrescentHalls
Hartman'sMill
BelmontPark
TonslerPark
D o w n t o w n
Region10
Opportunities On-Street Routes Primary Routes Missing Sidewalks
Safe Crossings Improved Intersections with Potential Stormwater Treatment (see SIA Plan)
Greenway System Existing Trails Potential Greenway Extension Potential Access Points Potential Creek Crossings
Green Infrastructure Projects Potential Capstone Projects Potential Planted Buffers Potential WaterWise Murals
Skeo Solutions | Pollocks Branch Walkable Watershed Concept Plan 3
Improve On-Street RoutesPrimary RoutesAdd pedestrian and cyclist safety amenities along priority routes. Integrate natural drainage strategies to improve stormwater in conjunction with pedestrian amenities where feasible.
Missing SidewalksAdd missing sidewalks along primary routes.
Safe CrossingsProvide safe crossings at intersections along primary routes. Integrate stormwater treatment where feasible (see SIA Plan).
Monticello Ave. ConnectionCreate pedestrian connection from South 1st Street to Monticello Avenue.
Enhance and Extend Pollocks Branch GreenwayExisting TrailsFormalize and clean-up existing section of Pollocks Branch Greenway.
Greenway ExtensionExtend Pollocks Branch Greenway to Jordan Park, connect to regional trails along Moores Creek. Add creek overlooks at street crossings.
Access Points and Creek CrossingsProvide additional access points and creek crossings. Improve connections to on-street route.
Improve Water Quality through Green Infrastructure and ArtGreen Infrastructure Capstone Projects (see pg. 4)Build one of the following green infrastructure capstone projects with existing grant support:
A. Crescent Halls Concrete Channel RetrofitB. Jordan Park Stormwater Bioretention Garden
Planted BuffersConsider planting buffers at street ends to slow and clean runoff before entering creek.
Waterwise Street MuralsHost workshops to teach neighborhood children about watershed health and design murals to celebrate the creek. (Led by The Bridge PAI)
Rain Barrels and Educational WorkshopsInstall 100 rain barrels in the neighborhood and host residential workshops to promote watershed stewardship. (Led by the James River Association)
o p p o r t u n i t i e s
Examples of natural drainage strategies that support stormwater and walkability: a) curb extension, b) planted swale, c) curb extension with crosswalk, d) corner stormwater bulb-out with sidewalk.
Example of creek crossing.
Proposed WaterWise street murals inspired by local youth creek discoveries.
a
c
b
d
4
Existing
Proposed
C a p s t o n e p r o j e C t s + n e x t s t e p s
A. Crescent Halls Concrete Channel RetrofitOpportunities to:• Retrofit existing concrete
stormwater channel into a planted swale.
• Include benches for residents and plants that attract pollinators and birds.
• Consider adding walking/biking connection to Monticello Avenue.
B. Jordan Park Stormwater Bioretention GardenOpportunities to:• Install natural drainage
feature at entrance of park to slow and clean stormwater from large drainage area before it enters Moores Creek.
• Enhance park entrance by replacing guardrail.
• Consider including educational signage about the stormwater feature and the area’s history.
ChannelRetrofit
Monticello Ave. Connection
Crescent Halls
Monticello Ave.
1st S
t. S
2nd
St. S
E
Existing
Proposed
Stormwater Garden
Jordan Park
Rougemont Ave
6th
St. S
E
Next StepsFall 2015• Extend greenway trail from
Rougemont Avenue to Jordan Park.
• Improve existing trail at Elliott Avenue.
• Select green infrastructure capstone project.
• Plan Pollocks Branch trail and stream cleanup and educational workshop.
• Install rain barrels in Ridge Street community (ongoing).
Spring 2016• Improve intersection at Monticello
Avenue and 6th St.
• Construct green infrastructure capstone project with the help of volunteers.
• Host educational workshop
• Install WaterWise storm drain murals.
AcknowledgmentsThis effort is funded by a National Fish and Wildlife Foundation Innovative Nutrient and Sediment Reduction Grant.
Representatives from the following organizations participated in the process through interviews, briefings, community meetings or working sessions:
City of Charlottesville Departments of Public Works, Neighborhood Development Services and Parks and RecreationCharlottesville Redevelopment and Housing AuthorityRidge Street Neighborhood AssociationPiedmont Housing AllianceCharlottesville Public Housing Association of Residents
The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the opinions or policies of the U.S. Government or the National Fish and Wildlife Foundation. Mention of trade names or commercial products does not constitute their endorsement by the U.S. Government or the National Fish and Wildlife Foundation.
One of the following green infrastructure capstone projects will be selected after soliciting community input and will be constructed in spring 2016. See map on page 2 for project locations.
For more information, please visit: www.walkablewatershed.com or contact Dan Frisbee, City of Charlottesville at (434) 970-3997 or [email protected].