41
superlight aggregates for the preparation of lightweight thermal insulating mortars for screeds POLITERM BLU Insulation & Chemicals Division THERMAL APPLICATION MANUAL . POLITERM® BLU

POLITERM BLU - CellBetong Norge · · When laying on a porous or cementitious existing floor after cleaning the surface and before laying the Politerm® Blu screed, wet the floor

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

superlight aggregates for the preparation of lightweight thermal insulating mortars for screeds

POLITERM BLU

Insulation & Chemicals DivisionTHERMAL

APPLICATION MANUAL . POLITERM® BLU

Technology for the use of lightweight aggregates in slabs and screeds pg. 03

Base for floors

·Forfloorslabsandtraditionalscreeds pg.04

·Insulatedsubstrateforunderfloorheating pg.06

Roofs

·Forroofslaidtofalls,flatroofsandwaffleslabs pg.08

· News Politerm Rain Defence System pg. 14

Asbestos fibre cement

·Encapsulationofasbestosfibrecement pg.17

Single layer flat screeds

· Direct laying of ceramic tiles pg. 19

·Pouringontoporoussubstrates pg.22

·Pouringthinscreeds~ 50 mm pg. 25

·Pouringmediumthicknessscreeds~ 75 mm pg. 29

Other applications

·Beneathasphaltdriveways pg.31

·Beneathindustrialfloors pg.33

Batching plants

· Mixing instructions pg. 35

Main products pg. 37

Complementary products pg. 38

Equipment

·Mixers,pumpsandtools pg.39

IND

EX

TECHNOLOGY FOR THE USEOF LIGHTWEIGHT AGGREGATES

IN SLABS AND SCREEDSE.I.A.isthespecialadditivethatwhenappliedontotheEPSvirginbeadsguaranteesaperfectmixingoftheEPSbeadswiththecementandwater.EPSisamongstthebest insulatingmaterialwiththemostcosteffectiveperformance.DuetothedifferentspecificweightsitisalmostimpossibletomixEPSbeadswithcementsincetheytendtoseparate.WithE.I.A.thisproblemiscompletelyremovedandahomogeneousmixwithahighthermalinsulationlevelandcon-stantqualitycanbeachieved.· Perfectmixingwiththewaterandbinders.· HomogeneousdistributionoftheEPSbeadsthroughthegrout.· Perfectpumpingcapability.· Preventionofpolystyrenebeadflotation.

APPLICATION MANUAL . POLITERM® BLU RANGEThe preparation of this manual is a complex operation requiring many checks of the text, images and graphics. Experience teaches us that it is almost impossible to publish a manual flawlessly. Should you notice any errors during the reading of this manual, please inform us promptly. (What is reported in the manual has to be intended as merely indicative and none guarantee can be given if not directly taken from certification and belonging to the workmanlike. All indication given are not binding for legal purposes). “Recommendations as to methods, use of materials and construction details are given as a service to contractors and designers, on the basis of Edilteco’s experience with the use of Politerm® Blu. Any drawings are meant only to illustrate the various possibilities of applications and should not be taken as the basis for design. Since Edilteco as a material supplier, exercises no control over the installation of Politerm® Blu, no responsibility is accepted for such drawings or recommendations. Edilteco’s legal obligations in respect of any sale of Politerm® Blu shall be determined solely by the terms of the respective sales contract” All data is derived from laboratory tests and is subject to change according to environmental conditions and work practices. The user is required to check the suitability of the product in accordance with the specific application, undertaking all liability implicit in and deriving from use of the product itself; moreover the operator has to respect all application instructions and safety advice, respecting all norms attributable to the good work practice. Edilteco has the right to change at its sole discretion and without any advice the content of the present manual. The present manual cancels and replaces any other previous version of any application manual of Politerm® Blu, or any other Technical documents previously issued. The dissemination of this manual in any way, totally or even partially, is strictly forbidden without the authorization of Edilteco S.p.A.

Mixture

E.I.A.with

4

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

Base Layer

FOR USE AS A BASE LAYER BENEATH SAND-CEMENT AND SIMILAR TYPES OF SCREEDS

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200L,laidbyskilledinstallersusingthe base layer method for beneath sand cement screed, sand anhydrite or premixed screed.

INTENDED USE:groundbearingfloorslabsonadequatelycompactedhardcore/sub-baseflatroofingwithorwithoutfallsvoidfilling,intermediatefloorsoncorrugatedsteelsheetingetc.

MINIMUM APPLICATION THICKNESS: 50 mm.For thicknesses less than 50 mm proceed as follows:· Thicknessesbetween30mmand50mmonwellconsolidatedsurfaces(e.g.:withelectricalconduitand/orpipessecurelyhau-nchedwithcementmortar):thelesserthicknessmaybeconsideredacceptable.

· Forthicknessesbetween10mmand30mm:addtothemixofcementandPoliterm®Bluabout200kg/m³ofaggregatewithamaximumgrainsizeof0,6mm(mixedmanually)andincludeanelectro-weldedmetalmesh(ø 2mm).

ITEM SPECIFICATION:CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A.:superli-ghtaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3-6mmorø2mm(Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof200to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.Thelightweightscreedobtained,issuitableforsubsequentscreedlayingmadeofsandandcementorsandandanhydrite.Edil-tecotechnologysuggestsalsothenewhighinsulatingliquidscreedwithadensityofjust130kg/m3.ItispossibletoobtainthismixingthePoliterm®BluFeinwith110kg/m3 of cement.

The screed produced will have the following characteristics:

FORMULA 110 200 250 300 350

Densityafter28dayskg/m3 approx.130a approx.215 approx.265 approx.315 approx.365

ThermalconductivityλD W/mK 0,043 0,065 0,067 0,080 0,103

CompressivestrenghtN/mm2 0,528 0,69 0,83 1,61 1,69

FlexuralstrenghtN/mm2 0,12 0,37 0,46 0,95 0,59

CohesionkPa n.a. 82,62 n.a. 127,17 n.a.

Hot-sealedmembraneruptureN/50mm n.a. 57 n.a. 62 n.a.

Cold-sealedmembraneruptureN/50mm n.a. 35 n.a. 47 n.a.

ElasticitymoduleN/mm2 n.a. 235,3 n.a. 551,1 n.a.

Permeabilitytowatervapourμ 5,1 5,9 6,9 7,2 9,2

SpecificheatJ/kgK 1000* 1000* 1000* 1000* 1000*

Shrinkage(NBN)mm/m n.a. 0,427 n.a. 0,352 0,270

Acoustic performance ΔLw

n.a. 14dB** 14dB** 26dB*** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a. 61dBthick.11cm n.a. n.a.

Fire reactivity class n.a. A2-s1,d0

a-OnlywithPoliterm®BluFein.FormethodsandapplicationconsulttheEdiltecoTechnicalDepartment.*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith5cmofPoliterm®Blu+5cmofscreed/***Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

5

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

When placing Politerm® Blu screed over existing concrete slabs, concrete beam decks, compacted hardcore sub-base, etc: it can be done without using an electro welded mesh in the pour. If the receiving surface however comprises insulation boards, a bituminous and/or synthetic waterproofing layer, tiled floors, or corrugated steel sheet, etc., before pouring Politerm® Blu screed sheets of electro welded lath (minimum dimensions): wire ø 2 mm - mesh 50 x 50 mm) need to be included, appropriately tied and spaced from the laying surface.

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructural jointsand/orexpansion joints inthereceivingsurfacemustbemaintainedandextendedupthroughthePoliterm®Bluscreed.

· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· WhenlayingonaporousorcementitiousexistingflooraftercleaningthesurfaceandbeforelayingthePoliterm®Bluscreed,wetthefloorwellbutwithoutleavingpuddles.

· Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboards,waterprooflayersortiledfloorsdonotwetthesurface.

· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· Whencontinuingthepourthedayjointsneedtobetreatedwith Edilstik latexadhesive,tobeused“freshonfresh”.· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreeze additivesthatmaybeusedmustbecompatiblewiththephysicalchemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbene-fitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· In case of highly trafficked situations protect the Politerm® screed appropriately.· It is essential that you contact our Engineering Department when considering any application different from that described in

our technical data sheets and our manuals.

GROUND:LIGHTWEIGHT THERMAL INSULATING UNDERSCREED

SCREED:·Sand/Cement·Sand/Anhydride·Selflevelling

Politerm® Blu

FLOORING:Ceramic-Parquet-Marble-Moquette-Linoleum

Vapour Barrier

Vapour barrier

INTER FLOOR:INTERMEDIATE THERMAL INSULATING LAYER

FLOORING:Ceramic-Parquet-Marble-Moquette-Linoleum

Soundinsulating band Screed

Sound insulating element

Slab

Water pipes /electric cables

Politerm® Blu

WOOD CRAWL SPACE: INSULATING LAYER

FLOORING:Ceramic-Parquet-MarbleMoquette-Linoleum Politerm® Blu

Screed

Old masonry

Soundinsulating band

Screed

Galvanizedmesh

Wood crawl space, new or refurbished Politerm® Blu

FLOORING:Ceramic-Parquet-MarbleMoquette-Linoleum

SPECIAL APPLICATION:VAULTED OR WAFFLE FLOOR LEVELLING

HONEYCOMB

6

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

Intermediate Layer

FOR USE BENEATH SELF LEVELLING SCREEDS AND UNDERFLOOR HEATING SYSTEMS (UFH)

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200Llaidbyskilledinstallersusingthe base layer method for beneath self-levelling screed: that is to say it is suitable for the next base-scre-ed application of self-levelling mortar.

INTENDED USE:groundbearingfloorslabsonadequatelycompactedhardcore/sub-baseflatroofingwithorwithoutfallsabaseforunderfloorheatingsystems(wi,thorwithoutpanels)voidfilling,intermediatefloorsoncorrugatedsteelsheetingetc.

FOR USE BENEATH SELF LEVELLING SCREEDS:1. Thespecificcharacteristics(verylowwaterabsorption)ofPoliterm®Blubasemortars,whencorrectlymixedandinstalledas

perthemanufacturer’sinstructions,maketheuseofawaterprooflayerbetweenthePoliterm®Bluandtheselflevellingscreedunnecessary.

2. WhenPoliterm®BluistobeplaceddirectlyonthegroundorinsituationswheredampconditionsmayoccurbeneaththePoli-term®Bluscreeditwillbenecessarytoinstalladampproofmembrane(dpm).Incertaincircumstancesitmaybenecessarytoincorporateavapourcontrollayer(VCL)betweenthePoliterm®Blubaseandtheself-levellingscreed.

3. Incaseofparticularstaticsituationsuchasroofs,itisnecessarytoinstallaseparatinglayerbetweenthebasemadebyPoli-term®Bluandselflevellingscreed.

4. Thethicknessoftheselflevellingscreed,placedoverthePoliterm®Bluscreed,shouldbeinaccordancewiththerecommenda-tionsofthemanufacturersoftheself-levellingscreed.

FOR USE BENEATH UNDERFLOOR HEATING SYSTEMS:1. Thespecificcharacteristics(very lowwaterabsorption)ofPoliterm®Blubasemortars,whencorrectlymixedand installed

asperthemanufacturer’sinstructions,makestheuseofawaterproofinglayerbetweenthePoliterm®Bluandtheunderfloorheating system unnecessary.

2. Installationofufhpipingsysteminrigidinsulationpanels:followtheinstallationinstructionsofthesupplierofthethermalheating system.

3. Installationofufhpipingsystemwithoutpanel:usingthethermalperformancecharacteristicsofthePoliterm®BluinsulatingbaselayeritispossibletocalculateaPoliterm®basethicknessthatavoidstheneedforadditionalrigidinsulationboards.Inthiscaseitisnecessarytoinstallgalvanizedsheets,joinedtogetherontopofthePoliterm®Blubaseonwhichitispossibletofixtheufhpiping.

MINIMUM APPLICATION THICKNESS: 50 mm.For thicknesses less than 50 mm proceed as follows:· Thicknessesbetween30mmand50mmonwell‐consolidatedsurfaces(e.g.:withelectricalconduitand/orpipessecurelyhau-nchedwithcementmortar):thelesserthicknessmaybeconsideredacceptable.

· Forthicknessesbetween10mmand30mm:addtothemixofcementandPoliterm®Bluabout200kg/m³ofaggregatewithamaximumgrainsizeof0,6mm(mixedmanually)andincludeanelectro-weldedmetalmesh(2mmwirediameter).

ITEM SPECIFICATION:CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A.:super-lightaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof200to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.Thelightweightscreedobtained,issuitableforsubsequentscreedlayingmadeofsandandcementorsandandanhydrite.Edil-tecotechnologysuggestsalsothenewhighinsulatingliquidscreedwithadensityofjust130kg/m3.ItispossibletoobtainthismixingthePoliterm®BluFeinwith110kg/m3 of cement.

7

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

The screed produced will have the following characteristics:

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbemaintainedandextendedupthroughthePoliterm®Bluscreed.

· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· WhenlayingonaporousorcementitiousexistingflooraftercleaningthesurfaceandbeforelayingthePoliterm®Bluscreed,wetthefloorwellbutwithoutleavingpuddles.

· Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboards,waterprooflayersortiledfloorsdonotwetthesurface.

· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”.· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbecompatiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbenefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthisma-nual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· In case of highly trafficked situations protect the Politerm® screed appropriately.· It is essential that you contact our Engineering Department when considering any application different from that described in our technical

data sheets and our manuals.

FLOORING:Ceramic-Marble-Parquet-Moquette-Linoleum

Sound insulating band

Self levelling screed Autoliv SP or sand-cement fluidized screed

Floor heating panel

Slab

Water pipes / electric cables

Politerm® Blu

INTER FLOOR: LIGHTWEIGHT FILLING LAYER FOR RADIANT HEATING FLOOR SYSTEM

FLOORING:Ceramic-Marble- Parquet - Moquette - Linoleum

Soundinsulating band

Self levelling screed Autoliv SP or sand-cement fluidized screed

Layer of separation

Floor heating system

Slab

Water pipes / electric cables

Politerm® Blu

INTER FLOOR: LIGHTWEIGHT FILLING LAYER FOR RADIANT HEATING FLOOR SYSTEM

SPECIAL APPLICATION: INCLINED SINGLE LAYER LIGHTWEIGHT THERMAL INSULATED SCREED

Self levelling screedAutoliv SP

Politerm® Blu

FLOORING:Ceramic-Marble-Parquet-Moquette-Linoleum

Vapour barrier

GROUND:LIGHTWEIGHT THERMAL INSULATING UNDERSCREED

Self levelling screed Autoliv SP

Politerm® Blu

Vapour barrier

FLOORING:Ceramic-Parquet-Marble-Moquette-Linoleum

HONEYCOMB

FORMULA 110 200 250 300 350

Densityafter28dayskg/m3 approx.130a approx.215 approx.265 approx.315 approx.365

ThermalconductivityλD W/mK 0,043 0,065 0,067 0,080 0,103

CompressivestrenghtN/mm2 0,528 0,69 0,83 1,61 1,69

FlexuralstrenghtN/mm2 0,12 0,37 0,46 0,95 0,59

CohesionkPa n.a. 82,62 n.a. 127,17 n.a.

Hot-sealedmembraneruptureN/50mm n.a. 57 n.a. 62 n.a.

Cold-sealedmembraneruptureN/50mm n.a. 35 n.a. 47 n.a.

ElasticitymoduleN/mm2 n.a. 235,3 n.a. 551,1 n.a.

Permeabilitytowatervapourμ 5,1 5,9 6,9 7,2 9,2

SpecificheatJ/kgK 1000* 1000* 1000* 1000* 1000*

Shrinkage(NBN)mm/m n.a. 0,427 n.a. 0,352 0,270

Acoustic performance ΔLw

n.a. 14dB** 14dB** 26dB*** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a. 61dBthick.11cm n.a. n.a.

Fire reactivity class n.a. A2-s1,d0

a-OnlywithPoliterm®BluFein.FormethodsandapplicationconsulttheEdiltecoTechnicalDepartment.*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith5cmofPoliterm®Blu+5cmofscreed/***Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

8

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

Roofing

FOR USE ON INCLINED OR FLAT ROOF (WITH OR WITHOUT FALLS) AND FACESDirectly beneath an applied waterproofing layer

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200L,laidbyskilledinstallersusingthe base layer method to directly receive a waterproofing layer either (poured on), bituminous (hot or cold) and/or synthetic.

INTENDED USE:flatroofsandnon-traffickedterraces(withorwithoutfalls),coveringcorrugatedroofingsheetsetc...

MINIMUM THICKNESS ON ABSORBENT SURFACES: 50 mm.For thicknesses less than 50 mm proceed as follows:· Thicknessesbetween30mmand50mmonwellconsolidatedsurfacese.g.:withelectricalconduitand/orpipessecurelyhaun-chedwithcementmortar:thelesserthicknessmaybeconsideredacceptable.

· Forthicknessesbetween10mmand30mm:addtothemixofcementandPoliterm®Bluabout200kg/m³ofaggregatewithamaximumgrainsizeof0,6mm(mixedmanually)andincludeanelectro-weldedmetalmesh(2mmwirediameter).

When creating falls, the minimum thickness must not be less than 50 mm.

MINIMUM APPLICATION THICKNESS ON NON-ABSORBENT SURFACES: 50 mm with galvanizedmesh(minimumsize:wireø3mm–mesh50x50mm)ataduedistancefromthelayingsurface.Our Edilteco Technical Department is available for any question.

ITEM SPECIFICATION: CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A:superli-ghtaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof200to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.Thelightweightscreedobtained,issuitableforsubsequentscreedlayingmadeofsandandcementorsandandanhydrite.Edil-tecotechnologysuggestsalsothenewhighinsulatingliquidscreedwithadensityofjust130kg/m3.ItispossibletoobtainthismixingthePoliterm®BluFeinwith110kg/m3 of cement.

The screed produced will have the following characteristics:

FORMULA 200 250 300 350

Densityafter28dayskg/m3 approx.215 approx.265 approx.315 approx.365

ThermalconductivityλD W/mK 0,065 0,067 0,080 0,103

CompressivestrenghtN/mm2 0,69 0,83 1,61 1,69

FlexuralstrenghtN/mm2 0,37 0,46 0,95 0,59

CohesionkPa 82,62 n.a. 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 57 n.a. 62 n.a.

Cold-sealedmembraneruptureN/50mm 35 n.a. 47 n.a.

9

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

When placing Politerm® Blu screed over existing concrete roofs, concrete beam decks, it can be done without using an electro wel-ded mesh in the pour. If the receiving surface however comprises insulation boards, a bituminous and/or synthetic waterproofing layer, or corrugated steel sheet, etc., before pouring Politerm® Blu screed sheets of electro welded mesh (minimum dimensions): wire ø 2 mm - mesh 50 x 50 mm need to be included, appropriately tied and spaced from the laying surface.

Before apply the waterproof finish, it is necessary to prepare the surface using one of the two following methods:a. Abrade the surface using an electric sander fitted with an abrasive disk and dust extraction; alternativelyb. Melt the surface polystyrene beads polystyrene beads, using an LPG roofing gas torch.Neither method to be employed until 7 days after the screed has been laid.

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbe

maintainedandextendedupthroughthePoliterm®Bluscreed.· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· WhenlayingonaporousorcementitiousexistingroofaftercleaningthesurfaceandbeforelayingthePoliterm®Bluscreed,wet

thesurfacewellbutwithoutleavingpuddles.· Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboardsorwaterprooflayersdonotwet

the surface.· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”.· ThemaximumgradientdependingonthemixstrengthofthePoliterm®Bluisbetween30and40%.· ThePoliterm®Bluscreedneedstobeprotectedfromrainforthefirst48hoursafterlaying.· ThesubsequentlayingofaheavyscreedoverthePoliterm®Bluscreedmaybepossibleafteraperiodof7days.Thisperiodof

timemayneedtobeextendedsubjecttothethicknessofthePoliterm®Bluscreedandweatherconditions.Theinstallationofthewaterproofingmembraneshouldbestrictlyinaccordancewiththeinstructionsofthemembranemanufacturers.TheapplicationofliquidwaterproofingmembranesonPoliterm®Blu,shouldbestrictlyinaccordancewiththeinstructionsofthemembranemanufacturers.SolventbasedliquidmembranesmustnotbeusedonPoliterm®Bluscreeds.

· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbecompatiblewiththephysical/chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbe-nefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals.

FORMULA 200 250 300 350

ElasticitymoduleN/mm2 235,3 n.a. 551,1 n.a.

Permeabilitytowatervapourμ 5,9 6,9 7,2 9,2

SpecificheatJ/kgK 1000* 1000* 1000* 1000*

Shrinkage(NBN)mm/m 0,427 n.a. 0,352 0,270

Acoustic performance ΔLw

14dB** 14dB** 26dB*** n.a.

ImpactnoiseinsulationL’nT,W

n.a. 61dBthick.11cm n.a. n.a.

Fire reactivity class A2-s1,d0

a-OnlywithPoliterm®BluFein.FormethodsandapplicationconsulttheEdiltecoTechnicalDepartment.*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith5cmofPoliterm®Blu+5cmofscreed/***Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

10

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

COVER: LIGHTWEIGHT THERMAL INSULATING LEVELLINGON CORRUGATED DECK

SPECIAL APPLICATION:VAULTED OR WAFFLE FLOOR LEVELLING

Politerm® Blu

WATERPROOFING MEMBRANE:Bituminous precasted hot membrane; bituminous preca-stedcoldmembrane;liquidbituminousmembrane;synthe-ticprecastedmembrane; liquidsyntheticmembrane(con-tact Edilteco Technical Department)

Loading-cover made ofcorrugated sheet

Galvanized mesh

Politerm® Blu

Bituminous membrane

Old masonry

Waterpoofing element

Politerm® Blu

Slab

FLAT ROOF: SINGLE LAYER LIGHTWEIGHT THERMALINSULATING INCLINED SCREED

PITCHED ROOF: THERMAL INSULATING LAYER

Politerm® Blu

Tiles

Possiblewaterproofing element

Possiblewaterproofing element

Insole

11

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

Roofing

FOR USE ON INCLINED OR FLAT ROOF (WITH OR WITHOUT FALLS) AND WAFFLE SLABSBeneath sand-cement screed and waterproofing layer

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200L,laidbyskilledinstallersusingthe base layer method for beneath sand-cement screed to be followed by a waterproofing layer either (poured on), bituminous (hot or cold) and/or synthetic.

INTENDED USE:flatroofsandnon-traffickedterraces(withorwithoutfalls),coveringcorrugatedroofingsheetsetc...

MINIMUM THICKNESS ON ABSORBENT SURFACES: 50 mm.For thicknesses less than 50 mm proceed as follows:· Thicknessesbetween30mmand50mmonwellconsolidatedsurfaces(e.g.:withelectricalconduitand/orpipessecurelyhau-nchedwithcementmortar):thelesserthicknessmaybeconsideredacceptable.

· Forthicknessesbetween10mmand30mm:addtothemixofcementandPoliterm®Bluabout200kg/m³ofaggregatewithamaximumgrainsizeof0,6mm(mixedmanually)andincludeanelectro-weldedmetalmesh(2mmwirediameter).

When creating falls, the minimum thickness must not be less than 50 mm.

MINIMUM APPLICATION THICKNESS ON NON-ABSORBENT SURFACES: 50 mm withgalvanizedmesh(minimumsize:wireø3mm–mesh50x50mm)ataduedistancefromthelayingsurface.

Our Edilteco Technical Department is available for any question.

ITEM SPECIFICATION:CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A.:super-lightaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof200to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.Thelightweightscreedobtained,issuitableforsubsequentscreedlayingmadeofsandandcementorsandandanhydrite.Edil-tecotechnologysuggestsalsothenewhighinsulatingliquidscreedwithadensityofjust130kg/m3.ItispossibletoobtainthismixingthePoliterm®BluFeinwith110kg/m3 of cement.

The screed produced will have the following characteristics:

FORMULA 110 200 250 300 350

Densityafter28dayskg/m3 approx.130a approx.215 approx.265 approx.315 approx.365

ThermalconductivityλD W/mK 0,043 0,065 0,067 0,080 0,103

CompressivestrenghtN/mm2 0,528 0,69 0,83 1,61 1,69

FlexuralstrenghtN/mm2 0,12 0,37 0,46 0,95 0,59

CohesionkPa n.a. 82,62 n.a. 127,17 n.a.

Hot-sealedmembraneruptureN/50mm n.a. 57 n.a. 62 n.a.

Cold-sealedmembraneruptureN/50mm n.a. 35 n.a. 47 n.a.

ElasticitymoduleN/mm2 n.a. 235,3 n.a. 551,1 n.a.

12

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

When placing Politerm® Blu screed over existing concrete roofs, concrete beam decks, it can be done without using an electro welded mesh in the pour. If the receiving surface however comprises insulation boards, a bituminous and/or synthetic waterproofing layer, or corrugated steel sheet, etc., before pouring Politerm® Blu screed sheets of electro welded mesh (minimum dimensions): wire ø 2 mm - mesh 50 x 50 mm) need to be included, appropriately tied and spaced from the laying surface.

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbemaintai-

nedandextendedupthroughthePoliterm®Bluscreed.· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· WhenlayingonaporousorcementitiousexistingroofaftercleaningthesurfaceandbeforelayingthePoliterm®Bluscreed,wetthe

surfacewellbutwithoutleavingpuddles.· Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboardsorwaterprooflayersdonotwetthe

surface.· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”.· ThemaximumgradientdependingonthemixstrengthofthePoliterm®Bluisbetween30and40%.· ThePoliterm®Bluscreedneedstobeprotectedfromrainforthefirst48hoursafterlaying.· L’utilizzodiguaineliquidesuimassetticonfezionaticonPoliterm®Blu,nonpotràprescinderedallaverificaedapprovazionedaparte

delproduttore/fornitoredellaguainastessa.NonsidovrannocomunqueapplicaresuimassetticonfezionaticonPoliterm®Bluguaineliquideabasedisolventi.

· ThesubsequentlayingofaheavyscreedoverthePoliterm®Bluscreedmaybepossibleafteraperiodof7days.ThisperiodoftimemayneedtobeextendedsubjecttothethicknessofthePoliterm®Bluscreedandweatherconditions.Theinstallationofthewater-proofingmembraneshouldbestrictlyinaccordancewiththeinstructionsofthemembranemanufacturers.TheapplicationofliquidwaterproofingmembranesonPoliterm®Blu,shouldbestrictlyinaccordancewiththeinstructionsofthemembranemanufacturers.SolventbasedliquidmembranesmustnotbeusedonPoliterm®Bluscreeds.

· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbecompa-tiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbenefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals.

Waterpoofing element

Politerm® Blu

Cement Screed

Slab

FLAT ROOF: SINGLE LAYER LIGHTWEIGHT THERMALINSULATING INCLINED SCREED

PITCHED, FLAT (WITH OR WITHOUT INCLINATION FORMATION) AND VAULTED ROOFSwith the application of a sand-cement base-screed and the following waterproofing

FORMULA 110 200 250 300 350

Permeabilitytowatervapourμ 5,1 5,9 6,9 7,2 9,2

SpecificheatJ/kgK 1000* 1000* 1000* 1000* 1000*

Shrinkage(NBN)mm/m n.a. 0,427 n.a. 0,352 0,270

Acoustic performance ΔLw

n.a. 14dB** 14dB** 26dB*** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a. 61dBthick.11cm n.a. n.a.

Fire reactivity class n.a. A2-s1,d0

a-OnlywithPoliterm®BluFein.FormethodsandapplicationconsulttheEdiltecoTechnicalDepartment.*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith5cmofPoliterm®Blu+5cmofscreed/***Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

13

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

COVER: LIGHTWEIGHT THERMAL INSULATING LEVELLINGON CORRUGATED DECK

SPECIAL APPLICATION:WAFFLE SLABS OR WAFFLE FLOOR LEVELLING

Politerm® Blu

Cement Screed

WATERPROOFING MEMBRANE:Bituminous precasted hot membrane; bituminous preca-stedcoldmembrane;liquidbituminousmembrane;synthe-ticprecastedmembrane; liquidsyntheticmembrane(con-tact Edilteco Technical Department)

Loading-cover made ofcorrugated sheet

Galvanized mesh

Politerm® Blu

Cement Screed

Bituminous membrane

Old masonry

14

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

LIGHTWEIGHT NON-ABSORBENT THERMAL INSULATING SYSTEM FOR ROOFING AT PITCHED, FLAT (WITH OR WITHOUT FALLS) AND VAULTED ROOFS

TIPOLOGY:realizationofasuperlightandnon-absorbentbasescreedforthermalinsulation,preparedwithPoliterm®Blu(suppliedinbagsofayieldof500Lor200Leach),mixedwithaspecificpowderedbinderB.R.DBluRainDefence(anadditivethatallowstoleavePolitermundertherain,withoutslowingdownthedrying)andcement.ItislaidbyaspecializedteamthroughtheRoofing castingmethodology.

INTENDED USES: Roofingatsloping/flatroofs(see par. Roofing pag. 11)EncapsulationAsbestosfibersheet(see par. Encapsulation pag. 17)Piano Zero single-layer for exterior (see par. Piano Zero pag. 19)Intermediatelayerforthelayingoftheasphalt(see par. Intermediate layer pag. 31).

MINIMUM THICKNESS OF APPLICATION: 50 mm.In case of under thickness, the procedure is the following (only for limited surfaces):· Forthicknessbetween30mm/50mmandforwell-stablesurfaces(ex:pipesforelectrical/hydraulicinstallationpreviouslycoveredwithcementmortar):theunderthicknesscanbeaccepted.

· Forthicknessbetween10mm/30mm:addtoPoliterm®Blumixapproximately200kg/m³ofaggregatehavingamaximumgrain-sizeof0,6mm(manualmix),andplacethegalvanizedmesh(ø2mm).

In case of gradient, the starting minimum thickness cannot be less then 50 mm.

SPECIFICATION:creationofalightweightnon-absorbentthermalinsulatingbasescreed,preparedwithPoliterm®Blu,producedbyEdilte-coS.p.A:superlightaggregatecomposedofvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsofø3-6mm,orbeadsof ø2mm(Politerm®BluFein)andwithacontrolleddensity.Duringtheproduction,eachbeadismixedwithaspecialE.I.Aadditive,whichallowsaperfectmixingwiththehydrationbinder,eliminatestheproblemofbeadflotationandguaranteestheirperfecthomogenousdistributionthroughoutthemix.Themixcanbedosedfrom200to350kg/m³ofPortlandcement32.5CemIorCemIIandspecificpow-deredbinderBluRainDefence.Thequantityisof800gforeach50kgofcementbinder,andthereisnoneedtoaddsandand/orotheradditives.Eachm³ofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,B.R.D.BluRainDefencebinderandPortlandcement32.5/42.5/52.5CemIorCemII,withtherelativedosagesandhydrationwater.Theresultingbasescreedwillbesuitableoffortheappli-cationtoroofing,respectingthespecifictechniquesofapplication.

New systemPOLITERM

RAINDEFENCE

POLITERM® BLU+

B.R.D. BLU RAIN DEFENCEcreate a unique and

NON-ABSORBENT SYSTEM!

15

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

INTRODUCTION ORDER OF COMPONENTS:1. Water.2. Politerm.3. Cement:expectedquantityaccordingtothespecificapplication.4. BluRainDefencebinderinthequantityof0,800kgper50kgofcementbinder.5. Mixfor10minuteslong(introductiontimeincluded).

For mixture with sand (density greater than 350 kg/m3), add 400 gr of additive each 50 kg of aggregate.

In case of laying surfaces composed of floors, cls castings, loose stone foundations, etc.. the application of the base screed prepared with Politerm® Blu doesn’t require the insertion of a galvanized mesh into the casting. In case of laying surfaces composed of insulating sheets, waterproofing synthetic layers, ceramic floors, linoleum floors, pvc, wood, moquette, corrugated sheets, etc.. before to laying of the base screed prepared with Politerm® Blu, it is necessary to lay the galvanized sheets (minimum size: wire ø 2 mm – diameter 50 x 50 mm), tied together and well-distanced from the laying surface.

WARNINGS:· Duringtherealizationofthescreed,preparedwithPoliterm®Blu,thestructuraland/orthepreexistingexpansionjointsonthelaying

surfacemustbemaintained.· BeforethelayingofthebasescreedpreparedwithPoliterm®Blu,carefullycleanthesurface.· AfterthecleaningofthelayingsurfaceandbeforetheapplicationofPoliterm®Blubasescreed,itisnecessarytomoistenthesurface

(ifcomposedofclsslab),withoutcausingpuddles.Thepriormoistendoesnothavetobedoneincaseoflayingsurfacescomposedofwaterproofingmembrane,othernon-absorbentsupportsorwoodboards.

· Anycastinginterruptionorexecutionoflevellingstripshavetobedoneverticallyrespecttothelayingsurface.· Anypossiblecasting recoveringorexecutionof levellingstripsmustbepreviously treatedwithEdilstick latexanddonewith fre-

sh-on-freshmethod.· TheapplicationonpitchedorvaultedroofofPoliterm®Blubasescreedispossibleforgradientsbetween30%-40%(alsoaccordingto

thelayingsurface’snature).· The base screed will be therefore able to overcome the run-off caused by weak rain, even after 24 hours from the application (clima-

tic conditions of +20°C and U.R 50%).· The base screed will be able to eliminate the water absorption caused by weak rain, even after 48 hours from the application (cli-

matic conditions of +20°C and U.R 50%).· ThePoliterm®Blubasescreedmustbeprotectedfrommeteoricprecipitation(ex.rain)forthefirst48hoursfromthecastingexecu-

tion.· ThelayingoftheheavyscreedonthebasescreedpreparedwithPoliterm®Bluispossibleapproximatelyafter7daysfromtherealiza-

tionofthescreed.Thetimemaychangeaccordingtothethicknessandtheclimaticconditions.Theapplicationofthewaterproofinglayersmustfollowtheinstructionsoflayers’producers.

The packaged screed has the following characteristics:

FORMULA 200 250 300 350

Densityafter28dayskg/m3 approx.215 approx.265 approx.315 approx.365

ThermalconductivityλD W/mK 0,065 0,067 0,080 0,103

CompressivestrenghtN/mm2 0,69 0,83 1,61 1,69

FlexuralstrenghtN/mm2 0,37 0,46 0,95 0,59

CohesionkPa 82,62 n.a. 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 57 n.a. 62 n.a.

Cold-sealedmembraneruptureN/50mm 35 n.a. 47 n.a.

ElasticitymoduleN/mm2 235,3 n.a. 551,1 n.a.

Permeabilitytowatervapourμ 5,9 6,9 7,2 9,2

SpecificheatJ/kgK 1000* 1000* 1000* 1000*

Shrinkage(NBN)mm/m 0,427 n.a. 0,352 0,270

Acoustic performance ΔLw

14dB** 14dB** 26dB*** n.a.

ImpactnoiseinsulationL’nT,W

n.a. 61dBthick.11cm n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith5cmofPoliterm®Blu+5cmofscreed/***Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

16

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

· TheuseofliquidmembraneonthePoliterm®Blubasescreedscannotignorethetestandapprovalofthemembraneproducers/sup-plier.Liquidsolvent-basedmembranecannotbeappliedonPoliterm®Blubasescreeds.

· Withtemperatureinferiorto+5°CthescreedpreparationandapplicationwithPoliterm®Blushouldbeavoided.Thepossibleuseofanti-freezeadditivesiscompatiblewiththephysico-chemicalcharacteristicsofPoliterm®Blu.Anyway,itscostsandbenefitshavetobecarefullyanlysed,casebycase,bytheapplicator.

· DuringthepreparationofthescreedspreparedwithPoliterm®Bluitisnecessarytocarefullyfollowthedosagesandthemethodo-logiesindicatedonthetechnicaldatasheets,thepackagingoftheproductandthepresentmanual.OnlyinthiscasecanEdiltecoguarantees the results of its performances.

· In order to evaluate every different application from what is described in our manuals, please contact our Technical Department.

SOME PHASES OF THE new system POLITERM® RAIN DEFENCE

Waterproof strip

Politerm RainDefence

Slab

FLAT ROOFING: SINGLE-LAYERTHERMAL INSULATING LIGHT SLOPING SCREED

Politerm RainDefence

TERRACES AND BALCONIES: LIGHT THERMAL INSULATING SINGLE-LAYER

Piano ZeroGuide

FLOOR:ceramic/marble

Soundproof strip

WATERPROOFING LAYER SUI-TABLE FOR GLUE APPLICATION OF THE FLOOR·liquidsheath·prefabricatedmembrane

Slab

Installation(electrical, hydraulic, vacuum)

FLAT ROOFING: LIGHT SLOPING THERMAL INSULATING SIN-GLE-LAYER SCREED

Waterproofing layer

Cement screed

Slab

ROOFING AT PITCHED ROOF: LAYER OF THERMAL INSULATION

Shingles

Possible waterproofing layer

Possible waterproofing layer

Slab

17

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

FOR THE ENCAPSULATION OF ROOF SURFACESMADE UP WITH ASBESTOS FIBRE CEMENT BOARDS

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200L,laidbyskilledinstallersusingthe method to encapsulate roofs made up with asbestos fibre cement boards in order to avoid the air pollution by asbestos fibres and to offer a surface ready to receive a water proofing layer either (poured on), bituminous (hot or warm) and/or synthetic.

Usingthismethodtheencapsulationcanbedonewithoutusingthetraditionalhazardous,expensiveandcomplexwashingopera-tion,aswellasthescrapingandfixingofcracksandcrazing.Furthermore,usingthePoliterm®Bluencapsulationsystemthereisnoneedtoremove,cutordrilltheasbestosfibrecementboardsthusavoidingthecreationofhazardousdust.

INTENDED USE:pitchedroofsandshelters.

MINIMUM LAYER: 50 mm thickness above the top of the asbestos fibre cement corrugated sheet roof profile.The average thickness obtained will be approximately 80 mm depending on the corrugation profile.

ITEM SPECIFICATION:CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A:superli-ghtaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof200to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.

The screed produced will have the following characteristics:

Asbestosfibre cement

encapsulation

FORMULA 200 250 300 350

Densityafter28dayskg/m3 approx.215 approx.265 approx.315 approx.365

ThermalconductivityλD W/mK 0,065 0,067 0,080 0,103

CompressivestrenghtN/mm2 0,69 0,83 1,61 1,69

FlexuralstrenghtN/mm2 0,37 0,46 0,95 0,59

CohesionkPa 82,62 n.a. 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 57 n.a. 62 n.a.

Cold-sealedmembraneruptureN/50mm 35 n.a. 47 n.a.

ElasticitymoduleN/mm2 235,3 n.a. 551,1 n.a.

Permeabilitytowatervapourμ 5,9 6,9 7,2 9,2

SpecificheatJ/kgK 1000* 1000* 1000* 1000*

Shrinkage(NBN)mm/m 0,427 n.a. 0,352 0,270

Acoustic performance ΔLw

14dB** 14dB** 26dB*** n.a.

ImpactnoiseinsulationL’nT,W

n.a. 61dBthick.11cm n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith5cmofPoliterm®Blu+5cmofscreed/***Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

18

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

It isessentialandalegalrequirementtocheckregulationsinforcebeforestartinganyencapsulation.ItwillalsobenecessarybeforestartingencapsulationtostabilisethesurfaceoftheasbestosfibresmentboardsusinagacoatingofmodifiedlatexcalledEdilstikF.C.Aappliedusingalowpressurespray.TheEdilstikF.C.Atobedilutedincleanwater(1partEdilstikF.C.A.to2partscleanwater).

Before the laying the Politerm® Blu screed, it is necessary to place sheets of galvanized mesh (min dimension of the cable diam. 2 mm, mesh dimension 50 x 50 mm), appropriately tied and spaced from the roof surface. This system makes the cast screed monolithic and assists the installer when working on sloping roofs.

Before apply the waterproof finish, it is necessary to prepare the surface using one of the two following methods:a. Abrade the surface using an electric sander fitted with an abrasive disk and dust extraction; alternativelyb. Melt the surface polystyrene beads polystyrene beads, using an LPG roofing gas torch.Neither method to be employed until 7 days after the screed has been laid.

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbe

maintainedandextendedupthroughthePoliterm®Bluscreed.· Anyremedialactionsinvolvingasbestosfibrecementroofsmustbeperformedstrictlyinaccordancewithanyregulationsin

place.· TheEncapsulationwithPoliterm®Bluscreedonroofsconstructedusingboardsspanningmetalframedstructuresmustonly

beundertakenhavebeenfullyassessedandsanctionedbyastructuralengineertoensurethestructuralintegrityandalsothesafetyaspectsofperformingsuchanoperationintheprovisionofpersonalprotectionequipment,safeaccess,workingplatformsifrequiredandscaffolding.

· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”· ThemaximumgradientdependingonthemixstrengthofthePoliterm®Bluisbetween30and40%.· ThePoliterm®Bluscreedneedstobeprotectedfromrainforthefirst48hoursafterlaying.· ThesubsequentlayingofaheavyscreedoverthePoliterm®Bluscreedmaybepossibleafteraperiodof7days.Thisperiodof

timemayneedtobeextendedsubjecttothethicknessofthePoliterm®Bluscreedandweatherconditions.Theinstallationofthewaterproofingmembraneshouldbestrictlyinaccordancewiththeinstructionsofthemembranemanufacturers.TheapplicationofliquidwaterproofingmembranesonPoliterm®Blu,shouldbestrictlyinaccordancewiththeinstructionsofthemembranemanufacturers.SolventbasedliquidmembranesmustnotbeusedonPoliterm®Bluscreeds.

· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbecompatiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbe-nefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,ontheproductpacka-gingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals

SPECIAL APPLICATION: ENCAPSULATION OF ROOF SURFACES MADE UP WITH ASBESTOS FIBRE CEMENT BOARDS

Politerm® Blu

WATERPROOFING MEMBRANE:Bituminous precasted hot membrane; bituminous preca-stedcoldmembrane;liquidbituminousmembrane;synthe-ticprecastedmembrane; liquidsyntheticmembrane(con-tact Edilteco Technical Department)

Galvanized mesh

Politerm® Blu thickness 50 mm over the upper wave

WATERPROOFING MEMBRANE:Bituminousprecastedhotmembrane;bituminousprecastedcoldmembra-ne;liquidbituminousmembrane;syntheticprecastedmembrane;liquidsyntheticmembrane(contact Edilteco Technical Department)

Galvanized mesh Coverage in asbestos

Temporary stabilising with Edilstik F.C.A.

19

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200Llaidbyskilledinstallersusingthe single layer method to create a flat close tolerance surface suitable for the direct laying and adhesion of ceramic tiles, stone tiles and pre-polished marble.

INTENDED USE: internalfloors,externalterraces(withorwithoutfalls).

MINIMUM THICKNESS OF POLITERM® SCREED ON ABSORBENT SURFACES: 50 mm iftherearepipesorconduitspresentontherecei-vingsurfacethenthe50mmminimumappliestothethicknessabovethehighestlevelofthosepipesorconduits.Thisthicknessmustbeincreasedto100mmwherethereareseparatinglayerse.g.dampproofmembranes(dpm),vapourcontrollayers(VCL)orslipsheetsthatdebondthePoliterm®BluorPoliterm®BluFeinscreedfromtheexistingslab.Additionallyitwillbenecessarytopla-ceagalvanizedreinforcingmeshsheets(minimumdimensions:thread2mmdiameter,mesh50x50mm)properlytiedtogetherandappropriatelyspacedwithinthelightweightPoliterm®screed.For advice on thicknesses less than those recommended above please contact the Edilteco Technical Department.

MINIMUM THICKNESS OF POLITERM® SCREED ON NON ABSORBENT SURFACES: the minimum thickness of 50 mm is suitable only for the following surfaces:1) Existing floor finish comprising ceramic tiles, marble or similar having first been treated:a) Surfacecleaningtoremovealldemolitionwaste,wax,dust,particlesandanyothermaterialthatmightpreventagoodbond

betweentheexistingfloorsurfaceandnewscreed.b) Applicationofasuitableadhesionpromoter (like Wingrip Evo)tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).c) Afterthedrying(min24hours),layingofthelightweightthermalinsulatingscreedmadeofPoliterm®BluorPoliterm®BluFein,

withminimumdensityof300kg/m3.

2) Existing bituminous waterproof coating having first been treated:a) Surfacecleaningtoremoveallwax,dust,particlesandanyothermaterialthatmightpreventagoodbondbetweentheexisting

floorsurfaceandnewscreed.b) Applicationofasuitableadhesionpromoter(like Wingrip Evo)tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).Afterthedrying(min24hours),layingofthelightweightbasescreedmadeofPoliterm®BluorPoliterm®BluFein,withmini-mumdensityof300kg/m3,installgalvanizedmeshsheets(minimumdimensions:threadø3mm-mesh50x50mm),tiedtogetherandspacedfromthebase.

Note:Foranyothernonabsorbentsurfacestheminimumthicknessofscreedlayeris100mm.BeforelayingofthelightweightthermalinsulatingscreedmadeofPoliterm®BluorPoliterm®BluFein,installgalvanizedreinforcingmeshsheets(minimumdi-mensions:thread3mmdiameter,mesh50x50mm)tiedtogetherandspacedformthebase. Our technical department is available for any questions.

ITEM SPECIFICATION:CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A:superli-ghtaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof300to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.

InordertoachievetheflatsurfacerequiredtosuccessfullylayceramictilesormarbleonthescreedmadeofPoliterm®BluorPoli-term®BluFeinitwillbenecessarytoplacescreedrailsbeforemixingbegins.ThesearemadeofPVC,are50mmhighandremaininthescreedonceithascuredanddried.Thescreedrailshavetobesetupontheexistingfloorsurfaceandlevelled,packedupwithmortarasrequiredtoensurethatthetopoftherailisatthedesiredfinishedlevelofthePoliterm®BluorPoliterm®BluFeinscreed.Itisrecommendedthatthedistancebetweenscreedrailsshouldnotexceed2.5metres.Todiscussothersuitablealternatives

FlatSingle Layer Screed

FOR DIRECT ADHESION OF CERAMIC TILES, STONE TILES, PRE-POLISHED MARBLE (INTERNAL AND EXTERNAL)

20

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

pleasecontacttheEdiltecoTechnicalDepartment.

OncethescreedrailsaresetinpositionthescreedmadeofPoliterm®BluorPoliterm®BluFeincanbepouredbetweenthem,spre-adandthenlevelledusingastraightedgebladepulledoverthetopedgeofthescreedrails.

On average, once a period of 72 hours has elapsed since pouring and levelling the screed, the surface preparation for tiling can commence:1. Surfaceabrasion,carriedoutwithappropriateequipmentinordertoremoveanyimperfectionscausedbythestraightedge.2. Onareasofthefloorthatthefloorsandercannotreachi.e.theperimeteritwillbenecessarytopreparethoseareaswitha

scrapingknifeortool.3. Surfacecleaningtoremovedust,particlesandanyothermaterialthatmightpreventagoodbondbetweenthenewfloorscreed

surfaceandnextlayer.4. Checkthefinishedlevelandflatnessofthescreedusingaonemetrestraightedge.5. Additionalpreparationworkthatmaybecarriedoutbythecontractor:meltthesurfacepolystyrenebeadsusinganLPGroofing

gastorch,andtoremoveswirlscreatedasaconsequenceofthepolishing.Noneofthesemethodstobeemployeduntil7daysafterthescreedhasbeenlaid.

IfsodesiredaninitialnominalprotectionofthePoliterm®BluorPoliterm®BluFeinbasecanbeemployedbyusingathin(about2mm)protectivesmoothingmortarpreparedasfollows(suitableforinteriors):

Dosage for a cement mixer:· Tileadhesive: 125kg· Cement: 25kg· Sand: about90-120L(2wheelbarrows)· Hydration: hydratetoasemi-fluidconsistencywithamixturecomprising4partsofcleanwaterto 1partofEdilstik latex.· Application: withasmoothmetaltrowel.

Asanalternative,thesmoothingcoatcanbemadeusingpremixedself-levelledsmoothingmortarAutoliv,afterbeingtreatedwithEdilstiklatex,appliedfreshonfresh.Thiscoatedbasescreedwillbesuitableforsubsequentdirectadhesionofceramic,terracotta,stoneware,clinkerandprepolishedmarblefloorcoverings.

EXTERNAL SURFACES: In case of external surfaces, before the application of the final floor layer make a suitable waterproofing (bitumi-nous Wingrip use is recommended according the producer’s provisions).

The base screed will have the following characteristics:

FORMULA 300 350

Densityafter28dayskg/m3 approx.315 approx.365

ThermalconductivityλD W/mK 0,080 0,103

CompressivestrenghtN/mm2 1,61 1,69

FlexuralstrenghtN/mm2 0,95 0,59

CohesionkPa 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 62 n.a.

Cold-sealedmembraneruptureN/50mm 47 n.a.

ElasticitymoduleN/mm2 551,1 n.a.

Permeabilitytowatervapourμ 7,2 9,2

SpecificheatJ/kgK 1000* 1000*

Shrinkage(NBN)mm/m 0,352 0,270

Acoustic performance ΔLw

26dB** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

21

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbe

maintainedandextendedupthroughthePoliterm®Bluscreed.· IfacousticmatsorlayersaretobeincorporatedintotheconstructionbeneaththePoliterm®Bluscreedlaidusingthesingle

layermethodthentheseacoustic layersshouldbe installedbeneath,notover,anypipesorconduitstherebyavoidingthepossibilityofcreatingairpocketswhichcouldhavetheeffectsoflesseningtheacousticperformanceandalsothestructuralintegrityofthePoliterm®Bluscreed.

· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· AftercleaningofthescreedsurfaceandbeforelayingthescreedpreparedwithPoliterm®Blu,wetthefloorwellbutwithout

leavingpuddles.Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboards,waterprooflayersortiledfloorsdonotwetthesurface.

· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”.· Whenadheringfinalfinishsurfaces likeceramictilesorvinyls, ifasmoothing layer isnotappliedthentheconsumptionof

adhesivemaybe20%greaterthannormal.Thisisduetotheopencellsthatremainaftersurfacebeadshavebeenremoved.Thisdoeshoweverprovideastrongermechanicalbondbetweenthelayers.

· Theadhesivesmustbeusedstrictlyinaccordancewiththeinstructionsoftheadhesivemanufacturers.· Installingplasterboardpartitions:beforeinstallingplasterboardpartitionsdirectlyonSinglelayerscreedsmadewithPoliterm®

Blu‐orwithPoliterm®BluFein,firstapplyasmoothingplaster(thickness2mm).Thesmoothingplastermustcoveranareaequaltothewidthofthefloorplatesplus50mmeachside.Subsequently,thefloorplatescanbeinstalledusingspecialdou-ble-sidedadhesivetape.

· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.AnyantifreezeadditivesthatmaybeusedmustbeiscompatiblewiththephysicalchemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbenefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals.

INTER FLOOR: LIGHTWEIGHT THERMAL INSULATIN SINGLE LAYER FOR CERAMIT FLOOR

MasterPiano zero / Flat

FLOORING FIXED WITH GLUE:ceramic-prepolishedmarble

Politerm® Blu

Sound insulating band

Slab

Water pipes/electric cables

TERRACE AND BALCONY: LIGHTWEIGHT THERMAL INSULATING SINGLE LAYER

MasterPiano zero / Flat

FLOORING:ceramic - marble

Soundinsulating band

Politerm® Blu

WATERPROOFING MEMBRANE SUITABLE FOR THE GLUING OF THE FINISHED FLOOR·liquidmembrane·precastedmembrane

Slab

Water pipes / electric cables

22

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200Llaidbyskilledinstallersusingthe single layer method to create a flat close tolerance surface suitable for the direct laying and adhesion of ceramic tiles, stone tiles and pre-polished marble.

INTENDED USE: Internalfloors,externalterraces(withorwithoutfalls),fillingofvolumes,corrugatedsheetlofts,etc..

MINIMUM THICKNESS OF POLITERM® SCREED ON ABSORBENT SURFACES: 50 mm. Iftherearepipesorconduitspresentontherecei-vingsurfacethenthe50mmminimumappliestothethicknessabovethehighestlevelofthosepipesorconduits.Thisthicknessmustbeincreasedto100mmwherethereareseparatinglayerse.g.dampproofmembranes(dpm),vapourcontrollayers(VCL)orslipsheetsthatdebondthePoliterm®BluorPoliterm®BluFeinscreedfromtheexistingslab.Additionallyitwillbenecessarytoplaceagalvanizedreinforcingmeshsheets(minimumdimensions:thread2mmdiameter,mesh50x50mm)properlytiedtogether,andappropriatelyspacedwithinthelightweightPoliterm®screed.For advice on thicknesses less than those recommended above please contact the Edilteco Technical Department.

MINIMUM THICKNESS OF POLITERM® SCREED ON NON ABSORBENT SURFACES: the minimum thickness of 50 mm is suitable only for the following surfaces:1) Existing floor finish comprising ceramic tiles, marble or similar having first been treated:a) Surfacecleaningtoremoveallwax,dust,particlesandanyothermaterialthatmightpreventagoodbondbetweentheexisting

floorsurfaceandnewscreed.b) Applicationofasuitableadhesionpromoter(like Wingrip Evo)tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).c) WhiletheadhesiveisstilltackypourthelightweightscreedmadeofPoliterm®BluorPoliterm®BluFein,withaminimumden-

sityof300kg/m3,

2) Existing floor coated with a bituminous waterproofing layer:a) Surfacecleaningtoremoveallwax,dust,particlesandanyothermaterialthatmightpreventagoodbondbetweentheexisting

floorsurfaceandnewscreed.b) Applicationofasuitableadhesionpromoter(like Wingrip Evo) tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).Afterthedrying(min24hours),layingofthelightweightbasescreedmadeofPoliterm®BluorPoliterm®BluFein,withmini-mumdensityof300kg/m3,installgalvanizedmeshsheets(minimumdimensions:threadø3mm-mesh50x50mm),tiedtogetherandspacedfromthebase.

Note.Foranyothernonabsorbentsurfacestheminimumthicknessofscreedlayeris100mm.BeforelayingofthelightweightthermalinsulatingscreedmadeofPoliterm®BluorPoliterm®BluFein,installgalvanizedreinforcingmeshsheets(minimumdi-mensions:thread3mmdiameter,mesh50x50mm)tiedtogetherandspacedformthebase.Our technical department is available for any questions.

ITEM SPECIFICATION:“CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A:super-lightaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof300to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.

BeforethemixingandtheapplicationofthebasesceedmadeofPoliterm®Blu,proceedwiththeapplicationofthespecificPVCthrowawayguides,namedPianoZero(height:50mm).Thescreedrailshavetobesetuponthededucedfloorsurfacelevel,thefinalfloorlayerthickness,therelativeglueandtheirplantplacement,thatwillbemadeaccordingtodimensionsandspace.Itisrecommendedthatthedistancebetweenthescreedrailsshouldnotexceed2,50mt.Todiscussothersuitablealternativesforte

FlatSingle Layer

FOR DIRECT ADHESION OF CERAMIC TILES, STONE TILES, PRE-POLISHED MARBLEon thin-bed cement smoothing mortar

23

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

realizationoflevelstrips,pleasecontacttheEdiltecotechnicaldepartiment.Thescreedrailsmustbesetonthebasewiththetopoftherailssetattherequiredfinishedfloorlevelbutallowingfor:1. Thethicknessofthecementitioussmoothinglayeratlowthickness.2. Thethickessofthefinalfloorfinshlayerandtheadhesivelayerthatsecuresit.

ThesubsequentapplicationofthemortarmadeofPoliterm®Blu,willrequirethematerialspredingthroughthesalt(itisreccomen-dedtheuseofacuttingfloat)followingthePiano Zero guides.

Onaverage,onceaperiodof72hourshaselapsedsincepouringandlevellingthescreed,thesurfacepreparationfortilingcancommence:1. Surfaceabrasion,carriedoutwithappropriateequipmentinordertoremoveanyimperfectionscausedbythestraightedge.2. Onareasofthefloorthatthefloorsandercannotreachi.e.theperimeteritwillbenecessarytopreparethoseareaswitha

scrapingknifeortool.3. Surfacecleaningtoremovedust,particlesandanyothermaterialthatmightpreventagoodbondbetweenthenewfloorscreed

surfaceandnextlayer.4. Checkthefinishedlevelandflatnessofthescreedusingaonemetrestraightedge.5. Additionalpreparationworkthatmaybecarriedoutbythecontractor:meltthesurfacepolystyrenebeadsusinganLPGroofing

gastorch,andtoremoveswirlscreatedasaconsequenceofthepolishing.Noneofthesemethodstobeemployeduntil7daysafterthescreedhasbeenlaid.

6. Thethin-bedcementsmoothingmortar(2mm)maybeappliedusingoneofthetwofollowingmethods:a. Self levellingpremixedmortarAutoliv(seethespecifictechnicaldatasheet),afterthetreatingthesurfaceusing“freshon

fresh”methodwithEdilstik.b. Mortarmixedonsite.

Dosaggio per una betoniera:· Tileadhesive:: 125kg· Cement: 25kg· Sand: about90-120L(2wheelbarrows)· Hydration: hydratetoasemi-fluidconsistencywithamixturecomprising4partsofcleanwaterto 1partofEdilstik latex.· Application: Withasmoothmetaltrowel.

Analternative,thesmoothingcoatcanbemadeusingpremixedself-levelledsmoothingmortarAutoliv.Thiscoatedbasescreedwillbesuitableforsubsequentdirectadhesionofceramic,terracotta,stoneware,clinkerandprepolishedmarblefloorcoverings.Waitatleast7daysfromlayingthebasescreedbeforelayingthefloorcovering.Checkingthatitiscuredanddry.

The base screed will have the following characteristics:

FORMULA 300 350

Densityafter28dayskg/m3 approx.315 approx.365

ThermalconductivityλD W/mK 0,080 0,103

CompressivestrenghtN/mm2 1,61 1,69

FlexuralstrenghtN/mm2 0,95 0,59

CohesionkPa 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 62 n.a.

Cold-sealedmembraneruptureN/50mm 47 n.a.

ElasticitymoduleN/mm2 551,1 n.a.

Permeabilitytowatervapourμ 7,2 9,2

SpecificheatJ/kgK 1000* 1000*

Shrinkage(NBN)mm/m 0,352 0,270

Acoustic performance ΔLw

26dB** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

24

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbe

maintainedandextendedupthroughthePoliterm®Bluscreed.· IfacousticmatsorlayersaretobeincorporatedintotheconstructionbeneaththePoliterm®Bluscreedlaidusingthesingle

layermethodthentheseacoustic layersshouldbe installedbeneath,notover,anypipesorconduitstherebyavoidingthepossibilityofcreatingairpocketswhichcouldhavetheeffectsoflesseningtheacousticperformanceandalsothestructuralintegrityofthePoliterm®BluscreedBeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.

· AftercleaningofthescreedsurfaceandbeforelayingthescreedpreparedwithPoliterm®Blu,wetthefloorwellbutwithoutleavingpuddles.Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboards,waterprooflayersortiledfloorsdonotwetthesurface.

· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”.· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbe

iscompatiblewiththephysicalchemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbenefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals.

INTER FLOOR: LIGHTWEIGHT THERMAL INSULATIN SINGLE LAYERWITH PROTECTIVE LOW THICKNESS SMOOTHING

FLOORING: ceramic-marble

Politerm® Blu

Slab

Soundinsulating band

Water pipes / electric cables

MasterPiano zero / Flat

Low thickness smoothing 2 mm made with Autoliv

25

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

FlatSingle Layer Screed

FOR PARQUET FLOORING AND MARBLE TO BE POLISHED ON SITE LAID ON A THIN BED COATING

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200Llaidbyskilledinstallersusingthe single layer method to create a flat close tolerance surface suitable for the direct laying and adhesion of ceramic tiles, stone tiles and pre-polished marble.

INTENDED USE: internalfloors,externalterraces(withorwithoutfalls).

MINIMUM THICKNESS OF POLITERM® SCREED ON ABSORBENT SURFACES: 55 mm iftherearepipesorconduitspresentontherecei-vingsurfacethenthe50mmminimumappliestothethicknessabovethehighestlevelofthosepipesorconduits.Thisthicknessmustbeincreasedto105mmwherethereareseparatinglayerse.g.dampproofmembranes(dpm),vapourcontrollayers(VCL)orslipsheetsthatdebondthePoliterm®BluorPoliterm®BluFeinscreedfromtheexistingslab.Additionallyitwillbenecessarytopla-ceagalvanizedreinforcingmeshsheets(minimumdimensions:thread2mmdiameter,mesh50x50mm)properlytiedtogether,andappropriatelyspacedwithinthelightweightPoliterm®screed.For advice on thicknesses less than those recommended above please contact the Edilteco Technical Department.

MINIMUM THICKNESS OF POLITERM® SCREED ON NON ABSORBENT SURFACES: the minimum thickness of 55 mm including the thick-ness of the cement section (minimum 5 mm) is suitable only for the following surfaces, is suitable only for the following surfaces:1) Existing floor finish comprising ceramic tiles, marble or similar having first been treated:a) Surfacecleaningtoremoveallwax,dust,particlesandanyothermaterialthatmightpreventagoodbondbetweentheexisting

floorsurfaceandnewscreed.b) Applicationofasuitableadhesionpromoter(like Wingrip Evo)tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).c) Afterthedrying(min24hours),layingofthelightweightthermalinsulatingscreedmadeofPoliterm®BluorPoliterm®BluFein,

withminimumdensityof300kg/m3.

2) Existing bituminous waterproof coating having first been treated: a) Surfacecleaningtoremoveallwax,dust,particlesandanyothermaterialthatmightpreventagoodbondbetweentheexisting

floorsurfaceandnewscreed.b) Applicationofasuitableadhesionpromoter(like Wingrip Evo)tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).Afterthedrying(min24hours),layingofthelightweightbasescreedmadeofPoliterm®BluorPoliterm®BluFein,withmini-mumdensityof300kg/m3,installgalvanizedmeshsheets(minimumdimensions:threadø3mm-mesh50x50mm),tiedtogetherandspacedfromthebase.

Note.Foranyothernonabsorbentsurfacestheminimumthicknessofscreedlayeris100mm.BeforelayingofthelightweightthermalinsulatingscreedmadeofPoliterm®BluorPoliterm®BluFein,installgalvanizedreinforcingmeshsheets(minimumdi-mensions:threadø 3mmdiameter,mesh50x50mm)tiedtogetherandspacedformthebase.Our technical department is available for any questions.

ITEM SPECIFICATION: CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A.:super-lightaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof300to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.

InordertoachievetheflatsurfacerequiredtosuccessfullylayceramictilesormarbleonthescreedmadeofPoliterm®BluorPoli-term®BluFeinitwillbenecessarytoplacescreedrailsbeforemixingbegins.ThesearemadeofPVC,are50mmhighandremaininthescreedonceithascuredanddried.Thescreedrailshavetobesetupontheexistingfloorsurfaceandlevelled,packedupwithmortarasrequiredtoensurethatthetopoftherailisatthedesiredfinishedlevelofthePoliterm®BluorPoliterm®BluFeinscreed.

26

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

Itisrecommendedthatthedistancebetweenscreedrailsshouldnotexceed2.5metres.To discuss other suitable alternatives please contact the Edilteco Technical Department.The screed rails must be set on the base with the top of the rails set at the required finished floor level but allowing for:1. The thickness of the cementitious coating layer (minimum 5 mm);2. Thethicknessesofthefinalfloorfinishlayer(tiles,marble,engineeredwoodetc.)andtheadhesivelayerthatsecuresit.

OncethescreedrailsaresetinpositionthescreedmadeofPoliterm®BluorPoliterm®BluFeincanbepouredbetweenthem,spre-adandthenlevelledusingastraightedgebladepulledoverthetopedgeofthescreedrails.

On average, once a period of 72 hours has elapsed since pouring and levelling the screed, the surface preparation for tiling can commence: 1. Surfaceabrasion,carriedoutwithappropriateequipmentinordertoremoveanyimperfectionscausedbythestraightedge.2. Onareasofthefloorthatthefloorsandercannotreachi.e.theperimeteritwillbenecessarytopreparethoseareaswitha

scrapingknifeortool.3. Surfacecleaningtoremovedust,particlesandanyothermaterialthatmightpreventagoodbondbetweenthenewfloorscreed

surfaceandnextlayer.4. Checkthefinishedlevelandflatnessofthescreedusingaonemetrestraightedge.5. Additionalpreparationworkthatmaybecarriedoutbythecontractor:MeltthesurfacepolystyrenebeadsusinganLPGroofing

gastorch,andtoremoveswirlscreatedasaconsequenceofthepolishing.None of these methods to be employed until 7 days after the screed has been laid.

6. Thethinbedmortarcanbeprepared,withaminimumthicknessof5mmusingtheselflevellingpremixmortarAutoliv(seethespecifictechnicaldatasheet).Note.TheapplicationofAutolivispossibleonlyonabasewithamoisturecontentnotexceeding2%involume(measuredwithacalciumcarbideinstrument,seealsothetechnicalspecification)andalsoafterthetreatmentofthesurfacewithEdilstikusingthe“freshonfresh”method.

Thisthin-coatedbasescreedwillbesuitableforsubsequentdirectadhesionofceramic,terracotta,stoneware,clinkerandprepo-lishedmarblefloorcoverings.Waitatleast7daysfromlayingthebasescreedbeforelayingthefloorcovering,checkingthatitiscuredanddry.

The base screed will have the following characteristics:

WARNINGS AND PRECAUTIONS:· ScreedsmadewithPoliterm®Bluand“PianoZero”system,arenotcomparabletothetraditionalsand-cementscreeds.Inpar-

ticular,thewaterabsorptionisparticularlyreduced.Becauseofthis,itisnecessarytobeextremelycarefulinselectingadhe-sivesforparquetormarble.Waterbasedadhesivesarenotrecommended,sincesuchwaterwon’tbeabsorbedbythescreedandtheriskofbulgesand/ordelaminationishigh.

· IfacousticmatsorlayersaretobeincorporatedintotheconstructionbeneaththePoliterm®Bluscreedlaidusingthesinglelayermethodthentheseacoustic layersshouldbe installedbeneath,notover,anypipesorconduitstherebyavoidingthepossibilityofcreatingairpocketswhichcouldhavetheeffectsoflesseningtheacousticperformanceandalsothestructuralintegrityofthePoliterm®Bluscreed.

· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.

FORMULA 300 350

Densityafter28dayskg/m3 approx.315 approx.365

ThermalconductivityλD W/mK 0,080 0,103

CompressivestrenghtN/mm2 1,61 1,69

FlexuralstrenghtN/mm2 0,95 0,59

CohesionkPa 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 62 n.a.

Cold-sealedmembraneruptureN/50mm 47 n.a.

ElasticitymoduleN/mm2 551,1 n.a.

Permeabilitytowatervapourμ 7,2 9,2

SpecificheatJ/kgK 1000* 1000*

Shrinkage(NBN)mm/m 0,352 0,270

Acoustic performance ΔLw

26dB** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

27

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”.· Thenormallayingofparquetflooringrequiresskillwithgreatcareandattentiontodetail.Itisexactlythesamewhenlaying

parquetflooringonapreparedPoliterm®Bluscreed. Following is a list of important instructions, these are guides and the list is not exhaustive:· Takecaretoconditiontheparquettiles,roombyroom,startingatleast8daysbeforeitsinstallationbegins.· Protecttheroomsandfloorsfromadverseconditions,atleast30daysbeforetheinstallationbegins.· Turnontheheatingsystematleast8daysbeforetheinstallationoftheparquetflooring.· Checkthemoisturecontentofthebasescreedandalsotheinternalenvironmentimmediatelybeforethestartingofthein-

stallation,inordertoestablishtheidealconditionforlayingtheparquetflooring(seealsothe“measurementofthemoisturecontentofalightbasemadewithPoliterm®Blu).

· Waterbasedadhesivesmustnotbeused.· Installtheparquetattheminimumdistanceof8mmfromwallsandanyotherpartswhichmayobstaclethenaturaldeforma-

tionofthewooditself.Allowanexpansiongapof8mmbetweentheparquetfloortilesandwallsanyotherfixedelementthatmayobstructmovement.

Consider what mentioned above, being understood any other precaution due to the rule of art.· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbe

maintainedandextendedupthroughthePoliterm®Bluscreed.· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· AftercleaningofthescreedsurfaceandbeforelayingthescreedpreparedwithPoliterm®Blu,wetthefloorwellbutwithout

leavingpuddles.Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboards,waterprooflayersortiledfloorsdonotwetthesurface.

· Theadhesivesmustbeusedstrictlyinaccordancewiththeinstructionsoftheadhesivemanufacturers.· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbe

compatiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbe-nefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,ontheproductpacka-gingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals.

MEASURING THE MOISTURE CONTENT OF LIGHTWEIGHT SCREEDS MADE USING POLITERM® BLU

Inordertoestablishthemoisturecontentofthescreeditwillbenecessarytomeasuretheamountofwaterpresentinaselectedsample.ThemethodemployedistheHOECHSTsystem.Thismethodisbasedontheuseofacalciumcarbidehygrometeronsite.Beforeproceedingwiththemeasurements, it isnecessaryto identifytheareasfromwheretotakesamples.Foreachsampletakenitisnecessarytonotethemeansoftakingthesample(thetypeofinstrumentsusedandthequantityofmaterialtaken)plusanyotherkindofinformationsuchasdatethesamplewastaken,theenvironmentalconditions,temperatureandhumidity.Bycarefullynotingalltheseconditions, itallowsapropercomparisonbetweendifferenttestsconductedatdifferenttimesbydifferentoperators.TheHoechstsystemformeasuringofmoisturecontentusesacalciumcarbidehygrometer,generallysoldasakit,comprising:abottleshapedcontainerwithabuiltingaspressuregauge,aboxwithvialsofcalciumcarbide,steelpulverisingballs,asetofpreci-siontestingscalesforweighingthesampleandotheraccessoriessuchasabrushtocleanthecontainerandchiselsforbreakingoutthesamplefromthescreedsurface.Theprocessissimple:measurethepressureexertedbythegasdevelopedbythereactionbetweencalciumcarbideandthewatercontainedinthesample.Accordingtoaparticularchemicalreactioncalciumcarbide(CaC2)andwaterproduceacertainamountofacetylene(C2H2)whiledevelopingacertainpressuremeasuredbythepressuregaugeinthetopofthecontainer.Basedonthepressureexertedandtheweightofthematerialitispossibletocalculatethepercentageofmoisturecontainedinthesample.Thetooliseasytouseandthemeasurementsobtainedareconsideredreliable.However,themostcriticalissueisthatthesamplingiscarriedoutcarefully.Thesamplescreedmaterialmustbetakenandfinelycrushedusingthemortarsupplied.Thesampleisthenweighedusingtestingscalessupplied,andtheninsertedintothebottletogetherwiththepulverisingsteelballsandthevialofcalciumcarbide.Shakingthecontainer,closedwiththecappressuregauge,thesteelballsbreaktheampouleofcalciumcarbide.Thenthereactionstartswhichendsatthemomentwhenonereadsaconstantpressureonthepressuregauge(usuallyafterabouttenminutes).Becausethereactionoccursinaclosedenvironment,asmoregasisformed,thehigherbecomesthepressurewhichismeasuredwiththepressuregauge.Thereactionofcalciumcarbideincontactwithwaterproducesanexplosivemixtureofair/acetyleneinsidethecylinder.There-fore,allpossiblesourcesofignitionshouldberemovedbeforeemptyingthecylinder.Ifpossiblethecylindershouldbeopenedoutdoors.Theinstrumentusedformeasuringthetemperatureandrelativehumidityoftheenvironmentatthetimeofsamplingandtestingisapsychometricbulb.Theinstrumentmustbeplaced,laidflat,intheareawhereyouwanttodeterminetheafore-mentionedparameters.Thepanatthebasemustbefilledwithdistilledwaterwhichhastobeincontactwithoneofthetwother-mometers(viaasockmadeofabsorbentmaterial).Byreadingthethermometerdryandthenreadingthewetthermometerthedifferencebetweenthetwomeasurementscanbeusedtoobtainavaluefromwhich,usinganappropriategraduatedscalecanbedeterminedtherelativehumidityoftheair.

28

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

ItisimportanttonotethatwhenperformingthesemeasurementsonabasescreedmadefromthelightweightmortarpreparedwithPoliterm®BluorPoliterm®BluFein,orabasescreedmadeusingaproductfromthelightweightpremixedIsolcaprangevalueobtainedbyusingthecalciumcarbidemethodhastobedividedby5or6dependingontheamountofcementbinderusedinthepreparationofthescreed.ThisisbecausethevolumetricmassofthePoliterm®Blueisone-fifthoronesixthofthemassofanormalsand-cementscreed.

Iftheamountofthecementbinderis300kg/m3themeasurementreadonthemanometermustbedividedby6;·Iftheamountofthecementbinderis350kg/m3themeasuringgaugereadingisdividedby5;·Theoptimalmeasureisobtainedwithasampleof20g.

Moisturecontentmeasuredusingthecarbidemethodisvalidonlyifyouareusingaproductmadeexclusivelywithvirginpoly-styrenebeads(whichisthecaseforPoliterm®BluandIsolcap,init’svarioustypes).Conductingthistestonscreedsmadeusinggroundorrecycledpolystyrenegranules,makesthemeasurementunreliablesincewaterremainsinsidegranulesofthemilledpolystyrene,therebydistortingthefinalmeasure.Ifyouapplyotherscreeds(sandandcement,self-leveling,etc...)ontopofthebasepreparedfromPoliterm®BluorPoliterm®BluFein,orabasescreedmadeusingaproductfromthelightweightpremixedIsol-caprangethemeasurementisperformedatthepartbeingthetwomaterialsdifferentincompositionandcharacteristics.

INTER FLOOR: LIGHTWEIGHT THERMAL INSULATIN SINGLE LAYERWITH PROTECTIVE LOW THICKNESS SMOOTHING

FLOORING: ceramic-marble-parquet

Politerm® Blu

Slab

Soundinsulating band

Water pipes / electric cables

Guida Piano Zero

low thickness smoothing 5 mm made with Autoliv

29

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

APPLICATION:lightweightthermalinsulatingscreed,madeusingPoliterm®Blubeads,suppliedinbagsof500Land/or200L,laidbyskil-ledinstallersusingthesinglelayermethodformediumthicknessscreedstocreateaflatclosetolerancesurfacesuitableforthedirectlayingandadhesionofflexibleflooringsuchaslinoleum,PVC,rubber,moquetteetc.

INTENDED USE:internalfloors,externalterraces(withorwithoutfalls).

MINIMUM THICKNESS OF POLITERM® SCREED ON ABSORBENT SURFACES: 70 mm including the thickness of the cement section (mini-mum 20 mm).Iftherearepipesorconduitspresentonthereceivingsurfacethenthe70mmminimumappliestothethicknessabovethehighestlevelofthosepipesorconduits.Thisthicknessmustbeincreasedto120mmincludingthethicknessofthecementsection(minimum20mm) wherethereareseparatinglayerse.g.dampproofmembranes(dpm),vapourcontrollayers(VCL)orslipsheetsthatdebondthePoliterm®BluorPoliterm®BluFeinscreedfromtheexistingslab.Additionallyitwillbenecessarytoplaceagalvanizedrein-forcingmeshsheets(minimumdimensions:thread2mmdiameter,mesh50x50mm)properlytiedtogether,andappropriatelyspacedwithinthe lightweightPoliterm®screed.For advice on thicknesses less than those recommended above please contact the Edilteco Technical Department.

MINIMUM THICKNESS OF POLITERM® SCREED ON NON ABSORBENT SURFACES: the minimum thickness of 70 mm is suitable only for the following surfaces:1) Existing floor finish comprising ceramic tiles, marble or similar having first been treated:a) Surfacecleaningtoremoveallwax,dust,particlesandanyothermaterialthatmightpreventagoodbondbetweentheexistingfloor

surfaceandnewscreed.b) Applicationofasuitableadhesionpromoter(like Wingrip Evo)tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).c) Afterthedrying(min24hours),layingofthelightweightthermalinsulatingscreedmadeofPoliterm®BluorPoliterm®BluFein,with

minimumdensityof300kg/m3.

2) Existing bituminous waterproof coating having first been treated: a) Surfacecleaningtoremoveallwax,dust,particlesandanyothermaterialthatmightpreventagoodbondbetweentheexistingfloor

surfaceandnewscreed.b) Applicationofasuitableadhesionpromoter(like Wingrip Evo)tousefollowingtheproducer’sprovisions(indicativeuseonflat

surface:300g/m2,onlyonecoat).Afterthedrying(min24hours),layingofthelightweightbasescreedmadeofPoliterm®BluorPoliterm®BluFein,withmini-mumdensityof300kg/m3,installgalvanizedmeshsheets(minimumdimensions:threadø3mm-mesh50x50mm),tiedtogetherandspacedfromthebase.

Note.Foranyothernonabsorbentsurfacestheminimumthicknessofscreedlayeris100mm.BeforelayingofthelightweightthermalinsulatingscreedmadeofPoliterm®BluorPoliterm®BluFein,installgalvanizedreinforcingmeshsheets(minimumdimensions:threadø 3mmdiameter,mesh50x50mm)tiedtogetherandspacedformthebase.Our technical department is available for any questions.

ITEM SPECIFICATION:Creationofthermal insulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A.:superlightaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof300to350kg/m³ofusingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.

InordertoachievetheflatsurfacerequiredtosuccessfullylayceramictilesormarbleonthescreedmadeofPoliterm®BluorPoliterm®BluFeinitwillbenecessarytoplacescreedrailsbeforemixingbegins.ThesearemadeofPVC,are50mmhighandremaininthescreedonceithascuredanddried.Thescreedrailshavetobesetupontheexistingfloorsurfaceandlevelled,packedupwithmortarasrequiredtoensurethatthetopoftherailisatthedesiredfinishedlevelofthePoliterm®BluorPoliterm®BluFeinscreed.Itisrecommendedthatthe

FlatSingle Layer Screed

FOR LAYING FLEXIBLE FLOOR COVERINGS ON A MEDIUM THICKNESS BASE

30

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

distancebetweenscreedrailsshouldnotexceed2.5metres.To discuss other suitable alternatives please contact the Edilteco Technical Department.Thescreedrailsmustbesetonthebasewiththetopoftherailssetattherequiredfinishedfloorlevelbutallowingfor:1. The thickness of the cementitious coating layer (minimum 20 mm);2. Thethicknessesofthefinalfloorfinishlayer(tiles,marble,engineeredwoodetc.)andtheadhesivelayerthatsecuresit.Oncethescreedrailsareset inpositionthescreedmadeofPoliterm®BluorPoliterm®BluFeincanbepouredbetweenthem,spreadandthenlevelledusingastraightedgebladepulledoverthetopedgeofthescreedrails.OncethescreedmadewithPoliterm®Bluhasattainedamoisturecontentof2%(measuredwithacalciumcarbideinstrument),thetoppinglayercanbeprepared,withaminimumthicknessof20mmusingtheselflevellingpremixmortarAutoliv(seethespecifictechnicaldatasheet).Note. theapplicationofAutolivispossibleonlyonabasewithamoisturecontentnotexceeding2%involume(measuredwithacalciumcarbide instrument,seealsothetechnicalspecification)andalsoafterthetreatmentof thesurfacewithEdilstikusingthe“freshonfresh”method.Thelightweightscreedsurfaceproducedissuitabletoreceivethedirectlayingofflexibleflooringsuchaslinoleum,pvc,rubber,moquetteetc.installingthemdirectlywithadhesive.Theinstallationofthefinalfinishlayerisonlypossibleafteradequatecuringandcorrectmoisturecontentofthebase.

The thus prepared footing will have the following characteristics:

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbemaintai-

nedandextendedupthroughthePoliterm®Bluscreed.· IfacousticmatsorlayersaretobeincorporatedintotheconstructionbeneaththePoliterm®Bluscreedlaidusingthesinglelayer

methodthentheseacousticlayersshouldbeinstalledbeneath,notover,anypipesorconduitstherebyavoidingthepossibilityofcreatingairpocketswhichcouldhavetheeffectsoflesseningtheacousticperformanceandalsothestructuralintegrityofthePoli-term®Bluscreed.

· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· Whenrequired,dayjointsinthePoliterm®Bluscreedshouldbecastvertically.· WhencontinuingthepourthedayjointsneedtobetreatedwithEdilstiklatexadhesive,tobeused“freshonfresh”.· Adhesivesmustbeusedstrictlyinaccordancewiththeinstructionsoftheadhesivemanufacturers.· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbecompa-

tiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbenefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals.

FORMULA 300 350

Densityafter28dayskg/m3 approx.315 approx.365

ThermalconductivityλD W/mK 0,080 0,103

CompressivestrenghtN/mm2 1,61 1,69

FlexuralstrenghtN/mm2 0,95 0,59

CohesionkPa 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 62 n.a.

Cold-sealedmembraneruptureN/50mm 47 n.a.

ElasticitymoduleN/mm2 551,1 n.a.

Permeabilitytowatervapourμ 7,2 9,2

SpecificheatJ/kgK 1000* 1000*

Shrinkage(NBN)mm/m 0,352 0,270

Acoustic performance ΔLw

26dB** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

31

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

TYPE:constructionoflightweightthermallyinsulatedbasepreparedusingPoliterm®Blu,suppliedinbagsof500Lyieldor200Lyieldeach;laidbyaspecialisedteamusingthe Intermediate Layer method: i.e. suitable for subsequent laying of an asphalt pavement for motor vehicle traffic.

INTENDED USE: spacebetweenfloors-basements(onloosestonefoundationswellconsolidated)etc.

MINIMUM APPLICATION THICKNESS: 100 mm. For advice on thicknesses less than 100 mm please contact the Edilteco Technical Department.

ITEM SPECIFICATION: CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A.:super-lightaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof300to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.The base is suitable for subsequent laying of:a. Flooringwithwaterproofinglayer:waterproofinglayer+non‐wovenfabriclayer+asphaltlayerwithaminimumthicknessof50

mm.b. Basementflooringwithoutwaterproofing:non‐wovenfabriclayer+asphaltlayerwithaminimumthicknessof50mm.Note:Wheninstallingawaterproofinglayerand/orvapourbarrierbelowaPoliterm®Bluscreed,thelayerhastobecoveredwithareinforcedconcreteslab,withaminimumthicknessof100mm.Types,layingmethodsandcharacteristicsmustbedeterminedbythedesignerresponsibleorthecustomeraccordingtothespecificintendeduses.

The base will have the following characteristics:

IntermediateLayer

BENEATH TRAFFICABLE ASPHALT PAVEMENTS

FORMULA 300 350

Densityafter28dayskg/m3 approx.315 approx.365

ThermalconductivityλD W/mK 0,080 0,103

CompressivestrenghtN/mm2 1,61 1,69

FlexuralstrenghtN/mm2 0,95 0,59

CohesionkPa 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 62 n.a.

Cold-sealedmembraneruptureN/50mm 47 n.a.

ElasticitymoduleN/mm2 551,1 n.a.

Permeabilitytowatervapourμ 7,2 9,2

SpecificheatJ/kgK 1000* 1000*

Shrinkage(NBN)mm/m 0,352 0,270

Acoustic performance ΔLw

26dB** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

32

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

In case of crawl space subbase, concreting, honeycomb... the laying of the screed made with Politerm® Blu, may be done without interpose on the casting a galvanized mesh. In case that the subbase is made by insulating sheets, bituminous and/or synthetic waterproofing mats, ceramic or linoleum pavements, pvc, wood, moquette, corrugated sheet etc. before the laying of the screed made with Politerm® Blu, it is necessary proceeding installing sheets of galvanized mesh (minimum dimension: wire diam. 2 mm, mesh 50 x 50 mm) properly connected and spaced from the subbase.

TECHNICAL EVALUATION: below isanexampleofa loadingcalculationforasubbasemadewithPoliterm®Bluwhenused intheconstructionofcarparksandparkingareasconsideringtheloadsimposedbyamotorvehiclenotexceedingatareweightof3.5tonswhenfullyloaded.

ThesubbasemadewithPoliterm®Bluandbatchedwith350kg/m³ofcement,compressivestrengthofabout1,69N/mm2. If for the purposeofthiscalculationweassignacompressivestrengthtotheasphaltpavementnohigherthanthatofthePoliterm®basebeneathitandalsoignoretheloadspreadaffordedbythe50mmlayerofasphalt,thenweobtainthefollowing:·Max.loadofthemotorvehicle: 3500kg·Footprint(contactarea)ofeachtyre(20x10cm): 200cm2

·For4tyresthetotalloadsupportedwillbe: 800cm2

·ThecompressivestrengthofPoliterm®Blubase(cementdosage350kg/m3=1,69N/mm2=17,24kg/cm2): approx.17,24kg/cm2

·TheloadimposedbythevehicleonthePoliterm®Blubasewillbeequaltocm2800x17,24kg/cm2= 13.792kg

TheabovecalculationshowsthathecompressivestrengthofthePoliterm®baseissignificantlygreaterthanthemaximumloadappliedbyany4‐wheeledvehicle.ThereforenodifficultiesareforeseenwhenusingPoliterm®Bluathisdensityinthisapplication.Politerm®BluhasbeenusedinthisapplicationunderthedirectsupervisionofEdiltecotechnicians,inSpain(undergroundparkingattheNewTheatreofCatalunyainBarcelona-year1995)andinPortugal(municipalparkinginthecityofPorto-year1996andalsoinBraga).

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbe

maintainedandextendedupthroughthePoliterm®Bluscreed.· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· AftercleaningofthescreedsurfaceandbeforelayingthescreedpreparedwithPoliterm®Blu,wetthefloorwellbutwithout

leavingpuddles.Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboards,waterprooflayersortiledfloorsdonotwetthesurface.

· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbecompatiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbe-nefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,ontheproductpacka-gingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals.

SPECIAL APPLICATION: FOUNDATION FOR BITUMINOUS-ASPHALT COAT

Politerm® Blumin. thickness 100 mm

bituminous-asphalt coat, min. 50 mm

Tissue non tissue

Compacted soil

33

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

TYPE: constructionoflightweightthermallyinsulatedbasepreparedusingPoliterm®Blu,suppliedinbagsof500Lyieldor200Lyieldeach;laidbyaspecialisedteamusingthe Intermediate Layer method: i.e. suitable for subsequent laying of a concrete pavement for motor vehicle traffic.

INTENDED USE: spacebetweenfloors-basements(onloosestonefoundationswell‐consolidated)etc.

MINIMUM APPLICATION THICKNESS: 100 mm. For advice on thicknesses less than 100 mm please contact the Edilteco Technical Department.

ITEM SPECIFICATION:CreationofthermalinsulatingbaseslabpreparedwithPoliterm®BlumanufacturedbyEdiltecoS.p.A.:super-lightaggregateinvirginexpandedpolystyrenebeadswithconstantparticlesize(beadsø3/6mmorø2mm-Politerm®BluFein)andwithcontrolleddensity;premixedpearlbypearlwithE.I.A.®additiveintheproductionphase,whichallowsperfectmixingwithwaterbinder,eliminatesthebeadfloatingphenomenonandguaranteestheirhomogeneousdistributioninthemix.Themixcanbebatchedwithadensityof300to350kg/m³usingPortland32.5CemIoCemII,withoutaddinganysandand/orotheradditives.Therefore,everycubicmetreofmortarwillbepreparedonlywith840LofPoliterm®Blubeads,Portland32.5CemIoCemIIcementinthedosagesprescribedandtherelevantvolumeofwaterrequiredforhydration.

Main construction types and build ups are: a. Paving on the floor with underlying waterproofing:waterproofinglayer+non‐wovenfabriclayer+concreteindustrialflooring

designedandconstructedtosuitthespecificintendeduse.b. Basement flooring on waterproofing and/or vapour barrier:waterproofinglayerand/orvapourbarrier+non‐wovenfabriclayer

+concreteindustrialflooringdesignedandconstructedtosuitthespecificintendeduse.c. Basement flooring without waterproofing and/or vapour barrier:non‐wovenfabriclayer+concreteindustrialflooringdesigned

andconstructedtosuitthespecificintendeduse.Note:whenthelayingofthewaterproofingsurfaceand/orwatervaporbarrierisrequiredunderthePoliterm®Blubase-screed,thisonemustbecoveredwithareinforcingconcreteslab,withthicknessof100mm.Typologiesandmethodologies,prescribedbythedesigner,dependontheparticularapplicationfields.

The base will have the following characteristics:

IntermediateLayer

LAYING BENEATH INDUSTRIAL CONCRETE TRAFFICABLE PAVEMENTS AND FLOORS

FORMULA 300 350

Densityafter28dayskg/m3 approx.315 approx.365

ThermalconductivityλD W/mK 0,080 0,103

CompressivestrenghtN/mm2 1,61 1,69

FlexuralstrenghtN/mm2 0,95 0,59

CohesionkPa 127,17 n.a.

Hot-sealedmembraneruptureN/50mm 62 n.a.

Cold-sealedmembraneruptureN/50mm 47 n.a.

ElasticitymoduleN/mm2 551,1 n.a.

Permeabilitytowatervapourμ 7,2 9,2

SpecificheatJ/kgK 1000* 1000*

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

34

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

In case of crawl space subbase, concreting, honeycomb. the laying of the screed made with Politerm® Blu, may be done without interpose on the casting a galvanized mesh. In case that the subbase is made by insulating sheets, bituminous and/or synthetic waterproofing mats, ceramic or linoleum pavements, pvc, wood, moquette, corrugated sheet etc. before the laying of the screed made with Politerm® Blu, it is necessary proceeding installing sheets of galvanized mesh (minimum dimension: wire diam. 2 mm, mesh 50 x 50 mm) properly connected and spaced from the subbase.

TECHNICAL EVALUATION: below isanexampleofa loadingcalculationforasubbasemadewithPoliterm®Bluwhenused intheconstructionofcarparksandparkingareasconsideringtheloadsimposedbyamotorvehiclenotexceedingatareweightof3.5tonswhenfullyloaded.

ThesubbasemadewithPoliterm®Bluandbatchedwith350kg/m³ofcement,compressivestrengthofabout1,69N/mm2. If for the purposeofthiscalculationweassignacompressivestrengthtotheconcretepavementnohigherthanthatofthePoliterm®basebeneathitandalsoignoretheloadspreadaffordedbythe100mmlayerofconcretethenweobtainthefollowing:·Max.loadofthemotorvehicle: 3500kg·Footprint(contactarea)ofeachtyre(20x10cm): 200cm2

·For4tyresthetotalloadsupportedwillbe: 800cm2

·ThecompressivestrengthofPoliterm®Blubase(cementdosage350kg/m3=1,69N/mm2=17,24kg/cm2)isequalto: Approx.17,24kg/cm2

·TheloadimposedbythevehicleonthePoliterm®Blubasewillbeequaltocm2800x17,24kg/cm2= Approx.13.792kg

TheabovecalculationshowsthatthecompressivestrengthofthePoliterm®baseissignificantlygreaterthanthemaximumloadappliedbyany4‐wheeledvehicle.ThereforenodifficultiesareforeseenwhenusingPoliterm®Bluathisdensityinthisapplication

WARNINGS AND PRECAUTIONS:· WhenlayingthePoliterm®Bluscreedanyexistingstructuraljointsand/orexpansionjointsinthereceivingsurfacemustbe

maintainedandextendedupthroughthePoliterm®Bluscreed.· BeforelayingthePoliterm®Bluscreed,thoroughlycleanthereceivingsurface.· AftercleaningofthescreedsurfaceandbeforelayingthescreedpreparedwithPoliterm®Blu,wetthefloorwellbutwithout

leavingpuddles.Whenlayingonanonporousorwaterproofsurfacelikeplasticsheetingoverinsulationboards,waterprooflayersortiledfloorsdonotwetthesurface.

· AvoidmixingandlayingPoliterm®Bluwhentemperaturesarebelow5°C.Anyantifreezeadditivesthatmaybeusedmustbecompatiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecontractorshouldhoweverevaluatethecostsandbe-nefitsofusingantifreezeadditivesonacasebycasebasis.

· WhenmixingPoliterm®Blu,strictlyfollowthedosagesandmethodsindicatedinthetechnicalsheets,theproductpackagingandinthismanual.OnlythencanEdiltecoguaranteetheresultsandperformanceclaimed.

· It is essential that you contact our Engineering Department when considering any application different from that described in our technical data sheets and our manuals

SPECIAL APPLICATION: LAYER LEVEL INSULATION IN INDUSTRIAL FLOOR

Galvanised mesh

Politerm® Blu

Vapour barrier

Industrial pavement made of concrete, finished with streight edge or with mechanical device

HONEYCOMB

FORMULA 300 350

Shrinkage(NBN)mm/m 0,352 0,270

Acoustic performance ΔLw

26dB** n.a.

ImpactnoiseinsulationL’nT,W

n.a. n.a.

Fire reactivity class A2-s1,d0

*1000J/kgK=0,24kcal/kgK/**Valueobtainedinlaboratorywith7cmofPoliterm®Blu+Fonotech5

35

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

ConcreteBatching Plants

DOSES AND METHODS FOR PREPARATION OF LIGHTWEIGHT THERMAL INSULATING MORTARSMADE WITH POLITERM® BLU READY MIX AND FEIN READY MIX IN TRUCK MIXER

DOSES FOR 1 m³ YIELD OF LIGHTWEIGHT THERMAL INSULATING MORTAR:

ORDER OF INTRODUCTION INTO THE TRUCK MIXER - MIXING AT FULL SPEED:1. Water:asmuchasrequiredforthemix,lessabout20-30litres(seepoint7). NOTE: water-cementratio0,4:0,5accordingtothe

cementcharacteristics;2. Politerm® Blu Ready Mix - Politerm® Blu Fein Ready Mix;3. Mixforabout10minutesattopspeed;4. Cement;5. Sand(ifapplicable);6. Mixforabout10minutesattopspeed;7. Cleantheloadingbowlwithabout20-30litresofwater(thuscompletingdosageofthemixingwater);8. Dependingontheresidualmoistureinthesand,addwater.

WARNINGS AND PRECAUTIONS:· Ifthetruckmixerhasavolumetriccapacityof10m³,preparetheloadfor9m³.· Duringthetripfromthebatchingplanttositethetruckmixerhastorunatmaintenancespeed.Onceonsite,andafterpossibly

addingwater,thelengthoftimespentmixinginthetruckmixeris1minuteforeachm3 of mixture.· Theambienttemperaturecanaffecttheyield.Insummerthisisnotaproblembutinwinterthemixingwatertemperaturemay

dropcloseto“zero”.Itisthereforerecommendedtoincreasethemixingtimeinthetruckmixerby5-8minutesafteraddingsome cement.

· Attemperaturesbelow+5°C,itisrecommendedtoaddliquidantifreezetothedosagesrecommendedbythemanufacturer.Anyantifreezeadditivesthatmaybeusedmustbecompatiblewiththephysical‐chemicalpropertiesofPoliterm®Blu.Thecon-tractorshouldhoweverevaluatethecostsandbenefitsofusingantifreezeadditivesonacasebycasebasis.

· BeforestartingtopumpthemortarmadewithPoliterm®BluReadyMix,itisimportantinitiallytopumpjustwaterorgroutwa-ter/cement,inordertowettheentirepipesection.Then,beforebeginningtopumpthemortarmadewithPoliterm®BluReadyMix,introducethesponge“tubecleaner”.Thislastactionpreventsthepossiblewashingoutofthebeads,causedbystandingwaterinthepipes,andsoavoidsthepossibleformationofplugs.Forcorrectpumping,normallydoneusingpistonpumps,pourthemortarmadewithPoliterm®BluReadyMixintothepumphopperandstartpumpingslowly,untilthemortarflowsoutfromthepumptube.Thencontinuepumpingatthedesiredspeed.

· Checktheamountofresidualmoistureinthesandsoasnottoaddtoomuchwatertothemix.· Ifusingdifferentmixingdevice,pleasecontacttheEdiltecoTechnicalDepartment· Forcorrectoperationandoptimalpumping,itisrecommendedtoruntestswithquantitiesnotlessthan5m³atatime.

FORMULA WATER *(L)

CEMENT PORTLAND32.5R CEM I o CEM II (kg)

POLITERM® BLU READY MIXAND POLITERM® BLU

FEIN READY MIX

SAND 0,4 - 0,6 mm(kg)

200 90 200

840L

-

250 110 250 -

300 140 300 -

350 160 350 -

500 140** 300 160

800 140** 300 680L 450

1200 140** 300 510L 850

*Thewaterdosagehastobeadaptedtothequalityofthelotofcementtobeused.**Adjustaccordingtothesandmoisturecontent.Pleasecontactusforfurtherformulas.

36

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

· Anyrestriction/bottleneckontheholdingmaterialpipecancausethe‘cap’formation.Itisthereforerecommendedtousepipeswiththesamediameteruptothedischargeterminal.

· AlwaysverifythattheheldhoseconnectorareintactavoidinganypossibleairsuctionthatwouldcausethelackofpumpingofthelightweightbasescreedpreparedwithPoliterm®BluReadyMix.

ADVICE FOR THE WASHING OF CONCRETE MIXER: · DischargetheleftovermaterialintocontainerswhichallowthewatertorunoffandthenrecoverthePoliterm®BluReadyMix

beadsandtheaggregate,whichcanthenonlybeusedforoversiteconcrete.· UsingsandinthepreparationofmortarmadewithPoliterm®BluReadyMix,reduceswastageofbeads,butDOESNOTmeanthat

youcandoawaywiththeabovementionedwashingphases.Thefollowingrulemustalsoberespected.

OBLIGATIONS:Whenthetruckmixerhasbeenwashedoutinthisway,thenextmixmustonlybeusedforoversiteconcreteandNOTforpouringindustrialflooring.

SPECIFIC EQUIPMENT (see appendix 3. “Equipments and spare parts”):Ediltecosuggestsusingequipmentspecificallydesignedforbatchingplants,forpreparationandpumpingoflightweightthermalinsulatingmortarspreparedwithPoliterm®BluReadyMix.Usingthisspecificequipmentspeedsuptheloading,preparationandworkingtimeandguaranteesaconstantexcellentresultfromthefinishedproduct.

37

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

Main productsPOLITERM® BLUSuperlight thermal insulating aggregate composed of virgin expanded polystyrene beads withgrainsizeincurve (ø3-6mm)andwithacontrolleddensity.DuringproductionthebeadsaremixedwithaspecialE.I.A.additivewhichallowsperfectmixingwithwaterandbinder,evenatverylowdoses.Thehomogenousdistributionofthebeadsthroughoutthemixandtheeliminationoftheproblemofbeadflotationcreateaproductthatisperfectforpumping.

Packaging/Yield:Bagof170Lforayieldof200L(1/5m3)offinishedmortar;Bagof420Lforayieldof500L(1/2m3)offinishedmortar.

POLITERM® BLU FEINSuperlight thermal insulating aggregate composed of virgin expanded polystyrene beads withfinegrain(ø 2mm),andwithacontrolleddensity.DuringproductionthebeadsaremixedwithaspecialE.I.A.additivewhichallowsperfectmixingwithwaterandbinder,evenatverylowdoses.Thehomogenousdistributionofthebeadsthroughoutthemixandtheeliminationoftheproblemofbeadflotationcreateaproductthatisperfectforpumping.ItisidealforproducingsinglelayerlevelscreedsusingthePianoZerosystemthatoncecuredwillacceptthedirectadhesivefixingoffloorcoveringsandfinishes.There is no need to add sand.

Packaging/Yield:Bagof170Lforayieldof200L(1/5m3)offinishedmortar;Bagof420Lforayieldof500L(1/2m3)offinishedmortar.

POLITERM® BLU FEIN READY MIXSpecific for mix in concrete mixing and cls pump.Superlight and high thermal insulating aggregate composed of fine beads of expanded polystyrenewithconstantgrainsize(ø 3-6mm).andwithacontrolleddensity.Duringproduction,thebeadsaremixedwithaspecialE.I.A.additivewhichallowsperfectmixingwithwaterandbinder,evenatverylowdoses.Thehomogenousdistributionofthebeadsthroughoutthemixandtheeli-minationoftheproblemofbeadflotation.

Packaging/Yield:Bagforayieldof500L(1/2m3)offinishedmortar.

POLITERM® BLU READY MIXSpecific for mix in concrete mixing and cls pump.Superlight and high thermal insulating aggregate composed of fine beads of expanded polystyrene withconstantgrainsize(ø 3-6mm)andwithacontrolleddensity.Duringproduction,thebeadsaremixedwithaspecialE.I.A.additivewhichallowsperfectmixingwithwaterandbinder,evenatverylowdoses.Thehomogenousdistributionofthebeadsthroughoutthemixandtheeli-minationoftheproblemofbeadflotation.

Packaging/Yield:Bagforayieldof500L(1/2m3)offinishedmortar.

38

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

Complementary productsSCREED RAILSPVC profiles usedtofixthefinishedheightofthescreed.Theyareparticularlysuitableforsingle-layerlightweightscreeds.Eachprofileis2mlongand5cmhigh.Thespecialcross-sectiondesignallowsthemtobesecurelyfixedandheldwithinthescreed,highlystablewithexcellentalignment.Theyalsopreventtheformationofthermalbridges.PianoZeroProfilescanalsobeusedintraditionalsandandcementscreeds;inthiscase,theyactasthecontractionorshrinkagejoint.

EDILSTIKSynthetic latex forsurfacepreparationortoimprovethepropertiesofcementscreeds.Foruseinthelayingofsingle-layerlightweightscreeds(PianoZerosystem)topromoteadhesiontothereceivingsurfaceandforthepreparationofverythinsmoothingscreedsforsurfacepro-tection.

Packaging: 1kgcan/5kgcan/20kgcan/Palletised1.000kgtank.Fortheyeld,pleaserefertothetechnicaldatasheet

EDILSTIK F.C.A.Pigmented synthetic latex fortemporarystabilisationofasbestosfibrecementsheets(type“D” certificate). To apply before the encapsulationworkwith lightweight thermal insulatingmortarsforscreedspreparedwithproductsofPoliterm®Blurange.

Packaging:5kgcan/20kgcanorpalletised1.000kgtank.Colour:yellow-orange.Low-pressureapplicationwithspraynozzle(seeEdilstikBlowMachine)orairless.Alsoavailableinthepre-dilutedversion.Fortheyeld,pleaserefertothetechnicaldatasheet

AUTOLIV Smoothing screedReady to use self-levelling mineral screed powder, formanualandmechanical application.SuitableasahighstrengthtopcoatinglayerorforthefinelevellingofPoliterm®BluorIsolcaplightweightscreeds(seeEdilteco’sapplicationmanuals)priortolayingceramictiles,stoneormarblefloorsandparquetflooring.

Packaging/Yield:· Bagof25kg.· Yield:20kg/m2per1cmofthickness.

AUTOLIV SP ScreedCement-based self-levelling screed readytouse.Itiscomposedofspecialcementbinders,cal-careousandsiliceousaggregatesingrainsizecurvewithadditivestoimprovetheworkabilityandlevelling.

Packaging/Yield:· Bagof25kg.· Yield:20kg/m2per1cmofthickness.

39

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

EquipmentPOLITERM® MACHINE 1000 ECOEntirely stainless steel equipment for the preparation (mixture) and pumping of screeds and lightweight screeds composedbyfinegrainedmaterialssuchasvirginexpandedpolystyrenebeads, reclaimedex-pandedpolystyrenebeads,perlite,vermiculiteandcork,alsomixedwithcellularfoamproducedbyspecificequipment(FoamMakertype).Themaximumlengthofthepipeforcarryingthemortarisof100mwithamaximumheightof30m.

Electrical power supply: 400V-50Hz.Also available with diesel fuel:homologateddieselengineinaccordancewithregulationofnoisepollution.Available with tank:·from1m3

POLITERM® PUMP WITH OR WITHOUT HOPPERMixing machine with pumping system for lightweight screeds consisting of virtual aggregates likevirginexpandedpolystyrenebeads,recycledexpandedpolystyrenebeads,perlite,vermicu-liteandcork,evenwhenmixedwithcellularfoam.Pumpingcapacityupto120minlengthandupto30minheight.

Available in the following types:·Electricalpowersupply400V.·Withhydraulicengineprovidedbyexternalsupply(e.g.trucks).

Customized fittings available on request.

* It is also available in the following version:

POLITERM® MACHINE 1000 H2OEquipped with automatic water dosage system.For the setting up, please consult the technical sheet.

ISOLCAP MACHINE 400 V H2OEntirely stainless steel equipment for the preparation (mixing) and pumping of screeds and lightweight screeds (inparticularthereadytouseonesoftheIsolcaprange)composedoffinegrainedmaterialslikevirginexpandedpolystyrenebeads,reclaimedexpandedpolystyrenebe-ads,perlite,vermiculite,corkandself-levellingscreeds(concreteandanidrihite).

Weight:320kg.Capacity tank: approx.220LElectrical power supply: 2,2kw.400V.Maximum length of the pipe for carrying the mortar:30mwithamaximumheightof15m.Equippedwithautomaticwaterdosagesystem.

** It is also available in the following version:

ISOLCAP MACHINE 230 V H2O

Edilteco S.p.A. Via dell’Industria, 710 . 41038 San Felice sul Panaro (MO) ItalyPh. +39 0535 82161 . Fax +39 0535 82970 . www.edilteco.com I [email protected]

EquipmentPOLITERM® MACHINE SCREWEquipment for the mechanical addition ofcementintothePoliterm®machinetank.Electrical power supply: 400V.

Customized fittings available on request.

LEVELLING TOOLAluminium straight edge rail withhandleforthespreadingoflightweightscreeds.

EDILSTIK BLOW MACHINEEquipment for atomizing latex.Electricalpowersupply:230V/50Hz.

HIGH RESISTANCE RIGID METAL PIPEThisaccessoryimprovestheflowingofthemortarandavoidstherisksofbreakingandburstingthepipeswhileworking.Essentialforpumpingtoheightsgreaterthan10m.3mlongpipeswithflangesandringsforfixingtoscaffolding.

METAL ELBOWFOR PIPESAvailablewith45°and90°elbow.

STEEL REINFORCEDRUBBER PIPE Pipes for pumping lightweightscreedswithPoliterm®Machine.10 m long pipes complete withflanges.

LIGHT PLASTICPIPEPipes forpumping lightweightscreeds(end length) with Politerm® Machine.10mlongpipescompletewithflanges.

PartnersEdilteco Group

LEGEND

Distributors

Edilteco is associated with:

EDILTECO, ANINTERNATIONALSUCCESSitaly . france . benelux . sudamericana

350

- GB

Rev.

05

- 201

Cop

yrig

ht E

DILT

ECO

S.p.

A. -

Non

auth

oriz

ed re

prod

uctio

n is

forb

idde

n.

Consult our technical and application videos on the Edilteco YouTube Channel . www.youtube.com/user/EDILTECOvideo

Edilteco S.p.A.Viadell’Industria,710.41038SanFelicesulPanaro(MO)Italy.Ph.+39053582161.Fax+39053582970www.edilteco.com I [email protected]

360° Insulation