Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
PolicyBrief:SolarPhotovoltaicTechnologiesKarinKritzinger
13December2017
i
CONTENTSIntroduction........................................................................................................................................1
HistoryofPV......................................................................................................................................1
1: PVinstallationsinternationally......................................................................................................3
2: PVinstallationsinSouthAfrica......................................................................................................4
3: RelevantSouthAfricanlawsandregulations................................................................................5
3.1: TypesofrooftopPVinstallations..............................................................................................7
3.2: Impactontheutility.................................................................................................................7
4: ThebusinesscaseforrooftopPVinSouthAfrica..........................................................................8
4.1: IncentiveStructureforSSEGinSouthAfrica............................................................................8
4.2: CostofPV..................................................................................................................................8
4.3: Electricitytariffs........................................................................................................................9
4.4: Thebusinesscase...................................................................................................................11
ConclusionsandRecommendations.................................................................................................14
References........................................................................................................................................15
ii
LISTOFFIGURESFigure1:TimelineofthedevelopmentofPVpanels.........................................................................2
Figure2:GlobaltrendsofPVcapacityfrom2006to2016................................................................3
Figure3:EstimatedtotalrooftopPVinstallationsinSouthAfrica.....................................................4
Figure4:SAgovernmentprocessfromDiscussionstoRegulations...................................................5
Figure5:SummaryofMV/LVconnectioncriteriasetbyNRS097.....................................................6
Figure6:PVsystemcostbenchmarksummary,inflationadjusted,2010–2017..............................8
Figure7:Competitivetenderoutcome:newwind/solarprojectsinSouthAfrica............................9
Figure8:Eskom'sdefinedtimeperiodsformostTOUtariffs..........................................................10
iii
LISTOFTABLESTable2:ElectricitygenerationperkWpperarea.............................................................................12
Table2:FeasibilityofPVsystemsatdifferentcostsforanannualgenerationof1500kWh/kWp13
iv
LISTOFABBREVIATIONSCSP Concentratedsolarpower
CRSES CentreforRenewableandSustainableEnergyStudies
dti DepartmentofTradeandIndustry
EPP ElectricityPricingPolicy
ERA ElectricityRegulationAct
IEP Integratedenergyplan
IRP Integratedresourceplanforelectricity
NERSA NationalEnergyRegulatorofSouthAfrica
MFMA MunicipalFinanceManagementAct
PFMA PublicFinanceManagementAct
PV Photovoltaic
RE RenewableEnergy
REIPPPP RenewableEnergyIndependentPowerProducersProcurementProgramme
SA SouthAfrica
SOE Stateownedentity
SSEG Smallscaleembeddedgeneration
SWH Solarwaterheater
TOU Timeofuse
UK UnitedKingdom
USA UnitedStatesofAmerica
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
1
Introduction
Thisbriefprovidesanoverviewofsolarphotovoltaic(PV)technologiestoinformpolicy.Althoughanoverviewoftheinternationalmarketandlarge-scaleinstallationsisprovided,thefocusofthisdocumentisonrooftopPVinstallationsspecifictoSouthAfricancircumstances.
HistoryofPV
Therearetwomainwaysinwhichsolarenergycanbeharvestedforusefulenergy;
• thelightcanbeconvertedintoheat.Thisheatcanthenbeuseddirectlyasprocessheatoritcanbeusedtogenerateelectricity,or;
• thelightcanbeconverteddirectlyintoelectricitywithphotovoltaic(PV)panels.Theword“photovoltaic” is in fact a combinationof thewords “photos” (theGreekword for light)and“volt”(orvoltage,theunitofpotentialdifferenceinanelectriccircuit).
TheFrenchphysicist,EdmondBecquerelwasthefirstpersontoidentifythephotovoltaiceffect.Hepublishedapaper in1839mentioningthatbatteryvoltage is increasedwhen itssilverplatesareexposedtosunlight(Boyle,2012).
After an initial slow growth in development, the installations of PV technologies really startedtaking off a century and a half later, with an exponential increase over the past decade. For atimelineofthedevelopmentofPV,seeFigure1.
----------x----------
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
2
Figure1:TimelineofthedevelopmentofPVpanels
Adaptedfrom(Boyle,2012)
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
3
1: PVinstallationsinternationally
The global cumulative PV installations increased from ~7GW in 2006 to ~303GW by the end of
2016,a~40timesincreaseinonlytenyears(REN21,2017).SeeFigure2.Asaresult,PVcapacity
madeup1.5%oftheglobalelectricitycapacityby2016.Thisshareisenvisionedtofurtherincrease
to16%by2050(IEA,2014).
Figure2:GlobaltrendsofPVcapacityfrom2006to2016
(REN21Secretariat,2017)
Presently,ChinaistheworldleaderinPVinstallationswithatotalof~77GWinstalledin2016.This
is~5%of theirnetelectricity capacityand~26%of theglobalPV installations. Japanhada total
capacityof~43GWinstalledin2016,accountingfor~14%oftheirnetcapacity.Germany,USAand
Italyarenextinline,withtotalcapacitiesof~42GW,~41GWand~19GWrespectively,accounting
for ~21%, ~4% and ~16% of their net electricity capacity. Together, the top five countries
accountedfor~73%ofglobalPV installations.OthercountrieswithaconsiderableamountofPV
installedincludetheUK,India,France,AustraliaandSpain(REN21,2017).
7 9 16 2340
70100
138
177
227
303
0
50
100
150
200
250
300
350
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
GW
YEAR
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
4
2: PVinstallationsinSouthAfrica
South Africa introduced the Renewable Energy Independent Power Producer Procurement
Programme(REIPPPP)in2011.Sincethenutilityscalerenewableenergy(RE)hasmadeanotable
differenceintheenergymixofSouthAfrica.FromtheREIPPPP,thereareatotalof33operational
PVpowerplants inSouthAfricaatpresent,withanother12projectsfrombidwindow4thatare
awaitingsignoff.Forthedetailsofallofthesepowerplants,seeAppendixA(Forder,2017).
Therehasalsobeenasignificantriseininstallationsofsmall-scaleembeddedgeneration(SSEG)PV
systemsontheroofsofresidential,commercialandindustrialpremisesatacosttotheowners.As
ofFebruary2017,theestimatedprivatelyownedrooftopPVcapacityinSAamountedto~280MW,
with~120MWinstalledin2016alone(PQRS,2017).Thisincreaseininstallationsismostlikelydue
to the declining capital cost, rising electricity prices, increased environmental awareness and
energy security. Although the South African government acknowledges any impetus to reduce
carbon emissions, increase in SSEG could present technical challenges on both distribution and
transmissionnetworks.
Figure3:EstimatedtotalrooftopPVinstallationsinSouthAfrica
(PQRS,2017)
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
5
3: RelevantSouthAfricanlawsandregulations
Theprocess fromdiscussions, throughplans andpolicies to acts and regulations, followedby the
SouthAfricangovernmentasitrelatestoSSEGisshowninFigure4.
Figure4:SAgovernmentprocessfromDiscussionstoRegulations
(Reineckeetal.,2013)
TheElectricityPricingPolicy(EPP),theMunicipalFinanceManagementAct(MFMA)andthePublic
FinanceManagementAct(PFMA)givesdirectiveastothemaximumtariffthatmunicipalitiescan
compensateSSEGgeneratorsforelectricityfedbackintotheirnetwork.Thistariffcapisgenerally
agreedtobeattheblendedtariffthatthemunicipalitybuyselectricityfromEskom.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
6
TheIntegratedenergyplan(IEP)andtheIntegratedresourceplanforelectricity(IRP)providestheenergymixneededtomeetthedemandforSouthAfrica.BoththeIRPandtheIEPwereupdatedin2016,butthesehavenotbeensignedoffbyparliamentyet.The2016draftIRPincludesacaponSSEGinstallations,howeveritdoesnotprovideguidanceastohowthiswillbeenforced.
The electricity regulation act (ERA) was updated in late 2017. The updated ERA exempts thefollowinggeneratorsfromneedingalicencefromNERSA;
• Generators less than 1MW (needs a use-of-system agreement with grid operator andcappedbytheIRPallocation)
• Demonstrationfacilities(cannotoperateformorethan36months)• Existingfacilities• Electricity resellers (tariff is less or equal to existing tariff, agreement in place with
distributorandapprovedbyNERSA)
ThemaximumgenerationcapacitythatisallowedissetoutintheconnectioncriteriafordifferentnetworkconfigurationsshowninFigure5.
Figure5:SummaryofMV/LVconnectioncriteriasetbyNRS097
(Reineckeetal.,2013)
If the PV is installed on government buildings or by state owned entities (SOE), the localprocurementrulesofthedepartmentofTradeandIndustry(dti)needtobeabidedby(dti,2017).
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
7
3.1: TypesofrooftopPVinstallations
RooftopPVinstallationsaredifferentiatedbytheconnectiontothegrid.Themostcommontypesofinstallationsare;
GridTied/ConnectedWithReversePowerBlocking,wherethepropertyisconnectedtothegridandbuyselectricityfromtheutilitywhenthePVsystemisnotproducing,butthesurpluselectricitythatisgeneratedbythePVsystemispreventedfrombeingdirectedbackintothegrid.
Grid Tied / Connected,where the electricity generated can be used at the property and anysurpluscanbedirectedbackintothegrid.Insomecases,thisfeed-backiscompensatedfor.
Off-Grid / Standalone,where the PV system generates electricity for use on-site and operatescompletely independent of the national grid. In this case, it necessary to have additionalcomponentssuchasachargecontrollerandbatterystorage(PVGreencard,2017).
TheCentreforRenewableandSustainableEnergyStudiesatStellenboschUniversitydevelopedatwopage leaflet toassist in thedecisionmakingof installinga rooftopPVsystem(CRSES,2015).SeeAppendixB.
3.2: Impactontheutility
UtilitiesareimpactedbyinstallationsofrooftopPVsystemsbytheircustomersinafewways;
• Theinstallationsmighthaveanegativeimpactontherevenueoftheutility;• thePVsystemsmighthaveanimpactonnetworkstabilityand;• theutilitymighthave a addedadministrativeburdendue to the regulations that thePV
systemsneedtocomplywith.
However,theinstallationsofPVsystemsarewidelyseenbyutilitiesandelectricitycustomersalikeashavinganetpositiveimpactonenergysecurityandthemitigationofclimatechange. Forthisreasonmostutilitiesworldwideembrace thegrowth in the installationof thesesystemsandareactivelyworkingtowardsfindingsolutionstoaccommodatethesenewsystemsontheirnetwork.ThisisseeninSouthAfricaaswell,withmanymunicipalitiesalreadyhavingconnectionrulesandSSEGtariffsinplace(GreenCape,2016).
The electricity demand profile for each electricity customer is different. Large customerswith ahigh aggregated electricity demand can take advantage of this by installing PV systems thatmitigate their electricity use and typically do not feed electricity back into the grid. Residentialcustomers have less aggregated andmore fluctuating demand profiles and typically tend to selfconsume less electricity than they expect. These residential customers will either have energystorage systems installed to absorb the excess electricity, be on a special SSEG tariff from themunicipality,orhaveanunregulatedconnectionthatfeedselectricitybackintothegridwhiletheelectricitymeterrunsbackwards.SouthAfricanmunicipalitiesaretryingtoclampdownontheseunregulatedinstallationsforsafetyreasons,butarefindingitincreasinglydifficultwiththerateofinstallations. The policing of these unregulated systems also adds an additional administrativeburdenonalreadyoverstretchedmunicipalofficials.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
8
4: ThebusinesscaseforrooftopPVinSouthAfrica
4.1: IncentiveStructureforSSEGinSouthAfrica
Theaccelerateddepreciation12BtaxincentiveforREinstallationsallowsbusinessestodeductthefullcostof theirPVsystemsfromtheir taxable income intheyearof installation (SAPVIA,2015).Thisincentiveis,however,notavailableforprivatepersons.
The12LTaxincentiveprovidesanallowanceforbusinessestoimplementenergyefficiencysavings.The incentive allows tax deduction for all energy carriers (not just electricity). However, thisincentiveexcludestheenergygeneratedfromrenewableenergysources.
4.2: CostofPV
The cost of PV has come down rapidly in the last decade, coinciding with themajor growth ininstallations. Thisdecline isseenacross theworldandacrossall typesof installations. ThecostdeclineintheUSAfordifferentinstallationtypescanbeseeninFigure6.
Figure6:PVsystemcostbenchmarksummary,inflationadjusted,2010–2017
(Fu,Feldman,Margolis,Woodhouse,&Ardani,2017)
This cost reduction was also seen in South Africa, with the declining electricity cost from PVinstallationsacrossthefourbidwindowsintheREIPPPP.SeeFigure7.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
9
Figure7:Competitivetenderoutcome:newwind/solarprojectsinSouthAfrica
(Bischof-Niemz&Fourie,2016)
ThecostsofrooftopPVinstallationsinSouthAfricahavecomedowninlinewiththesereductions.Rooftopinstallationcostsrangefrom~R10000perkilowattpeak(kWp)forlargeinstallationsthatdon’tusestateofthearttechnologiesupto~R30000perkWpforsmallresidentialinstallationsorinstallations that are particularly complicated or use state of the art technologies. If an energystoragesysteminincludedintheinstallation,thesecostscandouble,dependingonthesizeofthestoragesystem.
4.3: Electricitytariffs
ThehistoryofelectricitybillingdatesbacktoveryfirstpowerstationsoperatedbyThomasEdison.In thosedays therewerenometersandcustomerswerebilledaccording to theamountof lightbulbs theyhad. Thesedayselectricitybilling isslightlymoresophisticated,withmostcustomerspayingforelectricityaccordingtotheamountofenergyusedovertime(theactiveenergychargeinkWh)plusthemaximumamountofpowertheyareabletouseatonetime(thecapacitychargesin kVA). Some customers also pay a specificmonthly or daily charge on top of this. The kWhchargeswill typically be higher if there are no other charges added. Larger customers are alsomost often on a rate that charges for both active energy and capacity, while many residentialcustomersinSAstillonlypayfortheiractiveenergyuse.
Allchargescanbebilledataflattariff,oritcanbedifferentiatedaccordingtowhenandhowmuchused. The timedifferentialmakes electricity consumed in peakhours in thewintermuchmoreexpensive than the same amount consumed in off peak hours in the summer. The EskomTOUtimescanbeseeninFigure8.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
10
Figure8:Eskom'sdefinedtimeperiodsformostTOUtariffs
(Eskom,2017)
ItisalsopossibletochargecustomersaccordingtoadynamicTOU.Thisimpliesthattheapplicablecharges don’t change according to a pre-set timing, but according to demand and supply ofelectricity at any given time. This type of billing usually forms part of a “smart grid” or “smartmeter”scenariowithrealtimeinformationexchange.ItisnotavailableinSAasyet,butisgainingpopularityworldwide.
ResidentialelectricitycustomersinSouthAfricaaretypicallychargedatanincliningblocktarifffortheiractiveenergyuse,mostoftenmakingtheadditionalelectricityconsumedabove600kWhforaspecificmonth themostexpensive. Most indigent SouthAfricanshaveaccess to50kWhof freebasic electricity per month and are also typically on a lower electricity tariff for additionalelectricitypurchasedthanothercustomers.
Electricity isdistributedbyeitherEskomorthe localmunicipality inSA,althoughsomeareasareservicedbyprivatedistributors. Thismostoftenhappens inhousingestatesandcommercial-orindustrial parks, where the electricity is bought in bulk from the utility (either Eskom or themunicipality)andresoldtocustomers.
MunicipalitiesinSouthAfricaareallowedtocrosssubsidiseotherservicesfromtheirincomefromelectricity sales. This practice tends to make municipalities overtly aware of the revenue theymightlosefromcustomersinstallingrooftopPVsystems.
For somecustomer types, theelectricity tariffsarehigher inareasservicedby themunicipalitiesthan the areas serviced by Eskom. This is especially true for larger commercial and industrialcustomers charged atMegaflex rates. These Eskom rates are similar for large customers as formunicipalities and the municipalities have to add additional charges to cover the cost ofdistribution.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
11
Many municipalities in SA now also offer SSEG tariffs. These tariffs typically include a highermonthlychargeandalowerperkWhcharge.Thepricingfortheelectricityfedbackintothegrid(wherethisisallowed)istypicallysimilartotheblendedtariffthatthemunicipalitypaystoEskom.
4.4: Thebusinesscase
The feasibilityofaPV installationwilldependon; the spaceavailable (strength, suitability, size);the design of the system (in relation to the space and resource available); whether an energystorage system is included; the system installation cost; the system operation andmaintenancecost;financingoptions(suchasgrantordebtandtaxincentives);theelectricityusageprofileofthesite;thegenerationprofileoftheplant;theplantavailabilityand;theapplicableelectricitytariffs(before and after the installation of the plant) (Scholtz,Muluadzi, Kritzinger,Mabaso,& Forder,2017). These factors differ substantially between sites, so the specifics canonly be determinedwithcertaintythroughapre-feasibilitystudy.AnexampleofsuchastudyistheoneconductedforDrakensteinMunicipalityintheWesternCape(Kritzinger,Meyer,vanNiekerk,&Scholtz,2015).
ThemostimportantofthefactorsinfluencingthefeasibilityofaPVsystemare;
• thecapitalcostofthesystem;• theactiveenergychargeofelectricity(kWh)1and;• theelectricitygeneratedbythesystem.
In somevery specific cases, therewill alsobea savingoncapacitycharges (KVA)due for thePVinstallation. Thiswill typicallybe incaseswherethepeakdemandfalls inthemiddleoftheday.TakenotehoweverthatsomepeakdemandchargesareonlymeasuredintheEskomhighdemandtimes.
Even thoughthecostofPV installationshasdroppedsignificantlyover thepast fewyears, thesestill representasignificant investment.Total installationcosts typically rangefrom~R11perkWp
forverylarge,easysystemsto~R30perkWporevenhigherformorecomplexandsmallersystems.
Electricitytariffsdiffersignificantlybetweenareasandalsopercustomertype.HighuseresidentialcustomerstendtopaythemostperkWh,especiallythosecustomerswhoroutinelyusemorethan600kWhpermonth.ThiscanbeashighasR2,80perkWh.Somesmallcommercialcustomersarecharged at an active energy charge only and this can be as high as R2.60 per kWh. Largecommercialandindustrialcustomerstendtohavehigherfixedandmaximumdemandchargesandtypically pay less for the active energy. This rate canbe as low as 35c in the lowdemand, lowseasontime.
Both the Eskom tariff and allmunicipal tariffs are approvedbyNERSAon an annual basis. ThispresentsasignificantrisktotheelectricitycustomerwantingtoinstallarooftopPVsystemastheirelectricitytariffmightchangesignificantly
1Thisactiveenergychargeisoftendifficulttopredictduetoincliningblocktariffforresidentialcustomers,TOUtariffsandtheamountofelectricityself-consumedvs.electricityfedbackintothegrid.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
12
The solar resource also differs significantly according to location. See Table 1 for the yearlyelectricitygenerationperkWpinstalledfordifferentareasinSouthAfrica.Asexpected,Kimberley,withitsmanysunnydays,hasthehighestsolarresourceoftheselocationsandDurban,withmanycloudydays,thelowest.However,DurbanstillhasahigherresourcethanGermanythathasahighpenetrationofrooftopPV.
Table1:ElectricitygenerationperkWpperarea
Location AnnualPVoutput(optimallyinclined)
Kimberley 1854kWh/kWp
Pretoria 1731kWh/kWp
CapeTown 1621kWh/kWp
George 1423kWh/kWp
Durban 1409kWh/kWp
If only these three factors (cost of the system, cost of electricity and solar resource) areconsidered, a first stab as to the feasibility of a specific project can be easily calculated. Thefeasibilityofasysteminstalledinanareawith1500kWh/kWpPVgenerationpotentialperyearisshown in Table 2 for different installation costs and different active energy charges. The greenblocksindicateprojectsthatcanbeinvestigatedfurther. Theyellowblocksindicateprojectsthatwillonlybefeasibleifthereareadditionalincentivesthataffecttheinvestmentdecision.Theredblocksarenotfinanciallyfeasibleoptions.
Inthefirstcolumn,aprojectataninstallationcostofR10000perkWp,willbefeasibleatanactiveenergychargeofmorethan90c/kWh.However,inthelastcolumn,aprojectataninstallationcostofR30000perkWpwillonlybefeasibleatanactiveenergychargeofmorethanR2,70/kWh.
AtanactiveenergychargeofR1.00/kWh(row7),aprojectwillonlybefeasibleatacapitalcostofR10000perkWporlower.However,inthelastrow(atanactiveenergychargeofR3.00/kWh)aprojectwillbefeasibleevenatacapitalcostofR30000perkWp.
If a project seems feasible with this first simple calculation, a more detailed study can beundertaken.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
13
Table2:FeasibilityofPVsystemsatdifferentcostsforanannualgenerationof1500kWh/kWp
CostperkWpinstalled
TariffperkWhcharged
R10000 R12000 R14000 R16000 R18000 R20000 R22000 R24000 R26000 R28000 R30000
R0.30 22 27 31 36 40 44 49 53 58 62 67
R0.40 17 20 23 27 30 33 37 40 43 47 50
R0.50 13 16 19 21 24 27 29 32 35 37 40
R0.60 11 13 16 18 20 22 24 27 29 31 33
R0.70 10 11 13 15 17 19 21 23 25 27 29
R0.80 8 10 12 13 15 17 18 20 22 23 25
R0.90 7 9 10 12 13 15 16 18 19 21 22
R1.00 7 8 9 11 12 13 15 16 17 19 20
R1.10 6 7 8 10 11 12 13 15 16 17 18
R1.20 6 7 8 9 10 11 12 13 14 16 17
R1.30 5 6 7 8 9 10 11 12 13 14 15
R1.40 5 6 7 8 9 10 10 11 12 13 14
R1.50 4 5 6 7 8 9 10 11 12 12 13
R1.60 4 5 6 7 8 8 9 10 11 12 13
R1.70 4 5 5 6 7 8 9 9 10 11 12
R1.80 4 4 5 6 7 7 8 9 10 10 11
R1.90 4 4 5 6 6 7 8 8 9 10 11
R2.00 3 4 5 5 6 7 7 8 9 9 10
R2.10 3 4 4 5 6 6 7 8 8 9 10
R2.20 3 4 4 5 5 6 7 7 8 8 9
R2.30 3 3 4 5 5 6 6 7 8 8 9
R2.40 3 3 4 4 5 6 6 7 7 8 8
R2.50 3 3 4 4 5 5 6 6 7 7 8
R2.60 3 3 4 4 5 5 6 6 7 7 8
R2.70 2 3 3 4 4 5 5 6 6 7 7
R2.80 2 3 3 4 4 5 5 6 6 7 7
R2.90 2 3 3 4 4 5 5 6 6 6 7
R3.00 2 3 3 4 4 4 5 5 6 6 7
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
14
ConclusionsandRecommendations
The installationsofPVsystemsaregrowingyearonyear internationallyandalso inSouthAfrica.ThisisbothtrueforlargestandalonePVpowerplantsandforSSEGorrooftopPVsystems.
WhilethelargescalePVpowerplantsareregulatedthroughtheREIPPPP,rooftopPVisinstalledatthecostandriskoftheelectriictycustomer.
ThelawsandregulationsmostrelevanttorooftopPVinSouthAfricaaretheERA,theEPP,theIRP,theMFMA, thePFMAand the tariff structureof theelectricity customer. The instalationhas tofurthercomplytoallthenetworkregulationsforgeneratorsandneedsagenerationlicencefromNERSAifitisbiggerthan1MW.IfthePVisinstalledongovernemntbuildingsorbySOEs,thelocalprocurementrulesofthedtineedtobeabidedby.
ThebusinesscaseforrooftopPVismostlyinfluencedbythecapitalcostofthesystem,theactiveenergychargeofelectricity(kWh)andthesolarresourceatthespecificlocation.
Rooftop PV installations will assist SA to reach the carbon emmision reduction targets and areembracedandencouragedbyallrelevantauthorities.
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
15
References
Bischof-Niemz, T., & Fourie, R. (2016). Cost of new power generators in South Africa. Pretoria.Retrieved from http://www.ee.co.za/wp-content/uploads/2016/10/New_Power_Generators_RSA-CSIR-14Oct2016.pdf
Boyle, G. (Ed.). (2012).Renewable Energy, Power for a Sustainable Future (Third). Oxford: OxfordUniversityPress.
CRSES. (2015). PV One Pager Info Brochure. Stellenbosch. Retrieved fromhttp://www.crses.sun.ac.za/files/news/PVonepagerinfobrochure_final.pdf
dti. (2017). Industrial Procurement. Retrieved December 13, 2017, fromhttp://www.dti.gov.za/industrial_development/ip.jsp
Eskom. (2017). Tariffs & Charges 2017/2018. Johannesburg. Retrieved fromhttp://www.eskom.co.za/CustomerCare/TariffsAndCharges/Documents/Tariff Book 2017-2018.pdf
Forder,S.(2017).Energyblog.Retrievedfromhttp://www.energy.org.za
Fu, R., Feldman, D. J., Margolis, R. M., Woodhouse, M. A., & Ardani, K. B. (2017). US solarphotovoltaicsystemcostbenchmark:Q12017,(September).
GreenCape. (2016). Small Scale Embedded Generation in the Western Cape. Retrieved fromhttp://greencape.co.za/munic-pv
Kritzinger,K.,Meyer,I.,vanNiekerk,W.,&Scholtz,L.(2015).Potentialforintegrationofdistributedsolar photovoltaic systems in Drakenstein municipality Energy. Retrieved fromhttp://awsassets.wwf.org.za/downloads/re_drakenstein_report_thursday_28_sep.pdf
PQRS. (2017). February 2017 - Solar PV Investment and Equipment Report. Retrieved fromhttp://pqrs.co.za/data/february-2017-solar-pv-investment-and-equipment-report/
PV Greencard. (2017). Information on Rooftop Solar PV Classi3cation Of Rooftop PV Systems.Retrieved from https://www.pvgreencard.co.za/rooftop-solar-pv/information-on-rooftop-solar-pv/
Reinecke,J.,Leonard,C.,Kritzinger,K.,Bekker,B.,vanNiekerk,J.L.,&Thilo,J.(2013).UnlockingtheRooftopPVMarketinSouthAfrica.CenterforRenewableandSustainableEnergyStudies(Vol.27). Retrieved from http://www.crses.sun.ac.za/files/research/publications/technical-reports/UnlockingtheRooftopPVMarketinSA_final.pdf
REN21Secretariat.(2017).Renewables2017globalstatusreport2017.
SAPVIA.(2015).SARSRenewableEnergy,R&DandEIncentives.
Scholtz, L.,Muluadzi, K., Kritzinger, K.,Mabaso,M.,& Forder, S. (2017).Renewable Energy : Factsand Futures The energy future we want. Cape Town. Retrieved fromhttp://dtnac4dfluyw8.cloudfront.net/downloads/WWF_Energy_Facts_and_Futures_Final_Version.pdf
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
16
AppendixA:PVpowerplantsinSouthAfricafromtheREIPPPP(Forder,2017)
NameCapacity(MW) Programme Nearesttown Status
AriesSolar 9.7 Window1 Kenhardt Fullyoperational
DeAarSolarPower 50 Window1 DeAar Fullyoperational
DroogfonteinSolarPower 50 Window1 Kimberley FullyoperationalGreefspanPVPowerPlant 10 Window1 Douglas Fullyoperational
HerbertPVPowerPlant 19.9 Window1 Douglas FullyoperationalKalkbult 72.5 Window1 DeAar Fullyoperational
KathuSolarEnergyFacility 75 Window1 Kathu Fullyoperational
KonkoonsiesSolar 9.7 Window1 Pofadder FullyoperationalLesediPowerCompany 64 Window1 Postmasburg Fullyoperational
LetsatsiPowerCompany 64 Window1 Bloemfontein FullyoperationalMulilo Renewable Energy Solar PV DeAar 9.7 Window1 DeAar FullyoperationalMulilo Renewable Energy Solar PVPrieska 19.9 Window1 Prieska Fullyoperational
RustMo1SolarFarm 6.8 Window1 Rustenburg FullyoperationalSlimSunSwartlandSolarPark 5 Window1 Swartland Fullyoperational
SolarCapitalDeAar(Pty)Ltd 75 Window1 DeAar Fullyoperational
SolarCapitalDeAar3 75 Window1 DeAar FullyoperationalSoutpanSolarPark 28 Window1 Mokopane Fullyoperational
TouwsrivierProject 36 Window1 Touwsrivier FullyoperationalWitkopSolarPark 30 Window1 Polokwane Fullyoperational
Aurora 10.35 Window2 Aurora Fullyoperational
BoshoffSolarPark 60 Window2 Boshof FullyoperationalDreunberg 75 Window2 Dreunberg Fullyoperational
JasperPowerCompany 75 Window2 Postmasburg FullyoperationalLinde 36.8 Window2 Hanover Fullyoperational
SishenSolarFacility 74 Window2 Sishen FullyoperationalUpingtonSolarPV 8.9 Window2 Upington Fullyoperational
Vredendal 8.8 Window2 Vredendal Fullyoperational
AdamsSolarPV2 82.5 Window3 Hotazel FullyoperationalElectraCapital-PaleisheuwelSolarPark 75 Window3 Clanwilliam Fullyoperational
MuliloPrieskaPV 75 Window3 Prieska FullyoperationalMuliloSonnedixPrieskaPV 75 Window3 Prieska Fullyoperational
PulidaSolarPark 75 Window3 Kimberley Fullyoperational
TomBurkeSolarPark 60 Window3 Lephalale FullyoperationalAggeneysSolarProject 40 Window4 Aggeneys Approvals,planning&financing
Bokamoso 68 Window4 Leeudoringstad Approvals,planning&financing
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
17
DeWildt 50 Window4 Brits Approvals,planning&financing
Droogfontein2Solar 75 Window4 Kimberley Approvals,planning&financing
Dyason’sKlip1 75 Window4 Upington Approvals,planning&financingDyason’sKlip2 75 Window4 Upington Approvals,planning&financingGreefspan PV Power Plant No. 2 SolarPark 55 Window4 Douglas Approvals,planning&financing
KonkoonsiesIISolarFacility 75 Window4 Pofadder Approvals,planning&financingSiriusSolarPVProjectOne 75 Window4 Upington Approvals,planning&financing
SolarCapitalOrange 75 Window4 Loeriesfontein Approvals,planning&financingWaterlooSolarPark 75 Window4 Vryburg Approvals,planning&financing
Zeerust 75 Window4 Zeerust Approvals,planning&financing
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
18
1. Have you implemented energy efficiency measures?
3. Do you have available space to place the PV installation?
4. What can I expect the installation to cost me?
5. Do I need permission from my local municipality to install PV?
Energy efficiency is usually the most cost effective way to reduce your electricity cost. Always put energy efficiency initiatives in place first. For example, replace all conventional light bulbs with energy efficient light bulbs.
WHY PV?
You will need an open area (roof or ground) without shading or obstructions for your PV panels. For a 3 to 6 kW installation approximately 25 to 50 m2 of space is required North facing areas are ideal for maximizing your electricity production
2. When do you use electricity? And how much?
Understanding your load profile is key in designing an optimal PV installation, you need to know: When do you need the electricity? Summer, winter, every day, only weekends,
day time, night time? Remember PV panels only produce electricity when the sun is shining and you will require batteries to store the generated electricity for later use if you do not use it when it is produced.
How much electricity do you need? The average South African household uses approximately 4 600 kWh/year, thus a 3 kW installation (10 PV panels; 25 m2) could cover 80% of this consumption.
As a guideline, the price of an installed PV system, including panels, inverter and cables (no batteries) ranges between R 18/W and R 25/W. For example: a 3 kW installation will cost between R 54 000 and R 75 000 (VAT incl.).
A system with batteries is likely to range between R 36/W and R 50/W; thus for a 3 kW system expect to pay between R 108 000 and R 150 000 (VAT incl.).
Each municipality has its own regulations, find out about these prior to installation.
A. Because there is no electricity supply where you live? B. To reduce your monthly electricity cost? C. To have power during load shedding?
Use the decision tree to help you understand solar PV installations better and how PV can help fulfil your energy needs
Next Step? Pick the system that suits your needs
B. I want to reduce my monthly electricity cost GridGrid--Tied system: Tied system: A grid-tied system can reduce your carbon footprint and electricity bill by providing part of the electricity consumed from the PV system.
A. I do not have an electricity supply and require an alternative source of electricity
OffOff--Grid system: Grid system: For a home or business that does not have a grid connection (usually far from grid connection points) namely: holiday home, telecom repeater, lighthouse or farm.
C. I want to be unaffected by load shedding Hybrid system: Hybrid system: A grid-tied system with battery back-up has the same advantages as a grid-tied system. In addition, such a system allows you to use solar energy in the evenings and on cloudy days as well as during load shedding.
DO DO YOU YOU WANT TO INSTALL A PVWANT TO INSTALL A PV SYSTEM? SYSTEM? Photovoltaic
AppendixB:PVInstallationinformationbrochure(CRSES,2015)
PolicyBrief:SolarPhotovoltaicTechnologies Dec-!"
19
GRI
D-T
IED
SYS
TEM
Electricity from this PV installation is consumed directly at home or business.
No batteries = No electricity from the PV installation when very cloudy or at night.
Low maintenance, depending on the dust in the area cleaning of the panels may be needed .
Approximately 20 year life span, but you may have to replace the inverter after 10 years .
Some municipalities allow you to feed electricity back into the grid and will compensate you for this. If you live in an area where this is not allowed, or should you choose a tariff structure with no grid feed back allowed, the generated electricity that is not immediately used, will be lost.
A grid-tied system requires an active grid connection to operate, thus
the PV system will not produce electricity during load shedding.
OFF
-GRI
D S
YSTE
M
The system consists of PV panels, invertor and battery pack. The sizing of batteries depends on your required load (kWh used) and
solar resource in the area (the number of days without sun you need to energize: the more cloudy days, the bigger the battery).
Batteries require regular maintenance. The batteries will need to be checked weekly by the owner. It is best to have your system serviced yearly.
Approximately 20 year life span, but you may have to replace the in-verter after 10 years. Batteries will last from 2 to 10 years, depending on the usage profile and maintenance record.
For off-grid systems use gas or solar thermal energy for heating applications to reduce the required battery capacity, for example use a
solar water heater for water heating and cook with gas.
HY
BRID
SYS
TEM
The hybrid system consists of PV panels, invertor, grid connection and battery pack.
Backup power is limited to the capacity of the battery bank. Batteries require regular maintenance. The batteries will need to be
checked weekly by the homeowner. It is best to have your system serviced yearly.
Approximately 20 year life span, but you may have to replace the in-vertor after 10 years. Batteries will last from 2 to 10 years, depending on the usage profile and maintenance record.
If you have a hybrid system installed, the batteries should only power essential loads, for example lights, computers and freezer/refrigerator.
Contact the Centre: www.crses.sun.ac.za
[email protected] 021 808 4069
BASICS OF EACH TYPE BASICS OF EACH TYPE OF PV SYSTEMOF PV SYSTEM