34
aS-lL4b 1 N Point Beach Nuclear Plant Safety + Innovation + Teamwork - .e. I I I I S EP Team On Call: Plan-of-the-Day Meeting UIR28: Day27 Team "D" 0815-0845 Days to U2R27: 337 Front Office Conference Room Days to U1R29: 512 Days Since Last HP Work Week: BO6BI Safety Event: Clock Reset: Date: Friday, April 30, 2004 f_ 1

Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

aS-lL4b

1N Point Beach Nuclear Plant

Safety + Innovation + Teamwork

- .e.

I I I IS

EP Team On Call: Plan-of-the-Day Meeting UIR28: Day27

Team "D" 0815-0845 Days to U2R27: 337Front Office Conference Room Days to U1R29: 512

Days Since Last HP Work Week: BO6BI Safety Event:

Clock Reset: Date: Friday, April 30, 2004 f_

1

Page 2: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Ptgw !anUqfth9=D ~;..enda -

Purpse:Understand unit status + Ensure ownership and support + Recognize performanceJI + Improve communications and teamwork

Daiy:A. [EP] - Event Response duty listPlant Status - Units I and 2: B. [Ops/Eng] - Fire Protection summary

A. IHS-SaetyC. [Safety) - Industrial safety action item list & safetyB. [ps]- Plnt ondtion (Uits &2 o.performanceB. Ops -lan Coditons(Unts &2 D.[Site Engineering] - Maintenance Rule 'Al' system

C. [Ops] - Immediate attention (Pri 2) review0. (Ops] - Operations' Dept concerns, activities, E. [Project Mgmt] - Major project status

and priorities F. [Business Mgr] - Budget overviewE. [Ops] - Status control events (last event) G. Excellence Plan reviewF. (Ops] - Regulatory notification I near misses *Tuesday:G. [Ops] - TSACs (active & potential A. [RPJ - Annual dose summary

H. ~ps -uisncealamsB. [Security] - Security system status & compensatory1. [p]-peain'Housekeeping Report maueI. [ps] Opratins'[PPG] - Forced outage schedule

J. [PA] - Operating Experience D. [Site Eng] - Thermal cycle efficiencyK. (Pit Mgr] - Communications E. [VP/Director] - INPO follow up & readiness

Sureilanc Shedle eviw:F. [EP] - EP issuesSurvillnceScheuleRevew:G. Human PerformanceA. [PPG MgrJ - 12-week rolling scheduleH.EcleePanrvwB. [PPG Mgr] - Equipment / system outages *Wdedy

Chemistry I RADCON Review, Units I and 2: A. [Training] - TrainingB. [PPG] - Management Risk Observations

Integrated Schedule I System Outagges: C. [Ops] - Operator WorkaroundsA. [Ops] - Operations' work week issues D. [Ops] - Leakage list; oil & water

Unit Outage (if applicable):E.EP-EPDilShdeF. [Engr] - Section XI equipment in double frequency

Administrative: G. [Maint] - Housekeeping IssuesA. [PPG Mgr] - Plant impact issuesH.EcleePanrvw

.Thursday:ActonItes:A. [EPJ - EP Pager Test Results (as applicable)

B. [Engr] - Temporary ModificationsC. [Ops] - Control Room Panel Deficiency Analysis

RoundTable: D. [Ops] - Disabled alarms (Units I &2)E. (Ops] - Instruments Out-of-Service (Units I &2)

Pagers: F. [PA] - CAP backlogsG. [Ops] - Out-of-Spec routine readings

AOM..........................H. Excellence Plan reviewChemistry Shift Supervisor ......... Friday:

IndstralSaftyA. [Reg Affairs] - Upcoming Licensing/QA ReviewsB. [QA] - Quality Assurance update

Maintenance....................C. [Maint] - WR Backlog

Outge anaerD. [EP] -Weekend coverage list (Units l &2)E. [Engr] - Predictive Monitoring

Radiation Protection ............. F. [PPG MgrJ - Next week's work week summary andShif Mangerhighlights

G. [Reg Affairs] - NRCIINPO Perf Indicators,Systemn Engineering ............. H. Excellence Plan reviewWork Week Manager ..........

2

Page 3: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Point Beach Nuclear Plant Outage 1 R28DAY

Supporting Operational Excellence25

Path1%

It

Picture

Meets

Outage Radiation Performance Doesn't Meet Exceeds

I * tw A * * - 1 * A :1This indicator measures cumulative dose radiation exposure andtotal number of personnel-contamination events (PCE's > 5000cpm) during refueling outages. The dose indicator is measured inRem and individual PCE events.

Meets: <=75 Rem Actual Cum.Exceeds: <=71 Rem Dose: 44.45 Rem

Uay 25 - Aprni 28Actual = 2.376Cumulative = 44.450Cumulative Forecast = 45.988

Daily dose and PCE goals reforecasted on 4/23.

Meets: <= 18 Exceeds: <= 12 Actual PCE's: 6

- -~ S. S61 M .UT

Stu Thomas I

Cummulative Dose ExposurePersonnel Contamination Events

S

uC0

C10g0

z

201816141210

864

20

80

. I

--- Acual

.. . . . .Foecast

IN' Goald, I

I

__ 0¢¢I,,______...._.

E - --%r- ---y_8 0~

.1

K -

E 60

o 40a

0 20

- Actual

. .Forecast

Goal

0 2 4 6 8 1012141618202224262830323436384042444648500 2 4 6 8 1012141618202224262830323436384042

Page 4: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

NUCLEAR POWER BUSINESS UNIT

PBNP DAILY CHEMISTRY STATUS REPORT

Date: 04130104 Time: 5:15

PARAMETER UNIT I UNIT 2 ACTION LEVEL(S)REACTOR COOLANT . .

Boron, ppm 3011 1247 N/ALithium, ppm <0.05 2.40 out of rangeChloride. ppb <5 <5 > 50Fluoride, ppb <5 <5 > 50Sulfate, ppb 21 <5 > 50Silica, ppb 4567 458 > 1000 at power

Dissolved H2, cclkg NIA 33.9 < 25. > 50Specific Activity, uCicc N/A 1.39E+0 >100 I E-Bar

100/E-Bar, uCVcc N/A 164.41-131 DE, uCicc N/A 2.19E-4 > 0.8

RWSTBoron, ppm 2977 3072SiO2. ppb 4140 5375

BDEB (last done dates) 4/28/04 0:50 4/14/04 6:00% Solids 6.5 4.2

% Boric Acid 7.2 4.4BAST A % Acid - Date & Time 3.71 4/27/04 14:16

B % Acid - Date & Time 3.73 4/27/04 10:48C % Acid - Date & Time 3.82 4/29/04 20:39

STEAM GENERATORS A B A Action Level INPO CPI

Chemistry Performance Index N/A 1.00 > 1.1 above 30% power (2)(C PI)__ _ _ _ _ _ _ _ _ _

P/S Leak Rate, gpd N/A 0 > 30 or > 60 gpd / hrCation Cond(1). uS/cm N/A N/A 0.057 0.056 > 0.8

Sodium, ppb N/A NIA 0.1 0.1 > 5 > 0.8Chloride, ppb N/A NIA 0.2 <0.1 > 10 > 1.6Sulfate, ppb N/A NIA 0.4 0.3 >10 > 1.7

pH N/A N/A 9.76 9.72 < 8.5FEEDWATER UNIT I UNIT 2 Action Level INPO CPI

Iron, ppb N/A 1.475 >3 >5Copper. ppb N/A 0.006 > 0.1 > 0.2

Dissolved 02, ppb N/A <5 >5pH N/A 9.66

CONDENSATE Action LevelDissolved 02, ppb N/A 3.3 > 10SAE Flow (scfm) N/A 3.1

NOTE: Bolded items require action by Chemistry (2) Best allowable CPI is 1.0

EMERGENT PROBLEMS / SIGNIFICANT ACTIVITIES / OTHER INFORMATIONPriority Chemistry equiPment currently OOS

Wet layup chemicals have been added to both Ul steam generators and they have been filled to 510".

4

Page 5: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Commilred to Nuclear Excellence

Plant Status ReportPlant: Point Beach Nuclear Plant Date: Friday, April 30, 2004Operations Report (Summary of Last 24 Hours of Operations):Unit I is in refueling shutdown (Mode 6). Unit 2 is at 100% power.

Days Without LTA: 587 Homeland Security Condition: Yellow

-Unit 1 :Ii . *Unit2 I: CPNVR PWR MWE MVE PWR PWVR MWE MWEMode Level (Gross) (Net) Mlode Level (Gross) (Net)

6 0% 0 0 1 100% 542.9 520.8

Days On Line: 0 Days Since Last Reactor Trip: 288 Days On Line: 162 Days Since Last Reactor Trip: 294'_____ _ '__ ''' f .. .' - TechnicaI SpecificationTAction Conditions cl' ; 4

Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip(Hr/Days) Spec Expected

Number RTS DateDate Time Date Time

2RC-508, 2 Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8127/04U2C RMW service.Supply

r Equip ent Out 'of Service or Degraded -' '' - ': ,

Item Unit Condition Date Time J Work Order Number Due Date Responsibilityi2P-2A, Charging 2 Out of service, 4129/04 0357 WO 0400329 4/30/04 B. Dungan

) Pump running for PMT.

-. .a . > -- I-.-.-.-.'.- . :: ..^.-; am:-:O'perational Problems IConicerns. i- -____ ____________

Item Unit Condition Actions Needed Due Date Responsibility2RC-508, U2C 2 Valve comes off shut seat Provide decision tree to Plant 4/30/04 K. KrauseReactor Makeup momentarily when RMW pump Manager.Suipply starts.Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5/7/04 N. StuartLetdown Flow2RE-215,2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. CarberryEjector Gas Monitor related. Scheduled completion is 5/14104.2TE-2259, 2P-28B 2 Minor steam leak. Prepare work package to repair leak 5/7/04 J. BranderSGFP Discharge weekend of 05/22/04.Temperature Element WO Initiation Tag #204297

____"_____-_________ ' i .; &; .' Aggregate Review of Issues .- ,:- * I . ___-- --I_ ,Item Unit Condition Actions Planned Due Date Responsibility

- : - ' : -':'- ' '-;;:Reportable Events C -- r ..' . .I ,' '.'As J t !*'--

NONE

Page 1 of 2

5

Page 6: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Committed to Mucluar Excellence

Plant Status ReportOutstanding Operability Determinations . ..-

OPR-109, IT-10 Aux Feedwater Motor-Driven Pump Acceptance. (Due 4130104, 1630 Hours)- -. . . ...... -. 'Protected Equip'ment' .. .-

- ~~Load Chanfges (Planned or Unplanned 2.:..

NONE

Reactor Coolant System Leajkag:,: . ..

Unit I Unit 2

Unidentified (gpm) 0 0.08(No leak rate determined due to draindown)

Identified (gpm) 0 0.02; . 7...:. ;.;.; . " - . -':' Major Tests and Evolutions Scheduled in'Next 24 Hours . - .C.-'.:

I X.04, 13.8 KV - 4160 V transformer out of service. (Pending procedure resolutions)PAB ventilation will be out of service for I B-42 outage preparations.

Page 2 of 2

6

Page 7: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

commifteeito NurerEciear~Ii

Outage Status Report

Plant: Point Beach Unit I Day: Friday Today's Date/ Time: 4/30/04 0400Outage Duration: Day 27 Of Refueling Outage Number UIR28

-.. :. * -; -:; .::.: SafetStatus; |' ; : , f -: - --

Industrial - Within the last 12 hoursOSHA Recordables 0 First Aid cases 0 Significant near misses 0Total for this outage l

Summary:

RadiologicalDose to date 44.450 Projected to date * 45.988 Outage Goal S75 RDifference -1.538 Number of PCEs 6

Summary: * Reforecast on 4/23

NuclearSignificant human performance errors and events in last 24 hours 0

Summary:

-PatStatus ,..7;r,:s; . - : :.' ;: : .- .: e' Plant S u:. -- ::. :.. ; : -. .:: ;

Mode: n Hot Standby (Mode 3) E Hot Shutdown (Mode4) E Cold Shutdown imode 5) ED Refueling Shutdown (mode 6)

RCS: Temperature: 76 Pressure: Vented to Atmosphere RV Level: Refueling HeightTime to Boil: 26 hours

.'o' -; .1 ... -' -'M 'ShutdownSafety ssessment Protected Equipment: .:.:.': !''.' ' , ;'J -t' !.''.u ._ ,- .. _ , , . _ ' . _ ". _ - . . .

.. '>.'Maori tivitlesCo alstedInLast ors CrItcalPath NdrCriticalPithAct vltk(Nek e Hours4;i* Fuel Motion is at Step 295 of 464 @ 0400 4/30/04 * Continue Fuel Motion. IA and lB S/G Placed in Wet Lay-up * B S/G Eddy Current Analysis. A S/G Eddy Current Analysis . Continue Reactor Vessel Head Inspection

* B RCP Motor Work* B RHR Pump Testing* Remove IX04 Low Voltage Station Transformer from Service

. ,niicant Outstanding I-ssue

Date Issue Due Responsibility4/03/04 Repair Blowdown Tank Leakage 4/30/04 Scott Manthei4/04/04 1 P2A Charging Pump Troubleshooting 4/30/04 Clay Hill4/25/04 B RCP Motor Oil 5/10/04 Rick Repshas

* . i. ; .: - v ; . *.;. - ;tt <s Ucom nga oMles ~.Scheduled_:* : Aclual Scheduled . . _-:.Actual .

Date Time Date Time _ Date Time -Date . -TimeCooldown <2000 4/03/04 2100 4/03104 2230 RCS Fill & Vent 4/23/04 1500 _ _ _

Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900

Refueled 4/14/04 0300 Reactor Critical 4/28/04 0800

RV Headset 4/18/04 1900 On-Line 4/30/04 0100

7

Page 8: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

P U I N I 8 t A C H N U C L t A K I' L A N I u):DD Itrway, Aprit 3u, CUU412 WEEK SURVEILLANCES - MANAGEMENT REPORTWITH SCHEDULED DATE AND TECH SPEC DUE DATE

SORTED BY SCHEDULED DUE DATEWE4920.PBNP.TRENDING/PB0071 .OPS.PROGRAMS(TSPECSUI)

SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/30/2004

UNITST URK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE 10% 25% DEFER ACT

PSI 40 0306530 CC-00779 MM SW1 M-RELVLV REPLACE RELIEF VAL 05/07/2003 05/28/2004. 09/30/2003 05/06/2004.05/15/2004 128NSP80 74---0308970 -------------- M-----------EL-LV--REPLACE--RELIEF--VAL--02/13/2004 ---06/14/2004-----11/27/2004 ---02/02/2006.---------PB0 74 0308971 DA-030558 MM 8A1 M-RELVLV REPLACE RELIEF VAL 02/13/2004 06/14/2004 . 11/27/2004 02/02/2006. COW~

PBO 74 0308972 DA-03055C MM 8A1 M-RELVLV REPLACE RELIEF VAL 02/13/2004 06114/2004 11/27/2004 02/02/2006. COIAI

P81 40 0214362 ICP-02.001 IC CW1 P81-l RP AND SG ANALOG T 12/29/2003 03/22/2004 03/29/2004 03/31/2004 04/12/2004.05/03/2004 NO-PX

P81 40 0214363 ICP-02.007 IC CU1 Pa1 POWER RANGE NIS TE 12/30/2003 03/23/2004 03/30/2004 04/01/2004 04/13/2004.05/03/2004 NO-PXP81 40 0214364....C----------IC ------------ RP-AND---G-ANALO --T-01/05/2004 --03/24/2004 -- 04/05/2004--0-/02/2004--------------------------N --P -PB1 40 0214371 ICP-02.001 IC CW1 PB1-3 RP AND SG ANALOG T 01/07/2004 03/29/2004 04/07/2004 04/07/2004 04/19/2004.05/03/2004 NO-PXP81 40 9950082 ICP- --------- IC ...1 -----2 --P-LO--C--TEST ----R-02/03/2004 --03/30/2004 --- 4/03/-- 004-04/05/2004--04---3/2-04.05/-3/ --004 ------

PS1 40 0214375 ICP-02.001 IC CW1 PB1-3 RP AND SG ANALOG T 01/07/2004 03/31/2004 04/07/2004 04/09/2004 04/21/2004.05/03/2004 NO-PXPB ---76 -0215117 ------- APR----2------- CALI--RATE--A-----TE-10/01/2002 --04/01/2004 --05/01/2004--04/02/2004--05/25/2004--08/17/2004.-------

P81 76 02151182 I-02.0 APRI 12 P8-R- CA LOIBRATESTA-0 TE 02/01300 0/200 004005/0/2004 04/02/2004 05/25/2004 08/17/2004.0513200 BEMP

PSI 76 021435122 A 02-001APR C1M A-R U PNDERFREQANCYRLO 010/07/2002 04/01/2004 050/0404/08/2004 05/25/2004 08/23/2004.0513200 8EMPP81 76..021 ..123 --------- APR--M---A-R - UNDER-- R-QUE-CY--REL-10/07/2002--04/01/2004 --05/09/2004 --04/08/2004---05/25/2004--08/23/2004.-------P81 76 0215120 803 APR 1M2 A-R-I CALIBRATE 19-03 TE 109/018/2002 04/01/2004 05/01/2004 03/020/2004 05/25/2004 08/04/2004. 128EMP81 --76 -0301896 ---- EP--- 3-2-----------V-----AS-E----PER----05/08/2001 --04/01/2004 --05/17/2004 ---05/07/2004--07/19/2004--------2---5------

P81 77 0301951 AV-029 EPT 1M2 ARIT-0 STCHCVALVBAEIA0EC 109/201/2002 04/01/2004 05/01/2004 03/22/2004 05/25/2004 08/06/2004. 128EM

P81 7 03019532 CV5204 AEPT IM2 AS-R0 1ST-CHRECKUVALV CL 109/22/2002 04/01/2004 05/01/2004 03/24/2004 05/25/2004 08/08/2004. 128EMP81--77-0301954- CV ---3--- EPT 1M-2 I -T-0---1ST-CHECK --VALVE -CL 09/26/2002 04/01/2004 04/29/2004 ----03/28/2004--05/25/2004-08/12/2004.-------

PSI 76 0216170 A5RE-1ARR EMR M2 E-R1 INSPECTRQAND Y MAIT 10/04/2002 04/01/2004 05/07/2004 04/05/2004 05/25/2004 08/20/2004. 128EM

P90 76 0215148 G-03 EMR IM2 E-RI MONIBRTOR 10 EMR ENC 09/17/2002 04/01/2004 04/06/2004 03/19/2004 05/25/2004 08/03/2004. 128EM

PB1 76 0300803 ICP-0208 IC 3M2 lPT1-l NI- AXIAL X OFFSET CA 51/08/2002 04/01/2004 05/20/2004 05/107/2004 05/25/2004 09/24/2004. 128EC

Pa1 76 0300804 ICV-000295 ICPT M2 PS-01- NISTPOWER RANGLVE 1L09/21/2002 04/01/2004 05/21/2004 04/22/2004 05/25/2004 09/06/2004. 128EN

P81 76 03008053 CV-020304A E IC M2 PS801- INT-CERMDIT RANGE 1L09/10/2002 04/01/2004 05/05/2004 04/11/2004 05/25/2004 08/26/2004. 128EC

P81 76 i03i00807z, 003-02.015 IC 14 P81-01 REACTOR PROTECTIO 109/06/2002 04/01/2004 05/029/2004 04/07/2004 05/25/2004 08/22/2004. 128ENP81--76-0300810 ---C ---------IC 1 ---2 P81-I RP SYSTEM- TRIP LOG 10/14/2002 04/01/2004 05/17/2004 04/15/2004 05/25/2004- 08/30/2004. 1281 C----PB1 76 0300115 ICV-0203837 P IC 2 PST-01 RPSST-CEM AUVATV C 109/06/2002 04/01/2004 05/05/2004 04/07/2004 05/25/2004 08/22/2004. 128EN

Pa1 76 0300812 FICP-BARRIE IC M2 P8-Mi RXSPETRI K AND MITU 10/05/2002 04/01/2004 05/08/2004 04/06/2004 05/25/2004 08/21/2004. 128EM

P81 76 03100813 GC-01.0 E I GI EB-TA2 T 2 SAEGARD ELOGTICAT 106/05/2002 04/01/2004 05/04/2004 040/20 05/25/2004 08/210/2004. C281

PB1 76 03008148 GC-01 E0 I IM P8-8 RPONDISOR ANALOGNCT 09/29/2002 04/01/2004 05/09/2004 03/319/2004 05/25/2004 08/15/2004. 128EM

Page 9: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

P a I N T B E A C H N U C L E A R P L A N T 05:55 Friday, April 30, 2004 *212 WEEK SURVEILLANCES - MANAGEMENT REPORTWITH SCHEDULED DATE AND TECH SPEC DUE DATE

SORTED BY SCHEDULED DUE DATEWE4920.PBNP.TRENDING/PB0071 .OPS.PROGRAMS(TSPECSUI)

SCHEDULED DUE DATE IS LESS THAN OR EOUAL T004/30/2004

UNITST WRK ORD EOUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE 10% 25% DEFER ACT

P81 76 0300815 ICP-02.020 IC IN? P81-RD RP AND SG ANALOG T 09/29/2002 04/01/2004 05/09/2004 03/31/2004 05/25/2004 08/15/2004. 1281CP81--76-0300816---C---2.020 IC --1M2-PB---- RP- AND SG-ANALOG --T-09/29/2002 04/01/2004 ---05/09/2004--03/31/2004-05/25/2004--08/15/2004.----8--PS1 76 0300817 ICP-02.020 IC 1142 PBl-YL RP AND SG ANALOG T 09/29/2002 04/01/2004 05/109/2004 03/31/2004 05/25/2004 08/15/2004. 1281CP81 --76-0300818 ------------- IC ------P -----R--AND -----ANALOG -T--10/14/2002 -04/01/2004 --05/17/2004--04/15/2004--05/25/2004-08/30/2004.-------

Pal 76 0300819 ICP-02.020 IC IN? P81-2L RP AND SG ANALOG T 109/14/2002 04/01/2004 05/17/2004 03/315/2004 05/25/2004 08/30/2004. 1281C

P81 76 0300840 ICP-02.020 IC 1N2 Pal1 OPS AND SGRAOSSOVE 10/04/2002 04/01/2004 05/017/2004 04/05/2004 05/25/2004 08/20/2004. 1281CP8 ---76-0300841 --------------IC--M-------CP--4.29-1 -RP ---INS-09/22/2002 --04/01/2004 --04/27/2004-03/24/2004--05/25/2004--08/08/2004.-------

Pal 76 0300842 ICP-02.020 IC 1M2 PBI-1 ICPP 4.29-2 ORA-3GR 10/15/2002 04/01/2004 05/17/2004 04/16/2004 05/25/2004 08/31/2004. 1281CP81 76 0300843- --CP-04.0 ----IC --M -P81 -- ROD--NSERTION- LIN- -0/08/2002 04/01/2004 ---04/30/2004 --04/09/2004 05/25/2004---08/24/2004.--1---CP81 76 0300844 ICP-04.034 IC IN? P81 CONTAINMENT HYDROG 09/29/2002 04/01/2004 05/101/2004 03/31/2004 05/25/2004 08/15/2004. 1281C

Pa1l7 0300896 ICP-04.028 IC IM2 P81 ZOSVANT CROSSMATRI 10/17/2002 04/01/2004 05/19/2004 04/18/2004 05/25/2004 09/202/2004. 1281CP81--77-0215885----T----O-A 0 -- 1N - -T - IT-OlA, HIGH HEAD- 10/10/2002-- 04/01/2004-05/13/2004 04/11/2004- 05/25/2004 08/26/2004.05/01/2004 ----80PPa1 76 0215886 OITP-0400A IPC IN? PT ITP43A9, RHRPUM AN 09/28/2002 04/01/2004 04/30/2004 03/30/2004 05/25/2004 08/14/2004. 1281C

P81 77 0215857 0ITP-040038 IC 1M2 OTl- IT-3829, LOR HEA R 10/11/2002 04/01/2004 03/29/2004 04/12/2004 05/25/2004 08/27/2004. 1281C

P81 77 0215890 OITP-040028 IC 1M2 PalTO IT-SERTCONT SPRAY 10/07/2002 04/01/2004 05/10/2004 04/08/2004 05/25/2004 08/23/2004.050/041281P

Pa1 76 0215892 -ITP-04090A IC IN? PaT COT-AI NIET 1YATM 109/13/2002 04/01/2004 05/016/2004 04/314/2004 05/25/2004 08/29/2004. 1281C

P81 77 02185089 OIT-03.0 0P IC OT G-1T-201 UISL CLASS1 106/14/2002 04/01/2004 05/17/2004 041/20 05/25/2004 08/309/2004.0610200 80P~P81 77--0215899 -----------A 0 -6--N---OT -I----0A--U---MS-ST- 09/18/2002 -04/01/2004 --05/06/2004 03/20/2004- 05/25/2004---08/04/2004. 1----PPB1 77 02150089 -ICP-19. 0P6 IC N2 Pal SVAT- 1 AFP DATISC 10/12/2002 04/01/2004 05/11/2004 04/13/2004 05/25/2004 08/028/2004. 1281C

P81 70 0215901 0 IT-0290A 0P6 1N2 OT IT-201A, HPIGH HAFP 10/14/2002 04/01/2004 05/16/2004 04/15/2004 05/25/2004 08/30/2004.050/041280P

P81 77 0215909 0-IT-0032A 0P6 IN? OT IT-032A, RCPUMSEAL 09/17/2002 04/01/2004 04/26/2004 03/19/2004 05/25/2004 08/03/2004. 128OP

P81 7 0215910 IT-00330 0P6 IN? OT IT-033, UNIT 1EACON 10/04/2002 04/01/2004 05/10/2004 04/05/2004 05/25/2004 08/20/2004. 1280PP81 -70 0215912 0-IT-O ---OB 0P6 1N2 OT IT--SlO-------SI -TES 10/06/2002 -04/01/2004 05/08/2004 04/07/2004---05/25/2004 08/22/2004. ------P

P81 77 02158913 0-IT-00528 0P6 IN? OT IT-0508, COTSPR8AY 10/01/2002 04/01/2004 05/10/2004 04/02/2004 05/25/2004 08/17/2004.050/041280P

PB1 77 02158916 O-IT-0530C 0P6 IN? OT IT-308C, DRP MIPNI0/3/20 04/01/2004 05/03/2004 040/20 05/25/2004 08/16/2004. 1280P

P81 77 02158917 0-IT-0090A 0P6 1M2 OT IT-530D, LRPT PRTG 109/130/2002 04/01/2004 04/30/2004 04/014/2004 05/25/2004 08/16/2004. 1280P

P81 77 02158918 0-IT-0230E 0P6 IN? OT IT-230EU CLRPATST 10/12/2002 04/01/2004 05/13/2004 04/13/2004 05/25/2004 08/28/2004. 1280P

Pa1 77 02158919 O-IT-0253A 0P6 IN? OT IT-280A, UI CMN SUO 09/24/2002 04/01/2004 05/01/2004 03/26/2004 05/25/2004 08/104/2004. 1280P

Pa1 77 0215922 0-IT-02980 0P6 IN? OT IT-290, UNIT21 PA 109/29/2002 04/01/2004 05/10/2004 03/315/2004 05/25/2004 08/15/2004. 1280P

PBI 77 0215924 0-IT-0300C 0P6 IN? OT IT-300C, UNIREACTOR 10/104/2002 04/01/2004 05/01/2004 04/11/2004 05/25/2004 08/26/2004. 1280P

Page 10: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

P 0 i N T B E A C H N U C L E A R P' L A N I uo:DD rruaoy, APOiL aU, U412 WEEK SURVEILLANCES - MANAGEMENT REPORTWITH SCHEDULED DATE AND TECH SPEC DUE DATE

SORTED BY SCHEDULED DUE DATEWJE4920.PBNP.TRENDING/PB0071 .OPS.PROGRAMS(TSPECSUl)

SCHEDULED DUE DATE is LESS THAN OR EQUAL T004/30/2004

UNIT-S-T UWR-K CRD E-QU-IP ID ---GR-P -FRO CALL-U-P--- D E S C RI P TI O N- ---- L A-ST --- D-UED ----- S K ED----- T S D U E --- 1 lOX,----- 25,% ---- DE F-E R ---- ACT----PBI 77 0215925 0-IT-0740 OP6 1HZ CT IT-740, UNIT 1 MAI 10/08/2002 04/01/2004 05/09/2004 04/09/2004 05/25/2004 08/24/2004. 12801'

PS1 77 0215927 0-IT-0770 OP6 1HZ OT IT-770, Ul SPRAY S 10/07/2002 04/01/2004 05/09/2004 04/08/2004 05/25/2004 08/23/2004. 1280P'P81.77.021604. O-Ts....2 0P6.. IM2..OT.T.-10...U.C. PERS.. NN. ¶0/12/2002...04.0./2..04.05/14/2004 ...04/13/2004 ..05/25/2004..08/28/2004....1280 ..PB1 77 0216005 0-TS-0102 0P6 1M2 OT TS-10, UC HIGH/OUN 10/13/2002 04/01/2004 05/13/2004 04/14/2004 05/25/2004 08/29/2004. 1280P

PSI 70 0216006 0-TS 030. 0P6 IM2 OT TS-30, UNITG1/COWT 10/12/2002 04/01/2004 05/13/2004 04/13/2004 05/25/2004 08/28/2004. 1280P

P81 77 0216007 0-TS 039 0P6 1HZ OT TS-39, UNIT 1 MSIV 10/16/2002 04/01/2004 05/19/2004 04/17/2004 05/25/2004 09/01/2004. 1280P'

P81 7 0305079 PT-RCS-l EPI 1H2 I-PT-RCS-l RCS PRESSURE TEST 01/22/2003 04/01/2004 05/17/2004 07/24/2004 05/25/2004 12/08/2004. 128EN

PB1 76 0214137 RC-00434 MMV 3A2 M-R3 REMOVE AND SHIP VA 04/01/2004.04/09/2004 . 07/19/2004 12/30/2004. 128MMP81 40 0214138 RC------3 ----M-V--H ------- HISTORY--REVIE--A----10/08/2002 --04/01/2004 --04/-9-2004 --04/09/2004--05/25/2004--08/24/2004.-------PB1 76 0214139 RC-00434 L MMV 1HZ M-R HISTORY REVIEW AND 102/05/2002 04/01/2004 04/27/2004 08/08/2004 05/25/2004 12/23/2003. 128MS

PB1 77 0214386 REC 003.1 PRE 1Z RE PRISTARY SYSTEW TNS 102/16/2002 04/01/2004 05/17/2004 04/17/2004 05/25/2004 09/01/2004. 128EM

P170236 REP41 PE[ZR iTA CRTCLT1/16/2002 04/01/2004 05/187/2004 04/17/2004 05/25/2004 09/01/2004. 128EN

PS1 77 0213865 RESP 5.2 PRE 1HZ RE RE TESTS DURING ES 10/29/2002 04/01/2004 05/19/2004 04/30/2004 05/25/2004 09/14/2004. 128EN

Pal 77 0213851 RESP 6.2 PRE 1HZ RE VERIFY RCS FLOW RA 02/11/2003 04/01/2004 05/22/2004 08/13/2004 05/25/2004 12/28/2004. 128ENPsi 76 0301901---RH- EP----A------------------A--E---- PER----04/20/2001--04/01/200 ---05/01/2004 --04/19/2004 ---07/19/2004--01/17/200--.------PB1 76 0301904 RH EPI 3A2 RH-lPT-2 VT-2.ASME XI PERIO 05/203/2001 04/01/2004 05/010/2004 05/02/2004 07/19/2004 01/30/2005. 128EN

PS1 76 0301905 SI EPI 3A2 SI-1PT-2 VT-2 ASME XI PERIO 05/08/2001 04/01/2004 05/17/2004 05/07/2004 07/19/2004 02/304/2005. 128EN

P81 76 0301986 SNUBBERS EPT 1HZ M-R-1 'VISUAL SNUBBER INS 10/05/2002 04/01/2004 04/08/2004 04/06/2004 05/25/2004 08/21/2004. 128EN

PB1 76 0214145 SNUBBERS MM 1HZ M-R-3 INSPECT STEAM GENE 10/13/2002 04/01/2004 05/17/2004 04/14/2004 05/25/2004 08/29/2004. 128MM

P81 77 0407987 TS-AF-001 0P6 1HZ OT DOCUMENTATION OF A 04/01/2004 . 05/25/2004 08/14/2004.P81 -60-0301907 U --C---TA-N-EPI 1 -Z CG*-O--E-N -VISUAL/ULTRASONI---10/02/2002-04/01/2004--04/18/2004-04/03/2004- 05/25/2004 08/18/2004.----8N5

PBI 60 0301908 Ul-CONTAIN EPI 1HZ CG-CKEYINSP VISUAL/UINRSPETONI 109/020/2002 04/01/2004 04/04/2004 03/22/2004 05/25/2004 08/06/2004. 128NS

PB1 77 0301909 Ul-CONTAIN EPI 1HZ CG-VT3GA CONT INSPECTION 1W 10/04/2002 04/01/2004 04/30/2004 04/05/2004 05/25/2004 08/20/2004. 128EN

P81 77 0301910 Ul-CONTAIN EPI 1HZ H-A INSPECT CONTAINMEN 10/04/2002 04/01/2004 04/28/2004 04/05/2004 05/25/2004 08/20/2004. 128EN

Pa1 76 0306921 IICP-02.02 IC 1M2 PBI-STARTU POWER RANGE NIS TE 07/17/2003 04/01/2004 04/30/2004 01/16/2005 05/25/2004 05/22/2005. 1281C

Pa1 76 0300963 I~cP-04.00 IC 1HZ Pa1 AUX FEEDWATER FLOW 09/27/2002 04/01/2004 04/28/2004 03/29/2004 05/25/2004 08/13/2004. 1281C

PsI 76 0300972 IICP 04 01 IC 1HZ PB1 FIRST STAGE PRESSU 09/27/2002 04/01/2004 04/23/2004 03/29/2004 05/25/2004 08/13/2004. 1281C

PB1 76 0300973 IICP-04.02 IC 1HZ P81 REACTOR VESSEL LEV 09/24/2002 04/01/2004 05/01/2004 03/26/2004 05/25/2004 08/10/2004. 1281C

PS1 76 0300976 1ICP04 03 IC IHZ Pai TURBINE VALVE CALI 10/06/2002 04/01/2004 05/04/2004 04/07/2004 05/25/2004 08/22/2004. 1281C

P81I7 0215240 162-A EM 1HZ E-R IHS-2019 AND INS 2 09/25/2002 04/01/2004 05/10/2004 03/27/2004 05/25/2004 08/11/2004. 128EM

P81 76 0215246 62/AOI EM 1H2 E-R CALIBRATE AND TEST 110/03/2002 04/01/2004 05/04/2004 04/04/2004 05/25/2004 08/19/2004. 128EM

P81l7 0301678 62/AD1 EM THZ E-R7 SEVENTH YEAR UV GU 04/01/2004 05/21/2004. 12/30/2004 02114/2006. 128NS

P81 71 0-O2152-47 -2-/-A0-2 - --E-M 1HI2 E-R CALIBRATE AND TEST 10/01/2002 04/01/2004 051/04040/040/2/040/1/04 2EH

P81 71 0301677 62/AO2 EM TM2 E-R7 SEVENTH YEAR UV BU 04/01/2004 05/22/2004 - 12/30/2004 02/14/2006. 128NS

Page 11: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

rUar c .n suL. r LAW., UJJJ I II .Y AO fl.* G..,12'WEEK SU'RV'EILLA'NCES MANAGEMENT RrEPOR.T IWITH SCHEDULED DATE AND TECH SPEC DUE DATE

SORTED BY SCHEDULED DUE DATEWE492D.PBNP.TRENDING/P90071 .OPS.PROGRAMS(TSPECSUl)

SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/30/2004

UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE 10% 25% DEFER ACT

PB1 60 0308967 SI-00840B NM 6A1 M-RELVLV REPLACE RELIEF VAL 04/10/2004 10/01/2005. 11/12/2004 10/02/2005.10/01/2005 H09Al

P91 77 0215777 TS PAM 001 OPI 441 OT MISCELLANEOUS EQUI 03/13/2004 04/10/2004 05/15/2004 04/13/2004 04/13/2004 04/17/204 B3A2

PSI 77 0215811 TS-CONT-00 OP1 1N2 OT CONT 1501 VALVE AN 03/12/2004 04/12/2004 04/30/2004 04/12/2004 04/15/2004 04/18/2004. / 0492

PBI 77 0215852 0-TS-0D3A oP3 441 OT TS-3A, UNIT 1 TURD 03/20/2004 04117/2004 05/19/2004 04/20/2004 04/20/2004 04/24/2004. 1280P

P81 77 0215802 0-TS-033 aP1 4U1 OT TS-33, UIC ACCIDEN 03/23/2004 04/20/2004 04/29/2004 04/23/2004 04/23/2004 04/27/2004. J 1280P

PBI 76 0300396 CHEM-SAMPL CH ACCUM.UNIT UNIT 1 SI ACCUMULA 04/22/2004 04/22/2004 04/25/2004 04/29/2004.~. 805A1P ---40-9950079 ICP --------IC --8-1 ------ RP-LOGIC--TEST---T---02/26/2004 -04/22/2004 --04/29/2004 --04/26/2004--04/28/2004-05/06/2004.-------

PS1 40 03500735 ICP 02.003 IC 8W1 P911 I SG LOGIC TEST- TR 02/26/2004 04/22/2004 04/29/2004 04/26/2004 04/28/2004 05/06/2004. 128NS5

PR0 76 0215479 0-IT-0011 0P2 CWI OT IT-li, P-12A/B SPE 01/30/2004 04/23/2004 05/01/2004 04/30/2004 05/02/2004 05/14/2004. B05Al

PBI 77 0215848 TS-CCW-001 0P3 1M2 OT CC SYSTEM VALVE PD 03/25/2004 04/25/2004 04/29/2004 04/25/2004 04/28/2004 05/01/2004. 90681P90.77 0300196 CHEM-SAMPL CH 141 BAST.BORON BAST.BORON TSR..5. 04/23/2004. 04/26/2004. 04/26/2004. 04/30/2004 04/26/2004.05/01/2004.. 90691........PR1 77 0300402 CHEM-SAMPL CH 141 RCST BORON RCST BORON TSR 3.9. 04/24/2004 04/26/2004 04/25/2004 05/301/2004 04/26/2004 05/02/2004. 90681P92 77--0300482...HEM--A--L-CM-141---CS --ORON -RCS --BORON -SR-3.9.1 --04/22/2004 -04/26/2004 --04/26/2004--04/29/2004--04/26/2004-04/30/2004.---0691P91 77 0300359 CHEM-SAMPL CM 141 RCS CLRO RCS CLROTSR 3.4.5. 04/24/2004 04/26/2004 04/25/2004 05/01/2004 04/26/2004 05/02/2004. 90691

P92 77 0300499 CHEM-SAMPL. CH 141 RCS BORONRCS CLROTSR 3.4.5. 04/23/2004 04/26/2004 04/26/2004 04/30/2004 04/26/2004 05/301/2004. 60691P91- 77 0300372--CHE ---AMPL ---H-141-RC --00 RCS- DO-TSR-3.4.5.1 --04/24/2004 04/26/2004 04/25/2004 05/01/2004 ----04/26/2004 05/02/2004.-- 90691PS2 77 03003512 CHEM-SAMPL. CH 141 RCS DO RCS DO TSR 3.4.5.1 04/23/2004 04/26/2004 04/26/2004 04/301/2004 04/26/2004 05/01/2004. 60691

P92 77 0300551 CHEM-SAMPL CH 141 RES229 RES2C9 ISOTPI 345204/22/2004 04/26/2004 04/26/2004 04/29/2004 04/26/2004 04/301/2004. B0691

P92 77 03005725 CHEM-SAMPL CH 141 SGBDFO RSGDFO GAMM SCAN5. 04/23/2004 04/26/2004 04/26/2004 04/301/2004 04/26/2004 05/01/2004. 906911

P82 770300565 CHEM-SAMPL CM 141 RCS SPE ARCS GROSS ACTIVITY 04/21/2004 04/28/2004 04/28/2004 04/28/2004 04/28/2004 04/09/2004. B0691

P92 77 0300590 CHEM-SAMPL CM 4l RS BRN E29 RUST2 BSORONPSR 3.504/22/2004 04/29/2004 04/29/2004 04/29/2004 04/29/2004 04/30/2004. 4 0691

P90 77 03005232 CHEM-SAMPL CM 141 S8FP OO SFPDBORONMM SRC37. 04/22/2004 04/29/2004 04/29/2004 04/29/2004 04/29/2004 04/301/2004. 50681

PS0 77 0472753 O-TS-0326 0P3 141 OT TEEKLY MICEDRIARYO 04/23/2004 04/30/2004 04/03/2004 04/30/2004 04/30/2004 05/01/2004. 1806P

PBI 77 99166940 IC-T3002 IPC CW1 POT COTAINIET 1YDCOGT 02/06/2004 04/30/2004 04/302/2004 05/07/2004 05/09/2004 05/218/2004. 80681

PB1 77 0302155 TS ECCSAB aP3 141 OT TS1AFEGUARD AIRTLM 04/23/2004 04/30/2004 05/15/2004 04/30/2004 04/30/2004 05/01/2004. 90691

Page 12: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

P,

Run Date 29APR04 13:51 Work Activity Risk Assignment Sheet 1 of 2

U ACT WOT GRP I HPE EQUIPMENT Activity Cal DUR START FINISH APR MAY

ID ST RISK Description ID A C.4-e 4iWd E111 16 0 lo 1 ,60 .1 , .6 tQ8-.6-nIA16

1I CE-1600-22 176 CE8 DR- YML-Y R-1 PERFORM UNDERHEAD U 23 123APR04 30APR04 ::= REACTOR VESSEL AND ASSEMBLYI ORT3-Y R-M INSPECTION OF RX HEAD _ 22:00A 12:59 213472 128CE

1 EM0216638 76 EM DR-N ML-N P-001B-M START REPAIRS FOR P-1 B 1 2 28APR04 29APR04 REACTOR COOLANT PUMP MOTORORT3-N R-M HIGH BREAKAWAY 01:00A 13:59 301756 - 128EM

1 EM-84801 76 EM DR-N ML-N RPI AT HEAD RPI COIL U 10 29APR04 29APR04 =RPI SYSTEM MULfl ANDIOR NON-NUMBERED EQUIPMENTORT3-N R-M RESISTANCE/INDUCTANCE _1Z00- 22.59 215213- 12SEM

1 EM-8480J 76 EM DR-N ML-N R-1 AT HEAD CRDM COIL U 10 29APR04 29APR04 REACTOR VESSEL AND ASSEMBLYORT3-N R-M RESISTANCEINDUCTANCE 12:00 22:59 215214 - 128EM

I EM-BMFP-03 76 EM DR-Y ML-Y P-028B-M P285 REMOVE MOTOR TOP 8 6 29APR04 30APR4 = STEAM GENERATOR FEED PUMP MOTORORT3-N R-M COVER 12:00 08:59 312035 - 128EM

1 EM0216638A 76 EM DR-N ML-N P-001B-M P-1B RE-ASSEMBLY OF 1 130 29APR04 04MAY04 I IREACTOR COOLANTPUNORT3-N R-M MOTOR 14:00 23:59 0301756 - 128EM

1 EM-BMFPCt2 76 EM DR-Y ML-Y P-028B-M CONTINUE P28B INPLACE 8 27 30APR04 03MAY04 = = = = STEAM GENERATOR FEED PUMP MOTORI ORT3-N R-M CLEANING (ROTOR & 09:00 08:59 0312035 - 128EM

I EM0216167 76 EM DR-N ML-N E-01 INSPECTAND MAINTAIN 9 10 30APR04 01MAY04 EJ==TG-01 TURBINE GENERATOR EXCITERORT3-N R-M EXCITER FUSES PER MWP 20.00 20:59 0216167 - 128EM

1 EM0215225 76 EM DR-N ML-N W-004A-M PERFORM MCE W-004A-M U 4 01MAY04 01MAY04 [CONTAINMENT REACTOR CAVITY COOUNG FAN MOTORORT3-N R-M (1B52-317MW1B-31) 05:00 09.59 0215225 - 128EM

1 EM0215223 76 EM DR-N ML-N W-003A-M PERFORM MCE W-03A-M U 4 01MAY04 01MAY04 OCONTAINMENT CONTROL ROD DRIVE SHROUD FAN MOTORORT3-N R-M (1852-3AI18-01) 09:00- 1259 0215223 - 128EM

i EM0215226 76 EM DR-N ML-N W-004B-M PERFORM MCE W-004B-M U 4 01MAY04 01MAY04 [CONTAINMENT REACTOR CAVITYCOOUNG FAN MOTORORT3-N R-M (1B52-318MW1B-31) 10:00 13:59 0215226 - 128EM

0 EM0215146 76 EMV DR-N ML-N AF404021-0 AF-4021 STEM CLEANING AND U 5 30APR04 30APR04 [OP48 AFP DISCHARGE TO 1HX-1B SG OPERATORORT3-N R-M LUBRICATION _0000 04:59 0215146 - 128EM

0 EM0215147 76 EMV DR-N ML-N AF-04023-0 AF-4023 STEM CLEANING AND U 5 30APR04 3DAPR04 mP-38A AFP DISCHARGE TO IHX-1A SG OPERATORI ORT3-N R-M WBRICATION 03:00 08:59 0215147 - 128EM

2 ICZ13RUN 76 ICI DR-N ML-Y ICP-02013 4160 VOLT UVrESTING (4WK) U 1 129APR04 29APR04 4160 VOLT UNDERVOLTAGEORT3-N R-M 08:OOA 12Z59 0 1013 - B06B1

1 IC2.13SDN 76 IC1 O DR-N ML-Y ICP-02013 4160 VOLT UVTESTING (4WKI U I1 29APR04 29APR04 4160 VOLT UNDERVOLTAGEI ORT3-N R-M 09:OOA 1Z59 C 100747 - B06B1

I MM0214052A MM1 DRN ML-Y 001A SESG 1 5 29APR04 29APR04 I ARSTEAM GENERATORORT3N R- 1HADHOLS 0700A 16:59 0: 14052.- 128MM

1 M02662 MV D-NMLN C-0296 CV126 -INTAL NW RIM Y 0 2AP0401MAY04 AUXIUXI ARY CHARGING LINE ISOLATIONI IORT3-N R-M I PER MOD 02-027 I08:OOA 13:59 F21662712M

1I MM0303680 176 |MMV DR-Y ML-Y MS-02005 I1MS-2005 - REMOVE VALVE U I10 |30APR04 30APR04 CMHX-1B SG HEADER SAFETYI__ IIORT3-N R-M TO PERFORM HEADER MOD 00-I00 10.59 0303680 - 128MM

r NMC / WE LT-81 HUMAN ERROR RISK BARCHARTC PBNP U1 Refueling 28 Outage I

O Pnlmavera Systems. Inc.I

Page 13: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

C

Run Date 29APR04 13:51 Work Activity Risk Assignment I Sheet 2of 2

U ACT WO GRP HPE EQUIPMENT Activity | Cal DUR START FINISH MAS AI S T RISK Description 1D0 8 160 t61 0 R

1 MMM0303681 76 MW DR-Y ML-Y MS-02010 1MS-2010-REMOVE VALVE U 12 30APR04 30APR04 =_CHX-1ASGHEADERSAFETYI ORT3-N R-M TO PERFORM HEADER MOD 11:00 23:59 0303681 - 128MM

1 MM0303680A 76 MMV DR.Y ML-Y MS-02005 IMS-2005 - PERFORM MOD 5 48 01MAY04 05MAY04 HX-IBB HEADER SAFETYC___ _ _ __ __

ORT3-N R-M FOR ROUNDED ENTRANCE 06:00 09 59 0303680 - 128MM

2 OP0216033 77 OPI DR-N ML-N O=TS-01AB.1 ITS-A U2C AIR LOCKDOOR 4 2 30APR04 130APR04 UU2 CONTAIR LOCK DOOR SEAL TESTORT3-NR-M SEALTEST 0000 01:59 0216033 - B06BI

2 OP0301626 77 OP3 DR-N ML-N O-TS-004A TS4A.UNIT2TURBINETRIP 3 1 01MAY04 01MAY04 |UNIT 2 TURBINE TRIP TESTORT3-N R-M TEST 16:00 16:59 0301626 - B06B1

I RP1C-030 OPS DR-N ML-N O-RP001C FUEL MOTION AND INSERT 1 29 25APR04 30APR04 REFUELNG_ORT3-N R-M SHUFFLE _ _ 08:OOA 23:59 1280P

1 X04-010 OPS DR-N ML-N X-04 CROSSTIE IA-03 & 1A-04 TO U 1 29APR04 29APR04 0ORT3-N R-M UNIT2 17:00 17:59 1280P

I X04-020 OPS DR-N ML-N X-04 DE-ENERGZE X-04 U 2 29APR04 29APR04 [1ORT3-N R-M 19-00 20 59 1280P

NMC/WE LT 61 HUMAN ERROR RISK BARCHART

OPtimaveraSystems, Inc. PBNP U1 Refueling 28 Outage FL-1 HUMANERRORPOTENtAL

Page 14: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

TEAM CI Pt

511712004Dosition soI Name I Home Phone I Pager# I Cell Phone I Work Phone

Ui DutvEmergency Director Jim Schwietzer 6

Operations Coordinator Tom Staskal 6

Engineering Coordinator Gary Sherwood

Rad/Chem Coordinator Dan Gesch 6

Dose/PAR Coordinator Carl OnestiEOF Manager Mike HolzmanTSC Manager Bill Herrman6

7676

6259

7630

6270

61707651

16213I I I

/Station Duty

ChemistryDCS .Engineering

SEN On-callASME On-callNDE On-callMSE Mech PMTMSE Elect PMT

Maintenance Contact Maintenance Supervisor on shiftNOS

Quality Control ._ _OperationsSecuritySupply Chain . _Radiation Protection _ _ _Reactor EngineeringRegulatory Affairs Lisa Schofield I 6043Work Week Coordinator Rick Varga 6564 El tJ:AShareDataICommonDuty RosterlEvent Response Teamsxis

14

Page 15: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

TEAM C 5/18/2004Position Name Home Phone Pager# Cell Phone Work Phone

ERO Duty

Emergency Director Jim Schwietzer 7676

Operations Coordinator Tom Staskal 6259

EngineeringCoordinator Gary Sherwood 7630

Rad/Chem Coordinator Dan Gesch 6270

Dose/PAR Coordinator Carl Onesti 6170EOF Manager Mike Holzman __7651

TSC Manager Bill Herrman 6213

. ~Station DutvyChemistryDCS .Engineering

SEN On-call .ASME On-callNDE On-callMSE Mech PMTMSE Elect PMT

Maintenance Contact Maintennce Supervisor on shiftNOS . .

Quality ControlOperationsSecuritySupply Chain .Radiation ProtectionReactor EngineeringRegulatory Affairs Vsa Schofield 6043Work Week Coordinate Rick Varga 6564

C-)

t-P

J:%ShareDataICommon\Duty Roster\Event Response Teams.xls

15

Page 16: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

TEAM C 5/19/2004Position Name Home Phone Pager# Cell Phone Work Phone

_ __ ERO Duty

Emergency Director Jim Schwietzer 7676OperationsCoordinator Tom Staskal 6259EngineeringCoordinator Gary Sherwood 7630

Rad/Chem Coordinator Dan Gesch 6270

Dose/PAR Coordinator Carl Onesti 6170EOF Manager Mike Holzman 7651TSC Manager Bill Herrman 6213

Station DutyChemistry |____ ___I

DCS _

EngineeringSEN On-callASME On-callNDE On-call _

MSE Mech PMT _

MSE Elect PMTMaintenance Contact Maintenance Supervisor on shiftNOS

Quality ControlOperations ______

SecuritySupply ChainRadiation ProtectionReactor Engineering _ _Regulatory Affairs Lisa Schofield 6043Work Week Coordinati Rick Varga 6564

J:AShareDatalCommonlDuty RosterlEvent Response Teams.xis

16

Page 17: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

'TEAM C 5/20/2004Position Name Home Phone Pager# Cell Phone Work Phone

ERO DutyEmergency Director Jim Schwietzer 7676OperationsCoordinator Tom Staskal 6259EngineeringCoordinator Gary Sherwood 7630

Rad/ChemCoordinator Dan Gesch 6270Dose/PARCoordinator Carl Onesti 6170EOF Manager Mike Holzman 7651TSC Manager Bill Herrman ._ 6213

_ _ _ _ _. _ _ _ 1 1 _ _ _

Station DutyChemistry . -

DCS .Engineering

SEN On-callASME On-call __ =__NDE On-callMSE Mech PMT . . . -

MSE Elect PMTMaintenance Contact Maintenance Supervisor on shiftNOS _

Quality Control .Operations . . -

SecuritySupply ChainRadiation ProtectionReactor EngineeringRegulatory Affairs Lisa Schofield 6043Work Week Coordina Rick Varga 6 __6564

EX

:lShareDatalCommonIDuty RosterlEvent Response Teams.xls

17

Page 18: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

/g TEAM C 5/21/2004

( Position Name [Home Phone Pager# X Cell Phone Work PhoneERO Duty

Emergency Director Jim Schwietzer 7676

Operations Coordinator Tom Staskal 6259EngineeringCoordinator Gary Sherwood . 7630

Rad/Chem Coordinator Dan Gesch 6270

Dose/PAR Coordinator Carl Onesti 6170EOF Manager Mike Holzman 7651TSC Manager Bill Herrman 6213

_ _ _ _ _ _ _ _ _r_ I I _ _ _ _

Station DutyChemistry _ . _

DCSEngineering . .

SEN On-callASME On-callNDE On-callMSE Mech PMT .MSE Elect PMT

Maintenance Contact Mainten nce Supervisor on shiftNOS .

Quality ControlOperations .SecuritySupply ChainRadiation ProtectionReactor EngineeringRegulatory Affairs Lisa Schofield 6043Work Week Coordinat Rick Varga 6564

E-1

J:IShareDatalCommonlDuty RosterlEvent Response Teams.xls

18

Page 19: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

TEAM C 5/22/2004Position Name IHome Phone Pager# Cell Phone Work Phone

ERO Duty

Emergency Director Jim Schwietzer 7676

Operations Coordinator Tom Staskal 6259

EngineeringCoordinator Gary Sherwood 7630

Rad/Chem Coordinator Dan Gesch 6270

Dose/PAR Coordinator Carl Onesti 6170EOF Manager Mike Holzman 7651TSC Manager Bill Herrman __6213

_ _ _ _ _ _ _ _ _ __ I _ _ _ _

Station DutyChemistry .DCSEngineering

SEN On-callASME On-call ___

NDE On-call .

MSE Mech PMTIMSE Elect PMT _ _ =_==

Maintenance Contact Mainte nce Supervisor on shiftNOS

Quality Control .OperationsSecuritySupply ChainRadiation ProtectionReactor Engineering -L_Regulatory Affairs Lisa Schofield 6043Work Week Coordinatc Rick Varga - . 6564

6

J:IShareDataXCommonIDuty Roster\Event Response Teams.xls

19

Page 20: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

TEAM C 5/23/2004Position Name |-Home Phone Pager Cell Phone Work Phone

ERO Duty

Emergency Director Jim Schwietzer 7676

Operations Coordinator Tom Staskal 6259

Engineering Coordinator Gary Sherwood 7630

Rad/Chem Coordinator Dan Gesch 6270

Dose/PAR Coordinator Carl Onesti 6170EOF Manager Mike Holzman 7651TSC Manager Bill Herrman 6213

Station DutyChemistryDCSEngineering

SEN On-callASME On-callNDE On-callMSE Mech PMTMSE Elect PMT

Maintenance Contact Maintena ce Supervisor on shiftNOS _ _________

Quality ControlOperationsSecuritySupply ChainRadiation ProtectionReactor Engineering _

Regulatory Affairs Lisa Schofield 6043Work Week Coordinatot Rick Varga j ll 6564

J:lShareData\CommonlDuty RosterlEvent Response Teams.xIs

20

Page 21: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

POD Bullet List for PdM group4/30/04

* Sludge in the RCP oil systems. Apparent drop out/ineffectiveness ofadditives in Chevron GST oil.

* RHR IP-O lOB RTS testing scheduled for midnight of 4/3 0/04.

* Change of the lP-029-GOV, AFP governor oil to Mobil 1 (SPEED2003-072) scheduled for 7:00 on 4/30/04.

* Wear debris from IP-O1A, RCP, examined under microscope.

21

Page 22: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

PDM TECHNOLOGIES MONTHLY EQUIPMENT CONDITION REPORTICHAMPS ID SUPPORT DOC. PROBLEM DESCRIPTION STATUS

9130/03 Motor vibration levels in excess of 3.0in/sec after 8 months of stand-by service. WO

2W-040A Tag initiated to repair damaged motor andMain Turbine LO CAP 050552 Motor vibration levels at point of existing WO to balance fan.Vapor Extractor WO 0209028 imminent failure. Fan declared 2111/04 Work postponed due to partsFan WO 0309381 00S. availablity. No reschedule date.

518103 Motor axial vibration increase of 25%noted. Coupling misalignment/degradationpresent. WO to inspect and realign scheduledfor 7/28/031.7/31/03 - Inspection completed. Couplinginstallation error induced unbalance that Isexciting a resonance. Pump returned to serviceat previous levels with CAP and WO issued toIdentify coupling problems.8/29/03 work scheduled for Z-5 work week(11/05/03)12/16/03 -work currently scheduled for A03[week.1/21/04 Work not perfomied as scheduled dueto maintenance resources.2/18104 Declared OOS due to apparent wipe ininboard motor bearing.2/25/04 59 gm-in of residual unbalance foundon coupling end of motor. Balancing reducedthe residual unbalance to approximately 2 gm-In. Uncoupled run of motor SAT followingbalancing. Awaiting return to service and finalPMT.3/6/04 - PMT SAT following replacement ofcoupling and addition of coupling spacers.Remove from list next month.

0P-503Gas Turbine FO

CAP 032707/034456/053947WO 030497910306786

Vibration Identified coupling defectand excessive 1x vibration.

J. A. I

2004 MARCH STATUS REPORT.XLSD YELLOW -PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATEDRED - FAILURE MODE IDENTIFIED. CR AND WO INITIATEI

Page 1 of 5

Page 23: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

ICONDITION ICHAMPS ID SUPPORT DOC. PROBLEM DESCRIPTION STATUS1W-040AMain Turbine LOVapor Extractor CAP 053950

WO 0405914

Motor vibration levels at point ofimminent failure. Fan declared00S.

2/18104 - Fan declared OOS for defective motorbearings3/31/04 - Currently WO is status 10.

1- I V -

3131/03 - Oil analysis results received on 10/8/02Indicate serious degradation Is possibly present onthree of the six gearboxes on the unit 1 polarcrane(lZ-013). The analysis results indicate thatthere may have been a compatibility issue with thesynthetic Mobil SHC 220 and the previous mineraloil. System engineer has scheduled vendor review.1Z-013

Polar CraneCAP 029789WO 0306551

Oil analysis identifies possible crosscontamination.YELLOW

* 4 4 4

3/31/03 - Oil indicates high level of Iron possiblydue to operation with low oil level. WO in placeto resample oil.8/28/03 WO completed 8/21/03. Awaitingresults.11/6/03 Oil samples were in fact collected on6/12103. Those samples indicate that theproblem is with contamination not machinedegradation. Pump will be resampled in Z08work week.02123/04 Oil sample analysis shows that theoutboard bearing is normal for this kind ofservice, but the high iron content of the inboardbearing is starting to show degredation.Vibrations trending upward on inboard bearing,but not at alert levels yet. Submitted new workorder and CAP to track the inboard bearing.The outboard may be removed from the list.

2P-011BCCW Pump

CAP 054114WO 0406032

Oil analysis indicates high levels ofiron from inboard bearing.YELLOW

2004 MARCH STATUS REPORT.XLSRED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED

Page 2 of 5

Page 24: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

CONDITION CHAMPS ID SUPPORT DOC. PROBLEM DESCRIPTION STATUS

4/10/03 - PMT for WO 0303760 identified lowermotor bearing defect in newly refurbishedmotor. PMT failed.

OP-501-M 2/27104 Update - Defect is still present in motorGas Turbine LO CAP 032134 Vibration Identified lower motor bearing but does not appear to be degrading

YELLOW Pump WO 0303760 bearing defect further. Vibration levels are constant.5/19/03 Oil analysis indicates an increase inwear debris In the oil samples. WO initiated tochange oil in the gearboxes scheduled 9122103.

OZ-015 CAP 032963/033609 7/29/03 Added main hoist to scope due to highYELLOW PAB Crane WO 0305393/0305976 Degradation noted in oil analysis. water content.

6/17/03 Vibration indicates large increase in therotor bar pass frequency with associated

OW-068 increase in 1x frequency amplitude. IncreasedCONTAINENT testing frequency to weekly.SPRAY PUMP 9/29/03 Bearings and sheave replaced. PMTAREA COOLING CAP 033598 Vibration identified rotor problems in was UNSAT with vib levels >.6 in/sec. Identified

YELLOW FAN WO 0305967 the motor as eccentric pulley or bent motor shaft.6/17/2003 Oil analysis show jump in main hoistoil sample moisture content from 100 ppm to200 ppm. Not an immediate concern, since acidnumber is still low. Source of water is probablyabsorbtion from atmosphere, since there are no

OZ-015 CAP 033609 High moisture content in oil analysis water or steam lines local to the main hoist.YELLOW PAB Crane WO 0305976 sample. WO initiated to change oil.

7/31/03 - Vibration and oil indicate earlydegradation of pump bearings with an elevated

IP-01OB CAP 029611 Early indication of bearing vane pass frequency. WO to change rotatingYELLOW RHR Pump WO 0305857 degradation from vibration and oil assemble during U1R28.

2004 MARCH STATUS REPORT.XLSRED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW -PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED

Page 3 of 5

Page 25: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

CONDITION CHAMPS ID SUPPORT DOC. PROBLEM DESCRIPTION STATUS7/29/03 High particle counts due to wearparticles as well as advanced additivedepletion. Recommended drain, flush, andchange of oil to mitigate degradation until

0-K-004D rebuild is completed. 10/29/03 Oil change andG-04 Diesel Air resample complete. Oil condition moved upStart CAP 034113/ 034461 Oil analysis Indicates high particle from critical, and will last until the rebuild WO is

YELLOW Compressor WO 0306503/0360779 counts. performed.

IRDC-LOGIC Thermography found dead 9/1/03 Thermography identified cold RI resistorPower Cabinet CAP 049786 suppression circuit in the one in A37 supression circuit. Work order is to

YELLOW I BD WO 0307357 thyristor phases. repair condition at next outage.Oil analysis results show that

0-K-004A compressor has high particleG-01 Diesel Air counts, high dissolved iron content,Start CAP 051807 corrosive wear, and black and red 11/14/03 - Oil changes scheduled until overhaul

YELLOW Compressor WO 0310212 oxides. can be performed.OK-004C 9/30/03 Oil sampled for the first time in almostDiesel Starting CAP 050532 Extreme high particle counts and 2 years and badly in need of replacement.

YELLOW Air Compressor Tag 202177 iron content. Overhaul also to be scheduled.Oil analysis results show that

0-K-005A compressor has high particleG-01 Diesel Air counts, high dissolved iron content,Start CAP 051807 corrosive wear, and black and red 11/14/03 -Oil changes scheduled until overhaul

YELLOW Compressor WO 0310211 oxides. can be performed.OK-005C 9/30/03 Oil sampled for the first time in almostDiesel Starting CAP 050532 Extreme high particle counts and 2 years and badly in need of replacement.

YELLOW Air Compressor Tag 202179 iron content. Overhaul also to be scheduled.01/19/2004 - Workorder submitted for oilsample and filter dissection. Recommended

OP-0351-E Oil analysis shows high particles, overhaul.Diesel Fire CAP 052967 iron, molybdenum, copper, 03/02/2004 Oil sample taken and filter changed

YELLOW Pump Tag 203303 manganese. out for dissection.2004 MARCH STATUS REPORT.XLS

RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED

Page 4 of 5

Page 26: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

CONDITION CHAMPS ID SUPPORT DOC. PROBLEM DESCRIPTION STATUS02/23104 - Item identified via CAP and identifies

G-01 need for MR 01-127 installation to correctEmergency CAP 054116 Vibration analysis shows binding In problem.

YELLOW Diesel Generator WO 9947398 gen. bearing fit.

3/6/04 - Axial movement in van-drive noted byOPS. Vibration data Indicates low level axial

1P-002C CAP 054558 Visible axial movement of varn-drive impact related to movement. WO submitted toYELLOW Charging Pum WO 0406232 output shaft and gearbox Input shaft correct Issue per 12 week process.

OP-217B 3/8/04 - Routine vibration data indicated a stepG-02 LO Circ CAP 054576 Coupling defect/distress noted in increase in coupling related vibration. WO

YELLOW Pump WO 0406273 vibration signature issued to repair/replace coupling and align.

3/15/04 - OPS reported motor as being noisy.OW-029 Vibration data collected indicated that theSSB Air CAP 054787 problem was belt related and not an Issue with

YELLOW Conditioner Fan WO 0406899 Motor reported as noisy by OPS the motor. WO initiated to correct belt problem.

3/26/04 - routine vibration data collection noteda step increase in gear related vibration on thespeed increaser. WO was initiated to do visualinspection during U1R28 and add sheet has

1 P-028A been routed. Additional inspections will occurSGFP Speed CAP 055137 Increased gear related vibration on 1P-028B during U1R28 and both unit 2

YELLOW Increaser WO 0407389 levels noted gearboxes will be inspected during U2R27

2004 MARCH STATUS REPORT.XLS

RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED

Page 5 of 5

Page 27: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Sheet 1 of 5,muuI gudi 29AI-RU4 16:131 WO STATUS <75ACT is wo JGRP nI -EQUIPMEN Activiy WWSC .,START. FINISH I

ID: T ST DeSCrpin. . .. 2

.E371 7 E1 -0 -0 ELC ATR 10A 11A14I01N1 TRS !F1EW !D E OW.20 45 TV-PF~FRDI

.M

SOLNOI 0700 4:5

____________________NMC IWE LT-87 <75 At Risk BARCHART

C P mveMWAstmsI* PBNP Unit I Cycle 29IUnit 2 Cycle 27 FL-87 (75 Wo Status

Page 28: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

flu I LOOM £YAVKU4 lb:1J1 WO STATUS <75 Sheet 2 of 5

ACT Rik WO GRP ni EQUIPMENT Activity WWSC START FINISH gI

ID T ST ..Descriptlon |191 i I I I 1 EMT

E '/-..,;t;-v17, e~g. , ,> ;t- ; -" ,,,wt-v.s ,..j..1_-;;r~¢4~-

EM0310314 M Z 71 EM 0 271-02 27I1-02 LOWER UW 81081 26MAY04 26MAY04 .PR, . O., 5EPATO 3 uRIi'E ' W R. 06e12MViSETPOINT 07:00' 10:59.IEIMtMAlEER PTEfLlI

. ii)5 AT RISK.-jU. IC 4/1304H ENWALK WN&,.DLVR TO WCC RE DAVE C ARBIA..

.EMRSUCES. 5 5.

EM0310315 M 71 EM 0 27/1-01 2711-01 LOWERUV 81081 26MAY04 26MAY04 . ... .. O. , , 5 i P u, H I NP ' 1' Opq 12PDSETPOINT 11:00 14:59 . , . ...... . I IM .A n

III RMSKMUM FLg4I30T4 FEE0WALXP 0 &I:

.,.. ;.... .... IVET9V^. M :D V L ¢41;DM j4 IE, ',,__ __ _ .LI159i. 5IIj ,

DEL Eft.70WCM RE: DAVE ~RI.~~EM RESOURCES::.I

EM0310316 M 71 EM 0 27)4-03 271D-03 LOWER UV 81081 27MAY04 27MAY04 ..... .... E, .,., R... ..A. E0-d3F-0d6 I .

: :: : :: : :: : :: : : :: 4 60:E C K mI. EftAbCNE FrO BdtAit CFEUit |-36:i

SETPOINT 07.00. 10:59 i M HtJM F .I: E: bI W . i IA ,, ISK. T UgTh 430?~ 04EED WALK OWN &

::ELIV.ER TO WCF : RME 0A)RCIA:

* _ _ _ _ *_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I _ _ _I' _ _ _ _ _ * I ''* I & ,''*I

EM0310317 M S 71 EM 0 27A0-04 27)1-04 LOWER UV BEB10B1 27MAY04 27MAY04 L 4SETPOIT 11:0 14:59PRI 3 QPERATCI ~g QRPgEN QVV4 Q.Q3 I.P96 12VD-

TSTipi~ 11:00- 14:59 . , ,*i**ii | @ ',RF E OR ,QY~tWtEPOVTEN~l, AL |

ET_ 113014 .EM ES OURCEZ

) AT:RISKTV U ML4/30704 EEDW*AUk OWN&kD-9.E~ RTbW JR'E.:bA EGARCIA:

EM0301804 R 'S 71 EM 0 D-105 STATION BATTERY SERVICE 610831 28MAY04 01JUN04 -~ Tll N~lI. NEED WAL.KDOMTEST 00:00, 23:59 IsJ~~ Q .. REDV GVi

:DU :-20N 5114 NErzQ: Q0/Lf0 46,i0941

C

_ I NMC I WE LT-87 <75 At Risk BARCHARI__ 0 DAMID 1 ;+ I..16 of oifll 13*4 7 01,y I FL-8T <75 Wo Statu

rI

O Primavera Systems. Inc. I%JlllL I %AYLlt7 AWW111111L A %.PYL.Itl AI

I

Page 29: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

n~unl vate 29APRO4 16:131 WO STATUS <75 Sheet 3 of 5

. I tlIACT -Rsk WO GRP n EQUIPMENT Activity WWSC START FINISHrID TST Descriptlon , I1t l

- _E II~~i 1 . - ...J...-11 ... " . . - - . I .. .... .. �,V,- , � - '.APS�� i I , ".1 �, i. " r ,,- 1.. ,. , -1 i-1� -T, w �W,, .1'y;,-,--:-�-,, 'Ive,�---'i. I y . , ;�,,., - - , I .", I � �;,:,

AP0307284 - P 71 APS 2 X-01-A COOLING SYSTEM B11A2 01JUN04 03JUN04I INSPECTION/CLEANING 07:00' 10:59

AP0309630 - 04 APS 2 X-01 2X-1 REPLACE FAN GUARD B11A2 01JUN04 01JUN04HARDWARE 07:00' 14:59

AP0305903 - P 71 APS 1 X-01-A DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0407:00- 07:59

AP0305904 - 71 APS 1 X-01-B DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0407:00' 07:59

AP0305905 - _ 71 APS 1 X-01.C DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0407:00- 07:59

AP0305906 P 71 APS 2 X-01-A DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0409:00' 09:59

AP0305907 P 71 APS 2 X-01-B DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN04

I 09:004 09:59AP0305908 P 71 APS 2 X-014C DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN04

09:00. 09:59

AP0305909 - P 71 APS 1 X-02 DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0410:004 0:59

AP0305910 p 71 APS 1 X-03 DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0410:00' 10:59

AP0305911 - P 71 APS 1 X-04 DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0410:00' 10:59

AP0305912 P71 APS 2 X.02 DISSOLVED GAS IN OIL B11A2 02JUN04 02JUN0413:00* 13:59

AP0305913 - P 71 APS 2 X-03 DISSOLVED GAS IN OIL 1A 02JUN04 02JUN04B1A113:00- 13:59

AP0305914 'P 71 APS 2 X-04 DISSOLVED GAS IN OIL B11A21 02JUN04 02JUN0413:00' 13:59

:SCHDL O0PTIMAPUE1I20P4 05174 NEED: 2Q04/DI9'L

IJtiE:2b64 6i6 NE]Eb t/bd 91

SCHEOUL EDOPTIMAL LY:

DUE12O 06101 NEED00416119 L

IitC21 661. Lpmt Y

PUF-12PQ4 0$/9j NE ED Q041.6Ii

:SCHtEDULE briADUE.:20 SltPED0161:

9CHEDU E bPI11MAILH0UE:2bd 0e/0 NEED 9:/01.9

SCHgEQI E POPTIMA VyDLF1204)601NEED: t04106l419.

SC6itbth : bofnMAt -VDIU]E 2b )61biI4NEb:.604/06119:L

:SCHEOUL -DOPTIM)U.E'2 S1QINE)ED2004IM619:1

:SCHEOUDPlDjUE2 2 )W01 NEED: 004/06119:L

.8CH~b50L -b WIMAb~UE:. 2b406 NE)Eb 6oM0919

DPUE2 ~ /4NEED 901M)619 L

TE2004/07JI

kOb.i~k 7 J C

kTE:2004JOJi

AP0305895 P 71 APS 12 X-01-B COOLING SYSTEMINSPECTION/CLEANING

B11A2 03JUN0411:00

07JUN0414:59

. .

- NMC I WE LT-87 <75 At Risk BARCHARI- I I .I , ... n . _ E'.9 I FL-87 <75 Wo Status

0 Primavera Svstems- Inc. IVr 21117 LIIIEL I %LY UItU £4 IL iIIL 4 %.,YtUIt A I

Page 30: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

_________ .0:1.31WCO STATUS <75 Set 1

ACT, Risk WWO GRP ~nIj EQUIPMENT I Activity IWWSC START IFINISH MAY UID__ __ _ STDescrIption

BM0214502 - 'P70 BMS 0 VNCR lOBTAIN SYSTEM AIRFLOWS BI 1A2 i 0JUN04 03JUN04 .H. ... EAN SLA... DRIL OKI 70 49Wit LNEED TO SWAP W-1 3B To B2ANE W-13AI TO k

SC EULE 0F TIMALLYCE90963 .___________I ________________ IDU 2:~004/Ova RtEDJ:2 7/07 LAT1E 2 0040b813'0:

C9063I N10C 0 SSB ISSB3 REPAIR INDUSTRIAL 13I1A21 01JUN04 07JUN04 :U UMBERED RE BARRI RBETVWEEt SSB & 44!__ _ _ _ _ _ _ _ _ _ _ FIRE BARRIER 07:0__4_5

EM0309381 C71 EM 2 W-040A 2W-40A-M REPLACE MOTOR B1IA2 01JUN04 01JUN04 blttSDJ /I/4i& No (r6M ihUlZ TO EVALJAAND FAN BEARINGS 06:0' 1:59AN3 Nbtki WITH LiANNINd cN 1I'M WOF K

EM0406383 P 71 EM 0 D-305 INSPECT CELLS FOR B11A2 01JUN04 01JUN04 :.$CHiuQpEETLYE07:00- 07:59 :.L304S3 ED 0I~Q~T:2004m!06

EM0406482 H 'P 71 EM 2 P-025A-M E-MAX ANALYZE MOTOR B11A2 01JUN04 01JUN04.i i HMJ nur

(A211A0)07:00- 08:59 :..IIAS'Tj EFEVbCiIJC 9HHsC)-IEb1) b b~IMAA LY .

EMD407649 'P 71 EM I H-04 ENERGIZED PARTIAL B11A2 01JUN04 01JUN04 $SCI-EDO DOPTIMA LYDISCHARGE TESTING 0700t259DE2D04 SnQ. NEEV:200417JQ5'L kTE:0W 08

EM0406413 p71 JEM 2 D-205 INSPECT CELLS FOR BIA2 01JUN04 01JUN04 :SCHEDUL DOPTI1MAL LY:EETOYE08:00 08:59 DUE!200 5/31 N~EED: 2004/06102:1 TE:2

EM0406483 H P 71 EM 2 P-02513.M E-MAX ANALYZE MOTOR 811A2 01JUN04 01JUN04 i Ii- 1? EF RO 0 M 3(2AS2-3212A-02) 09:00HI10 59.. A P~ERF.ERRRAOITifdNll

::: :~~~CHEOU E QPPTpwIj.y::

EM0408487 H 'P 71 EM 2 P-028A-M E-MAX ANALYZE MOTOR B11A2 01JUN04 01JUN04 : .. JIII iiiliph RH ibIk RPO Ei~iik i(2A52.23/2A-01) .. : 1:59SCHEDU.)ODPTIMAL Ly:

OUE.12 I080 NEED. 004$7/251 TE:20O4/0I

EM0407845 P71 EM 1 X-04 ENERGIZED PARTIAL BI1A2 01JUN04 02JUN04 :SCHEDULDOIM VDISCHARGE TESTING 13U002145590 PNEEDLy 00i70 TE.. .0.4.0

I)UEi2 513 N {D2L4 10: TE:2004illEM0301 801 'P 71 EM 0 B52-DB50-006 BREAKER MAINTENANCE B11A2 02JUN04 04JUN04 IB.1

PER RMP 9303 AND 07:001 14:59 :ALVrpWr 0'IS4zm $HEU001 L

EM0309076 'P 40 EM 0 D-105 STATION BATTERY INSP BI 1A2 02JUN04 02JUN04 WILB iOU TI' TOE -105 BATr. FEPLACEME1PER RMP 9046-1 07:00' 09:59 IELAD. ::: :;::::

S DILbb lkjML'Y

IJI E 2064)0/O kiztb:~o M/2l-Ati Ob4/06I06

NMC IWE 1LT-87 <75 At Risk BARCHART

OrmvrSytm.icPB3NP Unit I Cycle 29IUnit 2 Cycle 27 jFL-87 <75 Wo Status

Page 31: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Run Vate 29APRO4 16:131 WO STATUS <75 Sheet 5 of 5 I

C

ACT' jR-W WO GRP nIj EQUIPMENT I Activity IWWI IIHcAID, T ST Descriptlon

EM0406488 H p71 E 2 P-0288M E-MAX ANALYZE MOTOR B11A2 02JUN04 0JN4:

(2A52.30I2A-02) 07:00' 08:59 :.CI FlDUIJ- MA1 j P0 F R Q Q t.IDUE2004, 3601 NEED: 04/07I25: TE2004I10 14

.ityEM0308D42 P 71 EM 2 P-002C-M MCE ANALYZE MOTOR 81 1A2 03JUN04 03JUN04.:; SCHEDUL : EALY.AUTj(2B52.28A/2B-04) 07:00' 09 59 DJUE-.2b4 9§103 NEED LoId~ kTE:2p0b101

EM0407647 p 171 1EM 12 1 X.04 ENERGIZED PARTIAL 811A2 03JUN4 0JN4SCHiEDUO D PT1M4LVDISCHARGE TESTING 07:00 08:59 :IjUlE2bd4 0S I3 NEED42604I1t) 51T 200408 8

1C0400573 R C12132 1 TIC-03100 12TIC-3100 B1A 1U0 1JUN04 :.!ATh SK:' MAYA fLANN4INO LEFYI-IILBINGTROUBLESHOOTIREPAIR 000 14:59 .

1C0400574 JR C 72 I C5 12 1 TIC-03101 2TIC-3101 CONTROLLER B11A21 01JUIN04 01JUN04 '"A:TR sk.-, MAY, tLAWNII4 jt&J4ELFW idNOTWVORKING 07:00' 14:59

MM0310395 P73 MM 0 HX.055B-2 GL 89-13 HXfOPEN. CLOSE B11A 01U0 1U04 SHD Pi

AND CLEAN 07 00 14 59DU i04 05 3 NEE D 00 10 10 kTE:2004 0

MM0310580 R T 71 MM 2 RD-05975 2RD-5975 RUPTURE DISC 811A2 01JUN04 01JUN04 PI

CH-ANGEOUT 07:00 14:59 PRR: T LE.j P009DO tiOT M )VS WITHOL FIRST D15CUSSING ITTOM KENE ALL PDJS1Ji"AT RISII *'MAY 3 AKIOWN

MM0311872 R - 71 MM 2 HX-018B1 2HX-1881 LEAK ON HX-18B1 BI1A2 01JUN04 01JUN04.. -AT1FIS'K'-M'A'Y lWM-Aikcoo_ _ _ _ _ _07:00 14:59 I i H

MM0400059 R -Z 71 MM 2 MS-00263 2MS-263 VALVE LEAKS BY B1IA2 01JUN04 01JUN04ATS1Ai LID07:00 14.59 0

MM0211168 R C 71 MM 2 T.026 2T-26 REPL MANWAY B11A2 01JUN04 01JUN04 .'A II<AYWKQGASKET 09:00' 16:59 I

MM0400060 R C 1711 MM 2 T-058C 2T-58C STABI1LIZERZ NOISY B13IA2 03JUN04 03JUN04 :W, TISI(MAYDAU0DWN_ _ _ _ - --- 07:00 14:59.

MM04DD623 R 71 MM 2 P-002C 2P-2C SEAL LEAKAGE B11A2 03JUN04 03JUN04 "'- T:RISK-t M YW?4IKDIW07:00 14:59

MM0407306 R Z 71 MM 2 P-029-T 2P-29.T SAMPLE & CHANGE Dl 1A2 03JUN04 03JUN04 t'f RISK 'M kY3 WALKD 3WN:OIL BEFORE PUMP RUN 07:00 09:59 I

MM0407307 R - 71 MM 2 P-029-T 2P-29-T SAMPLE & REPLACE BII1A2 03JUN04 03JUN04 TRS V3AKc ow~iOIL AFTER PUMP RUN 15:00 17:59I

TG04DTG112 SERVICE ISEN FLAMMABLE STORAGE8113A21 01JUN04 01JUN04 : SCHEDIJ O1MA V .....1 I . . 1LO C K E R IN SP 07:00' 08:59 D U E ;20 0 06 I NE~E D 2004M/0610 : T 2004 /06 3

NMC_______I____WE_____LT-87 .c75 At Risk BARCHART___A."_P___UnitICyle_29__ni_2_Cycle_2 FL-87 <75 Wo Status

Page 32: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

All Excellence Plan Commitment Action Steps Due Within 30 Days

tTrack Stoe Owner Start Date Due Date

AmisesmentOP-104'11

OP-10-1 1.3.D

OP-10-11.4.C

Improve Effectiveness of Self AssessmentsPerform on effectiveness review of siteleadership observation programs.

CA028467 Purcell, J. 2)15/2004 5115/2004

Purcell, J. 411512003 5U1512004

Commitment

CommitmentPerform benchmarking effectiveness review. CA028465

OP-l-1Ol 1.5.F Develop a process for site leadershipreview of completed self-assessments.

CA030635 Purcell, J. 1112)2004 5115t2004 Commitment

Total # of items for Assessment

BusIness Procedures:3

OR-01-004OR-01-004. 19

Individual Behavioral ExcellenceBegin review of department indicators atManagement Review Meetings.

CA054880 Breene, T. 4/1312004 51712004 Commitment

Total I of Items for Business Procedures

Emergency PlanningOPO9-004 Upgrade Emergency Action Levels (EALs)

OP-09-004.8 PORC approval of EAL upgrade changes. CA052689

:1

Schwartz, P. 4115J2004 5)21/2004 Commitment

Total S of tems for Emergency Planning

Engineering Design:1

OP-14-001

OP-14-001. 11

OP-14-001. 12

Improve the Configuration ManagementProgram

Implement fleet standards for modificationcloseout (Objective 2).

Interim Effectiveness Review (EFR).

CA030747

EFR030748

Marean. J.

Holt, K.

512012004 Commitment

5/20/2004 Commitment

Total U of Items for Engineering Design

Engineering Design Configuration Management (and Q.LIst Items)OP-14-007 Updated Vendor Technical Information

Program (VTIP)OP-14-007.8 Review andaddress Issues Identifiedin the CA055685

VT/P self-assessment end In CA000248,CA001634, and CA002968.

: 2

Holt, K. 4/1512004 5/2012004 Commitment

Total I of eIems for Engineering Design Configuration Management (and Q-Ust Items)

Engineering Processes

OR-05-008 AFW Root Cause Evaluation (RCE)Corrective Actions

OR-05-008.2 Develop an effectiveness review plan and CA055859schedule.

:1

Peterson, L 4115/2004 511112004 Commitment

: 1Total U of Items for Engineering Processes

Performance AssessmentOR-01-004

OR-01-004. I8Individual Behavioral Excellence

Begin Monthly group/department/site rollups CA054879with month of March.

Hennessy. F. 4/11/2004 412912004 Commitment

Printed: 412712004 2:31:17 PM Page 1 of 2

33

Page 33: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Point Beach CAP ActivitiesDelay of Game Clock

Friday, 04/30/2004

1.Day since(Last Reset: PME I

last fumbled itemPlant Electrical Maintenance)

2 Day ssince last Unassigned item(Last reset: BS Business Supply Chain

WAhJ

.' t,4X. 6 ____ It ,I ~

Et t-j T1. t 91 5.,2s vtU. I, , vmUA- ~ ~we '4's

34

Page 34: Point Beach Nuclear Plant · TechnicaI cl' SpecificationTAction Conditions ; 4 Item Unit Condition Out of Service Length Tech Expires Responsibility . Equip (Hr/Days) Spec Expected

Committed to Nuclear N Miq iC.jExcellence , :. A

Plan of the Day Meeting8:15 - 8:45 am

Front Office Conference Room

"Do the job right the first time. "

Plan of the Day MeetingAction Register

Short Term Actions (<7 days)

Responsible Department Manager will provide weekly updates at POD Meeting on Monday, Wednesday,

and Friday.Entry Date Action Description Due Date Owner

4/23/04 Discuss with all groups the Confirmatory Action Letter 4/30/04 All Managers4/23/04 Review degraded (caution) NRC performance 4/30/04 Jim Connolly

indicators and establish single point of accountability,with recovery plans

Long Term Actions (>7 days)nsible Departm nt Manager will provide weekly updates at P D Meeting on Friday.

Entry Date Action Description Due Date OwnerRespo

_ _ _ _ I _ _ _ _ _ __ _ _ _ I _ _ _ _ I _ _ _ _

35