Upload
lionel-leo-green
View
229
Download
1
Tags:
Embed Size (px)
Citation preview
PM_WO_310 Components v4 1
PM ComponentsPM_WO_310
PM_WO_310 Components v4 2
Course ContentCourse Content
• Introduction
• Unit 1- Components Process
• Unit 2 – Editing Components
• Unit 3 – Documents and Approvals
• Course Summary
PM_WO_310 Components v4 3
Learning ObjectivesLearning Objectives
• Upon completing this course, participants will be able to:
Understand the PM components process through the work order
Enter requests for materials on the components tab to generate through the work order
Enter requests for services on the components tab through the work order
Change components on work order
Cancel components on work order
Attach documents to a work order
PM_WO_310 Components v4 4
Prerequisites and RolesPrerequisites and Roles
•Prerequisites
PM_UK_100 Plant Maintenance IRIS Awareness & Navigation
PM_WO_300 Work Orders
•Roles
PM Users
PM_WO_310 Components v4 5
Unit 1Unit 1
ComponentsProcess
PM_WO_310 Components v4 6
Unit 1- Components Process Unit 1- Components Process
• Maintenance Process
• Components Process
• Stock, Non-Stock, and Non-File materials
• Enter Requisitions for Materials/Services
• Find Vendors
PM_WO_310 Components v4 7
Materials and InventoryMaterials and Inventory
• Materials Management Inventory will be replacing Stores Inventory Systems
• On-shelf inventory will be minimized
• Moving toward “just –in-time” inventory (parts will be requisitioned daily)
• Moving away from ProCard being used for materials; instead, contracts will be set up
PM_WO_310 Components v4 8
Materials and InventoryMaterials and Inventory
• There will be stock, non-stock, and non-file materials
• Materials may be planned (used on a routine basis) and unplanned
• Stock and non-stock will be identified by 6-digit numbers in IRIS
PM_WO_310 Components v4 9
Components ProcessComponents Process
• Components can be selected in several ways:
A search may be performed to find the part number
In the future, the Bill of Material (BOM) may be used to suggest part numbers, if it has been entered for the building, room, or equipment to be maintained
In the future, if the BOM has been created, include the Task List on an order also will include any materials on that Task List
PM_WO_310 Components v4 10
Planned MaterialsPlanned Materials
• Planned stock materials result in a Reservation being created in the Storeroom
• Planned non-stock materials/services result in a Purchase Requisition being created
• Planned text items are instructions/comments about the materials required for a work order, such as a note to bring a ladder or supplies
PM_WO_310 Components v4 11
Unplanned MaterialsUnplanned Materials
• Unplanned stock materials may be issued directly to a work order
• Storeroom MM Techs will issue the materials and charge it to the work order number
• The name of the person receiving the materials is recorded
PM_WO_310 Components v4 12
Search for ComponentsSearch for Components
• By Description
The description is often used to search for maintenance orders
Asterisks can be used as “wildcards” in a search, to let you search using partial information
Examples: *bearing* will find all materials with “bearing” in the
description
*filter*16* will find all materials with “filter” and “16” in the description, such as Filter, Air, 16X20X1
PM_WO_310 Components v4 13
Search for ComponentsSearch for Components
• By Bill of Materials (BOM) – Future Use
BOMs are parts lists that may be created for any Building, Floor, Room, or Equipment
BOMs list the parts frequently used to maintain that item
Parts may be directly selected from the BOM
BOMs can help plan work orders quickly
PM_WO_310 Components v4 14
Search for ComponentsSearch for Components
• By Task List (Future Use)
Task Lists are maintenance procedures which include parts and labor
These may be created for any Building, Floor, Room, or Equipment
Including a Task List on an order will also include any materials on that Task List
PM_WO_310 Components v4 15
Stock & Non-Stock MaterialsStock & Non-Stock Materials
• Stock Materials
Parts which have IRIS material numbers and are kept in Central Stores
• Non-stock Materials
Parts which are used less frequently, have IRIS material numbers, and are ordered as needed
PM_WO_310 Components v4 16
Enter ComponentsEnter Components
Type the Type the Order number Order number
and Press and Press EnterEnter
PM_WO_310 Components v4 17
Enter ComponentsEnter Components
Click on the Click on the Components Components
TabTab
PM_WO_310 Components v4 18
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
Click on the Click on the Possible Possible
Entries icon Entries icon to searchto search
The Material The Material Search box Search box will openwill open
PM_WO_310 Components v4 19
Click on the Click on the Tab List iconTab List icon
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
Several search Several search tabs may be tabs may be
useful for useful for finding the finding the componentcomponent
PM_WO_310 Components v4 20
Enter the Enter the description description
or part of the or part of the descriptiondescription
Click on the Click on the Continue Continue
iconicon
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
PM_WO_310 Components v4 21
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
Double-click Double-click on the on the needed needed materialmaterial
PM_WO_310 Components v4 22
Enter the Enter the quantity quantity requiredrequired
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
PM_WO_310 Components v4 23
For both Stock and Non-Stock For both Stock and Non-Stock items, the UM (Unit of items, the UM (Unit of Measure), IC (Item Category), Measure), IC (Item Category), and SLoc (Storage Location) and SLoc (Storage Location) will defaultwill default
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
PM_WO_310 Components v4 24
When you have When you have finished adding finished adding
Components, click on Components, click on the Save iconthe Save icon
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
PM_WO_310 Components v4 25
Non-File MaterialsNon-File Materials
• Non-File Materials
Parts which are used less frequently, do NOT have IRIS material numbers, and are ordered as needed
PM_WO_310 Components v4 26
Enter Components – Non-FileEnter Components – Non-File
Click in the Click in the Description field Description field
and enter a and enter a description of description of the needed the needed
materialmaterial
PM_WO_310 Components v4 27
Enter the quantity of components, Enter the quantity of components, unit of measurement, and the item unit of measurement, and the item category (N for Non-stock). The category (N for Non-stock). The SLoc (storage location) for the SLoc (storage location) for the delivery will default to Central delivery will default to Central StoresStores
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 28
Press Enter or Press Enter or click on the click on the
Continue iconContinue icon
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 29
When the boxes When the boxes appear, click on the appear, click on the Continue icon in the Continue icon in the first box to close itfirst box to close it
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 30
• Requirement Quantity – defaults from what was entered on the Components tab
• Price – estimate of the cost
• Material Group – PM000001 for PM Non-Material Master Material, PM000002 for PM Non-Material Master Service
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 31
• For Services – Enter PM000002 in the Material Group field
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 32
• Purchasing Group – will default to 000/UK00 (000 = Work Order / UK00 = Purchasing
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 33
• Goods Recipient – who receives the goods
• Requisitioner – who is requesting
• Unloading Point – where goods are delivered
• Vendor Material Number – plus additional description of the material (model, size, color, etc.)
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 34
Click in the Vendor Click in the Vendor field, then click on the field, then click on the Possible Entries iconPossible Entries icon
Find Vendors – Non-FileFind Vendors – Non-File
PM_WO_310 Components v4 35
Click on the Click on the Tab List icon Tab List icon in the upper-in the upper-right cornerright corner
Find Vendors – Non-FileFind Vendors – Non-File
PM_WO_310 Components v4 36
Click on UK Click on UK Vendor Vendor SearchSearch
Find Vendors – Non-FileFind Vendors – Non-File
PM_WO_310 Components v4 37
Enter the name or Enter the name or part of the name for part of the name for the Vendorthe Vendor
You can use You can use wildcards (*) in your wildcards (*) in your searchsearch
Click on the Click on the Continue iconContinue icon
Enter Components – Non-FileEnter Components – Non-File
PM_WO_310 Components v4 38
Double-click on Double-click on the Vendor’s the Vendor’s namename
Find Vendors – Non-FileFind Vendors – Non-File
PM_WO_310 Components v4 39
Find Vendors – Non-FileFind Vendors – Non-File
Click on the Click on the Continue iconContinue icon
PM_WO_310 Components v4 40
Vendor Master DataVendor Master Data
• A vendor master data is maintained in the IRIS system
• If a desired vendor is not found in the database the department should do the following:
Download the UK Vendor Form located at http://www.uky.edu/Purchasing/vendapp102606.pdf or from UK’s forms page
Submit to desired vendor for completion
Fax or mail the completed form to Purchasing
• Once this form is received, Purchasing will create the vendor information in IRIS
PM_WO_310 Components v4 41
Non-File Components Non-File Components
If you accidentally close If you accidentally close the Non-File component the Non-File component detail box before you detail box before you entered all the necessary entered all the necessary information, click on the information, click on the Select icon to the left of Select icon to the left of the componentthe component
PM_WO_310 Components v4 42
Non-File Components Non-File Components
Click on the Purchasing Click on the Purchasing buttonbutton
PM_WO_310 Components v4 43
Non-File Components Non-File Components
You can enter the You can enter the missing detailsmissing details
PM_WO_310 Components v4 44
Non-File Components Non-File Components
When you are When you are finished, click on the finished, click on the Back icon to return Back icon to return to the Components to the Components tabtab
PM_WO_310 Components v4 45
SummarySummary
• Maintenance Process
• Components Process
• Stock, Non-Stock, and Non-File materials
• Enter Requests/Requisitions for Materials/Services
• Find Vendors
PM_WO_310 Components v4 46
Unit 2Unit 2
EditingComponents
PM_WO_310 Components v4 47
Unit 2- Editing Components Unit 2- Editing Components
• Change requests/requisitions for materials/services
• Cancel requests/requisitions for materials/services
PM_WO_310 Components v4 48
•To Change a component:
Pull up the work order
Go to the Components Tab
Change ComponentsChange Components
PM_WO_310 Components v4 49
Change ComponentsChange Components
Notice that the Stock and Notice that the Stock and Non-stock components are Non-stock components are grayed-out which means grayed-out which means they cannot be changed by they cannot be changed by selecting a new selecting a new component; you can component; you can change the quantity and change the quantity and Unit of Measure.Unit of Measure.
PM_WO_310 Components v4 50
Change ComponentsChange Components
For the Non-File For the Non-File Component, you can Component, you can change any of the change any of the informationinformation
PM_WO_310 Components v4 51
Change ComponentsChange Components
To change the To change the description of a Stock or description of a Stock or Non-Stock component, Non-Stock component, click on the Select icon to click on the Select icon to the left of the componentthe left of the component
PM_WO_310 Components v4 52
Change ComponentsChange Components
At the bottom of the At the bottom of the screen, click on the screen, click on the Delete Row iconDelete Row icon
When the Confirm. When the Confirm. box appears, click box appears, click on Yeson Yes
PM_WO_310 Components v4 53
Change ComponentsChange Components
To add the new To add the new component, click on component, click on the Possible Entries the Possible Entries icon to search for iticon to search for it
The Material The Material Search box Search box will openwill open
PM_WO_310 Components v4 54
Enter the Enter the description description
or part of the or part of the descriptiondescription
Click on the Click on the Continue Continue
iconicon
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
PM_WO_310 Components v4 55
Enter Components – Stock/Non-StockEnter Components – Stock/Non-Stock
When the list When the list appears, appears, double-click double-click on the itemon the item
PM_WO_310 Components v4 56
Change ComponentsChange Components
Press Enter and the new Press Enter and the new component will be addedcomponent will be added
PM_WO_310 Components v4 57
•To cancel a component:
Pull up the work order
Go to the Components Tab
Cancel ComponentsCancel Components
PM_WO_310 Components v4 58
Cancel ComponentsCancel Components
To cancel a To cancel a component, click on component, click on the Select icon to the the Select icon to the left of the left of the componentcomponent
PM_WO_310 Components v4 59
Cancel ComponentsCancel Components
At the bottom of the At the bottom of the screen, click on the screen, click on the Delete Row iconDelete Row icon
When the Confirm. When the Confirm. box appears, click box appears, click on Yeson Yes
PM_WO_310 Components v4 60
SummarySummary
• Change requests/requisitions for materials/services
• Cancel requests/requisitions for materials/services
PM_WO_310 Components v4 61
Unit 3Unit 3
DocumentsAnd Approvals
PM_WO_310 Components v4 62
Unit 3- Documents and Approvals Unit 3- Documents and Approvals
• Entering item long text
• Attaching supporting documents
• Release approvals
PM_WO_310 Components v4 63
Enter Item Long TextEnter Item Long Text
Comments about Comments about the Line Item can the Line Item can be entered in the be entered in the Long Text area, Long Text area, which will print which will print on the purchase on the purchase orderorder
Click on the Click on the Create Text Create Text iconicon
PM_WO_310 Components v4 64
Enter Item Long TextEnter Item Long Text
Enter detailed Enter detailed information about information about the line item in the line item in this field. This this field. This can be used for can be used for all Material all Material Management Management numbers & for numbers & for Non-File itemsNon-File items
Word documents Word documents can be directly can be directly cut and pasted cut and pasted to this sectionto this section
PM_WO_310 Components v4 65
Enter Item Long TextEnter Item Long Text
Click on the Back Click on the Back icon to close the icon to close the Long Text Long Text windowwindow
PM_WO_310 Components v4 66
Attaching Supporting DocumentsAttaching Supporting Documents
• Supporting Documents can include:
Certificates of insurance
Drawings
Warranties
Quotes
PM_WO_310 Components v4 67
Attaching Supporting DocumentsAttaching Supporting Documents
To attach a document, To attach a document, click on the Services click on the Services for Objects iconfor Objects icon
PM_WO_310 Components v4 68
Attaching Supporting DocumentsAttaching Supporting Documents
Click on the Select Click on the Select icon to the left of icon to the left of Maintenance OrderMaintenance Order
Click on the Click on the Enter iconEnter icon
PM_WO_310 Components v4 69
Attaching Supporting DocumentsAttaching Supporting Documents
Follow the menu Follow the menu and click on Create and click on Create Attachment to Attachment to immediately create immediately create the attachmentthe attachment
PM_WO_310 Components v4 70
Attaching Supporting DocumentsAttaching Supporting Documents
In the Look In: In the Look In: field, find the field, find the document folder document folder on your on your computercomputer
Double-click on Double-click on the file name and the file name and the file will be the file will be attached attached immediately to immediately to the work orderthe work order
PM_WO_310 Components v4 71
Attaching Supporting DocumentsAttaching Supporting Documents
To view the To view the attachment, click on attachment, click on the Services for the Services for Objects iconObjects icon
PM_WO_310 Components v4 72
Attaching Supporting DocumentsAttaching Supporting Documents
Click on the Select Click on the Select icon to the left of icon to the left of Maintenance OrderMaintenance Order
Click on the Click on the Enter iconEnter icon
PM_WO_310 Components v4 73
Attaching Supporting DocumentsAttaching Supporting Documents
Click on Attachment Click on Attachment ListList
Note: When the Note: When the Attachment List is in Attachment List is in BOLD, a document is BOLD, a document is attachedattached
PM_WO_310 Components v4 74
Attaching Supporting DocumentsAttaching Supporting Documents
Double-click on Double-click on the attachment the attachment to open itto open it
PM_WO_310 Components v4 75
Attaching Supporting DocumentsAttaching Supporting Documents
Click on Click on the Close the Close icon to icon to close the close the documentdocument
PM_WO_310 Components v4 76
Release ApprovalsRelease Approvals
• Needed for over $10,000 per line item
Follows normal approval process through the business officer
PM_WO_310 Components v4 77
SummarySummary
• Entering item long text
• Attaching supporting documents
• Release approvals
PM_WO_310 Components v4 78
Course SummaryCourse Summary
• Understand the PM components process through the work order
• Enter requests for materials through the work order
• Enter requests for services through the work order
• Change components on work order
• Cancel components on work order
• Attach documents to a work order