Project Brief
Template version 2.0
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
2/49
2
1. Mandate
Please summarize the project background
Project Background Rationale for Action
Please summarize the project objectives in a list (1-5) and link them toyour company KPIs (e.g. risk, profit, cost)
Project Objectives
Please summarize the project key deliverables in a list (1-5)
Project Deliverables
Please summarize what is inscope
In Scope
Please summarize what is out ofscope
Out of Scope
Governing Body Name(s)
Project Manager
Project Board Executive
Sr. User
Sr. Supplier
Sponsor
Project Governance
Milestone Date
Start date xx-xx-xxxx
End date xx-xx-xxxx
Launch date: xx-xx-xxxx
Tolerance(calendardays):
+n/-n
Project Planning Budget / Resources
Project Dependency
Project Dependencies
Constraints & Risks
Please describe any limitations you can think of
EUR x 1000 Next step (specify 1,2,3) Overall project
Cash out 2011
P&L 2011
Cash out 2012
P&L 2012
Tolerance (%) +n% / -n% +n% / -n%
Benefits
Resources Int n mandays n mandays
Resources Ext n mandays n mandays
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
3/49
3
Document Management
Revision History
ApprovalsThis document requires the following approvals. Signed approval forms are filed in the Management section of the project file.
DistributionThis document has been distributed to.
Version Revision Date Status Summary of Changes By
Name Signature/Approved Title Date of issue Version Executive
Senior User
Senior Supplier
Name Title Date of issue Version
For each a description needs to be provided on the recommnedations building block (3).
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
4/49
4
3. Project Background / Dependencies
Context of the Project
>
ThisProject
Projectname
Projectname
Project name
Waiting foroutput from
Deliversoutput to
Project name
Project name
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
5/49
5
4a. Scope (1/2)
Geographic
Area
Client
Groups
Distribution
Channels
Involved
Processes
Involved
Systems
Involved
Departments
Involved
Products?
BeneluxCREAPIM globalCountry xCountry y
AgentBrokerBankDirectFlex Force
Process name 1>
Key deliverablePoint of Value
Weight %*Depth (project execution phases - deployment - handover benefit realization)
Total PoV
Out of Scope
PoV: Business capabilities to measure project execution success
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
6/49
6
4a. Scope (2/2)
Key deliverablePoint of Value
Weight %*Depth (project execution phases - deployment - handover benefit realization)
Total PoV 100%
Out of Scope
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
7/4977
4b. Product Breakdown Structure
2.1.1 Subdeliverable
2.2.1 Subdeliverable
2.1.2 Subdeliverable
2 Milestone
2.2.2 Subdeliverable
2.1 Group A 2.2 Group B
2.2.3External
deliverable
(Sub) Product/deliverable
Legend
MilestoneExternal
deliverableGroup
1.1.1 Subdeliverable
1.1.2 Subdeliverable
1.1.3 Subdeliverable
1 Milestone
1.3 Externaldeliverable
1.1.3.1 Subdeliverable
1.1.3.2 Subdeliverable
1.1 Keydeliverable
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
8/498
5. Acceptance Criteria(to accept completed project)
MoS-CoW
Definition in measurable terms of what must be done for the final product to be acceptable to the customer and staff who will be affected.
Topic Current level (situation before the project) Acceptance level (acceptable at hand-over)
M/S/C/W Target dates
Major functions
Appearance
Personnel level required touse/operate the product
Performance levels
Capacity
Accuracy
Availability
Reliability
Development costs
Running costs
Security
Ease of use
Timing
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
9/499
6a. Impact Analysis
Impact
Level
Description of the Impact
CommerceLow What is the most important from a commerce perspective (e.g. client satisfaction, increased saels, new products,
.)
PeopleMedium (incl. culture & performance): What has the most important impact on the people? What main
departments/functions will be affected? Approximately how many people are affected by the solutions set in yourproject (change targets)? To what extent are you aiming to hire, retain or lay off people? How does the realization
of your project help in achieving a common winning performance culture? (one aligned organizational culture andmindset, and act and think as one team with local teams focused on the customer)
Organisation Medium What are the most important organizational changes? E.g. structure, roles & responsibilities, competencies,payment structure?
Processes High What are the most important process changes? Which processes are you changing? Are you aiming at modifyingor fully redesigning processes?
Technology High What are the most important system changes? Are you aiming at replacing, modifying or building new systems?
Facilities, Legal,Housing
Low What are the most important changes in facilities / locations? E.g. centralizing, opening new locations, closinglocations?
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
10/4910
6b. Project Approach
Comments
Projectname
Package
Based onexistingproduct In stages,
rolling waveplanning
AlternativeC
Developed
In HouseBased onSpecific
Technology Big Bangimplemen-
tation
AlternativeA
AlternativeB
Legend
Road tofollow
Alternative path(not chosen)
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
11/4911
6c. Assumptions
A/A Title Description Project Critical DateImpact onthe Project
1 Low
2 Medium
3 High
4
5
6
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
12/4912
7b. Risks
To be reported to Project Board
Risk description Impact assessmentProba-bility
Impact Priority Mitigating actionDate to beresolved
Risk owner
Provide a description of therisk
Provide a description of theimpact
Rare /Unlikely /Possible /
Likely /Almostcertain
Insignificant /Minor /
Moderate /Major /
Catastrophic
Low /Medium /
High /Critical
Provide a description of themitigating action
xx-xx-xxxx Provide thename of therisk owner
Low
Medium
High
Critical
once a month (almost certain) 5 Medium High High Critical Critical Critical Critical Critical Critical
once a quarter (likely) 4 Medium Medium High High Critical Critical Critical Critical Critical
once a year (possible) 3 low Medium Medium High High Critical Critical Critical Critical
once every 5 years (unlikely) 2 low low Medium Medium High High Critical Critical Critical
once every 10 years (rare) 1 low low low Medium Medium High High Critical Critical
Catastrophic
PROBABILITY
IMPACT
Insignificant Minor Moderate Major
Risk Priority Levels
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
13/49
8a. Cost and Benefit Cash Flow Streams
13
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
14/4914
9. Organisation
Project Board
Project Manager
Project Team
Project Assurance (PMO)
(Expert) (Architecture)
Sponsor
Executive/OwnerSr. User
Sr. Supplier
Other Stakeholders
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
15/4915
10. Project Plan /
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov2011
Requirements gathering
Product design and build of prototype
Testing
Roll out / implementation
Business requirements
Functionalrequiremetns
First design
Reviewdesign
Buildprototype
FAT
UAT
Prepare for roll out
Local communication andtraining local organization
Approval of requirements by Project Board
Stage 2 Stage 3 Stage 4
Milestone
Tolerance: =/- xx days
Legend
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
16/49
20. Initiation Stage Plan /
16
date date date date date date date date date date date2011
PID preparation
Detail Businessrequirements
Define PoVsanddeliverables
Detailfunctionalrequirements
Prepare
QualityPlan
PID Approval by ProjectBoard
DetailSystemrequirements
PrepareComm.Plan
ResourcePlanning
CreateProject Plan
RefineBusinessCase
PID
qualityapproval
Milestone
Tolerance: =/- xx days
Legend
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
17/49
17
11. Resources /
Deliverable Name RoleDepartment /Vendor name
Man-days/
week
Start-dateEnd-date
Purch.TariffinclVAT
Totalplanned
Man-days
Totalcost
Total cost
Needed for PIDcreation
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
18/49
18
14. Budget Details /
Project Budget Details Currency: EUR
Cost CategoryBudget
Approved
Change
Requests (+/-)
Actual CostsCommitted
Costs
Estimated to
Complete
Budget
Forecast (total)
CAPEX (Investments) 0 0 0 0 0 0
Software 0
Hardware 0
Other (IT or deprecia ted assets) 0
OPEX (cost out of pocket) 0 0 0 0 0 0
0
0
0
0
0
0 0
0
0
0
0
Contingency 0
RESOURCES MDs 0 0 0 0 0 0
Internal Staff MDs - IT 0
Internal Staff MDs - non IT 0
Total Cost
(OPEX incl. internal staff cost)N/A N/A N/A N/A N/A N/A
OPEX Resources OPEX Resources
Budget approved 0 0 0 0
Actual Costs 0 0 0 0
Commited Costs 0 0 0 0
Remaining Budget 0 0 N/A N/A
Budget usage [%] N/A N/A
Estimated to Complete
Budget Forecast (total)
Bugeted - Forecasted
Forecasted Budget Usage [%]
Needed for PIDcreation
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
19/49
Project Initiation Documentation
Version 2.0
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
20/49
20
Document Management
Revision History
ApprovalsThis document requires the following approvals. Signed approval forms are filed in the Management section of the project file.
DistributionThis document has been distributed to.
Version Revision Date Status Summary of Changes By
Name Signature/Approved Title Date of issue Version Executive
Senior User
Senior Supplier
Name Title Date of issue Version
For each a description needs to be provided on the recommnedations building block (3).
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
21/49
21
PID
Please include all building blocks fromthe PB except the initiation stage plan,resources and budget.
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
22/49
22
11. Resources
Deliverable Name Role
Depart-ment /Vendorname
Man-days/
week
Start-date
End-date
Purch.TariffinclVAT
Totalplanned
Man-days
Totalcost
Resourcemanager
name
Resourcescommited?
Total cost
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
23/49
23
12. Budget Details /
Project Budget Details Currency: EUR
Cost CategoryBudget
Approved
Change
Requests (+/-)
Actual CostsCommitted
Costs
Estimated to
Complete
Budget
Forecast (total)
CAPEX (Investments) 0 0 0 0 0 0
Software 0
Hardware 0
Other (IT or deprecia ted assets) 0
OPEX (cost out of pocket) 0 0 0 0 0 0
0
0
0
0
0
0 0
0
0
0
0
Contingency 0
RESOURCES MDs 0 0 0 0 0 0
Internal Staff MDs - IT 0
Internal Staff MDs - non IT 0
Total Cost
(OPEX incl. internal staff cost)
N/A N/A N/A N/A N/A N/A
OPEX Resources OPEX Resources
Budget approved 0 0 0 0
Actual Costs 0 0 0 0
Commited Costs 0 0 0 0
Remaining Budget 0 0 N/A N/A
Budget usage [%] N/A N/A
Estimated to Complete
Budget Forecast (total)
Bugeted - Forecasted
Forecasted Budget Usage [%]
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
24/49
24
13a. Quality Plan
Key Deliverable Quality Criteria (Business Requirements)To be reviewed by (on
behalf of Sr. User)
To be reviewed by (on
behalf of Sr. Supplier)
j
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
25/49
25
14. Benefits Review Plan
(non) Financial BenefitsQuantification
(KPI)
Who isaccoun-
table
When toachieve
Resourcesneeded tocarry out
review
Baselinemeasures
How will the performance of theprojects products (deliverables)
be reviewed
j t
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
26/49
26
15a. Stakeholders Map
Importance of the stakeholders to the organisational activity
L
ow
Key stakeholders need to accept the objectives and will be fully engaged
Participation project boardSign-off business requirements
Demo product
Weekly highlight reports & issue log
Regular business update meetings
Operational acceptance
Stakeholders need to agree the translation of objectives into activities
Good working relationships to ensure an effective coalition of support for theproject
Careful monitoring and management as they may be a source of significantrisk
Progress updates via newsletters
Stakeholders be kept informed of progress and remedies taken to achievethe objectives
limited monitoring or evaluation
Progress updates via newsletters
Stakeholders notified of milestone completionlimited monitoring or evaluation
Progress update via newsletters
Low
Medium
Medium High
High
Potentialimpactoforganisationalactivityofthestakeholders 1
2
3
4
1
2
3
4
Name
PMO
Risk
Compliance
(Audit)
Name
Name
Name
Name
Positionstakeholders on the
map
j t
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
27/49
27
15b. Communication ManagementStrategy
Actions Requirements
What When How Responsible Agree with Preparation Approval Adressee
1 Newsletters
2 Presentations at
(informal) meetings
3 Public newsletter
4 Mass media clippings
5 Lessons learned
6
Please summarize the project background
Project Background What should be known on forehand?
Please summarize the communication assumptions in a list (1-5)
Assumptions
Please summarize the communication issue
AnalysisWhat is the communication issue?
Project Communication Action Plan
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
28/49
Version 2.0
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
29/49
Document Management
29
Revision History
ApprovalsThis document requires the following approvals. Signed approval forms are filed in the Management section of the project file.
DistributionThis document has been distributed to.
Version Revision Date Status Summary of Changes By
Name Signature/Approved Title Date of issue Version Project Manager
Senior Supplier
Name Title Date of issue Version
For each a description needs to be provided on the recommnedations buildingblock (3).
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
30/49
30
Work Package
Please include Mandate + Scope +Product Breakdown building blocksfrom the PID
21 Work Breakdown
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
31/49
21. Work Breakdown - Work Package -
31
1.1.1 Subdeliverable
1.1.2 Subdeliverable
1.1.3 Subdeliverable
1 Milestone
1.3 Externaldeliverable
1.1.3.1 Subdeliverable
1.1.3.2 Subdeliverable
1.1 Keydeliverable
(Sub)Product/
deliverable
Legend
MilestoneExternal
deliverable
Group
22 Product Description -
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
32/49
22. Product Description - Work Package - (1/3)
32
(sub) deliverable Depth (project execution phases - deployment - handover benefit realization)
Out of Scope
22 Product Description -
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
33/49
22. Product Description Work Package - (2/3)
33
Quality criteria Quality methodReviewed by (on
behalf of Sr.User)
Reviewed by (on
behalf of Sr.Supplier)
22 Product Description -
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
34/49
22. Product Description Work Package - (3/3)
34
Layout, Format
Techniques
Relation to otheractivities or products
Contacts
Delivery requirements
Additional requirements/ Assignments
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
35/49
35
Highlight Report
Please include budget details buildingblock from PID
P j N Hi hli h 1/2Project Manager: xxx
Project Owner: yyy
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
36/49
36
Project Name - Highlight 1/2Reporting period dd/mm/yyyy dd/mm/yyyy
Project Owner: yyy
Project ID: id
Project Cost Center: CC
Project Progress
Start Date: mm/yyyy
End Date: mm/yyyyRevised End Date: mm/yyyy
Phase [T0-T6]: Tx
PoV%: x %
Issue Consequences Mitigation Actions Decisions Needed
1 In terms of: planning, budget, resources andfor other projects
2
3
Milestone/ Main Result PoV% Due date Revised date Indicator%
CompleteExplanation
1 % dd/mm/yy dd/mm/yy GREEN 70%
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
37/49
37
Change requests
Reason for the change DescriptionRequesteddate Status
Estimatedadded cost
Estimated
added/diminishedeffort ( +/-mandays)
1 In terms of: planning, budget, resources and forother projects
2
3
Project Name - Highlight 2/2Reporting period dd/mm/yyyy dd/mm/yyyy
Project Owner: yyy
Project ID: id
Project Cost Center: CC
Activities executed in the Reported Period
Actvitity
Activities Planned for the Next Period
(dd/mm/yyyy dd/mm/yyyy)
Activity
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
38/49
End Stage Report
Version 2.0
D t M t
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
39/49
Document Management
39
Revision History
ApprovalsThis document requires the following approvals. Signed approval forms are filed in the Management section of the project file.
DistributionThis document has been distributed to.
Version Revision Date Status Summary of Changes By
Name Signature/Approved Title Date of issue Version Executive
Senior User
Senior Supplier
Name Title Date of issue Version
For each a description needs to be provided on the recommnedations buildingblock (3).
p j
E d St R t
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
40/49
40
End Stage Report
Please include updated building blocks
from the Mandate, Business Case andthe last Highlight Report and the Risk
building block
25 Recapitulation
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
41/49
41
25. Recapitulation
Budget (Euros)
45000 50000 55000 60000
Actual
Budget
Original
Budget
Duration (Weeks)
0 10 20 30
ActualDuration
OriginalDuration
Key Deliverables Delivered
please explain what was delivered, who
approved, any off-specifations, handover
Project Team
.(PM)
Main Reasons for Budget/Time overrun
...
Scope Changes
# (Total number ofchanges)
26 Follow on Action Recommendations
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
42/49
42
26. Follow-on Action Recommendations
Action Description/Rationale AO-scan Due date Who
Solve Project Issue 1 Y/N
Solve Project Issue n Y/N
Mitigate Risk 1 Y/N
Mitigate Risk n Y/N
Recommendation 1 Y/N
Recommendation n Y/N
Post Project Review Plan Describes who is going to measure the business case benefits(including how and when)
N.A. PM, stakeholders,PMO department
Post Project Reviewmeeting
Date and participants for the post project review plan meeting N.A. PM, PMOdepartment
27 L L d
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
43/49
43
27. Lessons Learned
Lessons Learned
Concentrate on items which can be of use to future projects.
Observations on failures and omissions can be as useful as identification of successful elements.
Which management processes or procedures worked well?
Which management processes have had problems?
Was it easy to achieve the required quality?
Which quality procedures worked well?
Were there any weaknesses in quality procedures for specific types of product?
How well did risk strategies work?
Were there any unforeseen risks?
How well were the risks managed?
Was the contingency used?
Was training in the management, quality and delivery processes and procedures adequate?
Were there recognisable benefits from the level of training given, or recognisable problems caused by lack of training?
How well did any support tools work?
Could anything have been done to improve skill levels before the relevant work was done?
Remarks: Collecting to be mentioned items during the project
life cycle makes life easier at the end. (Lessons Log) What went well, what could be improved? What would
you do different if you have to do it again?
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
44/49
End Project Report
Version 2.0
Doc ment Management
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
45/49
Document Management
45
Revision History
ApprovalsThis document requires the following approvals. Signed approval forms are filed in the Management section of the project file.
DistributionThis document has been distributed to.
Version Revision Date Status Summary of Changes By
Name Signature/Approved Title Date of issue Version Executive
Senior User
Senior Supplier
Name Title Date of issue Version
For each a description needs to be provided on the recommnedations buildingblock (3).
End Project Report
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
46/49
46
End Project Report
Please include updated building blocksfrom the Mandate, Business Case andthe last Highlight Report
25 Recapitulation
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
47/49
47
25. Recapitulation
Budget (Euros)
45000 50000 55000 60000
Actual
Budget
Original
Budget
Duration (Weeks)
0 10 20 30
ActualDuration
OriginalDuration
Key Deliverables Delivered
please explain what was delivered, who
approved, any off-specifations, handover
Project Team
.(PM)
Main Reasons for Budget/Time overrun
...
Scope Changes
# (Total number ofchanges)
26 Follow on Action Recommendations
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
48/49
48
26. Follow-on Action Recommendations
Action Description/Rationale AO-scan Due date Who
Solve Project Issue 1 Y/N
Solve Project Issue n Y/N
Mitigate Risk 1 Y/N
Mitigate Risk n Y/N
Recommendation 1 Y/N
Recommendation n Y/N
Post Project Review Plan Describes who is going to measure the business case benefits(including how and when)
N.A. PM, stakeholders,PMO department
Post Project Reviewmeeting
Date and participants for the post project review plan meeting N.A. PM, PMOdepartment
27 Lessons Learned
8/2/2019 Pmo Prince2 Building Blocks 110601 v2 0
49/49
27. Lessons Learned
Lessons Learned
Concentrate on items which can be of use to future projects.
Observations on failures and omissions can be as useful as identification of successful elements.
Which management processes or procedures worked well?
Which management processes have had problems?
Was it easy to achieve the required quality?
Which quality procedures worked well?
Were there any weaknesses in quality procedures for specific types of product?
How well did risk strategies work?
Were there any unforeseen risks?
How well were the risks managed? Was the contingency used?
Was training in the management, quality and delivery processes and procedures adequate?
Were there recognisable benefits from the level of training given, or recognisable problems caused by lack of training?
How well did any support tools work?
Could anything have been done to improve skill levels before the relevant work was done?
Remarks: Collecting to be mentioned items during the project
life cycle makes life easier at the end. (Lessons Log) What went well, what could be improved? What would
you do different if you have to do it again?