17
PM&Es: Through the Looking Glass FERC Perspectives Jennifer Hill Federal Energy Regulatory Commission NHA Annual Conference May 12, 2009

PM&Es: Through the Looking Glass FERC Perspectives

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PM&Es: Through the Looking Glass FERC Perspectives

PM&Es: Through the Looking GlassFERC Perspectives

Jennifer Hill

Federal Energy Regulatory Commission

NHA Annual Conference May 12, 2009

Page 2: PM&Es: Through the Looking Glass FERC Perspectives

Issue

• Applicants do not always have well-defined PM&E measures in their application.

• It is difficult for Commission staff to assess the benefits and costs of vague measures.

• Implementation of environmental measures are delayed.

Page 3: PM&Es: Through the Looking Glass FERC Perspectives

What are PM&Es?

Protection, Mitigation and Enhancement Measures (PM&Es) could be:

• Modifications to project facilities and operations

• Construction and O&M of new facilities• Protection or mitigation measures for addressing project-related effects

Page 4: PM&Es: Through the Looking Glass FERC Perspectives

Typical Environmental PM&Es for Hydro

AestheticsWildlife

Water quality

Cultural

Recreation

Fisheries

Page 5: PM&Es: Through the Looking Glass FERC Perspectives

Environmental Concerns and Developmental Concerns

Page 6: PM&Es: Through the Looking Glass FERC Perspectives

Competing Environmental Concerns

Page 7: PM&Es: Through the Looking Glass FERC Perspectives

National Environmental Policy Act (NEPA)

Page 8: PM&Es: Through the Looking Glass FERC Perspectives

Goal

• Sufficient information on PM&E measures to be able to recommend to the Commission implementation of those measures that are best adapted to a comprehensive plan for improving or developing the waterway in any license issued.

Page 9: PM&Es: Through the Looking Glass FERC Perspectives

Information Requirements

• What?• Where?• When?• How?• Why?

Page 10: PM&Es: Through the Looking Glass FERC Perspectives

What?• A description of the specific measures to be

implemented, including conceptual drawings, depictions, or similar graphic information for any facilities proposed to be constructed.

Page 11: PM&Es: Through the Looking Glass FERC Perspectives

Where?• A clear description of where any proposed

measures are to be implemented, including reference to the project boundary.

20 cfsX

Page 12: PM&Es: Through the Looking Glass FERC Perspectives

When?• Preliminary schedules for implementing the

measures should be referenced to the license issuance date.

Page 13: PM&Es: Through the Looking Glass FERC Perspectives

How?

• A preliminary description of any stepsnecessary to implement measures.

Page 14: PM&Es: Through the Looking Glass FERC Perspectives

Why?• A description of the purpose of the measures

and the benefits that they would provide.

• The consultation record leading to the measures.

Page 15: PM&Es: Through the Looking Glass FERC Perspectives

Cost?

• To facilitate Commission staff’s comprehensive development analysis, costs for implementing each measure should be provided.

Page 16: PM&Es: Through the Looking Glass FERC Perspectives

When should this information be provided?

• After studies

• Preliminary Licensing Proposal or Draft Application

• License Application

Page 17: PM&Es: Through the Looking Glass FERC Perspectives

Benefits

• Allows for a comprehensive NEPA analysis in a reasonable time frame

• Sets the stage for early agreement on PM&Es and possible settlement (possibly avoiding the need for EPAct hearings)

• Can expedite license decisions• Gives certainty on the measures and costs