Pm0004 -Managing Human Resources in Projects-mqp

Embed Size (px)

Citation preview

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    1/21

    MODEL QUESTION PAPER

    PM0004 MANAGING HUMAN RESOURCES IN PROJECTS

    SECTION A 1 MARK QUESTIONS

    1. Which of the following is a key determinant of project performance &

    success in todays competitive world of business?

    a)Cross-functional teamwork

    b)Cross functional department work

    c) Cross functional unit work

    d)Cross functional companywide work

    2. Which of the following is not a responsibility of project team leader?

    a) Building the specific skills & organizational support.

    b) Dealing with anxieties, power struggles & conflict

    c) Dealing with technical complexities

    d) Strategic decision making

    3. Team building is defined as:

    a) The process of taking a collection of individuals with different needs,

    backgrounds & expertise & transforming them into an integrated,

    effective work unit

    b) Sustaining high individual efforts & commitment

    c) Fostering a professionally stimulating work environment

    d) Facilitating team decision making

    4. Which of the following is quoted by Jack E Welch, CEO of GE Company

    about management style?

    a) Leadership is a process & property

    b) cannot afford management styles that suppress & intimidate

    subordinates

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    2/21

    c) A leader who does not meet commitments & does not share values is

    soon gone from the company

    d)That effective Leadership is based primarily on being consistent.

    5. According to whom effective leadership is based primarily on being

    consistent?

    a)Arthur Jago.

    b)Peter Drucker

    c) Hans J

    d)Feidler

    6. Team Characteristics drive project performance. However, this

    relationship is not ----------.

    a)Non-linear

    b)Linear

    c) Lateral

    d)Diagonal

    7. Which of the following is not an advantage of matrix structure?

    a)Adaptability to changing market conditions

    b)Allows sharing of highly specialized skills

    c) Conflict among project team members

    d) none of the above

    8. Which of the following is a multidisciplinary activity requiring unifiedteamwork for successful integration?

    a)Establishing a new program

    b)Strategic planning

    c) Conflicts among team members

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    3/21

    d) Computer Aided Software Engineering

    9. The criteria of effective team management have ------------

    propositions stated to highlight the organizational environment & managerial

    style conducive to high project team performance.

    a)2

    b)3

    c) 4

    d)5

    10. Expand the Acronym CASE.

    a)Customer Aided Survey Engineering

    b)Consumer Aided Software Engineering

    c) Computer Aided Software Engineering

    d)Customer Aided Social Engineering

    11. -----------------methodology determines the business rules for storing,

    accessing & addressing a data repository under specific conditions.

    a)Project management information system

    b)Project Management

    c)Database Information System

    d)Issues management process

    12. Communication is -----------------by which information is exchanged

    between senders & receivers through common system of symbols.a)Exchange

    b)Conversation

    c) process

    d)none of the above

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    4/21

    13. Which of the following is not a method of non-verbal communication?

    a)Facial expressions

    b)Morals

    c) Hand & body movements

    d)Head nodding

    14. The structure of the CMP includes.

    a)Purpose

    b)Scope

    c) Table

    d)All of the above

    15. Which of the following is a challenge to project managers in

    implementing a CMP?

    a)No of People

    b)Technical jargon

    c) Distributed teams

    d)All the above

    16. Expand the acronym CMP.

    a)Coordination management plan

    b)Communication management plan

    c) Customer management plan

    d)Cool management plan

    17. -------------------is a role model who sets the stage for the members

    of the project team to carry out their responsibilities through mentoring,

    teaching & coaching the people who work on project work packages

    a)Project Manager

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    5/21

    b)Project Engineer

    c) Functional manager

    d)Operational manager

    18. Which of the following is not a role of a project team leader?

    a)Team facilitator

    b)Coach

    c) Spectator

    d)Mentor

    19. The project managers success as a leader is dependent on a set of---

    ------------------.

    a)Project on hand

    b)Project not on hand

    c) Facilitators

    d)Personal capabilities

    20.

    Putting someone in the job because that person is a -------------------

    can be risky.

    a)Bad manager

    b)Good manager

    c) Risky manager

    d) Intelligent manager

    21. For a proposed strategy to be successful it should be built on aphilosophy that recognizes the ----------- of going through a specific

    strength weakness analysis to develop project strategy.

    a) system

    b)value

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    6/21

    c) attitude

    d)perception

    22. ---------------------channels with adversarial stakeholders should be

    kept open because this is critical to getting the project point of view across.

    a)Communication

    b)Co-ordination

    c) Co-operation

    d)Competition

    23. A state legislator concerned about the transportation of toxic wastes

    from power plant to a repository site is an example of------------.

    a) Legal right

    b)Political support

    c) Health & safety

    d)Economic interest

    24.

    Providing leadership to the project team is not an important

    responsibility of a stakeholder. True/False

    25. A proper stakeholder management process is essential because.

    a)They can affect the outcome of the project

    b)Their inputs ma help proper design of the project

    c) There may be political & social ramifications

    d)None of the above

    26. ---------------------- consists of executing the management functions

    of planning, organizing, motivating, directing & controlling the

    resources used to cope with external stakeholders strategies.

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    7/21

    a)Management process

    b)Production process

    c) Stakeholder Management process

    d)None of the above

    27. Stakeholders management is also an important of the -----------------

    of organizations.

    a)Operations management

    b)Marketing management

    c) Strategic management

    d)None of the above

    28. Which of the following is not included in the stakeholders list?

    a)The project manager

    b)The managers in the company who are involved with approvals

    c) The customer

    d)Computers

    29. The stakeholders include all those who do not make a meaningful

    contribution to a project. True/False

    30. Which of the following activity is not performed by PMIS?

    a)Retrieving data from different sources

    b)Sending information to specific destinations

    c) Conflict resolutiond)Storing data & information

    31. Virtual teams are also called ---------------- teams.

    a)Distributed teams

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    8/21

    b)Life cycle teams

    c) Boundary spanning teams

    d)Communication teams

    32. Temporal distribution refers to whether a team operates in the same

    locale or is distributed across space-time. True/False

    33. Which of the following is not a characteristic of virtual teams?

    a)Temporal distribution

    b)Boundary spanning

    c) Life cycle

    d)distribution

    34. In the simplest sense, -----------------is a performance arrangement

    that affects how the team members send, receive, interpret, and encode

    information.

    a)Construction

    b)repercussion

    c) distribution

    d)co-ordination

    35. Which of the following organizations has not integrated virtual teams

    into its marketing and manufacturing functions?

    a)HP

    b)Whirlpool.c) Sole trading concern

    d) IBM

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    9/21

    36. To the extent that distributed team members feel socially isolated from

    their coworkers, supervisors, and subordinates, the quality of both their

    work and family lives will suffer. True/False

    37. Firms are increasingly adopting ----------------communication tools to

    facilitate collaboration among individuals and groups, both within and

    beyond organizational boundaries.

    a)Mechanical.

    b)Electronic

    c) Electrical

    d)Superficial.

    38. The changes in business practice and advances in telecommunications

    have led to the increasing prevalence of distributed teams that interact over

    long distances. True/False

    39. Communication channels with -------------------stakeholders should be

    kept open because this is critical to getting the project point of view across.

    a)Primary

    b)secondary

    c) Adversarial

    d)None of the above

    40. Tatas nano project at Singur is one of the examples of projects

    where the stakeholders interests have directly clashed derailing theseprojects seriously. True/False

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    10/21

    SECTION B 2 MARK QUESTIONS

    1. Defining ----------------& ----------------- is one of the characteristics

    of a High Performance project Teams.

    a)CAD, CAM

    b)Purpose, Goals

    c) Methods, Channels

    d)None of the above

    2. Team Leadership evolves on the basis of expertise, ----------------- &

    ------------------.

    a)Bureaucracy, procedures

    b)Trust, respect

    c) Procedures, politics

    d)Expertise, politics

    3. The four stage model of the Team performance was originally

    developed by -----------& ------------.

    a)Hersey, Blanchard

    b)Henry, Fayol

    c) Philip, Kotler

    d)Fayol, Kotler

    4. The degree of project success is primarily determined by the strength

    of specific ---------- & --------- that are related to the work environment.a)Work & process

    b) Interesting & challenging

    c) Driving forces & barriers

    d)Scope & objectives

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    11/21

    5. Identify the emerging young professionals who show a potential for ---

    ---------- & ------------------ & put them in charge of projects is found in

    organisations.

    a)Knowledge & experience

    b)People & tasks

    c) Leadership & management

    d)None of the above

    6. Diversity in communication can manifest itself through cultural

    differences, -------------- & ------------ styles & communication approaches.

    a)Thinking & working

    b)Reading & writing

    c) Formal & informal

    d)All the above

    7. Project meetings, both ------------- & ---------------- are an extremely

    important means for communicating about the projects status.

    a)Forms, reports

    b)Theory, practice

    c) Formal, informal

    d) Integration & interdependence

    8. The management of a project entails bringing into the picture those

    persons & groups that have both -------------interests & --------------

    interests in the management of the project as well as its outcomes.a)Contractual, vested

    b)Primary, secondary

    c) Secondary, tertiary

    d)None of the above

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    12/21

    9. Shareholders can also be classified as ------------------& ----------------

    -----.

    a)Primary, tertiary

    b)Secondary, tertiary

    c) Supportive, adverse

    d)None of the above

    10. Once the stakeholders mission is understood, then the stakeholders -

    ------------- & --------------- should be evaluated.

    a) Interest, motivation

    b)Strengths, weakness

    c) Weakness, interests

    d)Motivation, strengths

    11. A useful technique to better understand the nature of the external

    stakeholders claim in the project is to categorize their stake as a ------------

    or as ------------------- to the project.

    a)Interest, motivation

    b)Supportive, adverse

    c) Primary, secondary

    d)Policies, procedures

    12. Primary stakeholders have the residual ---------------- & ----------------

    to use resources to support the project objectives..

    a)Efficiency, effectivenessb)Goals, objectives

    c) Authority, responsibilities

    d)Reports, forms

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    13/21

    13. The core implementation team doesnt usually have signature

    authority for the project, but this group of people is directly

    responsible for the overall success of the project ------------- & --------

    ----phases.

    a)Planning & implementation

    b)Designing & implementation

    c) Operational & implementation

    d)None of the above

    14. Because of the ------------- & ----------------of many modern-day

    tasks, there has been a heightened realization over the past decade of the

    value of team performance to business, industry, and the military.

    a)Visibility & audibility

    b)People, purpose

    c) Complexity & scope

    d)Purpose & output

    15.

    Virtual team members have the capability to span organizational,

    ----------------- and ---------------boundaries (boundary spanning).

    a)Functional, cultural

    b)Area, sub-area

    c) People, purpose

    d)Manual, departmental

    16. Team members possess ------------------- task and team ---------------that must be communicated to and understood by other team members.

    a)Conflicting, additional

    b)Additional, conflicting

    c) Contextual, information

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    14/21

    d)Management, information

    17. The use of collaborative technologies improves the three aspects of

    knowledge management knowledge creation, knowledge --------------, and

    knowledge ------------------.

    a)Discovery, transfer

    b)Management, transfer

    c) Discovery, management

    d)None of the above

    18. Key stakeholders must be diligent in implementing and maintaining

    virtual teams by providing them with the ------------and --------------to be

    successful.

    a)Equipment, tools

    b)Resources, equipments

    c) Machinery, furniture

    d)Tools, resources

    19. Without sufficient trust, team members will expend -----------time and

    -----------energy protecting, checking, and inspecting each other's

    work as opposed to collaborating in facilitation of process gains.

    a)Time, energy

    b)Resources, Management

    c) Tools, Machinery

    d)Weapons, Machinery

    20. -------------------- &----------------- are examples of synchronous

    communication applications.

    a)Teleconferencing and videoconferencing.

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    15/21

    b)Television, Radio

    c) Broadcasting, journals

    d)None of the above

    SECTION C 4 MARK QUESTIONS

    1. Match the following drivers & Barriers of project team performance:

    1. Clear Project Plans & Objectives a) Poor qualification of team

    2. Good interpersonal relations b) Objectives & priorities

    3. Good project leadership c) Conflict among team members

    4. Professional growth potential d) Communication problems

    a)1- b ,2-c ,3-d ,4-a

    b)1- a,2- b,3-c ,4- d

    c) 1-d ,2- c,3-b ,4-a

    d)1-b ,2-a ,3-c ,4- d

    2. Match the following measures of team effectiveness with their

    appropriate meaning.

    1. Work & team structure a) Inspire & encourage

    2. Communication & control b) Participation in project

    definition & work plans

    3. Team Leadership c) Flexibility & willingness to

    change

    4. Attitudes & Values d) Self control, accountability &

    ownershipa)1- b ,2-d ,3-a ,4-c

    b)1- a,2- b,3-c ,4- d

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-c ,4- d

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    16/21

    3. Match the following phrases of Team Building sessions.

    1. Ensure project leadership a) Personnel Evaluation

    2. Create proper reward systems b) To build & lead a project team

    3. Manage conflict & problems c) Integrate personal needs of

    their staff

    4. Ensure personal drive &

    involvement

    d) Resolutions

    a)1- b ,2-c ,3-d ,4-a

    b)1- a,2- b,3-c ,4- d

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-d ,4- c

    4. Match the following phrases with their appropriate meanings.

    1. Project Manager a) a subset of enterprise

    2. Technology b) Key competency area

    3. Project Management c) Engineering

    4. Business Analysis d) personal capabilities

    a)1- b ,2-c ,3-d ,4-a

    b)1- d,2- c,3-a ,4- b

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-c ,4- d

    5. Match the following competencies of project manager with their

    appropriate meanings.

    1. Ability to assume risk a) Perseverance & toughness2. Ability & the courage to make

    decisions

    b) teach, coach & guide people

    3. Tenacity / Persistence c) inevitable trade offs

    4. Ability to mentor d) creativity & innovation

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    17/21

    a)1- b ,2-c ,3-d ,4-a

    b)1- d,2- c,3-a ,4- b

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-c ,4- d

    6. Match the following challenges faced by the project managers in

    communication with their proper meanings.

    1. Size a) Common differences

    2. Complexity b) Number of people

    3. Location c) Technical requirements

    4. Diversity d) Geographical area

    a)1- b ,2-c ,3-d ,4-a

    b)1- a,2- b,3-c ,4- d

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-c ,4- d

    7. Match the following contents of CMP with their meanings.

    1. Purpose a) Coverage

    2. Scope b) Goals

    3. Constraints c) Description

    4. Table d) Restrictions

    a)1- b ,2-c ,3-d ,4-a

    b)1- a,2- b,3-c ,4- d

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-d ,4- c

    8. Match the following table columns of a structure of CMP with

    their proper meanings.

    1. Responsibilities column a) Specific support

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    18/21

    requirements

    2. Frequency & time

    column

    b) Lists factors that restrict the

    performance

    3. Equipment & supplies

    column

    c) Lists major activities

    4. Constraints column d) Lists how often

    communication occurs & when

    a)1- b ,2-c ,3-d ,4-a

    b)1- a,2- b,3-c ,4- d

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-d ,4- c

    9. Given below are the stakeholders and their roles, match them

    together.

    1. The Customer a) The person who shares

    responsibility for project

    success

    2. The Projectsponsor

    b) Person / entity that paysfor the project

    3. Functional

    Management

    c) Approve the project

    documents

    4. The Review &

    Approval Team

    d) The company's officials

    with an interest in your

    project

    a)1- b ,2-c ,3-d ,4-ab)1- a,2- b,3-c ,4- d

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-d ,4- c

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    19/21

    10. The following are the strategic issues identified in the

    stakeholders vested interest. Match them.

    1. Economic interest a) Operating license

    2. Legal right b) Wage rates

    3. Helath & safety c) Values enjoyed by the group

    4. Life Style d) working conditions

    a)1- b ,2-c ,3-d ,4-a

    b)1- a,2- b,3-c ,4- d

    c) 1-c ,2- d,3-a ,4-b

    d)1-b ,2-a ,3-d ,4- c

    11. Match the following environmental factors affecting the project.

    1. License a) Technological factors

    2. Education b) Environmental factors

    3. Pollution c) Social factors

    4. Knowhow d) Legal factors

    a)1-a,2-b,3-c,4-d

    b)1-b,2-d,3-a,4-cc) 1-d,2-c,3-b,4-a

    d)1-c,2-d,3-b,4-a

    12. Match the dimensions of team work with their proper meaning

    1. People a) Task-technology-structure

    2. Purpose b) satisfaction

    3. Output c) Technical4. Technology d) Trust

    a)1-a,2-b,3-c,4-d

    b)1-d,2-a,3-c,4-b

    c) 1-d,2-c,3-b,4-a

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    20/21

    d)1-c,2-a,3-b,4-d

    13. Match the different types of distributed environments with their

    appropriate meaning:

    1. Adhoc tem a) Task-technology-structure fit

    2. Intact team b) Hierarchical

    3. structured teams c) stable membership

    4. Technology d) temporary team

    a)1-a,2-b,3-c,4-d

    b)1-b,2-d,3-a,4-c

    c) 1-c,2-a,3-b,4-dd)1-d,2-c,3-b,4-a

    14. The following are the aspects of face - to - face communication &

    distributed settings that determine the nature of communication within

    team. Match them:

    1. Co-presence a) See each other

    2. Visibility b) Physical space3. Audibility c) Time

    4. Contemporability d) Hear each other

    a)1-d,2-b,3-c,4-a

    b)1-b,2-a,3-d,4-c

    c) 1-c,2-d,3-a,4-b

    d)1-a,2-d,3-c,4-a

    15. Match the pairs:

    1. Team work a) a process & a property

    2. project leadership b) High performance teams

    3. project communication c) temporal distribution

  • 8/3/2019 Pm0004 -Managing Human Resources in Projects-mqp

    21/21

    4. virtual team d) PMIS

    a)1-b,2-a,3-d,4-c

    b)1-a,2-b,3-c,4-d

    c) 1-d,2-a,3-b,4-c

    d)1-a,2-c,3-d,4-b