21
PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems Singapore/U.S. Vehicle Electronics & Architecture Workshop Meeting UNCLASSIFIED: Distribution Statement A. Approved for public release.

PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

PM HBCT VHMS Program

16 August 2011

Larry Marino, Deputy PM HBCT-VHMS, CBM &

CLOE/GCSS-Army Systems

Singapore/U.S. Vehicle Electronics & Architecture Workshop Meeting

UNCLASSIFIED: Distribution Statement A. Approved for public release.

Page 2: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE 12 AUG 2011

2. REPORT TYPE Briefing Charts

3. DATES COVERED 12-08-2011 to 12-08-2011

4. TITLE AND SUBTITLE Vehicle Health Management System Definition

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) Larry Marino

5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army TACOM ,PM HBCT,6501 E.11 Mile Rd,Warren,MI,48397-5000

8. PERFORMING ORGANIZATIONREPORT NUMBER TACOM

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) U.S. Army TACOM, PM HBCT, 6501 E.11 Mile Rd, Warren, MI, 48397-5000

10. SPONSOR/MONITOR’S ACRONYM(S) TACOM

11. SPONSOR/MONITOR’S REPORT NUMBER(S) #22217

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES briefed to SINGAPORE/US VEHICLE ELECTRONICS AND ARCHITECTURE WORKSHOP ATTACOM, 16 AUGUST 11

14. ABSTRACT n/a

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

20

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Agenda

Objective: Provide an overview of PM HBCT ‘s VHMS Program (Informational Brief):

Vehicle Health Management System Definition

User Requirements and System Engineering Artifacts VHMS System Software and Hardware Components

VHMS Key Products

Condition Based Maintenance & Command Guidance

Off-Platform Reporting to the GCSS-Army Enterprise Tactical Logistics Systems

Question/Answer Session

2 UNCLASSIFIED

Page 4: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

On-platform: Improved embedded diagnostics (self reporting platform) Data collection and storage (faults, supply, configuration management, etc.) User interface for:

• Interactive PMCS & troubleshooting (IETMs) • System state, configuration & supply status management • Off-platform reporting & requisitioning

VHMS links to Army Logistics Enterprise networks for (Future Capability): Logistics reporting Supply requisitioning Fleet data storage & analysis CBM:

• Predictive (use-based) maintenance • Development & refinement of prognostic (condition-based) maintenance

algorithms

VHMS Definition

3 UNCLASSIFIED

Page 5: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

VHMS: Building the Future Incremental Capability Development

Digital Platforms: Digital Bus, Sidecar, Vehicle Databus (1553)

Platform Information: Digital PM HBCT, IETMS, BIT/FIT, VDMS

VHMS: ED, Self Reporting, Self Monitoring

CBM: Fact Based, Trend Analysis

Prognostics: Predictive

Maintenance

Improve process effectiveness RESPOND

DECIDE

Know more faster!

Make smarter

decisions

Information

Action

SENSE

Data

Outcome

4

PM HBCT Modernization

Programs

PM HBCT Legacy Platform

Upgrades

UNCLASSIFIED

Page 6: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

VHMS Operational Requirement Traceability

Incorporate class III ETMs

Provide automated troubleshooting

with ETMs

Track on-hand fuel/ammunition and report to C2

Manage software and hardware configuration

Provide wired interface for SoS

sharing

Provide prognostic capability

Track equipment capability and report to C2

Provide fault resolution and

maintenance action tracking

Provide automated PMCS

Incorporate class V IETMs

Track equipment usage

Display vehicle history

Provide wireless interface for SoS

sharing

Current diagnostic performance

Enhanced diagnostic

performance

Record diagnostic events and data in

non-volatile memory

Report equipment health to operator

Provide PMA

Report deadlining faults to C2

Operational requirements with trace to approved ORDs

Operational requirements that need approval of draft ORD/CDD requirements

33 VHMS operational requirements

28 VHMS operational requirements

Increment 2 Capabilities Hard or Desired Requirement Increment 1 Capabilities

5

Start with User Requirements from the Warfighter

UNCLASSIFIED

Page 7: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Common System Engineering Document Tree

VHMS scope, purpose, definitions and technical standards.

Operational concept describing the “as is” and “to be VHMS concept.

Operational Views & OV Use Cases describe VHMS capabilities through user scenarios.

Operational Requirements Analysis provides top-level VHMS requirements & traceability to sources.

Interface requirements between on components on platform and requirements to communicate off- platform. (i.e.. GCSS-Army)

Common user interface design for each VHMS screen. Style guide to facilitate tailoring an individual screen.

System Views & Black Box Use Cases decompose VHMS capabilities into system functions and define interfaces.

GCS Requirements needed to implement VHMS.

Army Regulations

Logistics Policies & Guidance

Vehicle-specific Requirements

Operational Requirements Analysis/Allocation

ORA OVUCs/DoDAF OVs OCD

System Requirements Functional Analysis/Allocation

GCS SegmentSpec

GCS BBUCs/DoDAF SVs GCS IRS

Architectural Analysis Requirements Decomposition

Requirements Analysis

GCS ComponentSpecs GCS GBUCsGCS Segment

SADGCS Segment

SSDD

UIDD & Style Guide

All Views Technical View

6

Derive Requirements to Performance Specifications

UNCLASSIFIED

Page 8: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

VHMS Requirements Flow-Down

- Modernization - VHMS Tech Development - Current Gen Upgrades

Vehicle ORD

Vehicle Performance

Spec

Vehicle SSS

Vehicle Component

Specs

VHMS Operational

Requirements Analysis

VHMS GCS Spec/IRS

VHMS Component

Specs

Vehicle CDDs

Vehicle Performance

Spec

Vehicle SSS

Vehicle Component

Specs

VHMS SSS

Vehicle Component

Specs

Modernization Current Generation HBCT Vehicles VHMS Common

VHMS GCS SSDD

Vehicle SSDD

VHMS SSDD Vehicle

SSDD

7

Requirements Across Platforms and Future Capability Increments

UNCLASSIFIED

Page 9: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Vehicle Health Management System (VHMS)

• Development of overarching system requirements and architecture for a PM HBCT VHMS implementation

• Enhance and Integrate Diagnostics on platform

• Coordinate off-platform interfaces with Enterprise-level logistics systems (GCSS-A, CBM Data Warehouse)

• Centralized Health Management Application • Common GUI that reduces training footprint for HBCT maintainers

• Enhance Embedded Diagnostics • Enable platform data storage and transfer • Develop & integrate IETMs • Integrate Ground Digital Log Book (GDLB) • Plan for future upgrades (LRMs, SRU-level Fault Isolation)

8

Commonality where feasible with Industry Partners UNCLASSIFIED

Page 10: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

GCS Software Architecture

VCN – VHMS Communication Network

VHM – Vehicle Health Management

IETM-M – IETM Management

DPC – Diagnostics, Prognostics, CBM

LDB – Logistics Database

LDBM – LDB Management

9

OEMs to integrate as GFM OEMs Responsible Integrate VCN Component PMA / MSD V3

OEM Platform

Developed VHMS

Components

UNCLASSIFIED

Page 11: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Hardware Approaches Ab

ram

s B

radl

ey

& P

IM

Mai

ntai

ner

SMART Display*

Recording & Simulation Unit (RSU)

Portable Multi-Functional Display*

PMA EDC Ethernet Switch Wireless

NIC

E-Switch

E-Switch

Common WNIC

Common WNIC

MSD V3 * Current display HW are surrogates until common display IPT does official RFI/RFP

Display/EDC

10

MSD V3 to be used for At-Platform Functions & Off-Platform Data Transfer

UNCLASSIFIED

Page 12: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

11

Systems Engineering Work Products

Materiel Solutions

VHMS Key Products

GCS Specification Interface Requirements User Interface Descriptions DoDAF Architecture Artifacts

Platform Software Vehicle Health Management Enhanced Diagnostics Logistics Database Management Integrating GFM

Integrated Solutions

Ground Digital Logbook IETMs VHMS Comms Network (VCN) E-switch Wireless Network Card

Wireless NIC

E-switch

EMS-NG(IETM) Ground Digital LB

Specifications Common Screens

DoDAF Architecture Artifacts

OV

SV

TV DPC

VHM IETM GDLB

VCN

GFM

OEM

LDBM

UNCLASSIFIED

Page 13: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

PM HBCT capabilities based initiative Mission Readiness Assessment Improved diagnostics and provides data storage & transfer capability Provides a systems engineering approach to obsolescence

Reduce Logistics Footprint and increase reliability STE / BRADS / ATE Reduction/Elimination (cost avoidance) Reduces Troubleshooting burdens (IETMS, GDLB) Self diagnosing, self reporting and verification on board (real time) Automates maintenance processes (PMCS) Common User Interface (Screens) Leverages existing platform diagnostics and vehicle networks

Baseline Benefits of Vehicle Health Management

12

Improved diagnostics, reduced maintenance time, increased reliability, reduced NEOF’s = improved OR rates and improved

combat power for soldiers and reduced costs

UNCLASSIFIED

Page 14: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Summary of Benefits Achievable with VHMS & CBM+

Reduce or eliminate reliance on DSESTS in Field (cost avoidance) Reduce NEOF rates in Field & Sustainment (cost avoidance, inventory reduction) Platforms become self-diagnosing & self-reporting (workload reduction, accuracy

increase) Automate maintenance (workload reduction & increase accuracy) Common maintenance display (reduced training assets, cross-functional field

diagnosis) Increase Ao Reduce MDT (shorter diagnostic time, reduced maintenance workload, reduced part

order errors) Automate PMCS (workload reduction & increase accuracy) Reduce time to process repair parts requisitions Increase asset visibility, situational understanding of combat power, consumables &

crew situation Contribution to net-centric warfare & logistics capabilities Increase early warning of possible failures through CBM condition advisories (increase

MTBSA, reduce potential collateral damage) P3I

13

VHMS Program is being implemented with incremental capabilities on Current Legacy and future Modernization Programs (P3I)

UNCLASSIFIED

Page 15: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

DUSD(L&MR) memorandum, 25 Nov 2002 ASA(ALT) memorandum, 25 Jul 2003 MILDEP & G-4 memorandum, 05 May 2005 ASA(ALT) memorandum, 17 August 2005 AR 750-1, 20 Sep 2007 DOD Instruction 4151.22, 2 Dec 2007 ASA(ALT) memorandum, March 20 2008 CLOE/CBM+ Policy Memorandum, 09 Feb 2009

Command Guidance for CBM

Bottom line: PMs must implement

CBM+ and integrate CLOE standards into both new and existing systems when deemed feasible and cost effective.

Requires cost-benefit analysis for existing systems.

14

Next Capability Increment for Modernization

Programs

UNCLASSIFIED

Page 16: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Condition Based Maintenance (CBM)

• A set of proactive maintenance processes and capabilities that improve operational availability and reduce the soldier’s maintenance burden by performing maintenance based upon evidence of need in lieu of scheduled based or run-to-failure maintenance processes . • Accomplished through:

• Digitized platform (embedded sensors and vehicle network) • Enhanced diagnostics • Evolving systems to predict remaining useful life of components • Then to automate supply transactions

• Derived from near real-time assessment and analysis of data from: • Embedded Sensors • Platform Maintenance Environments • Platform Supply & Maintenance Data (historical)

15

Proactive. Evidence of Need. Condition Based Overhauls & Inspections

UNCLASSIFIED

Page 17: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

PM Responsibility

Ground Platform VHMS

16 UNCLASSIFIED

Pldtform Level Bdttdllon Level Enterpnse Level

GC

' I I ......... ,.,_!:~Atr f • 11 ~ - - - -- --- - - -1 - --'-- - -- - LIW

' 1fiaru't0 FE '

boo • • • .

I •

~ :~DJ&I ~ •tli!U c.

. • I:JLi ' I ' I.-·

Page 18: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

Visualizing the Enterprise

PM Responsibility

17 UNCLASSIFIED

Platform Level Battalion Level Aviation

~ ..... ~:-·-· ~

o.gl:al sc .1rc,:-~ Cc lectc:-s 111111111

II Antblablo: Faull Oat;1 \ -- .. A' ,._ ____________ _,,_ __ ,...

.::..; ----------- --- ...;, _- .. ---.~~ , H~tklelil\)ll;l C8W Dab \ ......

: ! \ ,Flight Op• ; '..ACtiOn$ ; • , \ ·-: ·~nFnull OM'! • :-;11 \1 \ ; • ~l'tt t<H: .. ;s: · ·= r.1 \

··-··----J .. . ·~~ • ALS-: • Ill ~ht ·:·~·3 '"":;;;:= ;;>

Ground

' Act :.:u\btl! ' " •I<'•"'

C yi..al S~.:.ll ' .. ''-'.;;,'1 ull +- -------- -----~ ....... cc l•ctcrs ._, -/ - - - -- - - - - - - - - - - .,..

: , f~on-Actlonablt Oc.ta

'

~ """""; Platform Device ! logbook

• F«~lll C•:.~t:.~ • CEV ·ICThl

• Local ~E 1E \ hnagerTlt

''• ·. •,

-----------

--~'l Enterprise Level j

GCSS-Army

CCSS-Army - Oo\S

LIW tcJQfmo ·rr-m.'d l'l<ln>hiOIIse

LOOSA- O&S

CBM DIW CB.UD.:ti• l•/8/'Ph()(.'J('

Page 19: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

18

PBUSE

ULLS-A(E)

SAAS-MOD

SARSS-1

SARSS-2AC/B

SAMS-E

SARSS-GW

Provides ACCURATE VISIBILITY OF PARTS in the Supply Chain

Provides Accurate

EQUIPMENT READINESS Data

Provides a CENTRALIZED AMMUNITION

MANAGEMENT System

Enables Accurate PROPERTY

ACCOUNTABILITY

Today’s Tactical Logistics Systems:

Captures Total Weapons System

COSTS

Performs Tactical Logistics

FINANCIAL FUNCTIONS

The Tactical

Army’s Logistics ERP

GCSS-Army IOC in FY12 FOC in FY15

Equipment Master

Benefits of GCSS-Army/CLOE

Providing Soldiers a Single System to accomplish a wide range of Logistics Missions HBCT is Leveraging “Big Army” Initiatives

UNCLASSIFIED

Page 20: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

PM HBCT VHMS Program Summary

The VHMS program has developed and delivered system engineering

documentation and a set of common materiel solutions. VHMS team is now developing platform specific materiel solutions to

implement a VHMS system to connect to End to End Logistics Systems and Data Warehouses (logistics, engineering and CBM data).

VHMS will connect to the Global Combat Support System Army (GCSS-A)

– which is the Army’s future Enterprise Resource Planning (ERP) system.

19 UNCLASSIFIED

Page 21: PM HBCT VHMS Program - DTIC · 2011-11-17 · PM HBCT VHMS Program 16 August 2011 Larry Marino, Deputy PM HBCT-VHMS, CBM & CLOE/GCSS-Army Systems . Singapore/U.S. Vehicle Electronics

20

Question/Answer Session

PM HBCT VHMS Program

UNCLASSIFIED