27
PM ConSim for Worldwide Joint Training and Scheduling Conference COL Karen Saunders [email protected] PM Constructive Simulation 407-384-3650 Rick Copeland [email protected] DPM Constructive Simulation 407-384-3652

PM ConSim for Worldwide Joint Training and Scheduling Conference

  • Upload
    seoras

  • View
    98

  • Download
    2

Embed Size (px)

DESCRIPTION

PM ConSim for Worldwide Joint Training and Scheduling Conference. Rick Copeland [email protected] DPM Constructive Simulation 407-384-3652. COL Karen Saunders [email protected] PM Constructive Simulation 407-384-3650. PEO Mission - PowerPoint PPT Presentation

Citation preview

Page 1: PM ConSim for Worldwide Joint Training and Scheduling Conference

PM ConSim for Worldwide Joint Training and Scheduling Conference

PM ConSim for Worldwide Joint Training and Scheduling Conference

COL Karen [email protected] Constructive Simulation407-384-3650

Rick [email protected]

DPM Constructive Simulation407-384-3652

Page 2: PM ConSim for Worldwide Joint Training and Scheduling Conference

PEO

Acquisition CenterDirector/PARC

Associate DirectorContracting Operations

Associate DirectorPolicy & Systems

BusinessOperations

DPEO (SES)

Customer Support

Project Support

Special Staff

PM TRADE

PM ConSim

PM Field OPS

PM CATT

PM ITTS

PM FF(S)

DPEO Programs

PEO STRI OrganizationPEO STRI Organization

End 4.0 Shape a “world class” workforce with acquisition, functional and leadership skills

PEO Vision The Center of Acquisition Excellence

Providing Simulation, Training, and Testing Solutions for the Nation.

PEO Mission To Provide Responsive Interoperable

Simulation, Training, and Testing Solutions and Acquisition Services for

the Warfighter and the Nation.

Page 3: PM ConSim for Worldwide Joint Training and Scheduling Conference

PM ConSim

COL KAREN SAUNDERS (PM)MR. RICK COPELAND (DPM)

APM JLCCTCPRODUCTION

MR. ROY WHITEHEAD

APM JLCCTCDEVELOPMENT

MR. MIKE HADDAD

TRAINING SIMULATIONS OFFICER

LTC STEVE FRENCH

PdM Warrior Training Integration (WTI)

LTC KEITH FLAIL (PdM)Vacant (DPdM)

Joint and Coalition Simulation Systems

(JCSS)

Vacant (Director)

DON PHILPITT (APM)

PdM OneSAFLTC ROB RASCH (PdM)

MR. JOHN LOGSDON (DPdM)

ConSim Organization

JCSS

Page 4: PM ConSim for Worldwide Joint Training and Scheduling Conference

ConSim Vision: To be the Recognized Leader for Providing Constructive and Integrated Simulation Environments.

ConSim Mission: To Provide Operationally Relevant Constructive and Integrated Simulation Environments for the Warfighter and the Nation.

ConSim MissionConSim Mission

Joint Coalition Simulation Systems (JCSS) - Develop, acquire, field and sustain interoperable simulation environments in support of Joint and Coalition Forces and the Nation.

PdM OneSAF – Develop, field and configuration manage the OneSAF constructive simulation for the US Army.

The Training Simulation Office executes the SIMCI project for HQDA and serves as the designated FA57 proponent within PEO STRI.

APM JLCCTC (Production) - Focused Management of both the Multi-Resolution Federation and Entity Resolution Federation compositions of the Joint Land Component Constructive Training Capability (JLCCTC).

APM JLCCTC (Development) – Focused Management on Objective Simulations targeted at training commanders and staffs at Brigade and above.

PdM Warrior Training Integration (WTI) - Provide persistent and integrated LVC training enablers that allow Commanders to plan and execute realistic Battle Command, Intelligence, and Joint Training to prepare their soldiers and staffs for combat.

Joint Coalition Simulation Systems (JCSS) - Develop, acquire, field and sustain interoperable simulation environments in support of Joint and Coalition Forces and the Nation.JCSS

Page 5: PM ConSim for Worldwide Joint Training and Scheduling Conference

BLUF:The LVC-IA will enable seamless LVC

& C2 connections

C2• ABCS• GCCS

CONSTRUCTIVE• JLCCTC• OneSAF

LIVE• HITS

VIRTUAL• AVCATT

• CCTT/RVTT• CFFT

LVC-IA

Increment 1 Focus- Brigade Combat Team (BCT)

- Home Station Training- BCTC is LVC Hub

LVC-IA Increment 1 ConceptLVC-IA Increment 1 Concept

Page 6: PM ConSim for Worldwide Joint Training and Scheduling Conference

6

LVC-IA

Requirement/Capabilities: • LVC-IA integrates L-V-C systems and ABCS enabling unit and battle staff configurable tailored combined arms and joint collective training at multiple echelons. • LVC-IA provides appropriate 'conditions' for realistic training, increasing unit force effectiveness and readiness. • It will create a Joint, interoperable, seamless architecture to support training environments for Current and Future Forces in the Institutional, Operational, and Self Development Domains. • LVC-IA will support development of an LVC Integrated Training Environment (ITE)

Current Activities: • Acquisition documentation in support of Milestone B decision and program initiation

• ACAT III program, MDA delegation to PEO STRI •Materiel Development Decision (MDD) - June 2009•Anticipated MS B in September 2009

• Contract actions:• Industry Day – May 2009 •Request for Information – June 2009• Request for Proposal – October 2009• Anticipated Contract Award – January 2010

• Live, Virtual, Constructive Integration Cell (LVCIC)• Technological and Programmatic Risk Reduction

• LVC-IA Site Survey and Prioritization Visits

OCONUS Fielding

US Army Pacific (USARPAC)

US Army Europe (USAREUR)

FT CarsonFT Lewis

FT Bliss

FT Hood

FT KnoxFT Campbell

FT Bragg

FT Stewart

FT Drum

Camp Shelby

Page 7: PM ConSim for Worldwide Joint Training and Scheduling Conference

BCTP TSS Convergence Roadmap

JNEMISM

LOGFED

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

OneSAF R & D

BCT & Below

OneSAF

Div & Above

WARSIM R&D – DIV (+)

CSSTSS

JNEMISM

LOGFED

CBCSE, BCTC Equipment & MCA OPA

ERFERF

V2.0V1.0 V3.0 V4.0 V5.0 V6.0

V3.0

V4.0

V4.0

V5.0

V6.0

V6.0

V5.0

IEWTPT

DBSTTACSIM

Common HW

Obj MRF

Refresh

LCMP/P3I

WARSIM R&D – BCT

DBSTJCATS

EADSIMFIRESIMTACSIMSIMPLEMUSE

VISION XXI

ACTFCBS

TACSIMCSS/TSS

RTMMUSE

AAR TOOLS

V5.0

V6.0

MRF CBSTACSIM

JLCCTC

Page 8: PM ConSim for Worldwide Joint Training and Scheduling Conference

*Friends of the family

ERF

MRF-WMRF-C

JCATS (m)JDLM (or LID) (m/i)

JNEM (m)MUSE (m/i)

ISM (m)RTM (i)

AARS (t)FMT-R (t)

EADSIM (m)FIRESIM (m)

ETSIU (i)SIMPLE (i)JSPA (t)HDC (t)SASS (t)

CBS (m)*BICM (m/i)

WARSIM (m/i)WIM (m)

*IEWTPT (m/i)

ACE/ASCCE (m/i)BE Server (m)

*Archer (t)Rialto (t)

ExCIS (m/i)TACSIM (m/i)

ERFMRF-W

MRF-C

OneSAF (m/i)

m = modeli = sim/C2 interface

t = tool* Friends of family

JLCCTC ChallengeJLCCTC Challenge

Page 9: PM ConSim for Worldwide Joint Training and Scheduling Conference

Fielding Plan or Schedule

Capabilities Summary

Current Activities

JLCCTC MRF-WARSIM is the US Army’s next generation constructive training simulation that creates a Realistic Training Environment for Commanders and their Staffs. Capabilities includes:

Supporting a DIV WFX/CPX Use Case C2 Stim with ABCS 6.4 devices including BCS3 and

DCGS-A Three Enclave Solution with Intel capabilities (HUMINT,

IMINT, ELINT, COMINT, and MASINT systems) Interface with AARS, ARCHER, MUSE, JNEM, ISM, and

JCATS Provide Fixed sites capability with BE Services Improved Diagnosis/Recovery and parametric data

management

• Just completed a very productive MRF-W v5.5 VE and ORE at the NSC and BCTC/BCTP • The MRF-W VE/ORE provided the best operational environment to date to "stress and shake-out" the system to ensure readiness for Army DIV WFXs. • During the VE, the federation availability was 98% with an overall requirements pass rate of an impressive 85%• During the ORE, the System was solid and available 100% the first 60 hrs before encountering the first period of down time; final availability was 91.8%• Conducted four Analysis Events at Fort Huachuca to compare their current simulation systems to WARSIM’s capabilities:• WARSIM interfaced/stimulated DGCS-A v3.0.1 • Verified/updated Intel sensors parametric data/capability • Demonstrated interface with IEWTPT• Upon addressing any outstanding gaps, Fort Huachuca plans to use WARSIM for their school house training exercises

Aug 09: Complete v5.5 MRF-W fielding to the NSC and BCTP

Sep/Oct 09: Field Tech Control Forward suite to Korea in support of the WARPATH II Exercise and 2ID CPX/ORE

2QFY10 & beyond: Field to additional Army Tier one BCTCs

XX

XX

X

XXX

XXXX

XX

X

WarFighting Functions:• Irregular Warfare• Conventional Warfare• Stability/Support Operations• Non-Military Infrastructure

Joint, Combined, Foreign & Noncombatant:• Universal Data Base • Multi-Sided Combat• Common SNE

2-Way C2 System Interface:• TA Graphics to Role-player

Combat Service Support:• Convoy Self-Defense• Integrated Logistics Play• Total Asset Visibility

Single Consistent View of Battlespace:• Intel• C2• Models• Role-player• Data Collector• AAR

Non-Combat Effects: • Interface with JNEM• Battle Outcome Adjudicator

Intelligence: • HUMINT• IMINT• ELINT• COMINT• MASINT• Golden Nugget

Role-Player/Workstation Efficiencies:• Automated Unit Behaviors• Common interface for Intel & ground model

as of 29 May '09

JLCCTC MRF-WMulti Resolution Federation (MRF) - WARfighters’ SIMulation (WARSIM)

Page 10: PM ConSim for Worldwide Joint Training and Scheduling Conference

JLCCTC ERF

Current Activities V5.x Being Fielded at 22 CONUS/OCONUS sites during FY09• Week 2 of the VE finished on 29 May with the following results:

• 182 of 209 tests completed, with 86% tests passed. The remaining tests will be run during the ERF ORE with BCTP in July.• Overall federation availability was 97%.• 74 PTRs were written, of which 43 were closed or deferred.

V5.2 Development (2nd Qtr FY09)

ROK

• 22 Fielded locations• v5.1 – 2nd Qtr FY09• v5.2 – 4rd Qtr FY09• v5.3 – 4th Qtr FY10

Italy

FRG

Capabilities Summary• Full automation of TTP behaviors and simulation objects down to the soldier or vehicle level• Supports exercises from Company to BDE• Models sides/factions BLUFOR, OPFOR, Non-aligned, Neutral and Non-combatants• Trains hundreds of commanders and staff yearly at 22 CONUS and OCONUS sites • DIS / HLA Compliant • Stimulates ABCS 6.4 including Native AFATDS• Software operates on COTS HW• Hardened the integration of LOGFED in FY09.

Page 11: PM ConSim for Worldwide Joint Training and Scheduling Conference

Users:•RDECs / Battle Labs / Active Duty Brigades & Battalions• Service / Joint Organizations• International Partners• USG Contractors / Academia

Objectives: • Reduce Army Life Cycle M&S costs

• Capable of replacing USA legacy entity based simulations: BBS, OTB / ModSAF, CCTT / AVCATT SAF, Janus (A&T), JCATS MOUT

Technical Capability Highlights:

• Provides entity modeling to BDE level

• Supports both Constructive & Virtual Domains

• Provides Urban Operation modeling with COE Focus

• Provides DIS/HLA/JC3IEDM/ ABCS Interoperability

• Supports ACR, RDA, TEMO) Domain applications

Programmatics:• MNS: May 97• PM Charter: May 00 • V1.0 (FOC): Sep 06• V3.0: Feb 09

Ares Control Interface

OneSAF OverviewOneSAF Overview

Page 12: PM ConSim for Worldwide Joint Training and Scheduling Conference

Capabilities Summary

• Supports PEO STRI integration of Army System & Non-System training devices with existing and emerging Army Battle Command Systems (ABCS)

•Augments & Supports CTSF distributed Army Interoperability Certification (AIC) / testing

•Supports PEO STRI Training Development Community by providing ABCS technical expertise and early access to emerging ABCS SW Baselines

Current Activities

• Undergoing DIACAP for DIL Network Accreditation

• Federated Net-Centric Site (FaNS) Accreditation 5 June 2009

• RFP for new competitive effort expected to be posted by mid June

DR

EN

PM ConSim•JLCCTC•WARSIM•OneSAF

PM CATT

Other Agencies •JFCOM/JDIF

•RDECOM•NSC

PM TRADE•LT2

•DRTS•ETC-IS

•SE CORE•AVCATT

•CCTT•PM STS

AFATDSAMDWS

ASASFAADFBCB2

GCCS-A MCSBCS

DCGS-A

System Architecture/DIL Network Diagram

DIGITAL INTEGRATION LABORATORY (DIL)

Page 13: PM ConSim for Worldwide Joint Training and Scheduling Conference
Page 14: PM ConSim for Worldwide Joint Training and Scheduling Conference

Acronyms

AAR After Action ReviewAPI Application Protocol InterfaceBC Battle CommandCATT Combined Arms Tactical TrainerC2SE Command and Control Simulation EquipmentC2 Command and ControlCBS CORPS Battle SimulationCOE Contemporary Operating EnvironmentCSS Combat Service SupportCSSTSS Combat Service Support Training Simulation SystemCTIA Common Training Instrumentation ArchitectureDBST Digital Battlestaff Sustainment TrainerDIF Data Interchange FormatIEWTPT Intelligence & Electronic Warfare Tactical Proficiency TrainerISR Intelligence, Surveillance and ReconnaissanceJCATS Joint Conflict And Tactical Simulation JDLM Joint Deployment Logistics ModelJOE Joint Operations EnvironmentJLCCTC Joint Land Component Constructive Training Capability -MRF Multi-Resolution Federation -ERF Entity Resolution FederationLOD Low Overhead DriverLVC - IA Live, Virtual, Constructive - Integrated ArchitectureMOUT Military Operations in Urban TerrainOneSAF One Semi-Automated ForcesOneTESS One Tactical Engagement Simulation SystemOIS Future Instrumentation SystemPoP Proof of PrincipalSE Core Synthetic Environment CoreTACSIM Tactical SimulationTENA Test and Training ENabling ArchitectureWARSIM Warfighter's Simulation

Page 15: PM ConSim for Worldwide Joint Training and Scheduling Conference

ConSim Portfolio

UBC

CONSTRUCTIVE

LIVE

VIRTUAL

LVC-IA

Page 16: PM ConSim for Worldwide Joint Training and Scheduling Conference

ConSim Portfolio

JLCCTC (WARSIM)

FT Riley BCTC

IEWTPT HCC

Page 17: PM ConSim for Worldwide Joint Training and Scheduling Conference

LVC IC Build 0LVC IC Build 0

Page 18: PM ConSim for Worldwide Joint Training and Scheduling Conference

Enabling Technologies:Each of the training domains provide unique complementary capabilities to the entire LVC training environment.

Elements of Live Virtual ConstructiveElements of Live Virtual Constructive

Integration of Battle Command:Real world tactical systems used in the training environment.

Page 19: PM ConSim for Worldwide Joint Training and Scheduling Conference

Current State of Modeling and Simulation for TrainingCurrent State of Modeling and Simulation for Training

VIRTUAL

CONSTRUCTIVE

LIVE

Page 20: PM ConSim for Worldwide Joint Training and Scheduling Conference

Today’s RealityToday’s Reality

Live

Enablers Products Future Products

LT2 Product LineCTIAFASITOneTESS Standard

DIS/HLADistributed RepositorySecurity ServicesCommon Components C4I Adapter

SE Core VSA DVED CM2

CCTTAVCATTGames for Training

CDTRCTSJFETSVirtual

Constructive

CTC OISMILESDigital RangesT-IED

HITSCTC IS ModificationETC-ISI-MTSOneTESS

JLCCTCCBSWARSIMOneSAF

One MergedFederation&LVC-IA

Page 21: PM ConSim for Worldwide Joint Training and Scheduling Conference

21

as of: For Official Use Only

21

MRF-W Plan to Support 2ID WARPATH II Exercise & CPX/ORE

2008 2009Sep Oct Nov Dec Jan Feb Mar Apr May Jun JulAug Sep Oct Nov

====>>JLCCTC MRF-W V5.5 Development,

Integration, and Test

VE20 Apr -1 May 2009

ORE18-22 May2009

2ID CPX/ORE

Nov '09

Warpath IIOct '09

V5.5 (3QFY09) Capabilities:- DIV WFX/CPX Use Case- Three Enclaves with Intel (HUMINT, IMINT, ELINT, COMINT, MASINT)- Improved Diagnosis / Recovery and parametric data management- Address v5 Concerns/PTRs

Interfaces:- ABCS 6.4 including BCS3 Stim- AARS, ARCHER- JNEM, ISM, MUSE- Fixed sites capability with BE Services

MRF-W Preparation / Key Activities: 2ID WARPATH II Exercise and CPX/ORE Plan Forward:

26 May – 17 July ‘09: SW and Scenario Development of seven main tasks. (SW Freeze ~17 July)

Early June – Sept ‘09: Conduct IPRs with all stakeholders (2ID, 8th Army, KBSC, BCTP, NSC)

20 July – 8 Aug : Integration and Test Exer Design Conf: 13-17 July in Korea

3 Aug – 11 Sept: Numerous Scenario Data Scrubs 14-25 Sep ‘09: Master Training in Korea

8 –14 Aug: PTR Freeze date and Final SW Build produced

5-9 Oct ‘09: RolePlayer Functional Training in Korea

24 Aug – 4 Sept: SW Release Test at the NSC 12-16 Oct ‘09: WARPATH II Exercise Execution in Korea

7-12 Sept ’09: Set-up Tech Control Forward in Korea 6-19 Nov ’09: 2ID CPX/ORE and prep activities

Page 22: PM ConSim for Worldwide Joint Training and Scheduling Conference

Current Activities

Fielded v4.1 to NSC, BCTP, Hood, Bragg, Lewis, KBSC, and JMTC in FY 08.

Fielded V5.1 to Ft. Hood Jan 09

V5.2 FINAL PLANNED VERSION VE June 22nd – July 2nd

FY2010 CBS in Full Sustainment

KBSC

FRG

Capabilities Summary

• Models units from section/squad through division• Corps, Division & Unit Employment Operations, • High Fidelity Intel, Logistics & AAR Federates• Linkage to Battle Command & Control Systems• Trains commanders and staff • Only US Ground model that is KSIMS compatible• Key Events: Unified Endeavor, Ulchi-Freedom Guardian , Key Resolve, Yama Sakura, WarPath, Cobra, Rapid Thunder, Iron Focus.• Security Classification : Unclassified to TS/SCI

JMTC

JLCCTC MRF-C

Page 23: PM ConSim for Worldwide Joint Training and Scheduling Conference

23

Capabilities Summary• Supports Intelligence Surveillance & Reconnaissance• Operates in the Constructive & Live Domains • Supports the Intel Warfighter and Commander• Trains Intel Warfighter in their “Go-to-War” system • Forces cross domain fusion within intel BOS• Robust AAR Generation • Hardware/Software and contractor support at sites• Utilizes Service Based Architecture for large entity counts as well as aligning with Army ISR systems (DCGS-A, ACS)• 3-D environment to support realistic tactical questioning techniques and procedures• 19 scenarios currently fielded – 3 MP; 16 HUMINT

Current Activities• Developing Signals environment in the TCC to stimulate SIGINT ISR platforms• V4.0 Development (2nd Qtr FY10)• Integrating technology into HCC • Building new scenarios for the HCC• 7 scenarios (5 HUMINT, 2 MPs) currently being developed; 5 additional HUMINT scenarios planned • Integrating Quick Reaction Capabilities into TCC• Supporting Army G2 initiative in developing a training solution for DCGS-A• Working with Army Evaluation Center to use IEWTPT for DCGS-A testing and evaluation• Successfully supported Austere Challenge 09

Current Fielded Sites

FT Lewis

FT Hood

Schofield

FT Huachuca

FT Bragg

IEWTPT – TCC/HCC

Page 24: PM ConSim for Worldwide Joint Training and Scheduling Conference

OneSAF

Capabilities Summary• CGF/SAF modeling from entity to BDE

• Supports Constructive & Virtual Domains

• COE Focus with Urban Operation modeling

• Operations from Scenario Generation thru AAR

• DIS / HLA / JC3IEDM / ABCS Interoperability

• Supports ACR, RDA, TEMO Domain Events

• Software only

• Platform independent (Linux/Windows) software

Current Activities

• TEMO Domain assessment @ NSC (July)

• OmniFusion (OF) 09 @ Maneuver Battle Lab (July)

• FCS Events @ Ft. Bliss (July)

• V3.0 International Development (3rd & 4th Qtr FY09)

• V4.0 Development (Planned delivery: 2nd Qtr FY10)

• V5.0 Development (Planned delivery: 2nd Qtr FY11)

• Merged software development baseline with SE Core

• FLOIS TALON STRIKE (TS) using OneSAF for collaborative US & UK Battle Command stimulation (FY10)

CTCs, Staff & Virtual Trainers

Paving The Way To The Future

GE

• Over 200 Hundred Domestic Locations & 7 International Partners

• v3.0 – Released 2nd Qtr FY09• v3.5 – 4th Qtr FY09 (Planned)

Interoperable Applications

CommonArchitectures

DIS, HLA

C4I Adapter, SNE, AAR, Scenario Generation

CTIA, VSA, OneSAF

Common APIs, DIFs, & Protocols

Common Components

Page 25: PM ConSim for Worldwide Joint Training and Scheduling Conference

Battle Command Training Capability – Equipment Support (BCTC-ES)

Fielding Plan or Schedule

Capabilities Summary

• Furniture, Fixtures, and Equipment• Battlefield Visualization System• Radio-Wire Integration System• Network Infrastructure Upgrade and Simulation System connectivity• Battle Command (C2) Server Fielding / Refresh• Simulation-to-C2 end-to-end Connectivity and Integration• Packet Radio Units and Antenna Systems (Fixed / Mobile)

Current Activities•Fielding Ft. Riley BCTC (med) (estimated completion

– 8 Jun)

• Working with the Ft. Benning (Harmony Church)

team for a 100% Design for the new facility

• Preparing contract actions for the Ft. Campbell & Ft.

Bliss Medium BCTC Fielding

• Scheduling Red Zone Meeting to complete plans on

fielding for the FY10 BCTC Fielding’s

Admin Support Staff

AAR

Reconfigurable Tactical Operations Centers

(RTOC) Expandable

CommsWorkcells

Tech Control

ExpandableClassrooms

WSMR

Ft. Riley

Ft. Sam Houston

Ft. Leonard Wood

Ft. Campbell

Ft. Benning

Ft. BlissFY09 Fielding

FY10 Fielding

FY11 Fielding

Page 26: PM ConSim for Worldwide Joint Training and Scheduling Conference

FITE JCTD

Transition:• Extended Use of Interim Capability, Targeted

Locations: – Camp Lejeune and Fort Benning– If conducted, resourced through BA4 funding

• Follow-on Development, Production, Fielding, and Sustainment, Targeted POR/Programs:

– Dismounted Soldier (PM CATT)– CACTF (PM TRADE)– IIT (PM TRASYS)– Mission Rehearsal (USSOCOM)– SITE [proposed TBD (PM TRASYS)]

Participants:• User Sponsor: JFCOM• Operational Manager: JFCOM• Technical Manager: ONR• Transition Manager: PEO STRI • Oversight Executive: ODUSD (AS&C)

Schedule:• Technical Demonstrations: May 09, Apr 10• Operational Demonstrations: Aug 09, Jul 10• Operational Utility Assessments Reports: Oct

09, Sep 10

Capabilities Solution:• Three Configurations:

– Spiral 1: Individual-worn Virtual Reality– Spiral 2: Facility-based Mixed Reality– Spiral 2: Individual-worn Augmented Reality

• Configuration Components:– Software virtual environment– Commercial hardware– Visual, auditory, touch, and smell components– Position and weapons tracking system– AAR system

• Funded by OSD/AS&C, JIEDDO, and JFCOM

Page 27: PM ConSim for Worldwide Joint Training and Scheduling Conference

Co-Chairs

PEO STRI PEO C3T

CIO/G6

G3DAMO-LB

ASA(ALT) G8

TRADOCARCIC

Core Members

CERDEC

ATEC

SMDC

JFCOMJWFC

PEOGCS

TCMLive

SignalCDID

CACCDID

TCMGeospatial

TCMLVC/NSC

TRAC

PMFCS (BCT)

(BC)

PMFCS (BCT)

(MSO)

PMFCS (BCT)(TNG IPT)

CGSCDLDC

TCMVirtual

3CE

TCMN&S

PEOIEW&S

PEOEIS

PEOAviation

PEOSoldier

OTC

G3DAMO-MS

Council of Architects

Secretariat

TCMBC

TEC

SIMCI Simulation-to-C4 Interoperability

FY09/10 Focus Areas

• Mitigating the impact of Capability Set 11-12 on M&S systems

• Initialization

• JC3IEDM Migration

Army Staff Material Developers Combat Developers Cross Domain SIMCI Management

SIMCI OIPT Membership

M&SDomain

C4IDomain

Interoperability of Current and Future

SystemsM&S

C4I

SharedSolutions

ProcessesCommon

Data

Reusable Components

Architectures

CommonStandards

Description• Mission: Provide policy, organizational, process,

and technical recommendations to Army Leadership to improve interoperability of M&S and C4I systems

• Focused on common components, data, standards, architectures, and processes

• Co-chaired by PEO STRI & PEO C3T; originally chartered in FY2000 Migration