PM 1000 URM
– Up to 100% recycling of the existing ballast material
– Creation of a new supporting layer using existing material
– Lower disposal costs
– Up to 50% fewer logistical pauses than existing systems
– Higher track availability thanks to shorter periods in possession
– Rehabilitation capacity of up to 1400 metres per day
– 3 excavation chains
– Simultaneous installation of 2 geoplastics possible
– Installation of supporting and protective layer in one operation
– Ballast recycling with high-pressure washing
– Short set-up times
Your competent partner eu rail po
Performance ø – 12 hours 500 m
Max. performance per hour 110 m
Ballast Ecavation Chain – Capacity 300 cbm/h
Excavation width 4.200 - 6.000 mm
Subgrade Ecavation Chain – Capacity 1.000 cbm/h
Excavation width 4.050 - 6.600 mm
Excavation depth max. 1.300 mm
Installation height up to 600 mm (PSS/FSS)
Installation height, track formation layer 300 mm
Material supply (container wagon backwards) BA 255
Evacuation (to the front) MFS 100
Yourcompetentpartner eu rail pool
Working direction
D riv e un it fro nt – 2 3, 24 m Wa te r t re at me nt wag on – 2 1, 24 m B all as t w as hi ng w ago n – 20, 82 m B al las t sc re en ing wa gon – 20 ,8 2 m M ot or wa go n – 24 ,4 1 m E xc av at ing mac hi ne A 33 ,11 m Excavating machine B – 42,225 m Ta mp in g m ac hi ne – 2 7, 57 5 m D ri ve u ni t r ea r – 2 7, 42 m
PM 1000-URM – Lenght over buffers 270,00 m
Austrianbranchoffice
Kl. NeusiedlerStr. 29–A-2401FischamendTel. +43(0)2230 9273Fax +43(0)22309279061
eurailpoolGmbH
Lise-Meitner-Straße9 –D-85737IsmaningTel. +49(0)89 909397-20Fax +49(0)89909397-266
[email protected] – www.eurailpool.com
PM 1000-URM Spoil
Excavated ballast
Mixed material
Ballast bed residue
New ballast
Recycled ballast
New FPLmaterial
Intermediate layer
Revolving grid Spiral conveyor Finger screenWashing screen Impact crusher Vibrating screen Excavating chain 1 and 2
Installationof newFPLmaterialExcavatingchain 3
Platecompactor
Portal cranewithnewFPLmatFlank compactor Ballast outlet hoppers
TampingunitCompactor intermediate layer Packing device
Kl. Neusiedler Str. 29 – A-2401 Fischamend
Tel. +43 (0) 2230 92 73
Fax +43 (0) 2230 92 79 061
Lise-Meitner-Straße 9 – D-85737 Ismaning
Tel. +49 (0) 89 90 93 97-20
Fax +49 (0) 89 90 93 97-266
[email protected] – www.eurailpool.com