Decmil Australia Pty Ltd ABN 58 116 776 991. The works included: CLIENT Woodside LOCATION Burrup Peninsula, Karratha, WA CONTRACT Construct EPCM Foster Wheeler Worley Parsons CONTRACT VALUE $92 Million START DATE October 2008 COMPLETION December 2009 The construction of 16,000m3 of in situ reinforced concrete with structures including pipe rack foundations, burn off gas table top, flare foundation, heavy rigid pavement, jetty abutment, condensate tank containment bund walls, in situ sumps and in situ manholes. In addition to the in situ concrete related infrastructure, Decmil’s contract also included all detailed earthworks associated with the concrete structures as well as excavation and installation of GRE fire mains, storm water services, HV and LV electrical services, precast trunkline foundation installation and retaining wall construction. Decmil also completed roadworks, flexible pavement hardstands and the installation of the site perimeter security fence as part of these works. Decmil was contracted to complete civil works associated with the import and export pipelines (jetty and ship berthing facility excluded) for the storage and loading facility of Woodside’s Pluto LNG Project. Pluto LNG Project Site A – Onshore Civil Works Civil

Pluto LNG Project Site A – Onshore Civil Works - …...and LV electrical services, precast trunkline foundation installation and retaining wall construction. Decmil also completed

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pluto LNG Project Site A – Onshore Civil Works - …...and LV electrical services, precast trunkline foundation installation and retaining wall construction. Decmil also completed

Decmil Australia Pty Ltd ABN 58 116 776 991.

The works included:CLIENTWoodside

LOCATIONBurrup Peninsula, Karratha, WA

CONTRACTConstruct

EPCMFoster Wheeler Worley Parsons

CONTRACT VALUE$92 Million

START DATEOctober 2008

COMPLETIONDecember 2009

The construction of 16,000m3 of in situ reinforced concrete with structures including pipe rack foundations, burn off gas table top, flare foundation, heavy rigid pavement, jetty abutment, condensate tank containment bund walls, in situ sumps and in situ manholes.

In addition to the in situ concrete related infrastructure, Decmil’s contract also included all detailed

earthworks associated with the concrete structures as well as excavation and installation of GRE fire mains, storm water services, HV and LV electrical services, precast trunkline foundation installation and retaining wall construction. Decmil also completed roadworks, flexible pavement hardstands and the installation of the site perimeter security fence as part of these works.

Decmil was contracted to complete civil works associated with the import and export pipelines (jetty and ship berthing facility excluded) for the storage and loading facility of Woodside’s Pluto LNG Project.

Pluto LNG ProjectSite A – Onshore Civil WorksCivil