5
ADDENDUM #1 ISSUED OCTOBER 9, 2020 To Bid Documents Dated September 21, 2020 REDWOOD CITY SCHOOL DISTRICT BID NUMBER: 200921DD PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT McKINLEY INSTITUTE OF TECHNOLOGY NORTH STAR ACADEMY 400 DUANE STREET REDWOOD CITY, CALIFORNIA 94062 SPENCER ASSOCIATES Architects & Planners 1121 San Antonio Road, Suite C201 Palo Alto, CA 94303 (650) 965-7000

PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT

ADDENDUM #1 ISSUED OCTOBER 9, 2020 To Bid Documents Dated September 21, 2020

REDWOOD CITY SCHOOL DISTRICT

BID NUMBER: 200921DD

PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT

McKINLEY INSTITUTE OF TECHNOLOGY

NORTH STAR ACADEMY

400 DUANE STREET

REDWOOD CITY, CALIFORNIA 94062

SPENCERASSOCIATES

Architects & Planners 1121 San Antonio Road, Suite C201

Palo Alto, CA 94303(650) 965-7000

Page 2: PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT

Plumbing Retrofit – Faucet and Flush Valve Replacement McKinley Institute of Technology/ North Star Academy Redwood City School District

10/09/2020 Addendum #1

2

I. PROJECT MANUAL CHANGES:

A. SECTION 00 52 13 – AGREEMENT 1. Replace paragraph 4 – Time for Completion, with the following:

4. Time for Completion: It is hereby understood and agreed that the Work under this

Contract shall be completed by February 26, 2021 (“Contract Time”) from the start date specified in the District's Notice to Proceed.

B. SECTION 01 32 13 – SCHEDULE OF WORK

1. Replace paragraph 1.03.C – Milestone Schedule:

C. Milestone Schedule:

ACTIVITY DESCRIPTION REQUIRED COMPLETION

Notice to Proceed 10/30/2020

Complete 2/26/2021

II. DRAWING CHANGES:

A. SHEET A3.1 – ENLARGED FLOOR PLANS (McKINLEY INSTITUTE OF

TECHNOLOGY): 1. Revise Enlarged Plan Key Note #3A as follows: “(E) FLOOR MOUNT FLUSH

TANK WATER CLOSET TO REMAIN.”

2. From Plumbing Fixture Schedule, remove item WC-2 for Flush Tank Water Closet. 3. In Enlarged Plans #1, #2, #4, #7, #9, #14, and #15, remove designation WC-2

adjacent note #3A.

B. SHEET A3.2 – ENLARGED FLOOR PLANS (NORTH STAR ACADEMY): 1. From Plumbing Fixture Schedule, remove item WC-2 for Flush Tank Water Closet.

C. SHEET A4.1 – SPECIFICATIONS: 1. In paragraph 2.01, remove item #C.6 for flush tank toilet touchless retrofit.

Page 3: PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT

Plumbing Retrofit – Faucet and Flush Valve Replacement McKinley Institute of Technology/ North Star Academy Redwood City School District

10/09/2020 Addendum #1

3

III. ENCLOSURES:

1. Phasing plan (Sheets SK-1 & SK-2)

END OF ADDENDUM #1

Page 4: PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Cloud+
mcasini
Cloud+
NIC
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Text Box
PHASING PLAN
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Typewritten Text
PHASE 1 NORMAL BUSINESS HOURS MONDAY -FRIDAY
mcasini
Typewritten Text
PHASE 2 NORMAL BUSINESS HOURS MONDAY -FRIDAY
mcasini
Typewritten Text
PHASE 3 NORMAL BUSINESS HOURS MONDAY -FRIDAY
mcasini
Typewritten Text
PHASE 4 NORMAL BUSINESS HOURS MONDAY -FRIDAY
mcasini
Typewritten Text
PHASE 5 NORMAL BUSINESS HOURS MONDAY -FRIDAY
mcasini
Typewritten Text
PHASE 6 NORMAL BUSINESS HOURS MONDAY -FRIDAY
mcasini
Typewritten Text
PHASE 7 NORMAL BUSINESS HOURS WEDNESDAY ONLY
mcasini
Typewritten Text
GENERAL PHASING PLAN NOTES: 1. EACH PHASE SHOWN IS DEPENDENT ON THE PREVIOUS PHASE STARTING & FINISHING. CONTRACTOR CANNOT START THE NEXT PHASE WITHOUT COMPLETING THE PREVIOUS PHASE. 2. PHASES 1-5: STUDENT RESTROOMS. THE INTENT IS TO ALLOW THE CONTRACTOR TO OCCUPY A BOY'S & GIRL'S RESTROOM AT A TIME FROM START TO FINISH, THEN MOVE TO THE NEXT PHASE 3. PHASE 6: SINGLE USE ADULT/STAFF RESTROOMS. THE INTENT IS TO COORDINATE THIS WORK BY STARTING AND FINISHING A SINLGE RESTROOM BEFORE STARTING ANOTHER ONE. 4. PHASE 7: CLASSROOM FAUCETS. THE INTENT IS TO COORDINATE THIS EFFORT ON WEDNESDAYS DURING THE SCHOOL'S PREP DAY BY DOING THIS WORK IN BATCHES OF +/- 6 CLASSROOMS AT A TIME. THIS WORK MUST BE COMPLETE THE SAME DAY. CONTRACTOR SHALL COORDINATE THIS EFFORT BY NOT TAKING MORE CLASSROOMS THAT CANNOT BE FINISHED. 5. THE INTENT OF THE SCHEDULE IS TO WORK DURING NORMAL BUSINESS HOURS.
mcasini
Text Box
PHASING PLAN
mcasini
Text Box
SK-1
Page 5: PLUMBING RETROFIT FAUCET AND FLUSH VALVE REPLACEMENT
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Snapshot
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Rectangle
mcasini
Text Box
PHASING PLAN
mcasini
Text Box
SK-2