Platform Design
Open Call to Industry briefing
29th July 2019
The MTC, Ansty Park, Coventry, CV7 9JU
Guest speaker presentations
29/07/19 Construction Innovation Hub | Platform Design Open Call 2
Designing for better outcomes
Platform Design Programme Open Call
Keith Waller FICE - Programme Director, Construction Innovation Hub
What is platform design?
Overview of the Construction Innovation Hub Building Platform and its components
Jaimie Johnston - Board Director, Head of Global Systems, Bryden Wood Architecture /
Design Lead, Manufacturing Technology Centre (MTC)
A call to arms
Platform Design Programme : Application process and down selection criteria
Mark Ireland CEng FIET - Chief Engineer, Technology Strategy, Manufacturing
Technology Centre (MTC)
Designing for better outcomesPlatform Design Programme Open Call
Keith Waller
Programme Director
Construction Innovation Hub
Catalyst for transformation
29/07/19 Construction Innovation Hub | Platform Design Open Call 4
Our mission is to be a catalyst for
transforming the UK construction sector
through manufacturing technologies
and digital ways of working –
boosting productivity, exports and
asset performance to benefit society
Programme > Key inputs
29/07/19 Construction Innovation Hub | Platform Design Open Call 5
Programme > Key outputs
29/07/19 Construction Innovation Hub | Platform Design Open Call 6
Physical
Twin outputs
Digital
Improved through life performance
▪ High quality projects ▪ High performing asset
▪ Better experience▪ Quality▪ Safety
▪ Better, usable data▪ More effective O&M strategies
▪ Safer▪ Predictable▪ Profitable
Owner
User
Industry
Operator
Programme > Key outcomes
29/07/19 Construction Innovation Hub | Platform Design Open Call 7
▪ Productivity – output per worker▪ Additional GVA▪ Business support – innovate, invest and grow
▪ Skills – jobs and apprenticeships▪ Support rebalancing ▪ Support local businesses and community
▪ Waste – reduction in volume to landfill ▪ Carbon – reduced whole life energy use▪ Emissions – reduced vehicle miles
Programme
▪ We need to expand focus away from just the capital phase to consider whole life performance and benefits - both direct (to user, owner, operator) and indirect (to wider society)
▪ So we should be designing for: cost, performance, safety, quality, time, accessibility, data, operation, time, sustainability, carbon, users, owners, jobs, skills, apprenticeships, rebalancing, interoperability, traceability, resilience, flexibility, manufacturing, assembly, productivity, waste minimisation, security-mindedness
▪ Could call it DfCPSQTADOTSCUOJSARITRFMAPWS or perhaps simpler - Df∑
This will be key in evaluation of our Platform Design Open Call.
Designing for…..
29/07/19 Construction Innovation Hub | Platform Design Open Call 9
So why are we holding this call?To identify and co-develop leading edge solutions from UK business that can accelerate transformation of the sector and improve outcomes
So why should you engage?▪ Tap into the world-leading expertise across MTC, CDBB & BRE▪ Take a central role as we help shape the new standards▪ Have your solution showcased and be part of the digital product catalogue
Aligns with UKRI’s Transforming Construction Second Round CR&D and Demonstrators competitions (access information here)
Builds on themes of IPA’s own P-DfMA consultation (access information here)
Platform Design Open Call
29/07/19 Construction Innovation Hub | Platform Design Open Call 10
Overview of the Construction Innovation
Hub Building Platform and its components
Jaimie Johnston
Board Director, Head of Global Systems
Bryden Wood Architecture
Design Lead MTC
What is Platform Design?
29/07/19 Construction Innovation Hub | Platform Design Open Call 12
1886 1913
Comparison with automotive
29/07/19 Construction Innovation Hub | Platform Design Open Call 13
Source: VDWI Automotive / Alamy Source: Science History Images / Alamy
Platforms in other sectors
29/07/19 14Construction Innovation Hub | Platform Design Open Call
Source: Bryden Wood Technology Limited
Evolution of government thinking
29/07/19 15Construction Innovation Hub | Platform Design Open Call
A platform approach means we will use digitally designed components across multiple types of asset and apply those components wherever possible, minimising the need to design bespoke components.
For example, a single component could be used as part of a school, hospital, prison building or station.
The three principles are:
▪ Design for manufacture;
▪ Use a Platform approach;
▪ Open for manufacture, use and procurement.
P-DfMA
29/07/19 16Construction Innovation Hub | Platform Design Open Call
1. Platforms combine design, manufacture and procurement
principles holistically to ensure a very high degree of
rationalisation and integration;
2. Platforms manifest themselves as a ‘kit of parts’ of pre-
engineered components, assemblies and products that go
together in pre-defined ways;
3. Platforms incorporate a number of interacting elements
including superstructure, envelope, MEP and fit out.
P-DfMA principles
29/07/19 17Construction Innovation Hub | Platform Design Open Call
Product Family Architecture
29/07/19
Fit out MEP
Central
Logic
Digital
Tools
Envelope
Delivery
Super
structure
Configurator tools
• PRISM;
• SEISMIC;
• …
Standardised requirements
• Space types +
performance
characteristics;
• Adjacencies + flows;
• Technical
specifications;
• Dimensional grids
• …
Construction Innovation Hub | Platform Design Open Call 18
Digital Configurators
29/07/19
Central
logic
Source: www.prism-app.io
Source: www.seismic-school-app.io
Digital
tools
Construction Innovation Hub | Platform Design Open Call 19
Platform example
Superstructure
29/07/19 20Construction Innovation Hub | Platform Design Open Call
Superstructure
29/07/19 21
Perhaps the most critical; generally the element with the greatest longevity
and provides key technical aspects:
▪ Fire resistance between floors;
▪ Acoustic separation between floors;
▪ Load bearing capacity;
▪ Vibration and structural response factor;
▪ Dimensional stability (particularly in response to humidity and moisture);
▪ Embodied carbon;
▪ Speed of erection.
Construction Innovation Hub | Platform Design Open Call
Super
structure
Superstructure
29/07/19 22
The ‘carrier frame’ is predominant because it has a role in enabling the
other platform systems, for example:
▪ Being the right cross section to accommodate services within structural depth;
▪ Supporting the envelope cladding panels;
▪ Allowing fit-out to be fixed without drilling holes.
Superstructure must therefore be
▪ Economic in material and labour;
▪ Promoting rapid and accurate attachments of cladding, installation of services and installation of partitions and ceilings;
▪ Enable the optimisation of sequence.
Construction Innovation Hub | Platform Design Open Call
Super
structure
Super
structure
Platform 2
29/07/19 23Construction Innovation Hub | Platform Design Open Call
Super
structure
Source: Bryden Wood Technology Limited
Platform 2 use cases
29/07/19 24
Education Residential Healthcare
Construction Innovation Hub | Platform Design Open Call
Super
structure
Super
structure
Source: Bryden Wood Technology Limited
Platform 2 prototype
29/07/19 25Construction Innovation Hub | Platform Design Open Call
Super
structure
Super
structure
Source:
Bryden Wood
Technology
Limited
Platform 2 prototype
29/07/19 26Construction Innovation Hub | Platform Design Open Call
Super
structure
Super
structure
Source: Bryden Wood Technology Limited, Platform 2 Superstructure
Source: SEISMIC (Standardisation of School Components) Project,
Connector + Standardised Structural Frame
Automated construction
29/07/19 27
Super
structure
Construction Innovation Hub | Platform Design Open Call
Access video here: vimeo.com/brydenwoodtech/review/312767498/7d82ddba1d
Platform benefits for clients
and the supply chain
29/07/19 28Construction Innovation Hub | Platform Design Open Call
Current state
29/07/19 29Construction Innovation Hub | Platform Design Open Call
Platform enabled
29/07/19 30Construction Innovation Hub | Platform Design Open Call
29/07/19 31
Target cost benefits
“Platforms could achieve a
33% reduction
in capital cost*”
Construction Innovation Hub | Platform Design Open Call
* This is a theoretical maximum saving under idealised conditions
based on work to date, but we will work towards realising this.
Proven cost benefits
29/07/19 32Construction Innovation Hub | Platform Design Open Call
Source: Bryden Wood Technology Limited
Engaging manufacturers
29/07/19 33
Source: vladru / iStock
Construction Innovation Hub | Platform Design Open Call
Source: Bryden Wood Technology Limited
Creating a sustainable pipeline
29/07/19 34Construction Innovation Hub | Platform Design Open Call
Logistical efficiency
29/07/19 35Construction Innovation Hub | Platform Design Open Call
Source: Bryden Wood Technology Limited
29/07/19 36
What are we asking for?
Construction Innovation Hub | Platform Design Open Call
Substructure systems that incorporate additional functions beyond simple
load bearing capacity are encouraged. Examples might include:
▪ Systems that miminise excavation while also reducing vibration
e.g. screw pile systems or similar;
▪ Systems that act as a carbon sink;
▪ Systems that integrate e.g. ground source heating / cooling.
Alternative structural systems, especially those providing sustainable alternatives
to traditional construction:
▪ Low embodied carbon materials;
▪ Bio technology materials.
Structure
29/07/19 37
Envelope
Structure
Construction Innovation Hub | Platform Design Open Call
The building envelope (including the roof covering) has a significant role in defining
energy efficiency of a building, since it controls heat loss and solar gain:
▪ Thermal insulation and potentially thermal mass;
▪ Solar control (and therefore potential for overheating);
▪ Natural daylight (and therefore the extent of artificial lighting);
▪ Air tightness (and therefore ability to control the internal environment);
Bidders should consider:
▪ The envelope has the potential to provide solar power generation, vegetation (in the form of green roofs or walls);
▪ Articulation in the facade may provide external space in the form of balconies (inset or cantilevered), winter gardens etc;
▪ The envelope is the most visible element externally, and has a large impact on the aesthetics;
▪ Cycle time may be less than for super structure - say 20 years.
Envelope
29/07/19 38
Envelope
Construction Innovation Hub | Platform Design Open Call
Envelope
29/07/19 39
Envelope
Envelope
Construction Innovation Hub | Platform Design Open Call
Source: Bryden Wood Technology Limited
These control the habitability and comfort of the internal environment –
temperature, lighting, provision of fresh air and air quality, provision of power, data etc.
Bidders should consider:
▪ Adaptability / suitability of MEP systems to multiple asset uses with minimal changes;
▪ Design for ease of maintenance and replacement;
▪ Ability for self-optimisation through use of IoT sensor data combined with machine learning;
▪ Integrated MEP ‘products’ (as opposed to multiple distinct systems or ‘trades’);
▪ ‘Cycle’ time may be shorter than carrier frame and envelope (say 10 – 20 years);
▪ Recyclability of components and materials;
▪ Implement energy efficiency measures to reduce the total regulated heating, cooling,
mechanical ventilation, lighting energy consumption and achieve a minimum 15% reduction in
energy consumption and carbon emissions without the use of low or zero carbon technologies.
Mechanical, electrical + public health
29/07/19 40
MEP
Construction Innovation Hub | Platform Design Open Call
This is the element that building users will most often interact with and creates the
‘look and feel’ of the asset.
Bidders should consider:
▪ To be rapidly installed if the benefits of other platforms are not to be lost (large %age of time on
site is in fit out);
▪ Should be an integrated multi-function kit of parts (not a series of separate, skilled, specialist
trades);
▪ Must be adaptable or reconfigurable through the life of the asset (‘cycle time’ may be 5 – 10
years);
▪ Ability to evolve individual components within the overall platform as materials science evolves
(e.g. printed electronics, ‘smart’ surfaces);
▪ Significant reduction in or removal altogether of ‘wet trades’.
Fit out
29/07/19 41
Fit out
Construction Innovation Hub | Platform Design Open Call
Systemisation
29/07/19 42
MEP Fit out
MEP Components Fit Out Components Integrated Assembly
Reduction of
site connections
Automation Level of
prefabrication
+ =
MEP Fit out+
Construction Innovation Hub | Platform Design Open Call
Bidders should consider:
▪ 100% of key materials (e.g. timber, concrete, metal, stone, glass etc.) must be covered by an
Environmental Management System (EMS) or a responsible sourcing certification scheme
(e.g. BES 6001, CARES, CSC, FSC, PEFC etc.).
▪ Maximise the specification of construction products with recognised Environmental Product
Declarations (EPDs).
▪ The system should enable a reduction of waste generated on site - a minimum of ≤ 3.4m³ per 100m²
GIA non-hazardous construction waste, with an aspiration to achieve ≤ 1.6m³ per 100m² GIA.
▪ A minimum of 25% of high-grade aggregate should be recycled or secondary aggregate.
▪ Consider ease of disassembly allowing the building or parts of the building to be disassembled at the
end of its life, including exposed and reversible connections, layer independence, standardisation etc.
▪ All elements of the design (e.g. superstructure, envelope, MEP systems etc.) must make allowance to
the impacts of climate change (e.g. flood, extreme temperature variation, increased wind speeds etc.).
Sustainability
29/07/19 Construction Innovation Hub | Platform Design Open Call 43
While health and safety has significantly increased in recent years, there still remains an imperative to:
▪ Increase productivity on site;
▪ Reduce overall numbers of operatives
▪ Reduce reliance on workmanship / skilled trades;
▪ Increase consistency and quality of installation;
▪ Continue to improve the health, safety and wellbeing of operatives,
We are therefore seeking solutions which address these through e.g.
▪ Automation in material movement, lifting, handling and placement;
▪ Enhancing operative safety and / or capability
▪ Automation in information capture and reporting;
▪ Automation in setting out and metrology;
▪ Carrying out dangerous tasks through automation.
Manufacturing + assembly equipment
29/07/19 44Construction Innovation Hub | Platform Design Open Call
Create a 2 storey building with:
▪ 8m long spans to a central corridor;
▪ 2.4m wide corridor;
▪ 3.2m floor to floor height (vary for each floor)
Demonstrator build
29/07/19 45
Education Residential Healthcare
Fit outMEPSuper
structureEnvelope
Platform Design Programme | Open CallConstruction Innovation Hub | Platform Design Open Call
Further resources
29/07/19 46
brydenwood.co.uk/resources/e-books/s36467/
the-mtc.worldsecuresystems.com/mtc-construction-handbook
lConstruction Innovation Hub | Platform Design Open Call
Thank you
➢ Twitter @Jaimie_BW
➢ Twitter @BrydenWood
➢ LinkedIn BrydenWood
➢ brydenwood.co.uk
A Call to Arms
Mark Ireland
Chief Engineer
MTC
Agenda
29/07/19 Construction Innovation Hub | Platform Design Open Call 49
MOBIE competition
Why should you enter?
What is the schedule and programme?
How do I enter?
What does good look like?
• Competition for
students 11 – 24 years
of age
• Design a 21st Century
Home For Life from
‘Starter’ to Multi-
Generational Family
• Design for a building
to be assembled from
3mx3mx3m cubes to
be manufactured off-
site
• Consideration of use
of space
▪ Finals on 28th June
29/07/19 Construction Innovation Hub | Platform Design Open Call 50
MOBIE Competition
MOBIE competition brief
29/07/19 Construction Innovation Hub | Platform Design Open Call 51
MOBIE Winners – Dudley College
29/07/19 Construction Innovation Hub | Platform Design Open Call 52
MOBIE Winners – Dudley College
29/07/19 Construction Innovation Hub | Platform Design Open Call 53
29/07/19 Construction Innovation Hub | Platform Design Open Call 54
Highly Commended –Architectural Association
29/07/19 Construction Innovation Hub | Platform Design Open Call 55
Highly Commended –Whitby High School
29/07/19 Construction Innovation Hub | Platform Design Open Call 56
Why is this relevant to the Hub?
Source: Manufacturing Technology Centre
Why should you enter?
29/07/19 Construction Innovation Hub | Platform Design Open Call 57
Product to process shiftProduct focus
Every product is
different
We establish how to
make it once we have
designed it
Reliant on skilled
trades and crafts
Quality dependent on
the team who build it
Do my job and move
on approach
Process focus
Every product made
using the same
process
We already know
how to make it and
design to suit this
Multiskilled workers
Quality dependent on
the design
Usually a fixed team
in a fixed location,
suited to OSMSource: RTimages / Alamy
Why should you enter?
29/07/19 Construction Innovation Hub | Platform Design Open Call 58
Process focus needs a different approach
▪ Collaboration drives innovation and improvements
▪ Strategic partnerships ensure consistency of demand
▪ Product and component focus rather than trade focus
▪ Increasing value of service offering
▪ Reduced time and risk to market
Specific to the CIH
▪ Part of the risk of developing a platform is being taken by CIH
▪ Training in “manufacturing” principles. Equivalent to Manufacturing Masters degree will be given to all involved in the platform programme
▪ Validation of platform is a barrier to entry
▪ Link to IUK Open call
What is the Schedule and Process?
Hold Briefing Event at the MTC
Open Call - Accept applicants from industry with products/ technologies/ services to integrate on to the
platform
Close Call + down select products/ technologies/ services to take forward
Hold 'Dragons Den' pitch event (if required)
Form collaborative development team
29/07/19 Construction Innovation Hub | Platform Design Open Call 59
Design
Test
Manufacture
Phase 1: Open Call Phase 2: Design / Make / Test Phase 3: Assemble Proof of Concept
Workshop
1Workshop
2
Workshop
3Briefing
Event
Down
Selection
Open CallAssemble and
Exhibit @ MTC
Assemble and
Exhibit @ BRE
Workshop
4
Workshop
5Workshop
6
Workshop
7Workshop
8
Workshop
9
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
2019 2020 2021
Timeline
29/07/19 Construction Innovation Hub | Platform Design Open Call 60
How do I enter?
1. Register your interest online at https://constructioninnovationhub.org.uk/
2. Open Call - complete the online application form - 6 questions with <450 word answers about how your product / technology / service is aligned to the CIH Benefit Areas and your intended
support for the programme.
3. Down Selection - Applications against each building element will be assessed by our judging panel formed from industry
professionals. They will down select the applicants that are taken forward in to the design team.
4. Pitch Event - Where it is not possible to select between competing applicants a Dragon’s Den type pitch event will be held to determine who to take through. You will be required to prepare
a 15 minute pitch and respond to 15 minutes Q&A
29/07/19 Construction Innovation Hub | Platform Design Open Call 61
What does good look like?
29/07/19 Construction Innovation Hub | Platform Design Open Call 62
Process focus needs a different approach
▪ Collaboration drives innovation and improvements
▪ Strategic partnerships ensure consistency of demand
▪ Product and component focus rather than trade focus
▪ Increasing value of service offering
▪ Reduced time and risk to market
Specific to the CIH
▪ Part of the risk of developing a platform is being taken by CIH
▪ Training in “manufacturing” principles. Equivalent to Manufacturing Masters degree will be given to all involved in the platform programme
▪ Validation of platform is a barrier to entry
▪ Link to IUK Open call
What does good look like?
29/07/19 Construction Innovation Hub | Platform Design Open Call 63
Benefits
Review process?
29/07/19 Construction Innovation Hub | Platform Design Open Call 64
This will partly depend on the entrants into the process.
We are actively looking for partners who are happy to help define and manage the
review process, independently against the top level programme benefits to
establish the best possible collaborative team to develop the platform.
Join the transformation
www.constructioninnovationhub.org.uk
@CIH_HUB
Construction Innovation Hub
#TransformingConstruction
#PlatformDesign