2
INNOVATEUR DEPUIS 1955 TMPH TUNNEL INNOVATEUR DEPUIS 1955 Tunnel forms are room-size formwork elements that allow walls and floors to be casted in a single pour. With multiple forms, the entire floor of a building can be done in one go. Thanks to the daily work cycle, builders can produce up to 400m² of floor area every workday. Tunnel form is mostly suitable for buildings that have the same or similar cells to allow re-use of the forms within the floor and from one floor to the next, such as prisons, apartments, hotels or mass housing projects. 25% time savings Simple and repetitive daily rotations Predictable production schedule Fast implementation of the tunnels 15 % cost savings High speed of construction Reduced need of skilled labour Minimal finishes to walls Realization of monolithic structures resistant to earthquakes High dimensional accuracy Optimal concrete quality PRODUCTIVITY ON SITE COST SAVINGS ON CONSTRUCTION QUALITY OF ACHIEVEMENTS C E R T I F I C A T I O N D E S Y S T È M E Q U A L I T É ISO 9001

Plaquette commerciale TMPH (A4 R-V) - outinord.fr TMPH Tunnel.pdf · Plaquette commerciale TMPH (A4 R-V).indd 1 01/04/2015 16:51:55. ANCE EOTION INNOATE EP IS 955 TMPH TUNNEL R S

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Plaquette commerciale TMPH (A4 R-V) - outinord.fr TMPH Tunnel.pdf · Plaquette commerciale TMPH (A4 R-V).indd 1 01/04/2015 16:51:55. ANCE EOTION INNOATE EP IS 955 TMPH TUNNEL R S

BANC

HE B

8000

EVO

LUTI

ON 4

I n n o v a t e u r d e p u I s 1 9 5 5

TMPH

TUN

NEL

I n n o v a t e u r d e p u I s 1 9 5 5

Tunnel forms are room-size formwork elements that allow walls and floors to be casted in a single pour. With multiple forms, the entire floor of a building can be done in one go. Thanks to the daily work cycle, builders can produce up to 400m² of floor area every workday.Tunnel form is mostly suitable for buildings that have the same or similar cells to allow re-use of the forms within the floor and from one floor to the next, such as prisons, apartments, hotels or mass housing projects.

25% time savingsSimple and repetitive daily rotationsPredictable production scheduleFast implementation of the tunnels

15 % cost savingsHigh speed of constructionReduced need of skilled labourMinimal finishes to walls

Realization of monolithic structures resistant to earthquakesHigh dimensional accuracyOptimal concrete quality

PRODUCTIVITY ON SITE

COST SAVINGS ON CONSTRUCTION

QUALITY OF ACHIEVEMENTS

CE

RTI

FICA

TION DE SYSTÈME Q

UA

LITÉ

ISO 9001

Plaquette commerciale TMPH (A4 R-V).indd 1 01/04/2015 16:51:55

Page 2: Plaquette commerciale TMPH (A4 R-V) - outinord.fr TMPH Tunnel.pdf · Plaquette commerciale TMPH (A4 R-V).indd 1 01/04/2015 16:51:55. ANCE EOTION INNOATE EP IS 955 TMPH TUNNEL R S

BANC

HE B

8000

EVO

LUTI

ON 4

I n n o v a t e u r d e p u I s 1 9 5 5

TMPH

TUN

NEL

I n n o v a t e u r d e p u I s 1 9 5 5

392 rue de Millonfosse 59230 saint amand-Les-eaux - tél: +33 (0)3 27 23 83 83 - email: [email protected] - www.outinord.com

SPECIFICATIONSBay width

Triangulation wheel with levelling jack.

Kicker formwork for upper walls.

Horizontal coupling system.

Strut system to ease the remo-val of the formwork.

Wheels and levelling jack.

Additional strip.

Bay width: 2.4m to 6m. Horizontal panel Type 1: 1.2m to 1.6m. Type 2: 1.8m to 2.4m. Type 3: 2.4m to 3m. Length of the packages: up to 12.5m depending on the crane capacity.

Average weight of the shutter: 100kg/m².Designed for 6T/m² concrete pour pressure.

Length

The stripping of the formwork is made half tunnel by half tunnel to constantly maintain the slab with props.

Many dimensions are possible with additional strips or table.

Plaquette commerciale TMPH (A4 R-V).indd 2 01/04/2015 16:51:58