Q U A L I F I C A T I O N S
HEALTHCARE AND L I FE SC IENCES January 2015
Table of Contents
Section 1
Corporate Information
Section 2 Awards & Recognition
Section 3 Current Projects
Section 4 Completed Projects
Section 5 References
Section 6 Project Photo Data Sheets
1
GBMC Oncology Unit
Corporate Information
Corporate Name: Plano‐Coudon, LLC
Corporate Address: 2101 Washington Boulevard
Baltimore , Maryland 21230
Telephone Number: 410‐837‐2570
Fax Number: 410‐837‐2571
Web Site: www.plano‐coudon.com
Date of Incorporation: July 7, 1998
State of Incorporation: Maryland
Years in Business: 16 years
Corporate Functions: Construction Management General Contracting Design/Build Pre‐Construction Services
Corporate Officers: Brett Plano, Principal/OwnerRyan Coudon, Principal/Owner
Maryland Construction License: 30896400
D.C. Construction License: Registered
Delaware Construction License: 2010605833
Pennsylvania Construction License: Registered
Virginia Construction License: 2705 113856A
Federal ID Number: 52‐2116907
Banking Reference: PNC Bank2 Hopkins Plaza Baltimore, Maryland 21203 410‐237‐5478 Scott Nicholson
Corporate Information
Bonding & Insurance Reference: HMS Insurance 10751 Falls Road Brooklandville, Maryland 21022 410‐337‐9755 Nelson Oster
Affiliations: American Institute of Architects (AIA) American Society of Mechanical Engineers (ASME) American Society of Professional Estimators (ASPE) Associated General Contractors of America (AGC) Baltimore Building Congress & Exchange (BC&E) Chesapeake Area Society of Healthcare Engineering (CASHE) Construction Management Association of America (CMAA) Construction Owners Association of America (COAA) International Facilities Management Association (IFMA) Leadership Howard County (LHC) National Association of Industrial & Office Properties
(NAIOP) Society for Marketing Professional Services (SMPS) United States Green Building Council (USGBC) Urban Land Institute (ULI)
2013 Work in Place:
2012 Work in Place:
2011 Work in Place:
$57 Million
$46.4 Million
$54.6 Million
2
UMMC IPHB—4H Shock Trauma Ambulatory Pa ent Room
Awards & Recognition
Baltimore Smart CEO Magazine Plano-Coudon named as a FUTURE 50 company (2010)
Building Congress and Exchange of Baltimore§ Craftsmanship Award in recognition of exceptional craftsmanship for Electrical Work at the
Baltimore Technology Park Data Center Expansion Phase 3 (2011) § Craftsmanship Award in recognition of exceptional craftsmanship for “Custom Sheetmetal
Work” at the Johns Hopkins University Dunning Hall project (2008) § Craftsmanship Award in recognition of exceptional craftsmanship for Architectural Millwork,
Casework, and Acoustical Work at the University of Baltimore Steven L. Snyder Moot Court Room (2005)
Construction Management Association of America§ Project Achievement Award for the Erinn McCarthy Humanities Building and Track and Field at
Maryvale Preparatory School. The project won for Project with Constructed Value Less Than $30 Million. (2013)
§ Project Achievement Award for the renovation of the Easton Hall at University of Maryland, College Park. The project won for Project with Constructed Value Less Than $10 Million. (2012)
§ Project Achievement Award for the renovation of the Shoemaker Building at University of Maryland, College Park. The project won for Project with Constructed Value Less Than $10 Million. (2011)
American Institute of Architects (AIA)§ President’s Award for Contractor of the Year (2011) § Honorable Mention by the Baltimore Chapter of the AIA for the Agape Mission Church (2009) § Citation Award by the Maryland Component of the AIA for the Towson University Daycare
Facility (2007) § Honorable Mention by the Baltimore Chapter of the AIA for the Towson University Daycare
Facility (2007) § Design Award by the AIA for Architectural Excellence for the 180’s Brands World
Headquarters (2004)
Baltimore Business Journal Book of Lists 2013 – ranked #10 on the list of largest contractors in the Baltimore area
AGC - Associated General Contractors of Maryland
The Associated General Contractors of Maryland elected Ryan Coudon as their new Chairman of the Board (2009)
Associated General Contractors of America2013 Certificate of Commendation for Excellent Safety Record
§
Baltimore Heritage Group Historic Preservation Award from the Baltimore Heritage Group in recognition of the restoration and reuse of The Women’s Industrial Exchange (2004)
§2013 Safety of Excellence Award
Inc. Magazine Ranked in the top 5000 list of fastest growing private companies in the United States (2010 and 2007)
General Contractors Insurance, Ltd. 2014 President’s Circle Risk Control Excellence Award Top 10 percent
Ernst & Young Brett Plano and Ryan Coudon were awarded the Ernst & Young Entrepreneur of the Year award in the Development and Construction category (2009)
Corridor, Inc. Corridor, Inc recognized Plano-Coudon as one of the Baltimore-Washington Corridor’s "Greatest Places to Work." (2008)
Greenhouse Residences
3
Current Projects
Project: UMB Langsdale Library RenovationAddress: Baltimore, Maryland Owner: University of Maryland, Baltimore Architect: Behnisch Architekten Contract: $17,000,000
Project: UMBC West Hill ApartmentsAddress: Catonsville, Maryland Owner: University of Maryland, Baltimore County Architect: Grimm + Parker Architects Contract: $15,325,000
Project: UMB HVAC Upgrades to Medical School Teaching Facility Address: Baltimore, Maryland Owner: University of Maryland, Baltimore Architect: MS Engineers, Inc. Contract: $12,800,000
Project: Fairhaven Retirement Community and Copper Ridge Outpatient & Residential Care
Address: Sykesville, Maryland Owner: Episcopal Ministries to the Aging, Inc. Architect: Perkins Eastman Contract: $4,456,645
Project: Rita Church Community Center Gymnasium Address: Baltimore, Maryland Owner: City of Baltimore Department of Recreation and Parks Architect: GWWO Inc./Architects Contract: $4,408,686
Project: 1535 N. Calvert Street Address: Baltimore, Maryland Owner: Calvert Federal, LLC Architect: Architectural Design Works, Inc. Contract: $14,000,000
Project: Taney Village Senior Apartments Renovation Address: Frederick, Maryland Owner: Enterprise Architect: Grimm + Parker Contract: $4,512,541
Current Projects
Project: Jackson Recreation Center Address: Baltimore, Maryland Owner: City of Baltimore Architect: GWWO Architects, Inc. Contract: $4,049,842
Project: Pandora Logistics Center Address: Columbia, Maryland Owner: Pandora Architect: Gensler Contract: $1,600,000
Project: Baltimore County Board of Elections Address: Hunt Valley, Maryland Owner: Baltimore County Government Architect: Colimore Architects Contract: $1,568,000
Project: UMMC Healing Garden Address: Baltimore, Maryland Owner: University of Maryland Medical Center Architect: Floura Teeter Landscape Architects Contract: $729,000
Small Projects Division - Current Projects
Plano-Coudon’s Small Projects and Service Division focuses exclusively on smaller construction and renovation projects, building maintenance and support services to clients in all sectors. Our current projects include:
Project: Key Technologies Type: Office Interior East Side Renovation
Project: COPT, Intelligent Solutions for Information Systems Type: Tenant Build-out
Project: Orthopedic Associates of Center Maryland Type: Columbia Office Renovation
Project: Baltimore City Public Schools Type: Elevator Renovations, various locations
Project: Institute of Notre Dame Type: Father’s Club Hall Renovation
Project: Maryvale Preparatory School Type: McGuire Hall Corridor Renovation
Project: GBMC Neurology Type: Interior Renovation
Project: Loyola Jenkins Hall Type: Academic Advising Suite Renovation
Current Projects
On Call Programs
Owner: Baltimore City Public SchoolsType: Construction Manager at RiskContract: Projects under $5,000,000
Owner: Baltimore County GovernmentType: Design/BuildContract: Projects over $500,000
Owner: Baltimore County Public SchoolsType: Building Renovations and AlterationsContract: IDIQ up to $2,500,000
Owner: Greater Baltimore Medical CenterType: Construction Manager AgencyContract: Various
Owner: Johns Hopkins HospitalType: Construction Manager at RiskContract: $400,000 to $850,000
Owner: University of Maryland, BaltimoreType: Construction Manager at RiskContract: Projects from $1,000,000 to $10,000,000
Owner: University of Maryland, College ParkType: Construction Manager at RiskContract: Projects from $1,000,000 to $10,000,000
Owner: University of Maryland, College ParkType: General ContractingContract: Projects under $1,000,000
Owner: University of Maryland Medical CenterType: Construction Manager at RiskContract: Projects from $400,000 to $700,000
Towson University Health and Counseling Center
4
Completed Healthcare Projects
TU Health & Counseling Center Towson University
$12,002,265
Green House Residences at Stadium PlaceGEDCO
$7,480,015
GBMC South Chapman Building Renova onsGreater Bal Medical Center
$5,922,377
UMB BioparkUniversity of Maryland, Baltimore
$5,732,264
UMB Bressler Research Building University of Maryland,
$3,437,593
JHU Homewood Health and Wellness CenterJohns Hopkins University
$2,767,562
Northwest Hospital Lobby UpgradeLifeBridge Health
$2,567,552
JHU Dunning Hall Lab ConversionJohns Hopkins University
$2,287,472
UMB MSTF 7th Floor Lab University of Maryland, Baltimore
$2,097,422
UMB Howard Hall – 6th Floor Animal Holding University of Maryland, College Park
$2,188,823
UMCP LPS Lab
$2,090,498
TU Smith Hall Biochemistry Lab Towson University
$1,939,488
Biomere Vivarium Labs Biomedical Research Models, Inc
$1,626,547
UB Forensics and General Sciences LabUniversity of Baltimore
$2,064,249
UMCP LPS Low Vibration LabUniversity of Maryland, College Park
$2,028,632
University of Maryland, Baltimore
JHBMC Crossroads RenovationJohns Hopkins Bay View Medical Campus
$1,831,229
UMCP BSL 3 LaboratoryUniversity of Maryland, College Park
$1,681,506
UMB Dental SchoolUniversity of Maryland, Baltimore
$1,615,742
Completed Projects
GBMC Oncology UnitGreater Baltimore Medical Center
$1,144,978
UMB Medical School Teaching Facility, 6th FloorUniversity of Maryland Baltimore
$941,458
GBMC Dance Center Expansion Greater Bal Medical Center
$766,642
UM School of Medicine MRI FacilityUniversity of Maryland School of Medicine
$1,071,341
UMB Howard Hall Animal MRI FacilityUniversity of Maryland, Baltimore
$675,316
UMMC T3N Office University of Maryland Medical System
$663,308
UMMC Shock Trauma P1G OfficeUniversity of Maryland Medical System
$608,765
Concentra Medical ClinicConcentra Health Services, Inc.
$672,407
Plano-Coudon, LLC has also completed many projects under $500,000 in value in various building types including projects for various clients completed by our Small Projects Division. about these projects is available upon request.
5
Northwest Hospital Lobby
Architectural References
Alexander Design Studio Ellicott City, Maryland
Hord, Coplan, Macht Baltimore, Maryland
Architectural Design Works Towson, Maryland
JRS Architects Inc.Baltimore, Maryland
Arris Design Studio Baltimore, Maryland
Marks, Thomas Architects Baltimore, Maryland
Ayers Saint Gross Baltimore, Maryland
Marshall Craft Associates Baltimore, Maryland
Bennett Frank McCarthy Architects, Inc.Silver Spring, Maryland
Melville Thomas Architects, Inc. Baltimore, Maryland
Bohlin Cywinski Jackson Philadelphia, Pennsylvania
Murdoch Smith Architects, LLC Baltimore, Maryland
Cho Benn Holback + Associates Baltimore, Maryland
Read & Company Architects Baltimore, Maryland
Colimore Architects Baltimore, Maryland
Richter Cornbrooks Gribble, Inc. Baltimore, Maryland
Design Collective, Inc. Baltimore, Maryland
Rubeling & Associates, Inc. Towson, Maryland
DNC Architects, Inc.Rockville, Maryland
Waldon Studio’s, Inc.Columbia, Maryland
GWWO Baltimore, Maryland
Whitman Requardt & Associates Baltimore, Maryland
HDR, Inc. Alexandria, Virginia
Ziger / SneadBaltimore, Maryland
CR Goodman AssociatesAnnapolis, Maryland
Client References
Archdiocese of Baltimore Baltimore, Maryland
Maryland Port Administration Baltimore, Maryland
Baltimore Technology Park Baltimore, Maryland
Maryland Stadium Authority Baltimore, Maryland
Biomedical Research Models, Inc.Worcester, Massachusetts
Mt. St Joseph High School Baltimore, Maryland
City of Baltimore Department of Recreation & Parks Baltimore, Maryland
Nemetschek North America Columbia, Maryland
Concentra Bingam Farms, Michigan
The Maryland Zoo Baltimore, Maryland
Corporate Office Properties TrustColumbia, Maryland
Total Health CareBaltimore, Maryland
Glen Mar United Methodist ChurchEllicott City, Maryland
Towson UniversityTowson, Maryland
Govans Ecumenical Development Corporation (GEDCO) Baltimore, Maryland
University of Baltimore Baltimore, Maryland
Greater Baltimore Medical CenterTowson, Maryland
University of Maryland, Baltimore Baltimore, Maryland
Helping Up Mission Baltimore, Maryland
University of Maryland, Baltimore CountyCatonsville, Maryland
Johns Hopkins University Baltimore, Maryland
University of Maryland, College ParkCollege Park, Maryland
LifeBridge Health System Baltimore, Maryland
University of Maryland Medical SystemBaltimore, Maryland
Loyola University Maryland Baltimore, Maryland
University of Maryland, University CenterLargo, Maryland
6
GBMC J. Milton Dance Head and Neck Center
Towson University—Health & Counseling Center
OWNER: Towson University
LOCATION: Towson, Maryland
ARCHITECT: Marshall Cra Associates, Inc.
CONTRACT: $12,002,265
PROJECT TYPE: Educa on
▪ LEED Silver 40,000 SF, three‐story building with student counseling and health suites.
▪ Complete demoli on and fit out of two exis ng dormitory buildings as well as the construc on of a ground up 9,000 SF building connec ng the two exis ng buildings.
▪ The project included chilled beams, construc on of a new elevator and sha , new MEP systems, and backup generator.
▪ Also included a campus u li es upgrade package which involved running new chilled water piping from the campus power plant as well as upgraded electrical services.
OWNER: GEDCO
LOCATION: Baltimore, Maryland
ARCHITECT: Marks Thomas Architects
CONTRACT: $7,480,015
PROJECT TYPE: Healthcare/Not-for-Profit
Green House Residences at Stadium Place
▪ Ground-up construction of a LEED Silver, 44,560 SF, 4-storywith basement, 49-bed skilled nursing facility.
▪ This facility is the first in Maryland meeting all requirementsto be called a “Greenhouse” facility.
▪ Each floor has 10 “apartments” with individual handicappedaccessible bathrooms and lift systems.
▪ Each floor also has a commercial kitchen, as well as diningand living rooms, with built-in book cases and electricfireplaces. The facility also houses a spa/salon on each floor,and a physical therapy room.
▪ One half of the basement level is fit-out as offices forGEDCO; the nursing home is run by Catholic Charities.
GBMC–South Chapman Building Renovation
▪ 3‐story, 62,000 SF renova on of an exis ng buildingfor a training facility and office space for the medicalcenter
▪ Interior ground floor renova ons were completedin 10 weeks to help the owner meet their spacerequirements
▪ Renova ons included replacement of air handlingunits, cooling tower, boilers, fire alarm system, ITclosets and temperature control systems
OWNER: Greater Bal more Medical Center
LOCATION: Towson, Maryland
ARCHITECT: LSC Design, Inc.
CONTRACT: $5,922,377
PROJECT TYPE: Healthcare
UMB–Biopark
▪ Construc on Manager for the University of Maryland, Bal more Biopark 2nd and 3rd floor fit‐out for the Red Cross
▪ Project included 44,000 SF of laboratory space with suppor ng office spaces
▪ Provided preconstruc on services including budge ng, scheduling, value engineering, constructability reviews and procurement of long lead equipment
OWNER: University of Maryland, Bal more
LOCATION: Bal more, Maryland
ARCHITECT: Ayers, Saint, Gross Architects and Planners
CONTRACT: $5,732,264
PROJECT TYPE: Life Sciences
UMB–Bressler Research Building
▪ 20,000 SF laboratory renova on on the 10th floor of an occupied building
▪ Extensive mechanical, plumbing, and electrical services for new laboratory casework and lab equipment
▪ CM at‐risk project
▪ State Funding with MBE requirements
▪ Downtown campus se ng
OWNER: University of Maryland, Bal more
LOCATION: Bal more, Maryland
ARCHITECT: Design Collec ve, Inc.
CONTRACT: $3,437,593
PROJECT TYPE: Life Sciences
JHU Homewood—Health and Wellness Center
▪ 20,000 SF renova on of an exis ng dormitory for a student health and counseling center
▪ Occupied renova on of 2nd floor with student apartments above the renova on and retail tenants below.
▪ Renova ons included new exam rooms, counseling rooms, offices, mee ng spaces, recep on area, restrooms and board room.
▪ Work included new mechanical, electrical, fire protec on and architectural finishes throughout. Exam & counseling rooms were STC rated.
OWNER: Johns Hopkins University
LOCATION: Bal more, Maryland
ARCHITECT: Rohrer Studio
CONTRACT: $2,886,614
PROJECT TYPE: Healthcare
Northwest Hospital Lobby Upgrade
▪ New canopy constructed of stainless steel, custom glass panels, and architectural precast concrete
▪ Exterior improvements included new asphalt turnaround, concrete paving, signage, site ligh ng, landscaping, and irriga on
▪ Addi on and renova ons included airlock ves bule, recep on area, administra on offices, wheelchair storage, and main lobby
▪ New interior included millwork wall panels, sliding glass doors, carpet, ceilings, ligh ng, HVAC, and paint
OWNER: LifeBridge Health
LOCATION: Bal more, Maryland
ARCHITECT: Hord Coplan Macht Architects, Inc
CONTRACT: $2,567,552
PROJECT TYPE: Healthcare
JHU–Dunning Hall Lab Conversion
▪ 9000 SF conversion of exis ng classrooms on the third and fourth floors into laboratories for the Biology Dept. and Mind/Brain Ins tute, and offices for the Psychological and Brain Sciences Dept.
▪ Installa on of a RO system, cold room, autoclave, clean bench, and fume hoods for the new lab spaces.
OWNER: Johns Hopkins University
LOCATION: Bal more, Maryland
ARCHITECT: Design Collec ve, Inc.
CONTRACT: $2,375,274
PROJECT TYPE: Educa on
UB–Forensics & General Sciences Labs
▪ 6,500 SF renovation to administrative/classroom area into forensics teaching and general sciences labs on the 4th floor of an occupied building
▪ New HVAC systems including two new dedicated RTUs, exhaust fans, DDC Controls, and seven lab compressor and vacuum systems
▪ New electrical and plumbing systems
▪ Wood lab casework and epoxy tops
OWNER: University of Baltimore
LOCATION: Baltimore, Maryland
ARCHITECT: Design Collective, Inc.
CONTRACT: $2,064,249
PROJECT TYPE: Education
UMCP—LPS Low Vibration Lab Addition
▪ 4,000 SF ground-up masonry laboratory addition toan existing building. Work included a new rooftopunit, CCMS controls, and new electrical system.Shell finishes, including paint and dissipativeflooring.
▪ A major feature of the project included two RFshielded enclosures with 13 foot concrete pits thatwere built to house large experimental magnets.
▪ The site access was extremely tight and P-C workedwith the Owner and facilities manager to minimizedisruptions to the building’s occupants.
OWNER: University of Maryland College Park
LOCATION: College Park, Maryland
ARCHITECT: HDR Architects, Inc.
CONTRACT: $2,028,632
PROJECT TYPE: Higher Education
JHBMC–Crossroads Renovation
▪ 17,500 SF outpa ent clinic and supportoffice space
▪ Provided design/build services with the architectsand engineers which included designdevelopment from schema c throughconstruc on comple on
▪ Project completed in an occupied hospital onmul ple floors with access and noise restric ons
▪ Project required close coordina on of outages soas not to disturb exis ng hospital func ons
OWNER: Johns Hopkins Bayview Medical Center
LOCATION: Bal more, Maryland
ARCHITECT: Colimore Thoemke Architects
CONTRACT: $1,831,229
PROJECT TYPE: Healthcare
UMCP–BSL 3 Laboratory
▪ Cer fied Level 3 Biosafety Laboratory
▪ New HVAC System included bag in/bag out HEPA filtra on unit, welded seam stainless steel ductwork with bubble ght dampers, and differen al pressure monitors to each room
▪ Project was fully commissioned using an independent commissioning agent
▪ Furnished & installed lab equipment including sterilizer with bioseal, biosafety cabinets and circular rodent racks
OWNER: University of Maryland, College Park
LOCATION: College Park, Maryland
ARCHITECT: Ballinger
CONTRACT: $1,681,506
PROJECT TYPE: Life Sciences
Biomere Vivarium Labs
▪ 13,000 SF fit‐out of a rodent vivarium in an occupied building at the UMB Biopark
▪ Clean room type finishes throughout including FRP wall panels, resinous flooring, and sealed ceilings
▪ Included new MEP systems independent of the main building including a steam boiler system
▪ Included a cage wash facility, sterilizer equipment, animal isola on and procedure rooms
OWNER: Biomedical Research Models, Inc
LOCATION: Bal more, Maryland
ARCHITECT: Dixon Salo Architects
CONTRACT: $1,626,547
PROJECT TYPE: Life Sciences
UMB–Dental School
▪ Mul ‐floor renova ons
▪ New service rough‐ins and mechanical equipment room to support state‐of‐the‐art dental chairs and laboratory equipment
▪ Project included modifica ons to drywall and storefront par ons in order to make the spaces HICFA compliant
▪ Renova on of laboratory space complete with casework, epoxy tops, fume hoods, and full mechanical gas, air, vacuum and water services
OWNER: University of Maryland, Bal more
LOCATION: Bal more, Maryland
ARCHITECT: RCG, Inc.
CONTRACT: $1,615,742
PROJECT TYPE: Healthcare
GBMC–Oncology Unit
▪ 9,500 SF fast track renova on, completed in ten weeks
▪ Contract included asbestos abatement and demoli on
▪ Replaced HVAC system to meet new air change requirements
▪ Replaced Nurses Call System to meet the most current technology
▪ All new finishes throughout the project
OWNER: Greater Bal more Medical Center
LOCATION: Towson, Maryland
ARCHITECT: LSC Design, Inc.
CONTRACT: $1,144,978
PROJECT TYPE: Healthcare
UM School of Medicine–MRI Facility
▪ Construc on manager at‐risk project
▪ Preconstruc on services provided
▪ Project included removal of the auditorium floor slab and installing a new slab on grade within the building
▪ The roof and slabs were removed on three floors to allow for a 15 ton magnet to be craned into the basement of the building
▪ Project had a very ght schedule to meet NIH grant requirements
OWNER: University of Maryland, School of Medicine
LOCATION: Bal more, Maryland
ARCHITECT: Colimore Gallow Architects
CONTRACT: $1,071,341
PROJECT TYPE: Life Sciences
UMB–Medical School Teaching Facility, 6th Floor
▪ 4,000 SF renova on to the oncology, radiology, and pathology laboratory in an occupied facility
▪ Installa on of new wood casework and Corian counter tops
▪ Installa on of new shower and locker room for adjacent animal facility
▪ Rework of exis ng HVAC and electrical systems
OWNER: University of Maryland, Bal more
LOCATION: Bal more, Maryland
ARCHITECT: Marshall Cra Assoc.
CONTRACT: $846,560
PROJECT TYPE: Life Sciences
OWNER: Greater Bal more Medical Center
LOCATION: Bal more, Maryland
ARCHITECT: Freeman Architecture
CONTRACT: $766,642
PROJECT TYPE: Healthcare
▪ 6,000 SF phased interior expansion and renova on
▪ While adhering to ICRA standards, the modifica ons /expansion included upgrades to the exis ng architectural features, the addi onal of new architectural features, the upgrades to exis ng the HVAC system, upgrade to electrical service, installa on of an up to date sprinkler system, etc.
GBMC Milton J. Dance, Jr. Head and Neck Center Expansion
UMB–Howard Hall Animal MRI Facility
▪ Construc on manager at‐risk, in an occupied se ng
▪ Steel and concrete delivered through 6th floor window in an occupied building
▪ Specialty construc on including an RF shielded room and a ‘floa ng’ structural floor on top of exis ng floor to support equipment
▪ Detailed coordina on required for the installa on of a six‐ton magnet including crea ng an exterior opening at the 6th floor and maintenance of traffic on a main downtown street
OWNER: University of Maryland, Bal more
LOCATION: Bal more, Maryland
ARCHITECT: Design Collec ve, Inc.
CONTRACT: $675,316
PROJECT TYPE: Life Sciences
Concentra Medical Clinic
▪ 7,400 SF medical clinic fit out in 100 S. Charles Street Building
▪ Clinic included x‐ray room, darkroom, eight exam rooms, two procedure rooms, and a physical therapy area with five treatment bays
▪ Fast track project completed in eight weeks
▪ Mechanical and electrical systems were delivered using design‐build
OWNER: Concentra Health Services, Inc.
LOCATION: Bal more, Maryland
ARCHITECT: Page Southerland Page, LLP
CONTRACT: $672,417
PROJECT TYPE: Healthcare
UMMC—T3N Office Renovation and On Call Shower Room
▪ This project was the 3,500 SF conversion of an exis ng pharmacy into office spaces.
▪ The conversion required complete demoli on of an exis ng pharmacy that was situated directly above the Shock Trauma Triage area.
▪ This required extensive infec on control measures in Triage in order to remove the dumbwaiter, it’s enclosure walls, and to infill the floor opening with structural steel and concrete.
▪ This project had mul ple phases in order to keep adjacent offices and medical support areas accessible.
OWNER: University of Maryland Medical Center
LOCATION: Bal more, Maryland
ARCHITECT: George Vaeth Associates, Inc.
CONTRACT: $663,308
PROJECT TYPE: Healthcare
UMMC—4STA Patient Unit Renovation
▪ This project was a renova on of an exis ng 20 bed inpa ent care unit to be u lized as a Trauma step‐down unit.
▪ This project involved light demoli on, minor electrical and mechanical upgrades, some new wall and door configura ons in support space areas, and new architectural finishes.
▪ This project was fast paced, with an aggressive schedule, and included long lead finish items.
OWNER: University of Maryland Medical Center
LOCATION: Bal more, Maryland
ARCHITECT: Harris Kupfer Architects, Inc.
CONTRACT: $493,689
PROJECT TYPE: Healthcare
Total Health Care
▪ Exterior work included pain ng, waterproofing, new lobby storefront, insulated panels and landscaping
▪ Interior work included new recep on desk, porcelain le, custom balcony railings, Duraplex textured finish on block walls, pain ng and ligh ng throughout
▪ Building occupied during and a er construc on
OWNER: Total Health Care
LOCATION: Bal more, Maryland
ARCHITECT: Rubeling & Associates
CONTRACT: $266,604
PROJECT TYPE: Healthcare
GBMC–Retina Specialists
▪ General contractor for the renova on of this 2,200 SF medical office
▪ Construc on schedule included nights and weekends
▪ Prac ce remained in opera on without interrup on throughout the project
OWNER: Greater Bal more Medical Center
LOCATION: Towson, Maryland
ARCHITECT: CSD, Inc.
CONTRACT: $256,353
PROJECT TYPE: Healthcare