Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results als of this discussion (planning) (priorities) Improve communication & Clarify roles Strategy

Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

Embed Size (px)

Citation preview

Page 1: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

Planning the AWA run schedule

1. Do experiments as quickly as possible2. Deliver meaningful results

Goals of this discussion

(planning)

(priorities)

Improve communication & Clarify roles

Strategy

Page 2: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

Timeline for Upgrades and Initial Experiments

Jul2012

Oct2012

Jan2013

Apr2013

Jul2013

Oct2013

Jan2014

commission first new linac tank & generate high charge bunch trains with new gun

civil construction, electrical, etc

move and flip witness gun

run experiments using witness beam

install & commission beamline switchyard

start experiments with new drive beam

install & commission more linac tanks

New linac tanks delivered 75 MeV beam

Presented to DOE: March 2013

Page 3: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

AWA SUPPORT SYSTEMSAWA Facility – Condea) Overall Coordination & Schedule – Conde b) Utilities and infrastructure – Doranc) Vacuum/Beamline installation – Wisniewskid) Laser – Powere) 1.3 GHz LLRF – Jingf) Modulator/Klystron – Liu g) Diagnostic – Powerh) Cathode – Wisniewski i) Beamline Physics Design – Powerj) Beamline Mechanical Design – Doran k) Control system – Liu

System mini-group leader

Page 4: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

AWA PROJECTS

• DL: High Q, 19 MeV Train (Measure: Current, Flatness)• DL: High Q, 75 MeV Single Bunch (Measure: charge,

energy, bunch length, emittance )• DL: High Q, 75 MeV Train, (Measure: Charge Flatness,

Energy Droop)• DL: 11.7GHz metallic wakefield power

extractor(16x60nC)• DL: 26GHz Dielectric Based Wakefield Power Extractor

with BBU solenoid (16x20nC)• WL: Ring beam and coaxial two channel structure • WL: EEX based bunch shaping• Many more…

*Each project is assigned a PI by Wei

Page 5: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

High Q, 19 MeV Train

High Q, 75 MeV Single Bunch

High Q, 75 MeV Train

11.7GHz metallic PETS

26GHz Dielectric PETS

Experimental Schedule

Utilities and infrastructure

Vacuum/Beamline installation

Laser

1.3 GHz LLRF

Modulator/Klystron

Diagnostic

Beamline Physics Design

Beamline Mechanical Design

Control system

Match systems to projects

Page 6: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

Experimental planning strategy

PI makes a to-do list

To-do list divided up into AWA SYSTEMS

AWA SYSTEMS lead makes a to-do list

AWA SYSTEMS lead gives job assignments

Wee

kly

open

mee

tings PI makes a to-do list

To-do list divided up into AWA SYSTEMS

AWA SYSTEMS lead makes a to-do list

AWA SYSTEMS lead gives job assignments

Wee

kly

open

mee

tings

1. Set Priorities2. Name a PI for a project3. Establish deliverables for the project

Wei

Page 7: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

Meetings1. AWA group meeting

1. Frequency: Weekly2. Purpose: discuss plan for that week3. Participants: everyone

2. Project meetings (PI initiated)1. Frequency: As needed (weekly in begin) 2. Purpose: discuss plan for that week3. Participants: as required

3. System meetings (system lead initiated)1. Frequency: As needed (weekly in begin) 2. Purpose: discuss plan for that week3. Participants: as required

4. Priorities Meeting (called by Wei)1. Frequency: As needed?? Monthly?? Quarterly??2. Purpose: Are we going in the right direction? Review AWA schedule3. Participants: as required

Page 8: Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve

PRIORITIES (highest level meeting)1. Demonstrate 1 GW2. Witness gun experiments

1. Ring beam2. coaxial two channel structure 2nd run

3. Demonstrate the high current drive beam in the new AWA drive beamline 4. Can we get 1 GW with minimal diagnostics. (deflecting cavity, emittance,

energy?)5. Purchase EEX equipment6. Clean and install EEX beamline7. Installation of LLRF feedback8. Improvement of Modulator9. Improvement of Control System10. Improvement of Multisplitter