Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Planning Strategies for
Urban Waterfront Regenerationunder the Water Framework Directive
Cristina Santos
Maria Matos Silva
Nadine Soubotin
Theresa Zaro
Environmental Engineering IST
Landscape Architecture ISA
Landscape Architecture UC Berkeley
Landscape Architecture UC Berkeley
Regional Data
Rio Real length is 29 kmfrom Montejunto headwaterstoBaia de S. Martinho (bay)
proposed airport is
• 50 km north of Lisbon
• 26 km south of Cadaval
• 32 km south of Bombarral
headwaters
Lagoa de Óbidos
vilartributary
rio real
Funding and Supportive Agencies:
EU ´s 2000-2006 : The European Agricultural
Guidance and Guarantee Fund (EAGGF)
The EAGGF is composed of two sections, the
Guidance section and the Guarantee section.
Within the framework of European economic and
social cohesion policy, the EAGGF supports rural
development and the improvement of agricultural
structures.
EAGGF: fields of application
Development of rural areas through the provision
of services, support for the local
economy, encouragement for tourism and
craft activities, etc.
nts
nts Proposed trail
Exisiting trail
river
Destination
Points
Legend
General Parameters for Waterfront (Re)Development:
Re-Use + Infill of exisitingbuilding and abandoned spaces
´Follow the Water` urbaninterventions
Viewsheds to river
Waterfront trail network
Intermediate designstages (Arundo uses)
Bicycle andPedestrian Path-Pervious Paving
UnpavedRegionalTrail
Low FlowChannel
AgriculturePreserve
Arundo Removal andRiparian Planting
Native Vegetation
with Urban Uses
Spoons
Hats
Instrument
Finger protector
Theme
Bank stabilization matting
Trellises for farming
Trellises for gardeningOrchard mulch
River Access – breaking the wall....
River Access – breaking the wall....
River Access – breaking the wall....
Existing Conditions and Opportunities- Vilar
Existing Conditions and
Opportunities- Bombarral
Chafa
riz
Capela
de M
adre
Deus
Chafa
riz
Capela
de M
adre
Deus
Igre
ja d
o S
antís
sim
o
Salv
ador d
o m
undo
Chafa
riz
Capela
de M
adre
Deus
Igre
ja d
o S
antís
sim
o
Salv
ador d
o m
undo
Chafa
rizE
sta
ção d
e
Com
boio
s
Bombarral Riverfront
Revitalization Plan
Economically viable solutions
for accessing, celebrating, and
improving the Rio Real
Connection to regionaltrail
Outdoor classroom andmonitoring station
Habitat path throughproposed development,connecting school toriver
Existing School
Native Tree Planting
Existing Trees to bePreserved
Native UnderstoryPlanting
Trail and Path Network
Solar energy
Data loggerJunction
box
Multi Probe:
Dissolved O2
pH
Temperature
Water Flow
Turbidity probe
Pressure Transducer : water level
Rio Real (nts)
Real Time Data
Broadcast in
Bombarral
=
Education
+
Water awareness
+
Informed Citizens
Water Monitoring Station
Multi-use trails alongboth sides of river
Agriculturalpreservation onurban edge
Scenic overlook andconnection to museum
Native Tree Planting
Existing Trees to bePreserved
Native UnderstoryPlanting
Trail and Path Network
Arundo removal andlevee setbacks alongagricultural/urbaninterface
Terraced outdoor café space withreuse of abandoned building;
Partial wall removal between caféand amphitheater/library space
Wall removal and façade remodelingfor improved residential access toriver
Outdoor dancing space and livemusic venue among preserved pearorchard
Native Tree Planting
Existing Trees to bePreserved
Native UnderstoryPlanting
Trail and Path Network
Murals on concrete wall
Weekly farmers market in parking lot
Private recreational space withviews and access to river
Connections to Mata Municipal
pastelaria
terrace gardens elevated
walk with
levee
river path +
native riparian
vegetation
section a – a´(nts)
High h2o mark
2006 flood
rio real
3
5
35
30
25
20
section a – a´ (nts)
rio real rio corga
train
building
High h2o
2006 mark
High h2o
2006 mark
Neighborhood connectionsto river trail
Improved pedestrian access totrain station
Public awareness opportunity atstormwater outlet
Native Tree Planting
Existing Trees to bePreserved
Native UnderstoryPlanting
Trail and Path Network
Trail and visitor facilities throughthe Quinta das Cerejeiras
Trail loop through vineyards andorchards
Industrial development site-opportunities for infiltration ponds,native vegetation, vegetatedswales, green roofs for stormwatermanagement
Connection to regional trail network
Thank you
Camara Municipal de BombarralJuntos de Freguesia de VilarClara, José, Rita (IST)Francisco (FA - IST)Susana (CESURO – DGOTDU)Águas Do OesteEmanuel (Real 21)Isabel (IDRNA – DGADR)Matt, Steffan, Clara, Juliet, Stephan, Ted (UCB)João (APAS) + our bus driver Sr. Herminio + the people of the Rio Real!
Planning Strategies for
Urban Waterfront Regenerationunder the Water Framework Directive