Upload
bhakhoa-doolshan
View
218
Download
0
Embed Size (px)
Citation preview
8/17/2019 PLANNING SOUTENANCE 2EME ANNEE STAGE 2015(1).pdf
1/2
MERCREDI 01 JUILLET 2015
Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de Pa ss ag e LIE U
1 ACKBAR SERVEQUIP LTD M.S.CHENGAREDDY D.MAWOOA 9H00-9H30
2 ALBERT ABC MOTORS VIK BUNGSY T.CUNDEN 9H30-10H00
3 BEEHARRY AIR MAURITIUS LTD M.MANOJ EMRIT T.CUNDEN 10H00-10H30
4 BHAKHOA PROXIMED LTD M.SANJAY KHUDOO N.LATCHOOMUN 10H30-11H00
5 BHANTOO CENTRAL ELECTRICITY BOARD M.S.SAHYE N.LATCHOOMUN 11H00-11H30
6 BHOOJAWON Omnicane Milling Operations Limited M.S.CHULWA D.MAWOOA 11H30-12H00
7 CAMATCHEE NEW MAURIFOODS LTD M.SALEEM KOODORUTH R.KAULLY 12H30-13H00
8 CHAN TIM L AIR CONDITIONING & REFRIGERATION LT M.NUNDLOLL PREETAM D.SOOBEN 13H00-13H30
9 CHUMROO ENGITECH LTD M.ANIL BHUJUN R.DREEPAUL 13H30-14H00
10 CHUTTURDHAREE AVIPRO M. MICHEL DE L'ESTRAC R.KAULLY 14H00-14H30
MAWOOA,RAMTOHUL,LATCHOOMUN
Mercredi 01 juillet
KAULLY,RAMTOHUL,CUNDEN
PLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015
S A L L E A U T O M A T I S M E S
( D 1 2
)
DATE COMPOSITION DU JURY
MAWOOA,RAMTOHUL,LATCHOOMUN
CUNDEN,MIGALE,RAMTOHUL
CUNDEN,MIGALE,RAMTOHUL
LATCHOOMUN,MIGALE,RAMTOHUL
LATCHOOMUN,CUNDEN,RAMTOHUL
MAWOOA,RAMTOHUL,LATCHOOMUN
KAULLY,RAMTOHUL,CUNDEN
SOOBEN,RAMTOHUL,CUNDEN
Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de P as sa ge L IE U
1 DWARKA FROID DES MASCAREIGNES D.SOOBEN 9H00-9H30
2 EMAMALLY MEADERS FEEDS LTD M.OLIVIER VAN ROY R.KAULLY 9H30-10H00
3 FLORENT PEX HYDRAULICS M.THIERRY LIM SIK FONG R.KAULLY 10H00-10H30
4 GOBURDHUN ALTEO MILLING LTD M.NADEN NAICKEN H.MIGALE 10H30-11H00
5 GREEDHARRY G ROUND SUPPOR T SER VICES W OR KSHOP M.ROY A UCKLOO T.CUNDEN 11H00-11H306 GUKHOOL DOMO-TECH LTEE M.BIGNOUX BERNARD HIMIGALE 11H30-12H00
7 JHURRY SERVEQUIP LTD M.S.CHENGAREDDY D.MAWOOA 12H30-13H008 JOGHEE BLANCHISSERIE PLUS M. S.DUSSORUTH R.KAULLY 13H00-13H30
9 JOOMUN D.SOOBEN 13H30-14H00
MIGALE,LATCHOOMAN,SOOBEN
DATEPLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015
COMPOSITION DU JURY
SOOBEN,MIGALE,CUNDEN
MAWOOA,KAULLY,LATCHOOMAN
KAULLY,LATCHOOMAN,MIGALE
MERCREDI O1JUILLET
SALL
E
D22
SOOBEN,KAULLY,MAWOOA
KAULLY,SOOBEN,MAWOOA
KAULLY,SOOBEN,MAWOOA
MIGALE,SOOBEN,KAULLY
CUNDEN,MIGALE.LATCHOOMAN
DEPARTEMENT GEMA-SOUTENANCE DEUXIEME ANNEE STAGE 2015
8/17/2019 PLANNING SOUTENANCE 2EME ANNEE STAGE 2015(1).pdf
2/2
JEUDI 02 JUILLET 2015
Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de Pa ss age L IE U1 KWOK CHUNG YEE MAURITIUS FR EEPORT DEVELOPMENT M.NITISH BEEHA RRY N.LA TC HOOMUN 9H00-9H30
2 MOOKEN MAURITIUS FR EEPORT DEVELOPMENT M.NITISH BEEHA RRY N.LA TC HOOMUN 9H30-10H003 NAUZEER ENGITECH LTD M.ANIL BHUJUN D.MAWOOA 10H00-10H30
4 NOBEEBUX ENGITECH LTD M.ANIL BHUJUN R.DREEPAUL 10H30-11H005 PAUHALOO GSS AIR MAURITIUS M.ROY AUCKLOO T.CUNDEN 11H00-11H306 POULAY MOOTIEN COMPAGNIE MARMITES DES ILES LTEE M.BEEBAKHEE RAKESH R.KAULLY 11H30-12H00
7 RADEGONDE TERRAGEN LTD H.MIGALE 12H30-13H00
8 ROSSAN SPREMA ENGINEERING WORKS D.SOOBEN 13H00-13H309 KHAIDOO CUISINE INTEGRALE D.SOOBEN 13H30-14H00 SOOBEN,MIGALE,LATCHOOMUN
MAWOOA,LATCHOOMUN,SOOBEN
SOOBEN,CUNDEN,KAULLY
PLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015DATE COMPOSITION DU JURY
LATCHOOMUN,MAWOOA,KAULLY
MAWOOA,LATCHOOMUN,SOOBEN
CUNDEN,KAULLY,MIGALE
KAULLY,MAWOOA,CUNDEN
MIGALE,CUNDEN,SOOBEN
LATCHOOMUN,SOOBEN,KAULLY
JEUDI 02 JUILLET
S A L L E A U T O M A T I S M E S
( D 1 2 )
Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de Pa ss ag e L IE U
1 RUJUB CUISINE INTEGRALE D.SOOBEN 9H00-9H30
2 SALANDY DOMO-TECH LTEE M.BIGNOUX BERNARD HIMIGALE 9H30-10H00
3 SAMOISY SCOMAT LTEE R.KAULLY 10H00-10H30
4 SAUTRELLE DOMO-TECH LTEE M.BIGNOUX BERNARD H.MIGALE 10H30-11H005 SOORIAH SCOMAT LTEE R.KAULLY 11H00-11H30
6 URJOON ALTEO MILLING LTD H.MIGALE 11H30-12H00
7 VARJANGBHAY SUGAR BEACH M.GULSHAN GOTEEA R.DREEPAUL 12H30-13H00
8 VEERARAGOO POWER SURE LTD N.LATCHOOMUN 13H00-13H30
9 VEERA SCOMAT LTEE R.KAULLY 13H30-14H00
PLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015DATE COMPOSITION DU JURY
SOOBEN,MIGALE,RAMTOHUL
MIGALE,SOOBEN,RAMTOHUL
JEUDI 02 JUILLET
SALLE
D22
KAULLY,MIGALE,RAMTOHUL
MIGALE,LATCHOOMUN,RAMTOHUL
MAWOOA,KAULLY,RAMTOHUL
LATCHOOMUN,MIGALE,RAMTOHUL
KAULLY,MAWOOA,RAMTOHUL
KAULLY,MIGALE,RAMTOHUL
MIGALE,CUNDEN,RAMTOHUL
DEPARTEMENT GEMA-SOUTENANCE DEUXIEME ANNEE STAGE 2015