PLANNING SOUTENANCE 2EME ANNEE STAGE 2015(1).pdf

Embed Size (px)

Citation preview

  • 8/17/2019 PLANNING SOUTENANCE 2EME ANNEE STAGE 2015(1).pdf

    1/2

    MERCREDI 01 JUILLET 2015

    Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de Pa ss ag e LIE U

    1 ACKBAR SERVEQUIP LTD M.S.CHENGAREDDY D.MAWOOA 9H00-9H30

    2 ALBERT ABC MOTORS VIK BUNGSY T.CUNDEN 9H30-10H00

    3 BEEHARRY AIR MAURITIUS LTD M.MANOJ EMRIT T.CUNDEN 10H00-10H30

    4 BHAKHOA PROXIMED LTD M.SANJAY KHUDOO N.LATCHOOMUN 10H30-11H00

    5 BHANTOO CENTRAL ELECTRICITY BOARD M.S.SAHYE N.LATCHOOMUN 11H00-11H30

    6 BHOOJAWON Omnicane Milling Operations Limited M.S.CHULWA D.MAWOOA 11H30-12H00

    7 CAMATCHEE NEW MAURIFOODS LTD M.SALEEM KOODORUTH R.KAULLY 12H30-13H00

    8 CHAN TIM L AIR CONDITIONING & REFRIGERATION LT M.NUNDLOLL PREETAM D.SOOBEN 13H00-13H30

    9 CHUMROO ENGITECH LTD M.ANIL BHUJUN R.DREEPAUL 13H30-14H00

    10 CHUTTURDHAREE AVIPRO M. MICHEL DE L'ESTRAC R.KAULLY 14H00-14H30

    MAWOOA,RAMTOHUL,LATCHOOMUN

    Mercredi 01 juillet

    KAULLY,RAMTOHUL,CUNDEN

    PLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015

    S A L L E A U T O M A T I S M E S

    ( D 1 2

    )

    DATE COMPOSITION DU JURY

    MAWOOA,RAMTOHUL,LATCHOOMUN

    CUNDEN,MIGALE,RAMTOHUL

    CUNDEN,MIGALE,RAMTOHUL

    LATCHOOMUN,MIGALE,RAMTOHUL

    LATCHOOMUN,CUNDEN,RAMTOHUL

    MAWOOA,RAMTOHUL,LATCHOOMUN

    KAULLY,RAMTOHUL,CUNDEN

    SOOBEN,RAMTOHUL,CUNDEN

    Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de P as sa ge L IE U

    1 DWARKA FROID DES MASCAREIGNES D.SOOBEN 9H00-9H30

    2 EMAMALLY MEADERS FEEDS LTD M.OLIVIER VAN ROY R.KAULLY 9H30-10H00

    3 FLORENT PEX HYDRAULICS M.THIERRY LIM SIK FONG R.KAULLY 10H00-10H30

    4 GOBURDHUN ALTEO MILLING LTD M.NADEN NAICKEN H.MIGALE 10H30-11H00

    5 GREEDHARRY G ROUND SUPPOR T SER VICES W OR KSHOP M.ROY A UCKLOO T.CUNDEN 11H00-11H306 GUKHOOL DOMO-TECH LTEE M.BIGNOUX BERNARD HIMIGALE 11H30-12H00

    7 JHURRY SERVEQUIP LTD M.S.CHENGAREDDY D.MAWOOA 12H30-13H008 JOGHEE BLANCHISSERIE PLUS M. S.DUSSORUTH R.KAULLY 13H00-13H30

    9 JOOMUN D.SOOBEN 13H30-14H00

    MIGALE,LATCHOOMAN,SOOBEN

    DATEPLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015

    COMPOSITION DU JURY

    SOOBEN,MIGALE,CUNDEN

    MAWOOA,KAULLY,LATCHOOMAN

    KAULLY,LATCHOOMAN,MIGALE

    MERCREDI O1JUILLET

    SALL

    E

    D22

    SOOBEN,KAULLY,MAWOOA

    KAULLY,SOOBEN,MAWOOA

    KAULLY,SOOBEN,MAWOOA

    MIGALE,SOOBEN,KAULLY

    CUNDEN,MIGALE.LATCHOOMAN

    DEPARTEMENT GEMA-SOUTENANCE DEUXIEME ANNEE STAGE 2015

  • 8/17/2019 PLANNING SOUTENANCE 2EME ANNEE STAGE 2015(1).pdf

    2/2

    JEUDI 02 JUILLET 2015

    Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de Pa ss age L IE U1 KWOK CHUNG YEE MAURITIUS FR EEPORT DEVELOPMENT M.NITISH BEEHA RRY N.LA TC HOOMUN 9H00-9H30

    2 MOOKEN MAURITIUS FR EEPORT DEVELOPMENT M.NITISH BEEHA RRY N.LA TC HOOMUN 9H30-10H003 NAUZEER ENGITECH LTD M.ANIL BHUJUN D.MAWOOA 10H00-10H30

    4 NOBEEBUX ENGITECH LTD M.ANIL BHUJUN R.DREEPAUL 10H30-11H005 PAUHALOO GSS AIR MAURITIUS M.ROY AUCKLOO T.CUNDEN 11H00-11H306 POULAY MOOTIEN COMPAGNIE MARMITES DES ILES LTEE M.BEEBAKHEE RAKESH R.KAULLY 11H30-12H00

    7 RADEGONDE TERRAGEN LTD H.MIGALE 12H30-13H00

    8 ROSSAN SPREMA ENGINEERING WORKS D.SOOBEN 13H00-13H309 KHAIDOO CUISINE INTEGRALE D.SOOBEN 13H30-14H00 SOOBEN,MIGALE,LATCHOOMUN

    MAWOOA,LATCHOOMUN,SOOBEN

    SOOBEN,CUNDEN,KAULLY

    PLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015DATE COMPOSITION DU JURY

    LATCHOOMUN,MAWOOA,KAULLY

    MAWOOA,LATCHOOMUN,SOOBEN

    CUNDEN,KAULLY,MIGALE

    KAULLY,MAWOOA,CUNDEN

    MIGALE,CUNDEN,SOOBEN

    LATCHOOMUN,SOOBEN,KAULLY

    JEUDI 02 JUILLET

    S A L L E A U T O M A T I S M E S

    ( D 1 2 )

    Noms Stagiaires Nom d’Entreprises Responsable de Stage Ent. Prof Responsable de Stage H eu re de Pa ss ag e L IE U

    1 RUJUB CUISINE INTEGRALE D.SOOBEN 9H00-9H30

    2 SALANDY DOMO-TECH LTEE M.BIGNOUX BERNARD HIMIGALE 9H30-10H00

    3 SAMOISY SCOMAT LTEE R.KAULLY 10H00-10H30

    4 SAUTRELLE DOMO-TECH LTEE M.BIGNOUX BERNARD H.MIGALE 10H30-11H005 SOORIAH SCOMAT LTEE R.KAULLY 11H00-11H30

    6 URJOON ALTEO MILLING LTD H.MIGALE 11H30-12H00

    7 VARJANGBHAY SUGAR BEACH M.GULSHAN GOTEEA R.DREEPAUL 12H30-13H00

    8 VEERARAGOO POWER SURE LTD N.LATCHOOMUN 13H00-13H30

    9 VEERA SCOMAT LTEE R.KAULLY 13H30-14H00

    PLANNING PREVISONNEL SOUTENANCE DEUXIEME ANNEE 2015DATE COMPOSITION DU JURY

    SOOBEN,MIGALE,RAMTOHUL

    MIGALE,SOOBEN,RAMTOHUL

    JEUDI 02 JUILLET

    SALLE

    D22

    KAULLY,MIGALE,RAMTOHUL

    MIGALE,LATCHOOMUN,RAMTOHUL

    MAWOOA,KAULLY,RAMTOHUL

    LATCHOOMUN,MIGALE,RAMTOHUL

    KAULLY,MAWOOA,RAMTOHUL

    KAULLY,MIGALE,RAMTOHUL

    MIGALE,CUNDEN,RAMTOHUL

    DEPARTEMENT GEMA-SOUTENANCE DEUXIEME ANNEE STAGE 2015