Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Planning & Engineering Department
Recent and Upcoming Projects
2
Felts Field Historic Flight Foundation Hangar
3
Felts Field Fuel Facility Relocation
4
Felts Field Fuel Facility Relocation
5
Felts Field Master Plan Update
6
Felts Field Historic District Gateway Study
7
Felts Field Historic District Gateway Study
8
Trunk Rail Extension
9
Convenience Store Site Preparation – Phase III
10
Flint Road Pavement Improvements
11
Airport Drive Inbound Improvements
12
West Parking Lot Improvements
13
Spotted Road Interchange and Realignment
14
Second Floor Administration Offices Renovation
BOARDROOM
Departments on the Second Floor:
• Finance and Accounting
• Human Resources
• Public Relations and Marketing
• Properties and Contracts
• Planning and Engineering
• Legal Counsel
• Administrative Staff
15
Airport Security Upgrades Project
GC/CM Services
16
Concourses A, B, & C
Inline Screening Devices (ISD) Recapitalization
17
Terminal Windows & Roof Upgrades
Roof UpgradesWindow Replacements
18
Terminal Renovation and Expansion (TREX) Project
19
Terminal Renovation and Expansion (TREX) Project
20
Program Elements
• Central Hall (Centralized Baggage
Claim and Consolidated Checkpoint)
• A/B Concourse Connector
• Concourse C West Expansion (6 Gates)
• Concourse C East Expansion (3 Gates)
• Curbside Canopies
• Gate B4 Relocation
• Dual Taxilane, Apron, RON Exp.
• Repurpose A/B & C Checkpoints
Consolidated Checkpoint TREX Program
21
Original TREX Program Consolidated Checkpoint TREX Program
Consolidated Checkpoint TREX Program
22
Operations & Maintenance and “Other”Projects
• Springhill Suites Sanitary Sewer Rehabilitation
• Hangar 725 PCCP Repairs
• Extend Perimeter Rd from ARFF to ASR9
• AOA Lighting Upgrades
• Mini Storage Access Control Upgrades
• RAC QTA High Speed Wash Bay Doors
• RAC Car Wash Heated Concrete
• Exit Lane Technology Pre-Design
• Recovered ADF Land Application
Thank You!