Upload
sabrina-brennan
View
218
Download
0
Embed Size (px)
Citation preview
8/7/2019 Planning Commission Hearing Nov 18 2009
1/35
Planning Commission HearingWednesday, Nov. 18th 2009
Board of Supervisors Chambers 400 County Center, Redwood City
SANATORIUM
OFFICE PARK
OFFICE PARK
8/7/2019 Planning Commission Hearing Nov 18 2009
2/35
The proximity of the project tothe partially enclosed PillarPoint Harbor and the potential
fortsunami events could exposepeople to inundation by seiche,which represents a potentiallysignificant impact.
Big Wave Project DEIRIV.H Hydrology & Water Quality
Page IV.H-61
8/7/2019 Planning Commission Hearing Nov 18 2009
3/35
Is the Big Wave Project
prepared for a BIG WAVE?
SANATORIUM
OFFICE PARK
Rancho Corral de Tierra
POST
Pillar Point Bluff
POST
FMR
8/7/2019 Planning Commission Hearing Nov 18 2009
4/35
2007 Grand Jury ReportTsunami Alert and Evacuation
On the San Mateo County Coast
SANATORIUM
BIG WAVE
TSUNAMI INUNDATION ZONE
Half Moon Bay, CA
8/7/2019 Planning Commission Hearing Nov 18 2009
5/35
A seiche (pronounced /se/ "saysh") is a standing wave
in an enclosed or partially enclosed body of water.
http://en.wikipedia.org/wiki/Standing_wavehttp://en.wikipedia.org/wiki/Standing_wavehttp://en.wikipedia.org/wiki/Wikipedia:IPA_for_Englishhttp://en.wikipedia.org/wiki/Wikipedia:IPA_for_English8/7/2019 Planning Commission Hearing Nov 18 2009
6/35
The tsunami that hit Hawaii in 1946 had a fifteen-minute interval between wave fronts. The naturalresonant period of Hilo Bay is about thirty minutes.
That meant that every second wave was in phase withthe motion of Hilo Bay, creating a seiche in the bay.
As a result, Hilo suffered worse damage than any
other place in Hawaii, with the tsunami/seichereaching a height of 26 feet along the Hilo Bayfront,
killing 96 people in the city alone. Seiche wavesmay continue for several days after a tsunami.
Hilo Bay Seiche
April 1st 1946
http://en.wikipedia.org/wiki/Hilohttp://en.wikipedia.org/wiki/Hilohttp://en.wikipedia.org/wiki/Hilohttp://en.wikipedia.org/wiki/Hilohttp://en.wikipedia.org/wiki/Hilohttp://en.wikipedia.org/wiki/Hilohttp://en.wikipedia.org/wiki/Hilohttp://en.wikipedia.org/wiki/1946http://en.wikipedia.org/wiki/1946http://en.wikipedia.org/wiki/Hawaiihttp://en.wikipedia.org/wiki/Hawaii8/7/2019 Planning Commission Hearing Nov 18 2009
7/35
In 1946 a Tsunami hit Princeton By-The-Sea
April 1, 1946
Tsunami DebrisWater Resources Center Archives: Robert L. Wiegel
8/7/2019 Planning Commission Hearing Nov 18 2009
8/35
Princeton By-The-Sea
April 1, 1946
Water Resources Center Archives: Robert L. Wiegel
8/7/2019 Planning Commission Hearing Nov 18 2009
9/35
Romeo Pier: April 1, 1946Water Resources Center Archives: Robert L. Wiegel
8/7/2019 Planning Commission Hearing Nov 18 2009
10/35
Romeo Pier: April 2, 1946 (day after the Tsunami)
Water Resources Center Archives: Robert L. Wiegel
8/7/2019 Planning Commission Hearing Nov 18 2009
11/35
Tsunamiwater level
April 1, 1946
Princeton By-The-Sea
Water Resources Center Archives: Robert L. Wiegel
8/7/2019 Planning Commission Hearing Nov 18 2009
12/35
Tsunami water level
April 2, 1946 (day after the Tsunami)
Water Resources Center Archives: Robert L. Wiegel
8/7/2019 Planning Commission Hearing Nov 18 2009
13/35
Structures should either be placedat elevations above those likely to be
adversely affected during a tsunami
or seiche event or be designed toallow swift water to flow around,through, or underneath without
causing collapse.
Big Wave Project DEIRIV.H Hydrology & Water QualityPage IV.H-61
8/7/2019 Planning Commission Hearing Nov 18 2009
14/35
ABAG tsunami maps show that the projectwould place residential and commercial
structures within a mapped tsunami zone.
This would represent a significant riskto human life.
Wellness Center, Building 1 SANATORIUM
8/7/2019 Planning Commission Hearing Nov 18 2009
15/35
Would you want to be trapped withswirling water and debris all around you?
Would you want to be desperately tryingto escape a natural disaster with trafficfrom the office park choking your exit?
How do special needs people get thenecessary evacuation help needed?
Emergency Evacuation
8/7/2019 Planning Commission Hearing Nov 18 2009
16/35
!"#$%&'#"!$()*)+,$-"!
),.$(/(0).$-1%$(/(*)'$(.-2)()*)+,$-"!
."3$%),#()*)+,$-"!%&'()*+,(-#./0&(1(2"34(5$%.64&%43(7789(:#+;(?
50 feet
ABAG tsunami maps show that theproject would place residential and
commercial structures within amapped tsunami zone.
This would represent a
significant riskto human life. OFFICE PARK
8/7/2019 Planning Commission Hearing Nov 18 2009
17/35
The San Gregorio fault, just off the SanMateo County Coast, has the potential ofcausing a tsunami with essentially
no warning time.
The San Mateo County Office ofEmergency Services (OES) advises thatmembers of the public who are in low-
lying areas immediately head for highground when an earthquake occurs.
Grand Jury Report: 2007Tsunami Alert and Evacuation
San Mateo County Coast
Grand Jury Report
8/7/2019 Planning Commission Hearing Nov 18 2009
18/35
Princeton, Pillar Ridge & Seal Cove only haveONE Tsunami Evacuation Exit
8/7/2019 Planning Commission Hearing Nov 18 2009
19/35
P i l l a r P o i n t
M a r s h
J a m e s V . F i t z g e r a l d
M a r i n e R e s e r v e
Critical Coastal Areas Pilot ProjectSan Francisco Esturay Institute and the
Association of Bay Area Governments, Consultants
For more information, please contact
Eric Zhang, Staff
San Francisco Estuary Institute
7770 Pardee Lane, 2nd FloorOakland, CA 94621
Kathleen Van Velsor, Staff
L e g e n d
Tsunami Evacuation Area
Urban Footprint
BIG WAVE
8/7/2019 Planning Commission Hearing Nov 18 2009
20/35
PrincetonTraffic Bottlenecks
BIG WAVE
BIG WAVE
Tsunami
EvacuationExit
Evacuation ExitCypress Ave & Highway 1
Traffic Bottleneck
8/7/2019 Planning Commission Hearing Nov 18 2009
21/35
Tsunami Evacuation RouteCypress Ave and Highway 1
8/7/2019 Planning Commission Hearing Nov 18 2009
22/35
BIG WAVE
BIG WAVE
BIG WAVE
Princeton Traffic Bottlenecks
8/7/2019 Planning Commission Hearing Nov 18 2009
23/35
Princeton TrafficBottlenecks
Prospect at Broadway
Capistrano Rd
8/7/2019 Planning Commission Hearing Nov 18 2009
24/35
Why did the County decide
this project only required a500 foot notification area?
8/7/2019 Planning Commission Hearing Nov 18 2009
25/35
red ring indicates the 500 foot
radius project notification areaBIG WAVE PROJECT
8/7/2019 Planning Commission Hearing Nov 18 2009
26/35
Why are the developers
refusing to put up storypoles during the CEQA
public comment period?
8/7/2019 Planning Commission Hearing Nov 18 2009
27/35
OFFICE PARK
Fitzgerald Marine ReservePillar Point Wetlands
8/7/2019 Planning Commission Hearing Nov 18 2009
28/35
Pillar Point Wetlands
Area of Special Biological Significance (ASBS) and part of thefederally protected Monterey Bay National Marine Sanctuary
Fitzgerald Marine Reserve
8/7/2019 Planning Commission Hearing Nov 18 2009
29/35
James Fitzgerald Marine ReserveCritical Coastal Area
State of CaliforniaArea of Special Biological Significance (ASBS)
part of the federally protected
Monterey Bay National Marine Sanctuary
San Francisco Estuary Institute
http://www.sfei.org/8/7/2019 Planning Commission Hearing Nov 18 2009
30/35
P
A
C
I
F
I
C
O
C
E
AN
S A N M A T E O
a
a
aaaa
aaa
a
a
aa
a
aa
a
a
aa
a
a a
aaa
aa
a
aaa
aa
a
aa
aa aa
a aaa
aa
aaa aa
aaa aaa
aa aaaa
aaaaa aa
aaaa aa
a aa
aa
aa a
a aa a a
aa
a
a
aa
aa
aa
a
aaa
aa a
aaa
aa
aaa
aa aa aa
aa
aa
a
a a
(!!
po
po
po
!!!!
!!
!!!!
!!!!!!
!!
!!
!!!!
!!
!!!! !!!!!!!!
!!!!!!!!
!!!!!!!!
!!
!!!!!!
!!!!
!!!!!!
!!!!
!!
!!
!!!!
!!!!
!!!!
!!!!
!!
!!!!
!!
!! !!!!!!!!!! !!
!!
!! !!
!!!!
!!
!!!!
!!!!
!!!!
!!!! !!!!
!!
!!!!!!
!!
!!!!
!!!!
!!
!!!!
!!!!
!!!!
!!!!
!! !!!!!!
!!!!
!!!!!!
!!!!
!!!! !!!
!
!!!!
!!!!
!!
!!
!!
!!
!!
!!!! !
!!!!!!
!
!!
!!
!!!!
!!!!!!
!!!!
!!
!!
!!
!!
!!!!
!!!!
!!
!!!!
!!
!!!!!!
!!!!!!!!
!!
!!!!
!!
!!
!!
!!!!
!!!!
!!!!!!!
!!!
!! !!
!!!!
!!!!
!!
!!!!
!!!!
!!!!
!!
!!!!!!
!!!!!!!!
!!!!
!!!!
!!
!!
!!
!!!!
!!
!!!!
!!!!!! !!
!!
!!!!
!!!!
!!!!!!
!!!!!!!! !!
!!!!
!!
!!
!.!.
!. !.
!.
!.
!.
!.
!.
!.!. !.
!. !.!.
!.
!.!.
!.
!.
J
a
m
e
s
V
. F
i
t
z
g
e
r
a
ld
Ma
r
i
n
e
R
e
s
e
rv
e
Pillar Point
Val le jo Beach
Point Montara
Montara Beach
Miramar Beach
WahlemanHarbor
El Granada Beach
HalfM
oonBayAirport
Pillar PointHarbor
Deer CreekStudy Area
Option
PillarPoint
AirforceFacility
Deer
Creek
San
Vi cen
teC
r ee k
LocksCreek
Den
n istonC
reek
Den
n istonC
reek
Arr o
yo D
eE
nMed
io
L
ocksC
r
e
e
k
Frenc
hmansC
re e
k
M
ontar a
Cr
e
e
k
KanoffCreek
D a ffod i l C
reek
Dean Cre
ek
Montara
El Granada
Moss Beach
Half Moon Bay
Rancho Corra lde T i e r ra
Wick low
Pi l lar Point
B luf f
MontaraStateBeach
SM CountyWaterDis t r ict El Granada
Park "Quarry"
PointMontara
L igh tHouse
Rancho Corra lde T i e r ra
San FranciscoWatershed Lands
Pillar
Point
Marsh
==1
DRAFT -FOR PLANNING PURPOSES
S A N M A T E O C O U N T Y
Yolo
SonomaNapa
Solano
Santa Clara
Marin
San Joaquin
Alameda
Sacramento
Lake
Contra Costa
Stanislaus
Placer
Santa Cruz
SutterMendocino
San Mateo
San Francisco
Critical Coastal AreaBoundary including ASBS
BIG WAVE
San Francisco Estuary Institute
www.sfei.org
Fitzgerald Marine Reserve CCA
http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/8/7/2019 Planning Commission Hearing Nov 18 2009
31/35
Denniston CreekWatershed
San Vicente CreekWatershed
Montara CreekWatershed
Pillar Point Marsh Watershed
Martini CreekWatershed
San Agustine Creek Watershed
Kanoff Creek
Watershed
Daffodil Creek Watershed
Deer CreekWatershed
Dean Creek* Watershed
SealCove
Watershed
Moss BeachWatershed
Montara UrbanWatershed
Princeton
WatershedHarbor
Watershed
Montara BeachWatershed
0 0.3 0.6 0.90.15Miles
-
gNatural and Artificial Hydrology
0.5
Miles
F LegendEnclosed pipeline > 24 "Natural channels and earthen ditches
CCA Boundary
Subwatersheds
Wetland and Riparian Areas
CCA Boundary including ASBS
www.sfei.org
Denniston Creekchd
http://www.sfei.org/http://www.sfei.org/8/7/2019 Planning Commission Hearing Nov 18 2009
32/35
Denniston CreekWatershed
Pillar Point Marsh WatershedSan Agustine Creek Watershed
Deer Creek
Watershed
d
PrincetonWatershed
HarborWatershed
0.6 0.9Miles
Miles
Legend
Enclosed pipeline > 24 "
Natural channels and earthen d
CCA Boundary
Subwatersheds
Wetland and Riparian Areas
CCA Boundary including ASBS
BIG WAVE
Pillar Point Marsh Watershed
the San FranciscoEstuary Institute
www.sfei.org
http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/http://www.sfei.org/8/7/2019 Planning Commission Hearing Nov 18 2009
33/35
AirportStreet
Riparian Wetland/
Drainage Channel
Active Agriculture
Seasonal Wet Meadow
Riparian Wetland
Riparian Wetland
Pillar Point Marsh
Freshwater Marsh
Active Agriculture
0 400200 300100
LegendProject Site
Wetland Boundary
BIG WAVE PROJECT SITE
Seasonal Creek
Pillar Point Marsh
Riparian Wetland
8/7/2019 Planning Commission Hearing Nov 18 2009
34/35
On Nov 4th 2009 it was brought to the Countiesattention that agencies and the public wereprovided an incomplete printed draft EIR.
One week later on Nov 11th 2009 the missingsection N. was delivered via FedEx to agenciesand the Half Moon Bay Library.
Why didnt the County restart the 60 day CEQAreview period on Nov 11th after the incompletedraft EIR had been supplemented with the 63 pagemissing chapter N. Utilities and Service Systems?
Incomplete
Draft Environmental Impact Report
8/7/2019 Planning Commission Hearing Nov 18 2009
35/35
Thank
You
Sabrina Brennan
Seal Cove Moss Beach